Burned media ----------------------- BD-R sequenziell (SRM) Devices ----------------------- HL-DT-ST BD-RE BH10LS38 1.00 (/dev/sr0, CD-R, CD-RW, CD-ROM, DVD-ROM, DVD-R, DVD-RW, DVD-R doppelschichtig, BD-CD-ROM, BD-CD-R, BD-RE, DVD+R, DVD+RW, DVD+R doppelschichtig) [DVD-ROM, DVD-R sequenziell, Zweischichtige DVD-R sequenziell, Zweischicht-DVD-R-Sprung, DVD-RAM, DVD-RW Eingeschränktes Überbrennen, DVD-RW sequenziell, DVD+RW, DVD+R, Zweischichtige DVD+R, CD-ROM, CD-R, CD-RW, BD-CD-ROM, BD-R sequenziell (SRM), BD-R Zufällig (RRM), BD-RE] [SAO, TAO, RAW, SAO/R96P, SAO/R96R, RAW/R16, RAW/R96P, RAW/R96R, Eingeschränktes Überschreiben, Sprung zwischen DVD-Schichten, Zufällige Aufnahme, Sequenzielle Aufnahme, Sequenzielle Aufnahme + POW] [%7] K3b::IsoImager ----------------------- mkisofs print size result: 9369461 (19188656128 bytes) System ----------------------- K3b Version: 2.0.1 KDE Version: 4.4.5 (KDE 4.4.5) QT Version: 4.6.3 Kernel: 3.1.2-030102-generic Used versions ----------------------- mkisofs: 1.1.11 growisofs: 7.1 growisofs ----------------------- Executing 'builtin_dd if=/dev/fd/0 of=/dev/sr0 obs=32k seek=0' /dev/sr0: pre-formatting blank BD-R for 24.8GB... /dev/sr0: "Current Write Speed" is 4.1x4390KBps. 8093696/19188656128 ( 0.0%) @0.5x, remaining 157:59 RBU 100.0% UBU 50.0% 30474240/19188656128 ( 0.2%) @1.5x, remaining 83:49 RBU 100.0% UBU 50.0% 56885248/19188656128 ( 0.3%) @1.8x, remaining 61:39 RBU 100.0% UBU 50.0% 85196800/19188656128 ( 0.4%) @1.9x, remaining 52:19 RBU 100.0% UBU 50.0% 111738880/19188656128 ( 0.6%) @1.8x, remaining 51:13 RBU 100.0% UBU 50.0% 139919360/19188656128 ( 0.7%) @1.9x, remaining 47:38 RBU 100.0% UBU 50.0% 166592512/19188656128 ( 0.9%) @1.8x, remaining 45:40 RBU 100.0% UBU 50.0% 194052096/19188656128 ( 1.0%) @1.8x, remaining 45:40 RBU 100.0% UBU 50.0% 221446144/19188656128 ( 1.2%) @1.8x, remaining 44:15 RBU 100.0% UBU 50.0% 247955456/19188656128 ( 1.3%) @1.8x, remaining 43:17 RBU 100.0% UBU 50.0% 275972096/19188656128 ( 1.4%) @1.9x, remaining 43:24 RBU 100.0% UBU 50.0% 302710784/19188656128 ( 1.6%) @1.8x, remaining 42:37 RBU 100.0% UBU 50.0% 329416704/19188656128 ( 1.7%) @1.8x, remaining 41:59 RBU 100.0% UBU 50.0% 357236736/19188656128 ( 1.9%) @1.9x, remaining 42:10 RBU 100.0% UBU 50.0% 383975424/19188656128 ( 2.0%) @1.8x, remaining 41:37 RBU 100.0% UBU 50.0% 410386432/19188656128 ( 2.1%) @1.8x, remaining 41:10 RBU 100.0% UBU 50.0% 437747712/19188656128 ( 2.3%) @1.8x, remaining 41:24 RBU 100.0% UBU 50.0% 465240064/19188656128 ( 2.4%) @1.8x, remaining 40:54 RBU 100.0% UBU 50.0% 491651072/19188656128 ( 2.6%) @1.8x, remaining 40:33 RBU 100.0% UBU 50.0% 518062080/19188656128 ( 2.7%) @1.8x, remaining 40:50 RBU 100.0% UBU 50.0% 544931840/19188656128 ( 2.8%) @1.8x, remaining 40:29 RBU 100.0% UBU 50.0% 572129280/19188656128 ( 3.0%) @1.8x, remaining 40:07 RBU 100.0% UBU 50.0% 599261184/19188656128 ( 3.1%) @1.8x, remaining 40:19 RBU 100.0% UBU 50.0% 625737728/19188656128 ( 3.3%) @1.8x, remaining 40:02 RBU 100.0% UBU 50.0% 652148736/19188656128 ( 3.4%) @1.8x, remaining 39:47 RBU 100.0% UBU 50.0% 678559744/19188656128 ( 3.5%) @1.8x, remaining 40:00 RBU 100.0% UBU 50.0% 704970752/19188656128 ( 3.7%) @1.8x, remaining 39:45 RBU 100.0% UBU 50.0% 733184000/19188656128 ( 3.8%) @1.9x, remaining 39:26 RBU 97.7% UBU 50.0% 759824384/19188656128 ( 4.0%) @1.8x, remaining 39:36 RBU 100.0% UBU 50.0% 788168704/19188656128 ( 4.1%) @1.9x, remaining 39:17 RBU 100.0% UBU 50.0% 811237376/19188656128 ( 4.2%) @1.5x, remaining 39:15 RBU 100.0% UBU 50.0% 839057408/19188656128 ( 4.4%) @1.9x, remaining 39:21 RBU 100.0% UBU 50.0% 865730560/19188656128 ( 4.5%) @1.8x, remaining 39:09 RBU 100.0% UBU 50.0% 893911040/19188656128 ( 4.7%) @1.9x, remaining 39:13 RBU 100.0% UBU 50.0% 920322048/19188656128 ( 4.8%) @1.8x, remaining 39:02 RBU 100.0% UBU 50.0% 948109312/19188656128 ( 4.9%) @1.9x, remaining 38:47 RBU 100.0% UBU 50.0% 975175680/19188656128 ( 5.1%) @1.8x, remaining 38:54 RBU 100.0% UBU 50.0% 1001914368/19188656128 ( 5.2%) @1.8x, remaining 38:43 RBU 100.0% UBU 50.0% 1029898240/19188656128 ( 5.4%) @1.9x, remaining 38:29 RBU 100.0% UBU 50.0% 1056440320/19188656128 ( 5.5%) @1.8x, remaining 38:37 RBU 100.0% UBU 50.0% 1082818560/19188656128 ( 5.6%) @1.8x, remaining 38:27 RBU 100.0% UBU 50.0% 1105199104/19188656128 ( 5.8%) @1.5x, remaining 38:27 RBU 100.0% UBU 50.0% 1131610112/19188656128 ( 5.9%) @1.8x, remaining 38:33 RBU 100.0% UBU 50.0% 1159004160/19188656128 ( 6.0%) @1.8x, remaining 38:22 RBU 100.0% UBU 50.0% 1186463744/19188656128 ( 6.2%) @1.8x, remaining 38:11 RBU 99.6% UBU 50.0% 1212874752/19188656128 ( 6.3%) @1.8x, remaining 38:17 RBU 100.0% UBU 50.0% 1239285760/19188656128 ( 6.5%) @1.8x, remaining 38:08 RBU 100.0% UBU 50.0% 1266679808/19188656128 ( 6.6%) @1.8x, remaining 37:57 RBU 100.0% UBU 50.0% 1293975552/19188656128 ( 6.7%) @1.8x, remaining 38:01 RBU 97.6% UBU 50.0% 1320550400/19188656128 ( 6.9%) @1.8x, remaining 37:53 RBU 100.0% UBU 50.0% 1346961408/19188656128 ( 7.0%) @1.8x, remaining 37:45 RBU 100.0% UBU 50.0% 1373372416/19188656128 ( 7.2%) @1.8x, remaining 37:50 RBU 100.0% UBU 50.0% 1400143872/19188656128 ( 7.3%) @1.8x, remaining 37:41 RBU 100.0% UBU 50.0% 1427374080/19188656128 ( 7.4%) @1.8x, remaining 37:32 RBU 100.0% UBU 50.0% 1454276608/19188656128 ( 7.6%) @1.8x, remaining 37:36 RBU 100.0% UBU 50.0% 1481048064/19188656128 ( 7.7%) @1.8x, remaining 37:27 RBU 97.8% UBU 50.0% 1507459072/19188656128 ( 7.9%) @1.8x, remaining 37:20 RBU 100.0% UBU 50.0% 1534984192/19188656128 ( 8.0%) @1.8x, remaining 37:22 RBU 100.0% UBU 50.0% 1562312704/19188656128 ( 8.1%) @1.8x, remaining 37:13 RBU 100.0% UBU 50.0% 1590132736/19188656128 ( 8.3%) @1.9x, remaining 37:04 RBU 100.0% UBU 50.0% 1617166336/19188656128 ( 8.4%) @1.8x, remaining 37:07 RBU 100.0% UBU 50.0% 1644953600/19188656128 ( 8.6%) @1.9x, remaining 36:58 RBU 100.0% UBU 50.0% 1672019968/19188656128 ( 8.7%) @1.8x, remaining 36:50 RBU 100.0% UBU 50.0% 1699610624/19188656128 ( 8.9%) @1.8x, remaining 36:52 RBU 100.0% UBU 50.0% 1726873600/19188656128 ( 9.0%) @1.8x, remaining 36:44 RBU 100.0% UBU 50.0% 1754005504/19188656128 ( 9.1%) @1.8x, remaining 36:36 RBU 100.0% UBU 50.0% 1781727232/19188656128 ( 9.3%) @1.8x, remaining 36:38 RBU 100.0% UBU 50.0% 1808138240/19188656128 ( 9.4%) @1.8x, remaining 36:31 RBU 100.0% UBU 50.0% 1836384256/19188656128 ( 9.6%) @1.9x, remaining 36:22 RBU 100.0% UBU 50.0% 1862991872/19188656128 ( 9.7%) @1.8x, remaining 36:25 RBU 99.3% UBU 50.0% 1886683136/19188656128 ( 9.8%) @1.6x, remaining 36:22 RBU 100.0% UBU 50.0% 1913782272/19188656128 (10.0%) @1.8x, remaining 36:15 RBU 100.0% UBU 50.0% 1940193280/19188656128 (10.1%) @1.8x, remaining 36:18 RBU 100.0% UBU 50.0% 1968144384/19188656128 (10.3%) @1.9x, remaining 36:09 RBU 100.0% UBU 50.0% 1995046912/19188656128 (10.4%) @1.8x, remaining 36:03 RBU 100.0% UBU 50.0% 2021457920/19188656128 (10.5%) @1.8x, remaining 36:05 RBU 100.0% UBU 50.0% 2048983040/19188656128 (10.7%) @1.8x, remaining 35:58 RBU 100.0% UBU 50.0% 2076311552/19188656128 (10.8%) @1.8x, remaining 35:51 RBU 100.0% UBU 50.0% 2102722560/19188656128 (11.0%) @1.8x, remaining 35:53 RBU 100.0% UBU 50.0% 2129330176/19188656128 (11.1%) @1.8x, remaining 35:47 RBU 100.0% UBU 50.0% 2155544576/19188656128 (11.2%) @1.7x, remaining 35:41 RBU 100.0% UBU 50.0% 2177892352/19188656128 (11.3%) @1.5x, remaining 35:47 RBU 100.0% UBU 50.0% 2204860416/19188656128 (11.5%) @1.8x, remaining 35:41 RBU 100.0% UBU 50.0% 2232156160/19188656128 (11.6%) @1.8x, remaining 35:34 RBU 100.0% UBU 50.0% 2259156992/19188656128 (11.8%) @1.8x, remaining 35:35 RBU 99.8% UBU 50.0% 2285568000/19188656128 (11.9%) @1.8x, remaining 35:29 RBU 100.0% UBU 50.0% 2311979008/19188656128 (12.0%) @1.8x, remaining 35:24 RBU 100.0% UBU 50.0% 2338390016/19188656128 (12.2%) @1.8x, remaining 35:25 RBU 100.0% UBU 50.0% 2365521920/19188656128 (12.3%) @1.8x, remaining 35:19 RBU 100.0% UBU 50.0% 2392457216/19188656128 (12.5%) @1.8x, remaining 35:13 RBU 100.0% UBU 50.0% 2419458048/19188656128 (12.6%) @1.8x, remaining 35:13 RBU 100.0% UBU 50.0% 2446065664/19188656128 (12.7%) @1.8x, remaining 35:08 RBU 99.8% UBU 50.0% 2472476672/19188656128 (12.9%) @1.8x, remaining 35:02 RBU 100.0% UBU 50.0% 2500296704/19188656128 (13.0%) @1.9x, remaining 35:02 RBU 100.0% UBU 50.0% 2527330304/19188656128 (13.2%) @1.8x, remaining 34:56 RBU 100.0% UBU 50.0% 2555772928/19188656128 (13.3%) @1.9x, remaining 34:49 RBU 100.0% UBU 50.0% 2582183936/19188656128 (13.5%) @1.8x, remaining 34:50 RBU 100.0% UBU 50.0% 2610626560/19188656128 (13.6%) @1.9x, remaining 34:42 RBU 100.0% UBU 50.0% 2637299712/19188656128 (13.7%) @1.8x, remaining 34:37 RBU 100.0% UBU 50.0% 2665119744/19188656128 (13.9%) @1.9x, remaining 34:36 RBU 100.0% UBU 50.0% 2692186112/19188656128 (14.0%) @1.8x, remaining 34:31 RBU 100.0% UBU 50.0% 2720333824/19188656128 (14.2%) @1.9x, remaining 34:24 RBU 100.0% UBU 50.0% 2746875904/19188656128 (14.3%) @1.8x, remaining 34:25 RBU 100.0% UBU 50.0% 2775187456/19188656128 (14.5%) @1.9x, remaining 34:18 RBU 100.0% UBU 50.0% 2801598464/19188656128 (14.6%) @1.8x, remaining 34:13 RBU 100.0% UBU 50.0% 2829713408/19188656128 (14.7%) @1.9x, remaining 34:12 RBU 100.0% UBU 50.0% 2856452096/19188656128 (14.9%) @1.8x, remaining 34:06 RBU 100.0% UBU 50.0% 2883846144/19188656128 (15.0%) @1.8x, remaining 34:01 RBU 100.0% UBU 50.0% 2911305728/19188656128 (15.2%) @1.8x, remaining 34:00 RBU 100.0% UBU 50.0% 2937716736/19188656128 (15.3%) @1.8x, remaining 33:55 RBU 100.0% UBU 50.0% 2965766144/19188656128 (15.5%) @1.9x, remaining 33:49 RBU 100.0% UBU 50.0% 2992570368/19188656128 (15.6%) @1.8x, remaining 33:49 RBU 100.0% UBU 50.0% 3019374592/19188656128 (15.7%) @1.8x, remaining 33:44 RBU 100.0% UBU 50.0% 3047358464/19188656128 (15.9%) @1.9x, remaining 33:38 RBU 100.0% UBU 50.0% 3073835008/19188656128 (16.0%) @1.8x, remaining 33:38 RBU 100.0% UBU 50.0% 3100606464/19188656128 (16.2%) @1.8x, remaining 33:33 RBU 100.0% UBU 50.0% 3128393728/19188656128 (16.3%) @1.9x, remaining 33:27 RBU 100.0% UBU 50.0% 3155099648/19188656128 (16.4%) @1.8x, remaining 33:27 RBU 100.0% UBU 50.0% 3181510656/19188656128 (16.6%) @1.8x, remaining 33:22 RBU 100.0% UBU 50.0% 3208839168/19188656128 (16.7%) @1.8x, remaining 33:16 RBU 100.0% UBU 50.0% 3232301056/19188656128 (16.8%) @1.6x, remaining 33:19 RBU 100.0% UBU 50.0% 3256942592/19188656128 (17.0%) @1.6x, remaining 33:15 RBU 100.0% UBU 50.0% 3284467712/19188656128 (17.1%) @1.8x, remaining 33:10 RBU 100.0% UBU 50.0% 3311534080/19188656128 (17.3%) @1.8x, remaining 33:09 RBU 100.0% UBU 50.0% 3337945088/19188656128 (17.4%) @1.8x, remaining 33:04 RBU 100.0% UBU 50.0% 3364356096/19188656128 (17.5%) @1.8x, remaining 33:00 RBU 100.0% UBU 50.0% 3391455232/19188656128 (17.7%) @1.8x, remaining 32:59 RBU 100.0% UBU 50.0% 3418685440/19188656128 (17.8%) @1.8x, remaining 32:54 RBU 100.0% UBU 50.0% 3445620736/19188656128 (18.0%) @1.8x, remaining 32:49 RBU 100.0% UBU 50.0% 3472031744/19188656128 (18.1%) @1.8x, remaining 32:49 RBU 99.1% UBU 50.0% 3498442752/19188656128 (18.2%) @1.8x, remaining 32:44 RBU 100.0% UBU 50.0% 3524853760/19188656128 (18.4%) @1.8x, remaining 32:39 RBU 100.0% UBU 50.0% 3551559680/19188656128 (18.5%) @1.8x, remaining 32:39 RBU 100.0% UBU 50.0% 3578593280/19188656128 (18.6%) @1.8x, remaining 32:34 RBU 100.0% UBU 50.0% 3605463040/19188656128 (18.8%) @1.8x, remaining 32:29 RBU 100.0% UBU 50.0% 3632300032/19188656128 (18.9%) @1.8x, remaining 32:28 RBU 100.0% UBU 50.0% 3658940416/19188656128 (19.1%) @1.8x, remaining 32:23 RBU 100.0% UBU 50.0% 3685351424/19188656128 (19.2%) @1.8x, remaining 32:19 RBU 100.0% UBU 50.0% 3713794048/19188656128 (19.4%) @1.9x, remaining 32:17 RBU 100.0% UBU 50.0% 3741057024/19188656128 (19.5%) @1.8x, remaining 32:12 RBU 100.0% UBU 50.0% 3768647680/19188656128 (19.6%) @1.8x, remaining 32:07 RBU 100.0% UBU 50.0% 3796664320/19188656128 (19.8%) @1.9x, remaining 32:05 RBU 100.0% UBU 50.0% 3823501312/19188656128 (19.9%) @1.8x, remaining 32:00 RBU 100.0% UBU 50.0% 3851943936/19188656128 (20.1%) @1.9x, remaining 31:55 RBU 100.0% UBU 50.0% 3878387712/19188656128 (20.2%) @1.8x, remaining 31:54 RBU 100.0% UBU 50.0% 3906797568/19188656128 (20.4%) @1.9x, remaining 31:48 RBU 100.0% UBU 50.0% 3933536256/19188656128 (20.5%) @1.8x, remaining 31:44 RBU 100.0% UBU 50.0% 3961651200/19188656128 (20.6%) @1.9x, remaining 31:42 RBU 100.0% UBU 50.0% 3988455424/19188656128 (20.8%) @1.8x, remaining 31:37 RBU 100.0% UBU 50.0% 4016504832/19188656128 (20.9%) @1.9x, remaining 31:32 RBU 100.0% UBU 50.0% 4043079680/19188656128 (21.1%) @1.8x, remaining 31:31 RBU 100.0% UBU 50.0% 4071358464/19188656128 (21.2%) @1.9x, remaining 31:26 RBU 100.0% UBU 50.0% 4097769472/19188656128 (21.4%) @1.8x, remaining 31:21 RBU 100.0% UBU 50.0% 4126015488/19188656128 (21.5%) @1.9x, remaining 31:20 RBU 100.0% UBU 50.0% 4152623104/19188656128 (21.6%) @1.8x, remaining 31:15 RBU 100.0% UBU 50.0% 4180279296/19188656128 (21.8%) @1.8x, remaining 31:10 RBU 100.0% UBU 50.0% 4207476736/19188656128 (21.9%) @1.8x, remaining 31:09 RBU 100.0% UBU 50.0% 4234280960/19188656128 (22.1%) @1.8x, remaining 31:04 RBU 100.0% UBU 50.0% 4262330368/19188656128 (22.2%) @1.9x, remaining 30:59 RBU 100.0% UBU 50.0% 4288741376/19188656128 (22.4%) @1.8x, remaining 30:58 RBU 100.0% UBU 50.0% 4311089152/19188656128 (22.5%) @1.5x, remaining 30:56 RBU 100.0% UBU 50.0% 4337500160/19188656128 (22.6%) @1.8x, remaining 30:52 RBU 100.0% UBU 50.0% 4365156352/19188656128 (22.7%) @1.8x, remaining 30:50 RBU 99.8% UBU 50.0% 4392353792/19188656128 (22.9%) @1.8x, remaining 30:46 RBU 100.0% UBU 50.0% 4418764800/19188656128 (23.0%) @1.8x, remaining 30:41 RBU 100.0% UBU 50.0% 4446486528/19188656128 (23.2%) @1.8x, remaining 30:40 RBU 100.0% UBU 50.0% 4473618432/19188656128 (23.3%) @1.8x, remaining 30:35 RBU 100.0% UBU 50.0% 4500029440/19188656128 (23.5%) @1.8x, remaining 30:31 RBU 100.0% UBU 50.0% 4527357952/19188656128 (23.6%) @1.8x, remaining 30:29 RBU 100.0% UBU 50.0% 4554883072/19188656128 (23.7%) @1.8x, remaining 30:24 RBU 100.0% UBU 50.0% 4581294080/19188656128 (23.9%) @1.8x, remaining 30:20 RBU 100.0% UBU 50.0% 4607770624/19188656128 (24.0%) @1.8x, remaining 30:19 RBU 100.0% UBU 50.0% 4635361280/19188656128 (24.2%) @1.8x, remaining 30:14 RBU 99.4% UBU 50.0% 4662558720/19188656128 (24.3%) @1.8x, remaining 30:13 RBU 98.7% UBU 50.0% 4688969728/19188656128 (24.4%) @1.8x, remaining 30:08 RBU 92.2% UBU 50.0% 4715380736/19188656128 (24.6%) @1.8x, remaining 30:04 RBU 100.0% UBU 50.0% 4742709248/19188656128 (24.7%) @1.8x, remaining 30:03 RBU 99.0% UBU 50.0% 4770070528/19188656128 (24.9%) @1.8x, remaining 29:58 RBU 98.3% UBU 50.0% 4796645376/19188656128 (25.0%) @1.8x, remaining 29:54 RBU 100.0% UBU 50.0% 4823056384/19188656128 (25.1%) @1.8x, remaining 29:53 RBU 100.0% UBU 50.0% 4849467392/19188656128 (25.3%) @1.8x, remaining 29:48 RBU 100.0% UBU 50.0% 4876533760/19188656128 (25.4%) @1.8x, remaining 29:44 RBU 99.4% UBU 50.0% 4903632896/19188656128 (25.6%) @1.8x, remaining 29:42 RBU 98.5% UBU 50.0% 4930732032/19188656128 (25.7%) @1.8x, remaining 29:38 RBU 97.4% UBU 50.0% 4957143040/19188656128 (25.8%) @1.8x, remaining 29:34 RBU 99.4% UBU 50.0% 4983554048/19188656128 (26.0%) @1.8x, remaining 29:32 RBU 100.0% UBU 50.0% 5009965056/19188656128 (26.1%) @1.8x, remaining 29:28 RBU 100.0% UBU 50.0% 5036376064/19188656128 (26.2%) @1.8x, remaining 29:24 RBU 100.0% UBU 50.0% 5063049216/19188656128 (26.4%) @1.8x, remaining 29:23 RBU 100.0% UBU 50.0% 5089918976/19188656128 (26.5%) @1.8x, remaining 29:18 RBU 99.4% UBU 50.0% 5116723200/19188656128 (26.7%) @1.8x, remaining 29:14 RBU 99.1% UBU 50.0% 5143494656/19188656128 (26.8%) @1.8x, remaining 29:13 RBU 100.0% UBU 50.0% 5170462720/19188656128 (26.9%) @1.8x, remaining 29:08 RBU 100.0% UBU 50.0% 5198282752/19188656128 (27.1%) @1.9x, remaining 29:03 RBU 98.3% UBU 50.0% 5225316352/19188656128 (27.2%) @1.8x, remaining 29:02 RBU 100.0% UBU 50.0% 5253758976/19188656128 (27.4%) @1.9x, remaining 28:57 RBU 100.0% UBU 50.0% 5281054720/19188656128 (27.5%) @1.8x, remaining 28:52 RBU 99.2% UBU 50.0% 5308612608/19188656128 (27.7%) @1.8x, remaining 28:50 RBU 100.0% UBU 50.0% 5336793088/19188656128 (27.8%) @1.9x, remaining 28:46 RBU 100.0% UBU 50.0% 5363466240/19188656128 (28.0%) @1.8x, remaining 28:41 RBU 100.0% UBU 50.0% 5385814016/19188656128 (28.1%) @1.5x, remaining 28:42 RBU 100.0% UBU 50.0% 5413797888/19188656128 (28.2%) @1.9x, remaining 28:37 RBU 99.4% UBU 50.0% 5440667648/19188656128 (28.4%) @1.8x, remaining 28:33 RBU 100.0% UBU 50.0% 5469110272/19188656128 (28.5%) @1.9x, remaining 28:30 RBU 100.0% UBU 50.0% 5495521280/19188656128 (28.6%) @1.8x, remaining 28:26 RBU 100.0% UBU 50.0% 5523963904/19188656128 (28.8%) @1.9x, remaining 28:21 RBU 100.0% UBU 50.0% 5550637056/19188656128 (28.9%) @1.8x, remaining 28:20 RBU 99.0% UBU 50.0% 5578817536/19188656128 (29.1%) @1.9x, remaining 28:15 RBU 99.8% UBU 50.0% 5605588992/19188656128 (29.2%) @1.8x, remaining 28:11 RBU 100.0% UBU 50.0% 5633671168/19188656128 (29.4%) @1.9x, remaining 28:09 RBU 100.0% UBU 50.0% 5660377088/19188656128 (29.5%) @1.8x, remaining 28:04 RBU 100.0% UBU 50.0% 5688524800/19188656128 (29.6%) @1.9x, remaining 28:00 RBU 100.0% UBU 50.0% 5715001344/19188656128 (29.8%) @1.8x, remaining 27:58 RBU 100.0% UBU 50.0% 5743378432/19188656128 (29.9%) @1.9x, remaining 27:53 RBU 100.0% UBU 50.0% 5769789440/19188656128 (30.1%) @1.8x, remaining 27:49 RBU 100.0% UBU 50.0% 5797806080/19188656128 (30.2%) @1.9x, remaining 27:47 RBU 99.5% UBU 50.0% 5824643072/19188656128 (30.4%) @1.8x, remaining 27:43 RBU 100.0% UBU 50.0% 5851971584/19188656128 (30.5%) @1.8x, remaining 27:39 RBU 99.0% UBU 50.0% 5879496704/19188656128 (30.6%) @1.8x, remaining 27:36 RBU 99.8% UBU 50.0% 5905973248/19188656128 (30.8%) @1.8x, remaining 27:33 RBU 100.0% UBU 50.0% 5934153728/19188656128 (30.9%) @1.9x, remaining 27:28 RBU 97.7% UBU 50.0% 5960761344/19188656128 (31.1%) @1.8x, remaining 27:26 RBU 100.0% UBU 50.0% 5987958784/19188656128 (31.2%) @1.8x, remaining 27:22 RBU 99.9% UBU 50.0% 6015614976/19188656128 (31.3%) @1.8x, remaining 27:17 RBU 100.0% UBU 50.0% 6042025984/19188656128 (31.5%) @1.8x, remaining 27:16 RBU 100.0% UBU 50.0% 6069616640/19188656128 (31.6%) @1.8x, remaining 27:11 RBU 98.7% UBU 50.0% 6096879616/19188656128 (31.8%) @1.8x, remaining 27:07 RBU 100.0% UBU 50.0% 6123290624/19188656128 (31.9%) @1.8x, remaining 27:05 RBU 100.0% UBU 50.0% 6151077888/19188656128 (32.1%) @1.9x, remaining 27:01 RBU 98.4% UBU 50.0% 6178144256/19188656128 (32.2%) @1.8x, remaining 26:57 RBU 100.0% UBU 50.0% 6204555264/19188656128 (32.3%) @1.8x, remaining 26:55 RBU 100.0% UBU 50.0% 6232047616/19188656128 (32.5%) @1.8x, remaining 26:51 RBU 98.9% UBU 50.0% 6259408896/19188656128 (32.6%) @1.8x, remaining 26:47 RBU 100.0% UBU 50.0% 6285819904/19188656128 (32.8%) @1.8x, remaining 26:45 RBU 100.0% UBU 50.0% 6312656896/19188656128 (32.9%) @1.8x, remaining 26:41 RBU 99.9% UBU 50.0% 6340280320/19188656128 (33.0%) @1.8x, remaining 26:36 RBU 97.9% UBU 50.0% 6367084544/19188656128 (33.2%) @1.8x, remaining 26:34 RBU 97.5% UBU 50.0% 6393495552/19188656128 (33.3%) @1.8x, remaining 26:31 RBU 98.7% UBU 50.0% 6420430848/19188656128 (33.5%) @1.8x, remaining 26:26 RBU 99.6% UBU 50.0% 6447890432/19188656128 (33.6%) @1.8x, remaining 26:24 RBU 98.9% UBU 50.0% 6468665344/19188656128 (33.7%) @1.4x, remaining 26:22 RBU 100.0% UBU 50.0% 6495830016/19188656128 (33.9%) @1.8x, remaining 26:18 RBU 100.0% UBU 50.0% 6523191296/19188656128 (34.0%) @1.8x, remaining 26:16 RBU 99.4% UBU 50.0% 6549929984/19188656128 (34.1%) @1.8x, remaining 26:12 RBU 100.0% UBU 50.0% 6576340992/19188656128 (34.3%) @1.8x, remaining 26:08 RBU 97.4% UBU 50.0% 6602752000/19188656128 (34.4%) @1.8x, remaining 26:06 RBU 100.0% UBU 50.0% 6629851136/19188656128 (34.6%) @1.8x, remaining 26:02 RBU 100.0% UBU 50.0% 6657081344/19188656128 (34.7%) @1.8x, remaining 25:58 RBU 98.1% UBU 50.0% 6684016640/19188656128 (34.8%) @1.8x, remaining 25:56 RBU 99.8% UBU 50.0% 6710427648/19188656128 (35.0%) @1.8x, remaining 25:52 RBU 100.0% UBU 50.0% 6736838656/19188656128 (35.1%) @1.8x, remaining 25:48 RBU 100.0% UBU 50.0% 6763249664/19188656128 (35.2%) @1.8x, remaining 25:46 RBU 100.0% UBU 50.0% 6789988352/19188656128 (35.4%) @1.8x, remaining 25:42 RBU 100.0% UBU 50.0% 6816989184/19188656128 (35.5%) @1.8x, remaining 25:38 RBU 100.0% UBU 50.0% 6843924480/19188656128 (35.7%) @1.8x, remaining 25:36 RBU 98.6% UBU 50.0% 6870827008/19188656128 (35.8%) @1.8x, remaining 25:32 RBU 100.0% UBU 50.0% 6897336320/19188656128 (35.9%) @1.8x, remaining 25:28 RBU 99.5% UBU 50.0% 6923747328/19188656128 (36.1%) @1.8x, remaining 25:26 RBU 100.0% UBU 50.0% 6950158336/19188656128 (36.2%) @1.8x, remaining 25:23 RBU 99.9% UBU 50.0% 6976569344/19188656128 (36.4%) @1.8x, remaining 25:19 RBU 100.0% UBU 50.0% 7002980352/19188656128 (36.5%) @1.8x, remaining 25:17 RBU 100.0% UBU 50.0% 7029391360/19188656128 (36.6%) @1.8x, remaining 25:13 RBU 100.0% UBU 50.0% 7055966208/19188656128 (36.8%) @1.8x, remaining 25:09 RBU 99.1% UBU 50.0% 7084244992/19188656128 (36.9%) @1.9x, remaining 25:07 RBU 98.5% UBU 50.0% 7111704576/19188656128 (37.1%) @1.8x, remaining 25:02 RBU 98.8% UBU 50.0% 7139098624/19188656128 (37.2%) @1.8x, remaining 24:58 RBU 100.0% UBU 50.0% 7167541248/19188656128 (37.4%) @1.9x, remaining 24:56 RBU 98.2% UBU 50.0% 7194869760/19188656128 (37.5%) @1.8x, remaining 24:51 RBU 100.0% UBU 50.0% 7222394880/19188656128 (37.6%) @1.8x, remaining 24:47 RBU 100.0% UBU 50.0% 7250837504/19188656128 (37.8%) @1.9x, remaining 24:45 RBU 98.1% UBU 50.0% 7277871104/19188656128 (37.9%) @1.8x, remaining 24:41 RBU 99.5% UBU 50.0% 7305691136/19188656128 (38.1%) @1.9x, remaining 24:36 RBU 100.0% UBU 50.0% 7333675008/19188656128 (38.2%) @1.9x, remaining 24:34 RBU 100.0% UBU 50.0% 7360544768/19188656128 (38.4%) @1.8x, remaining 24:30 RBU 100.0% UBU 50.0% 7388987392/19188656128 (38.5%) @1.9x, remaining 24:25 RBU 100.0% UBU 50.0% 7416119296/19188656128 (38.6%) @1.8x, remaining 24:23 RBU 100.0% UBU 50.0% 7443841024/19188656128 (38.8%) @1.8x, remaining 24:19 RBU 100.0% UBU 50.0% 7471661056/19188656128 (38.9%) @1.9x, remaining 24:15 RBU 98.8% UBU 50.0% 7498694656/19188656128 (39.1%) @1.8x, remaining 24:12 RBU 100.0% UBU 50.0% 7527071744/19188656128 (39.2%) @1.9x, remaining 24:08 RBU 100.0% UBU 50.0% 7548043264/19188656128 (39.3%) @1.4x, remaining 24:06 RBU 99.8% UBU 50.0% 7575896064/19188656128 (39.5%) @1.9x, remaining 24:03 RBU 100.0% UBU 50.0% 7603257344/19188656128 (39.6%) @1.8x, remaining 23:59 RBU 99.0% UBU 50.0% 7630749696/19188656128 (39.8%) @1.8x, remaining 23:55 RBU 100.0% UBU 50.0% 7658274816/19188656128 (39.9%) @1.8x, remaining 23:53 RBU 100.0% UBU 50.0% 7685603328/19188656128 (40.1%) @1.8x, remaining 23:49 RBU 100.0% UBU 50.0% 7713226752/19188656128 (40.2%) @1.8x, remaining 23:45 RBU 99.2% UBU 50.0% 7740456960/19188656128 (40.3%) @1.8x, remaining 23:42 RBU 100.0% UBU 50.0% 7767982080/19188656128 (40.5%) @1.8x, remaining 23:38 RBU 99.8% UBU 50.0% 7795310592/19188656128 (40.6%) @1.8x, remaining 23:34 RBU 100.0% UBU 50.0% 7822606336/19188656128 (40.8%) @1.8x, remaining 23:32 RBU 100.0% UBU 50.0% 7850164224/19188656128 (40.9%) @1.8x, remaining 23:28 RBU 100.0% UBU 50.0% 7877066752/19188656128 (41.1%) @1.8x, remaining 23:24 RBU 99.8% UBU 50.0% 7905017856/19188656128 (41.2%) @1.9x, remaining 23:21 RBU 99.9% UBU 50.0% 7931428864/19188656128 (41.3%) @1.8x, remaining 23:18 RBU 100.0% UBU 50.0% 7959805952/19188656128 (41.5%) @1.9x, remaining 23:13 RBU 97.9% UBU 50.0% 7986282496/19188656128 (41.6%) @1.8x, remaining 23:11 RBU 100.0% UBU 50.0% 8014004224/19188656128 (41.8%) @1.8x, remaining 23:07 RBU 98.8% UBU 50.0% 8041136128/19188656128 (41.9%) @1.8x, remaining 23:03 RBU 100.0% UBU 50.0% 8068038656/19188656128 (42.0%) @1.8x, remaining 23:01 RBU 99.8% UBU 50.0% 8095989760/19188656128 (42.2%) @1.9x, remaining 22:56 RBU 100.0% UBU 50.0% 8122400768/19188656128 (42.3%) @1.8x, remaining 22:53 RBU 100.0% UBU 50.0% 8150122496/19188656128 (42.5%) @1.8x, remaining 22:50 RBU 98.5% UBU 50.0% 8177254400/19188656128 (42.6%) @1.8x, remaining 22:46 RBU 99.6% UBU 50.0% 8203862016/19188656128 (42.8%) @1.8x, remaining 22:44 RBU 98.5% UBU 50.0% 8231911424/19188656128 (42.9%) @1.9x, remaining 22:40 RBU 99.9% UBU 50.0% 8258519040/19188656128 (43.0%) @1.8x, remaining 22:36 RBU 100.0% UBU 50.0% 8285356032/19188656128 (43.2%) @1.8x, remaining 22:34 RBU 100.0% UBU 50.0% 8313339904/19188656128 (43.3%) @1.9x, remaining 22:30 RBU 98.1% UBU 50.0% 8339783680/19188656128 (43.5%) @1.8x, remaining 22:26 RBU 100.0% UBU 50.0% 8366653440/19188656128 (43.6%) @1.8x, remaining 22:23 RBU 100.0% UBU 50.0% 8394539008/19188656128 (43.7%) @1.9x, remaining 22:19 RBU 99.8% UBU 50.0% 8421048320/19188656128 (43.9%) @1.8x, remaining 22:16 RBU 100.0% UBU 50.0% 8447655936/19188656128 (44.0%) @1.8x, remaining 22:13 RBU 100.0% UBU 50.0% 8475410432/19188656128 (44.2%) @1.9x, remaining 22:09 RBU 100.0% UBU 50.0% 8502312960/19188656128 (44.3%) @1.8x, remaining 22:06 RBU 98.1% UBU 50.0% 8528723968/19188656128 (44.4%) @1.8x, remaining 22:03 RBU 100.0% UBU 50.0% 8555986944/19188656128 (44.6%) @1.8x, remaining 21:59 RBU 100.0% UBU 50.0% 8583577600/19188656128 (44.7%) @1.8x, remaining 21:55 RBU 99.7% UBU 50.0% 8605925376/19188656128 (44.8%) @1.5x, remaining 21:54 RBU 100.0% UBU 50.0% 8631549952/19188656128 (45.0%) @1.7x, remaining 21:51 RBU 98.5% UBU 50.0% 8658747392/19188656128 (45.1%) @1.8x, remaining 21:47 RBU 100.0% UBU 50.0% 8685158400/19188656128 (45.3%) @1.8x, remaining 21:44 RBU 100.0% UBU 50.0% 8711569408/19188656128 (45.4%) @1.8x, remaining 21:41 RBU 100.0% UBU 50.0% 8739028992/19188656128 (45.5%) @1.8x, remaining 21:37 RBU 100.0% UBU 50.0% 8766423040/19188656128 (45.7%) @1.8x, remaining 21:34 RBU 100.0% UBU 50.0% 8792834048/19188656128 (45.8%) @1.8x, remaining 21:31 RBU 100.0% UBU 50.0% 8819245056/19188656128 (46.0%) @1.8x, remaining 21:27 RBU 100.0% UBU 50.0% 8845983744/19188656128 (46.1%) @1.8x, remaining 21:24 RBU 100.0% UBU 50.0% 8873246720/19188656128 (46.2%) @1.8x, remaining 21:21 RBU 100.0% UBU 50.0% 8900509696/19188656128 (46.4%) @1.8x, remaining 21:17 RBU 100.0% UBU 50.0% 8926920704/19188656128 (46.5%) @1.8x, remaining 21:14 RBU 100.0% UBU 50.0% 8953331712/19188656128 (46.7%) @1.8x, remaining 21:11 RBU 100.0% UBU 50.0% 8979742720/19188656128 (46.8%) @1.8x, remaining 21:07 RBU 100.0% UBU 50.0% 9006743552/19188656128 (46.9%) @1.8x, remaining 21:05 RBU 100.0% UBU 50.0% 9033875456/19188656128 (47.1%) @1.8x, remaining 21:01 RBU 100.0% UBU 50.0% 9060941824/19188656128 (47.2%) @1.8x, remaining 20:57 RBU 100.0% UBU 50.0% 9087418368/19188656128 (47.4%) @1.8x, remaining 20:54 RBU 100.0% UBU 50.0% 9113829376/19188656128 (47.5%) @1.8x, remaining 20:51 RBU 100.0% UBU 50.0% 9140240384/19188656128 (47.6%) @1.8x, remaining 20:47 RBU 100.0% UBU 50.0% 9166651392/19188656128 (47.8%) @1.8x, remaining 20:45 RBU 100.0% UBU 50.0% 9193357312/19188656128 (47.9%) @1.8x, remaining 20:41 RBU 100.0% UBU 50.0% 9220259840/19188656128 (48.1%) @1.8x, remaining 20:37 RBU 100.0% UBU 50.0% 9247129600/19188656128 (48.2%) @1.8x, remaining 20:35 RBU 100.0% UBU 50.0% 9273999360/19188656128 (48.3%) @1.8x, remaining 20:31 RBU 100.0% UBU 50.0% 9300738048/19188656128 (48.5%) @1.8x, remaining 20:27 RBU 100.0% UBU 50.0% 9327149056/19188656128 (48.6%) @1.8x, remaining 20:25 RBU 100.0% UBU 50.0% 9353560064/19188656128 (48.7%) @1.8x, remaining 20:21 RBU 100.0% UBU 50.0% 9379971072/19188656128 (48.9%) @1.8x, remaining 20:18 RBU 100.0% UBU 50.0% 9406382080/19188656128 (49.0%) @1.8x, remaining 20:15 RBU 100.0% UBU 50.0% 9432793088/19188656128 (49.2%) @1.8x, remaining 20:12 RBU 100.0% UBU 50.0% 9459204096/19188656128 (49.3%) @1.8x, remaining 20:08 RBU 100.0% UBU 50.0% 9485615104/19188656128 (49.4%) @1.8x, remaining 20:06 RBU 100.0% UBU 50.0% 9512026112/19188656128 (49.6%) @1.8x, remaining 20:02 RBU 100.0% UBU 50.0% 9538437120/19188656128 (49.7%) @1.8x, remaining 19:58 RBU 100.0% UBU 50.0% 9565143040/19188656128 (49.8%) @1.8x, remaining 19:56 RBU 100.0% UBU 50.0% 9593290752/19188656128 (50.0%) @1.9x, remaining 19:52 RBU 100.0% UBU 50.0% 9621733376/19188656128 (50.1%) @1.9x, remaining 19:48 RBU 100.0% UBU 50.0% 9648996352/19188656128 (50.3%) @1.8x, remaining 19:45 RBU 100.0% UBU 50.0% 9676587008/19188656128 (50.4%) @1.8x, remaining 19:41 RBU 100.0% UBU 50.0% 9698934784/19188656128 (50.5%) @1.5x, remaining 19:39 RBU 100.0% UBU 50.0% 9726853120/19188656128 (50.7%) @1.9x, remaining 19:36 RBU 100.0% UBU 50.0% 9753919488/19188656128 (50.8%) @1.8x, remaining 19:32 RBU 100.0% UBU 50.0% 9782231040/19188656128 (51.0%) @1.9x, remaining 19:28 RBU 100.0% UBU 50.0% 9810214912/19188656128 (51.1%) @1.9x, remaining 19:25 RBU 100.0% UBU 50.0% 9837150208/19188656128 (51.3%) @1.8x, remaining 19:21 RBU 100.0% UBU 50.0% 9865527296/19188656128 (51.4%) @1.9x, remaining 19:17 RBU 100.0% UBU 50.0% 9893249024/19188656128 (51.6%) @1.8x, remaining 19:14 RBU 100.0% UBU 50.0% 9920380928/19188656128 (51.7%) @1.8x, remaining 19:11 RBU 100.0% UBU 50.0% 9948823552/19188656128 (51.8%) @1.9x, remaining 19:06 RBU 100.0% UBU 50.0% 9976053760/19188656128 (52.0%) @1.8x, remaining 19:04 RBU 100.0% UBU 50.0% 10003677184/19188656128 (52.1%) @1.8x, remaining 19:00 RBU 100.0% UBU 50.0% 10031857664/19188656128 (52.3%) @1.9x, remaining 18:56 RBU 100.0% UBU 50.0% 10058530816/19188656128 (52.4%) @1.8x, remaining 18:53 RBU 100.0% UBU 50.0% 10086973440/19188656128 (52.6%) @1.9x, remaining 18:49 RBU 100.0% UBU 50.0% 10114236416/19188656128 (52.7%) @1.8x, remaining 18:45 RBU 100.0% UBU 50.0% 10141827072/19188656128 (52.9%) @1.8x, remaining 18:43 RBU 100.0% UBU 50.0% 10169745408/19188656128 (53.0%) @1.9x, remaining 18:39 RBU 100.0% UBU 50.0% 10196680704/19188656128 (53.1%) @1.8x, remaining 18:35 RBU 100.0% UBU 50.0% 10225123328/19188656128 (53.3%) @1.9x, remaining 18:32 RBU 100.0% UBU 50.0% 10251665408/19188656128 (53.4%) @1.8x, remaining 18:28 RBU 100.0% UBU 50.0% 10279976960/19188656128 (53.6%) @1.9x, remaining 18:24 RBU 100.0% UBU 50.0% 10306977792/19188656128 (53.7%) @1.8x, remaining 18:22 RBU 100.0% UBU 50.0% 10334830592/19188656128 (53.9%) @1.9x, remaining 18:18 RBU 98.5% UBU 50.0% 10362028032/19188656128 (54.0%) @1.8x, remaining 18:14 RBU 100.0% UBU 50.0% 10389684224/19188656128 (54.1%) @1.8x, remaining 18:11 RBU 100.0% UBU 50.0% 10417143808/19188656128 (54.3%) @1.8x, remaining 18:07 RBU 100.0% UBU 50.0% 10444537856/19188656128 (54.4%) @1.8x, remaining 18:04 RBU 100.0% UBU 50.0% 10472062976/19188656128 (54.6%) @1.8x, remaining 18:01 RBU 100.0% UBU 50.0% 10499391488/19188656128 (54.7%) @1.8x, remaining 17:57 RBU 100.0% UBU 50.0% 10526883840/19188656128 (54.9%) @1.8x, remaining 17:53 RBU 99.9% UBU 50.0% 10554245120/19188656128 (55.0%) @1.8x, remaining 17:50 RBU 100.0% UBU 50.0% 10581573632/19188656128 (55.1%) @1.8x, remaining 17:47 RBU 100.0% UBU 50.0% 10609098752/19188656128 (55.3%) @1.8x, remaining 17:43 RBU 100.0% UBU 50.0% 10636165120/19188656128 (55.4%) @1.8x, remaining 17:40 RBU 100.0% UBU 50.0% 10663952384/19188656128 (55.6%) @1.9x, remaining 17:36 RBU 100.0% UBU 50.0% 10690756608/19188656128 (55.7%) @1.8x, remaining 17:33 RBU 100.0% UBU 50.0% 10718806016/19188656128 (55.9%) @1.9x, remaining 17:30 RBU 100.0% UBU 50.0% 10745217024/19188656128 (56.0%) @1.8x, remaining 17:26 RBU 100.0% UBU 50.0% 10767564800/19188656128 (56.1%) @1.5x, remaining 17:24 RBU 100.0% UBU 50.0% 10794237952/19188656128 (56.3%) @1.8x, remaining 17:21 RBU 100.0% UBU 50.0% 10822418432/19188656128 (56.4%) @1.9x, remaining 17:17 RBU 100.0% UBU 50.0% 10848829440/19188656128 (56.5%) @1.8x, remaining 17:13 RBU 100.0% UBU 50.0% 10876682240/19188656128 (56.7%) @1.9x, remaining 17:10 RBU 100.0% UBU 50.0% 10903683072/19188656128 (56.8%) @1.8x, remaining 17:07 RBU 100.0% UBU 50.0% 10930618368/19188656128 (57.0%) @1.8x, remaining 17:03 RBU 100.0% UBU 50.0% 10958536704/19188656128 (57.1%) @1.9x, remaining 17:00 RBU 100.0% UBU 50.0% 10984947712/19188656128 (57.2%) @1.8x, remaining 16:57 RBU 100.0% UBU 50.0% 11012669440/19188656128 (57.4%) @1.8x, remaining 16:53 RBU 100.0% UBU 50.0% 11039801344/19188656128 (57.5%) @1.8x, remaining 16:50 RBU 100.0% UBU 50.0% 11066343424/19188656128 (57.7%) @1.8x, remaining 16:47 RBU 100.0% UBU 50.0% 11094392832/19188656128 (57.8%) @1.9x, remaining 16:43 RBU 100.0% UBU 50.0% 11121065984/19188656128 (58.0%) @1.8x, remaining 16:40 RBU 100.0% UBU 50.0% 11147804672/19188656128 (58.1%) @1.8x, remaining 16:36 RBU 100.0% UBU 50.0% 11175919616/19188656128 (58.2%) @1.9x, remaining 16:32 RBU 100.0% UBU 50.0% 11202330624/19188656128 (58.4%) @1.8x, remaining 16:30 RBU 100.0% UBU 50.0% 11229396992/19188656128 (58.5%) @1.8x, remaining 16:26 RBU 100.0% UBU 50.0% 11257184256/19188656128 (58.7%) @1.9x, remaining 16:22 RBU 100.0% UBU 50.0% 11283595264/19188656128 (58.8%) @1.8x, remaining 16:20 RBU 100.0% UBU 50.0% 11310497792/19188656128 (58.9%) @1.8x, remaining 16:16 RBU 97.6% UBU 50.0% 11338317824/19188656128 (59.1%) @1.9x, remaining 16:12 RBU 85.6% UBU 50.0% 11364859904/19188656128 (59.2%) @1.8x, remaining 16:09 RBU 100.0% UBU 50.0% 11391369216/19188656128 (59.4%) @1.8x, remaining 16:06 RBU 95.8% UBU 50.0% 11419123712/19188656128 (59.5%) @1.9x, remaining 16:02 RBU 96.7% UBU 50.0% 11446124544/19188656128 (59.7%) @1.8x, remaining 15:59 RBU 99.6% UBU 50.0% 11472535552/19188656128 (59.8%) @1.8x, remaining 15:56 RBU 100.0% UBU 50.0% 11499667456/19188656128 (59.9%) @1.8x, remaining 15:53 RBU 97.2% UBU 50.0% 11527323648/19188656128 (60.1%) @1.8x, remaining 15:49 RBU 99.3% UBU 50.0% 11553800192/19188656128 (60.2%) @1.8x, remaining 15:46 RBU 95.8% UBU 50.0% 11580211200/19188656128 (60.3%) @1.8x, remaining 15:43 RBU 94.7% UBU 50.0% 11607539712/19188656128 (60.5%) @1.8x, remaining 15:39 RBU 99.5% UBU 50.0% 11635064832/19188656128 (60.6%) @1.8x, remaining 15:36 RBU 89.2% UBU 50.0% 11661475840/19188656128 (60.8%) @1.8x, remaining 15:33 RBU 65.4% UBU 50.0% 11687886848/19188656128 (60.9%) @1.8x, remaining 15:29 RBU 52.1% UBU 50.0% 11715018752/19188656128 (61.1%) @1.8x, remaining 15:26 RBU 100.0% UBU 50.0% 11742412800/19188656128 (61.2%) @1.8x, remaining 15:23 RBU 100.0% UBU 50.0% 11769151488/19188656128 (61.3%) @1.8x, remaining 15:19 RBU 97.8% UBU 50.0% 11795562496/19188656128 (61.5%) @1.8x, remaining 15:16 RBU 100.0% UBU 50.0% 11822039040/19188656128 (61.6%) @1.8x, remaining 15:13 RBU 100.0% UBU 50.0% 11844321280/19188656128 (61.7%) @1.5x, remaining 15:10 RBU 100.0% UBU 50.0% 11870732288/19188656128 (61.9%) @1.8x, remaining 15:07 RBU 99.7% UBU 50.0% 11897143296/19188656128 (62.0%) @1.8x, remaining 15:04 RBU 100.0% UBU 50.0% 11924176896/19188656128 (62.1%) @1.8x, remaining 15:01 RBU 99.6% UBU 50.0% 11951407104/19188656128 (62.3%) @1.8x, remaining 14:57 RBU 98.2% UBU 50.0% 11978407936/19188656128 (62.4%) @1.8x, remaining 14:54 RBU 99.8% UBU 50.0% 12004818944/19188656128 (62.6%) @1.8x, remaining 14:51 RBU 100.0% UBU 50.0% 12031229952/19188656128 (62.7%) @1.8x, remaining 14:47 RBU 100.0% UBU 50.0% 12057640960/19188656128 (62.8%) @1.8x, remaining 14:44 RBU 100.0% UBU 50.0% 12084641792/19188656128 (63.0%) @1.8x, remaining 14:41 RBU 100.0% UBU 50.0% 12111708160/19188656128 (63.1%) @1.8x, remaining 14:37 RBU 99.2% UBU 50.0% 12138774528/19188656128 (63.3%) @1.8x, remaining 14:34 RBU 99.7% UBU 50.0% 12165316608/19188656128 (63.4%) @1.8x, remaining 14:31 RBU 99.0% UBU 50.0% 12191727616/19188656128 (63.5%) @1.8x, remaining 14:27 RBU 100.0% UBU 50.0% 12218138624/19188656128 (63.7%) @1.8x, remaining 14:24 RBU 100.0% UBU 50.0% 12244549632/19188656128 (63.8%) @1.8x, remaining 14:21 RBU 100.0% UBU 50.0% 12271091712/19188656128 (63.9%) @1.8x, remaining 14:17 RBU 100.0% UBU 50.0% 12297961472/19188656128 (64.1%) @1.8x, remaining 14:15 RBU 99.6% UBU 50.0% 12324864000/19188656128 (64.2%) @1.8x, remaining 14:11 RBU 98.8% UBU 50.0% 12351700992/19188656128 (64.4%) @1.8x, remaining 14:07 RBU 98.4% UBU 50.0% 12378537984/19188656128 (64.5%) @1.8x, remaining 14:05 RBU 97.5% UBU 50.0% 12405047296/19188656128 (64.6%) @1.8x, remaining 14:01 RBU 100.0% UBU 50.0% 12431458304/19188656128 (64.8%) @1.8x, remaining 13:58 RBU 100.0% UBU 50.0% 12457869312/19188656128 (64.9%) @1.8x, remaining 13:55 RBU 99.8% UBU 50.0% 12484280320/19188656128 (65.1%) @1.8x, remaining 13:51 RBU 100.0% UBU 50.0% 12510691328/19188656128 (65.2%) @1.8x, remaining 13:48 RBU 100.0% UBU 50.0% 12537102336/19188656128 (65.3%) @1.8x, remaining 13:45 RBU 100.0% UBU 50.0% 12563513344/19188656128 (65.5%) @1.8x, remaining 13:42 RBU 100.0% UBU 50.0% 12589924352/19188656128 (65.6%) @1.8x, remaining 13:38 RBU 100.0% UBU 50.0% 12616335360/19188656128 (65.7%) @1.8x, remaining 13:35 RBU 100.0% UBU 50.0% 12642877440/19188656128 (65.9%) @1.8x, remaining 13:32 RBU 100.0% UBU 50.0% 12669452288/19188656128 (66.0%) @1.8x, remaining 13:28 RBU 100.0% UBU 50.0% 12695961600/19188656128 (66.2%) @1.8x, remaining 13:25 RBU 99.9% UBU 50.0% 12722503680/19188656128 (66.3%) @1.8x, remaining 13:22 RBU 99.6% UBU 50.0% 12748980224/19188656128 (66.4%) @1.8x, remaining 13:19 RBU 99.6% UBU 50.0% 12775391232/19188656128 (66.6%) @1.8x, remaining 13:16 RBU 100.0% UBU 50.0% 12801867776/19188656128 (66.7%) @1.8x, remaining 13:12 RBU 99.5% UBU 50.0% 12828278784/19188656128 (66.9%) @1.8x, remaining 13:09 RBU 99.4% UBU 50.0% 12854657024/19188656128 (67.0%) @1.8x, remaining 13:06 RBU 99.6% UBU 50.0% 12881035264/19188656128 (67.1%) @1.8x, remaining 13:03 RBU 97.8% UBU 50.0% 12904824832/19188656128 (67.3%) @1.6x, remaining 13:00 RBU 100.0% UBU 50.0% 12929204224/19188656128 (67.4%) @1.6x, remaining 12:57 RBU 100.0% UBU 50.0% 12957646848/19188656128 (67.5%) @1.9x, remaining 12:53 RBU 100.0% UBU 50.0% 12985729024/19188656128 (67.7%) @1.9x, remaining 12:50 RBU 100.0% UBU 50.0% 13012959232/19188656128 (67.8%) @1.8x, remaining 12:46 RBU 99.8% UBU 50.0% 13040943104/19188656128 (68.0%) @1.9x, remaining 12:43 RBU 100.0% UBU 50.0% 13069385728/19188656128 (68.1%) @1.9x, remaining 12:39 RBU 99.9% UBU 50.0% 13096976384/19188656128 (68.3%) @1.8x, remaining 12:36 RBU 100.0% UBU 50.0% 13124239360/19188656128 (68.4%) @1.8x, remaining 12:32 RBU 100.0% UBU 50.0% 13152681984/19188656128 (68.5%) @1.9x, remaining 12:28 RBU 100.0% UBU 50.0% 13180764160/19188656128 (68.7%) @1.9x, remaining 12:25 RBU 98.0% UBU 50.0% 13207863296/19188656128 (68.8%) @1.8x, remaining 12:22 RBU 100.0% UBU 50.0% 13235978240/19188656128 (69.0%) @1.9x, remaining 12:18 RBU 100.0% UBU 50.0% 13264355328/19188656128 (69.1%) @1.9x, remaining 12:15 RBU 98.2% UBU 50.0% 13291421696/19188656128 (69.3%) @1.8x, remaining 12:11 RBU 98.7% UBU 50.0% 13319274496/19188656128 (69.4%) @1.9x, remaining 12:07 RBU 100.0% UBU 50.0% 13347717120/19188656128 (69.6%) @1.9x, remaining 12:04 RBU 98.0% UBU 50.0% 13374717952/19188656128 (69.7%) @1.8x, remaining 12:01 RBU 99.6% UBU 50.0% 13402570752/19188656128 (69.8%) @1.9x, remaining 11:57 RBU 100.0% UBU 50.0% 13430947840/19188656128 (70.0%) @1.9x, remaining 11:54 RBU 100.0% UBU 50.0% 13457817600/19188656128 (70.1%) @1.8x, remaining 11:50 RBU 99.8% UBU 50.0% 13485867008/19188656128 (70.3%) @1.9x, remaining 11:47 RBU 99.8% UBU 50.0% 13513916416/19188656128 (70.4%) @1.9x, remaining 11:43 RBU 98.0% UBU 50.0% 13540720640/19188656128 (70.6%) @1.8x, remaining 11:40 RBU 100.0% UBU 50.0% 13569163264/19188656128 (70.7%) @1.9x, remaining 11:36 RBU 99.5% UBU 50.0% 13596688384/19188656128 (70.9%) @1.8x, remaining 11:33 RBU 99.7% UBU 50.0% 13624016896/19188656128 (71.0%) @1.8x, remaining 11:29 RBU 100.0% UBU 50.0% 13652459520/19188656128 (71.1%) @1.9x, remaining 11:26 RBU 100.0% UBU 50.0% 13679198208/19188656128 (71.3%) @1.8x, remaining 11:23 RBU 100.0% UBU 50.0% 13707313152/19188656128 (71.4%) @1.9x, remaining 11:19 RBU 100.0% UBU 50.0% 13734936576/19188656128 (71.6%) @1.8x, remaining 11:15 RBU 99.2% UBU 50.0% 13762166784/19188656128 (71.7%) @1.8x, remaining 11:12 RBU 100.0% UBU 50.0% 13790543872/19188656128 (71.9%) @1.9x, remaining 11:08 RBU 100.0% UBU 50.0% 13817118720/19188656128 (72.0%) @1.8x, remaining 11:05 RBU 99.8% UBU 50.0% 13845463040/19188656128 (72.2%) @1.9x, remaining 11:02 RBU 100.0% UBU 50.0% 13872594944/19188656128 (72.3%) @1.8x, remaining 10:58 RBU 99.3% UBU 50.0% 13900316672/19188656128 (72.4%) @1.8x, remaining 10:55 RBU 100.0% UBU 50.0% 13927972864/19188656128 (72.6%) @1.8x, remaining 10:51 RBU 100.0% UBU 50.0% 13955170304/19188656128 (72.7%) @1.8x, remaining 10:48 RBU 100.0% UBU 50.0% 13979549696/19188656128 (72.9%) @1.6x, remaining 10:45 RBU 100.0% UBU 50.0% 14004355072/19188656128 (73.0%) @1.7x, remaining 10:42 RBU 99.9% UBU 50.0% 14032371712/19188656128 (73.1%) @1.9x, remaining 10:39 RBU 99.7% UBU 50.0% 14059503616/19188656128 (73.3%) @1.8x, remaining 10:35 RBU 100.0% UBU 50.0% 14087225344/19188656128 (73.4%) @1.8x, remaining 10:32 RBU 99.4% UBU 50.0% 14114553856/19188656128 (73.6%) @1.8x, remaining 10:28 RBU 99.1% UBU 50.0% 14142078976/19188656128 (73.7%) @1.8x, remaining 10:25 RBU 100.0% UBU 50.0% 14169538560/19188656128 (73.8%) @1.8x, remaining 10:22 RBU 99.4% UBU 50.0% 14196932608/19188656128 (74.0%) @1.8x, remaining 10:18 RBU 97.9% UBU 50.0% 14224457728/19188656128 (74.1%) @1.8x, remaining 10:14 RBU 100.0% UBU 50.0% 14251786240/19188656128 (74.3%) @1.8x, remaining 10:11 RBU 100.0% UBU 50.0% 14279245824/19188656128 (74.4%) @1.8x, remaining 10:08 RBU 99.8% UBU 50.0% 14306639872/19188656128 (74.6%) @1.8x, remaining 10:04 RBU 99.4% UBU 50.0% 14333935616/19188656128 (74.7%) @1.8x, remaining 10:01 RBU 100.0% UBU 50.0% 14361493504/19188656128 (74.8%) @1.8x, remaining 9:57 RBU 99.9% UBU 50.0% 14388559872/19188656128 (75.0%) @1.8x, remaining 9:54 RBU 100.0% UBU 50.0% 14416347136/19188656128 (75.1%) @1.9x, remaining 9:51 RBU 98.8% UBU 50.0% 14443216896/19188656128 (75.3%) @1.8x, remaining 9:47 RBU 99.8% UBU 50.0% 14471200768/19188656128 (75.4%) @1.9x, remaining 9:44 RBU 100.0% UBU 50.0% 14497644544/19188656128 (75.6%) @1.8x, remaining 9:41 RBU 100.0% UBU 50.0% 14526054400/19188656128 (75.7%) @1.9x, remaining 9:37 RBU 97.5% UBU 50.0% 14552465408/19188656128 (75.8%) @1.8x, remaining 9:34 RBU 100.0% UBU 50.0% 14580383744/19188656128 (76.0%) @1.9x, remaining 9:30 RBU 100.0% UBU 50.0% 14607319040/19188656128 (76.1%) @1.8x, remaining 9:27 RBU 100.0% UBU 50.0% 14634582016/19188656128 (76.3%) @1.8x, remaining 9:23 RBU 99.2% UBU 50.0% 14662172672/19188656128 (76.4%) @1.8x, remaining 9:20 RBU 100.0% UBU 50.0% 14688649216/19188656128 (76.5%) @1.8x, remaining 9:17 RBU 100.0% UBU 50.0% 14716960768/19188656128 (76.7%) @1.9x, remaining 9:13 RBU 99.7% UBU 50.0% 14743437312/19188656128 (76.8%) @1.8x, remaining 9:10 RBU 100.0% UBU 50.0% 14770896896/19188656128 (77.0%) @1.8x, remaining 9:07 RBU 100.0% UBU 50.0% 14798290944/19188656128 (77.1%) @1.8x, remaining 9:03 RBU 100.0% UBU 50.0% 14824800256/19188656128 (77.3%) @1.8x, remaining 9:00 RBU 100.0% UBU 50.0% 14852915200/19188656128 (77.4%) @1.9x, remaining 8:56 RBU 97.7% UBU 50.0% 14879555584/19188656128 (77.5%) @1.8x, remaining 8:53 RBU 100.0% UBU 50.0% 14906654720/19188656128 (77.7%) @1.8x, remaining 8:50 RBU 100.0% UBU 50.0% 14934409216/19188656128 (77.8%) @1.9x, remaining 8:46 RBU 100.0% UBU 50.0% 14960820224/19188656128 (78.0%) @1.8x, remaining 8:43 RBU 100.0% UBU 50.0% 14988345344/19188656128 (78.1%) @1.8x, remaining 8:40 RBU 99.2% UBU 50.0% 15015673856/19188656128 (78.3%) @1.8x, remaining 8:36 RBU 100.0% UBU 50.0% 15042084864/19188656128 (78.4%) @1.8x, remaining 8:33 RBU 100.0% UBU 50.0% 15064432640/19188656128 (78.5%) @1.5x, remaining 8:30 RBU 98.9% UBU 50.0% 15090843648/19188656128 (78.6%) @1.8x, remaining 8:27 RBU 99.0% UBU 50.0% 15118106624/19188656128 (78.8%) @1.8x, remaining 8:24 RBU 97.1% UBU 50.0% 15145697280/19188656128 (78.9%) @1.8x, remaining 8:20 RBU 100.0% UBU 50.0% 15172108288/19188656128 (79.1%) @1.8x, remaining 8:17 RBU 100.0% UBU 50.0% 15199371264/19188656128 (79.2%) @1.8x, remaining 8:14 RBU 99.2% UBU 50.0% 15226961920/19188656128 (79.4%) @1.8x, remaining 8:10 RBU 97.8% UBU 50.0% 15253372928/19188656128 (79.5%) @1.8x, remaining 8:07 RBU 100.0% UBU 50.0% 15280373760/19188656128 (79.6%) @1.8x, remaining 8:04 RBU 99.6% UBU 50.0% 15308161024/19188656128 (79.8%) @1.9x, remaining 8:00 RBU 98.4% UBU 50.0% 15334637568/19188656128 (79.9%) @1.8x, remaining 7:57 RBU 100.0% UBU 50.0% 15361179648/19188656128 (80.1%) @1.8x, remaining 7:54 RBU 100.0% UBU 50.0% 15388901376/19188656128 (80.2%) @1.8x, remaining 7:50 RBU 98.6% UBU 50.0% 15415902208/19188656128 (80.3%) @1.8x, remaining 7:47 RBU 99.8% UBU 50.0% 15442313216/19188656128 (80.5%) @1.8x, remaining 7:44 RBU 100.0% UBU 50.0% 15469510656/19188656128 (80.6%) @1.8x, remaining 7:40 RBU 99.2% UBU 50.0% 15497166848/19188656128 (80.8%) @1.8x, remaining 7:37 RBU 99.9% UBU 50.0% 15523577856/19188656128 (80.9%) @1.8x, remaining 7:34 RBU 100.0% UBU 50.0% 15549988864/19188656128 (81.0%) @1.8x, remaining 7:30 RBU 100.0% UBU 50.0% 15577513984/19188656128 (81.2%) @1.8x, remaining 7:27 RBU 100.0% UBU 50.0% 15604842496/19188656128 (81.3%) @1.8x, remaining 7:23 RBU 98.9% UBU 50.0% 15631253504/19188656128 (81.5%) @1.8x, remaining 7:20 RBU 100.0% UBU 50.0% 15657664512/19188656128 (81.6%) @1.8x, remaining 7:17 RBU 100.0% UBU 50.0% 15685124096/19188656128 (81.7%) @1.8x, remaining 7:14 RBU 99.2% UBU 50.0% 15712518144/19188656128 (81.9%) @1.8x, remaining 7:10 RBU 99.2% UBU 50.0% 15738929152/19188656128 (82.0%) @1.8x, remaining 7:07 RBU 99.1% UBU 50.0% 15765340160/19188656128 (82.2%) @1.8x, remaining 7:04 RBU 100.0% UBU 50.0% 15792406528/19188656128 (82.3%) @1.8x, remaining 7:00 RBU 99.5% UBU 50.0% 15819833344/19188656128 (82.4%) @1.8x, remaining 6:57 RBU 100.0% UBU 50.0% 15846604800/19188656128 (82.6%) @1.8x, remaining 6:53 RBU 100.0% UBU 50.0% 15873015808/19188656128 (82.7%) @1.8x, remaining 6:50 RBU 100.0% UBU 50.0% 15899426816/19188656128 (82.9%) @1.8x, remaining 6:47 RBU 100.0% UBU 50.0% 15926689792/19188656128 (83.0%) @1.8x, remaining 6:44 RBU 99.2% UBU 50.0% 15953952768/19188656128 (83.1%) @1.8x, remaining 6:40 RBU 99.2% UBU 50.0% 15980691456/19188656128 (83.3%) @1.8x, remaining 6:37 RBU 100.0% UBU 50.0% 16007102464/19188656128 (83.4%) @1.8x, remaining 6:34 RBU 99.3% UBU 50.0% 16033513472/19188656128 (83.6%) @1.8x, remaining 6:30 RBU 100.0% UBU 50.0% 16060383232/19188656128 (83.7%) @1.8x, remaining 6:27 RBU 99.8% UBU 50.0% 16087580672/19188656128 (83.8%) @1.8x, remaining 6:24 RBU 98.9% UBU 50.0% 16114745344/19188656128 (84.0%) @1.8x, remaining 6:20 RBU 97.9% UBU 50.0% 16135094272/19188656128 (84.1%) @1.4x, remaining 6:18 RBU 100.0% UBU 50.0% 16161505280/19188656128 (84.2%) @1.8x, remaining 6:15 RBU 100.0% UBU 50.0% 16188506112/19188656128 (84.4%) @1.8x, remaining 6:11 RBU 99.5% UBU 50.0% 16215638016/19188656128 (84.5%) @1.8x, remaining 6:08 RBU 99.3% UBU 50.0% 16242704384/19188656128 (84.6%) @1.8x, remaining 6:05 RBU 98.0% UBU 50.0% 16269180928/19188656128 (84.8%) @1.8x, remaining 6:01 RBU 100.0% UBU 50.0% 16295591936/19188656128 (84.9%) @1.8x, remaining 5:58 RBU 100.0% UBU 50.0% 16322002944/19188656128 (85.1%) @1.8x, remaining 5:55 RBU 100.0% UBU 50.0% 16348413952/19188656128 (85.2%) @1.8x, remaining 5:51 RBU 100.0% UBU 50.0% 16375021568/19188656128 (85.3%) @1.8x, remaining 5:48 RBU 100.0% UBU 50.0% 16402087936/19188656128 (85.5%) @1.8x, remaining 5:45 RBU 100.0% UBU 50.0% 16429023232/19188656128 (85.6%) @1.8x, remaining 5:41 RBU 98.3% UBU 50.0% 16455991296/19188656128 (85.8%) @1.8x, remaining 5:38 RBU 99.8% UBU 50.0% 16482500608/19188656128 (85.9%) @1.8x, remaining 5:35 RBU 99.9% UBU 50.0% 16508911616/19188656128 (86.0%) @1.8x, remaining 5:32 RBU 98.8% UBU 50.0% 16535322624/19188656128 (86.2%) @1.8x, remaining 5:28 RBU 99.1% UBU 50.0% 16561733632/19188656128 (86.3%) @1.8x, remaining 5:25 RBU 100.0% UBU 50.0% 16588144640/19188656128 (86.4%) @1.8x, remaining 5:22 RBU 100.0% UBU 50.0% 16614555648/19188656128 (86.6%) @1.8x, remaining 5:19 RBU 100.0% UBU 50.0% 16641196032/19188656128 (86.7%) @1.8x, remaining 5:15 RBU 100.0% UBU 50.0% 16667967488/19188656128 (86.9%) @1.8x, remaining 5:12 RBU 99.5% UBU 50.0% 16694640640/19188656128 (87.0%) @1.8x, remaining 5:09 RBU 99.2% UBU 50.0% 16721313792/19188656128 (87.1%) @1.8x, remaining 5:05 RBU 99.7% UBU 50.0% 16747986944/19188656128 (87.3%) @1.8x, remaining 5:02 RBU 99.2% UBU 50.0% 16774660096/19188656128 (87.4%) @1.8x, remaining 4:59 RBU 99.5% UBU 50.0% 16801333248/19188656128 (87.6%) @1.8x, remaining 4:55 RBU 97.7% UBU 50.0% 16827875328/19188656128 (87.7%) @1.8x, remaining 4:52 RBU 98.3% UBU 50.0% 16854286336/19188656128 (87.8%) @1.8x, remaining 4:49 RBU 100.0% UBU 50.0% 16880697344/19188656128 (88.0%) @1.8x, remaining 4:46 RBU 100.0% UBU 50.0% 16907108352/19188656128 (88.1%) @1.8x, remaining 4:42 RBU 97.5% UBU 50.0% 16933519360/19188656128 (88.2%) @1.8x, remaining 4:39 RBU 97.4% UBU 50.0% 16959930368/19188656128 (88.4%) @1.8x, remaining 4:36 RBU 100.0% UBU 50.0% 16986341376/19188656128 (88.5%) @1.8x, remaining 4:33 RBU 97.4% UBU 50.0% 17012752384/19188656128 (88.7%) @1.8x, remaining 4:29 RBU 100.0% UBU 50.0% 17039163392/19188656128 (88.8%) @1.8x, remaining 4:26 RBU 100.0% UBU 50.0% 17065574400/19188656128 (88.9%) @1.8x, remaining 4:23 RBU 100.0% UBU 50.0% 17091985408/19188656128 (89.1%) @1.8x, remaining 4:19 RBU 100.0% UBU 50.0% 17118396416/19188656128 (89.2%) @1.8x, remaining 4:16 RBU 99.6% UBU 50.0% 17144807424/19188656128 (89.3%) @1.8x, remaining 4:13 RBU 100.0% UBU 50.0% 17171218432/19188656128 (89.5%) @1.8x, remaining 4:10 RBU 98.0% UBU 50.0% 17197629440/19188656128 (89.6%) @1.8x, remaining 4:06 RBU 97.4% UBU 50.0% 17217945600/19188656128 (89.7%) @1.4x, remaining 4:04 RBU 100.0% UBU 50.0% 17244356608/19188656128 (89.9%) @1.8x, remaining 4:01 RBU 100.0% UBU 50.0% 17270767616/19188656128 (90.0%) @1.8x, remaining 3:57 RBU 100.0% UBU 50.0% 17297178624/19188656128 (90.1%) @1.8x, remaining 3:54 RBU 98.4% UBU 50.0% 17323589632/19188656128 (90.3%) @1.8x, remaining 3:51 RBU 100.0% UBU 50.0% 17350000640/19188656128 (90.4%) @1.8x, remaining 3:48 RBU 100.0% UBU 50.0% 17376411648/19188656128 (90.6%) @1.8x, remaining 3:44 RBU 100.0% UBU 50.0% 17402822656/19188656128 (90.7%) @1.8x, remaining 3:41 RBU 100.0% UBU 50.0% 17429233664/19188656128 (90.8%) @1.8x, remaining 3:38 RBU 100.0% UBU 50.0% 17455644672/19188656128 (91.0%) @1.8x, remaining 3:35 RBU 100.0% UBU 50.0% 17482055680/19188656128 (91.1%) @1.8x, remaining 3:31 RBU 97.4% UBU 50.0% 17508237312/19188656128 (91.2%) @1.7x, remaining 3:28 RBU 99.4% UBU 50.0% 17534353408/19188656128 (91.4%) @1.7x, remaining 3:25 RBU 98.9% UBU 50.0% 17561026560/19188656128 (91.5%) @1.8x, remaining 3:21 RBU 99.4% UBU 50.0% 17587699712/19188656128 (91.7%) @1.8x, remaining 3:18 RBU 99.7% UBU 50.0% 17614503936/19188656128 (91.8%) @1.8x, remaining 3:15 RBU 99.8% UBU 50.0% 17642553344/19188656128 (91.9%) @1.9x, remaining 3:11 RBU 100.0% UBU 50.0% 17670995968/19188656128 (92.1%) @1.9x, remaining 3:08 RBU 98.0% UBU 50.0% 17698652160/19188656128 (92.2%) @1.8x, remaining 3:04 RBU 100.0% UBU 50.0% 17726046208/19188656128 (92.4%) @1.8x, remaining 3:01 RBU 100.0% UBU 50.0% 17754292224/19188656128 (92.5%) @1.9x, remaining 2:57 RBU 100.0% UBU 50.0% 17782734848/19188656128 (92.7%) @1.9x, remaining 2:54 RBU 100.0% UBU 50.0% 17810456576/19188656128 (92.8%) @1.8x, remaining 2:50 RBU 99.8% UBU 50.0% 17837785088/19188656128 (93.0%) @1.8x, remaining 2:47 RBU 100.0% UBU 50.0% 17866031104/19188656128 (93.1%) @1.9x, remaining 2:44 RBU 100.0% UBU 50.0% 17894473728/19188656128 (93.3%) @1.9x, remaining 2:40 RBU 100.0% UBU 50.0% 17921998848/19188656128 (93.4%) @1.8x, remaining 2:37 RBU 98.8% UBU 50.0% 17949327360/19188656128 (93.5%) @1.8x, remaining 2:33 RBU 100.0% UBU 50.0% 17977769984/19188656128 (93.7%) @1.9x, remaining 2:30 RBU 100.0% UBU 50.0% 18006016000/19188656128 (93.8%) @1.9x, remaining 2:26 RBU 98.6% UBU 50.0% 18033147904/19188656128 (94.0%) @1.8x, remaining 2:23 RBU 98.0% UBU 50.0% 18061066240/19188656128 (94.1%) @1.9x, remaining 2:19 RBU 100.0% UBU 50.0% 18089508864/19188656128 (94.3%) @1.9x, remaining 2:16 RBU 100.0% UBU 50.0% 18117033984/19188656128 (94.4%) @1.8x, remaining 2:12 RBU 98.8% UBU 50.0% 18144362496/19188656128 (94.6%) @1.8x, remaining 2:09 RBU 100.0% UBU 50.0% 18172805120/19188656128 (94.7%) @1.9x, remaining 2:05 RBU 97.9% UBU 50.0% 18200723456/19188656128 (94.9%) @1.9x, remaining 2:02 RBU 98.5% UBU 50.0% 18227757056/19188656128 (95.0%) @1.8x, remaining 1:59 RBU 100.0% UBU 50.0% 18256101376/19188656128 (95.1%) @1.9x, remaining 1:55 RBU 99.8% UBU 50.0% 18278449152/19188656128 (95.3%) @1.5x, remaining 1:52 RBU 100.0% UBU 50.0% 18305712128/19188656128 (95.4%) @1.8x, remaining 1:49 RBU 99.1% UBU 50.0% 18333302784/19188656128 (95.5%) @1.8x, remaining 1:46 RBU 100.0% UBU 50.0% 18361745408/19188656128 (95.7%) @1.9x, remaining 1:42 RBU 100.0% UBU 50.0% 18388975616/19188656128 (95.8%) @1.8x, remaining 1:39 RBU 99.3% UBU 50.0% 18416599040/19188656128 (96.0%) @1.8x, remaining 1:35 RBU 100.0% UBU 50.0% 18445041664/19188656128 (96.1%) @1.9x, remaining 1:32 RBU 99.1% UBU 50.0% 18472108032/19188656128 (96.3%) @1.8x, remaining 1:28 RBU 99.4% UBU 50.0% 18499895296/19188656128 (96.4%) @1.9x, remaining 1:25 RBU 99.8% UBU 50.0% 18528174080/19188656128 (96.6%) @1.9x, remaining 1:21 RBU 99.9% UBU 50.0% 18555011072/19188656128 (96.7%) @1.8x, remaining 1:18 RBU 100.0% UBU 50.0% 18583191552/19188656128 (96.8%) @1.9x, remaining 1:15 RBU 100.0% UBU 50.0% 18610978816/19188656128 (97.0%) @1.9x, remaining 1:11 RBU 98.3% UBU 50.0% 18638045184/19188656128 (97.1%) @1.8x, remaining 1:08 RBU 100.0% UBU 50.0% 18666487808/19188656128 (97.3%) @1.9x, remaining 1:04 RBU 100.0% UBU 50.0% 18693652480/19188656128 (97.4%) @1.8x, remaining 1:01 RBU 99.4% UBU 50.0% 18721341440/19188656128 (97.6%) @1.8x, remaining 0:57 RBU 97.4% UBU 50.0% 18749489152/19188656128 (97.7%) @1.9x, remaining 0:54 RBU 97.8% UBU 50.0% 18776195072/19188656128 (97.9%) @1.8x, remaining 0:51 RBU 100.0% UBU 50.0% 18804637696/19188656128 (98.0%) @1.9x, remaining 0:47 RBU 100.0% UBU 50.0% 18831835136/19188656128 (98.1%) @1.8x, remaining 0:44 RBU 99.3% UBU 50.0% 18859491328/19188656128 (98.3%) @1.8x, remaining 0:40 RBU 100.0% UBU 50.0% 18887409664/19188656128 (98.4%) @1.9x, remaining 0:37 RBU 99.5% UBU 50.0% 18914344960/19188656128 (98.6%) @1.8x, remaining 0:33 RBU 100.0% UBU 50.0% 18942787584/19188656128 (98.7%) @1.9x, remaining 0:30 RBU 98.6% UBU 50.0% 18969493504/19188656128 (98.9%) @1.8x, remaining 0:27 RBU 100.0% UBU 50.0% 18997641216/19188656128 (99.0%) @1.9x, remaining 0:23 RBU 100.0% UBU 50.0% 19024838656/19188656128 (99.1%) @1.8x, remaining 0:20 RBU 100.0% UBU 50.0% 19052494848/19188656128 (99.3%) @1.8x, remaining 0:16 RBU 100.0% UBU 50.0% 19080314880/19188656128 (99.4%) @1.9x, remaining 0:13 RBU 100.0% UBU 50.0% 19107348480/19188656128 (99.6%) @1.8x, remaining 0:10 RBU 100.0% UBU 50.0% growisofs command: ----------------------- /usr/bin/growisofs -Z /dev/sr0=/dev/fd/0 -use-the-force-luke=notray -use-the-force-luke=tty -use-the-force-luke=4gms -use-the-force-luke=tracksize:9369461 -speed=4 -use-the-force-luke=bufsize:35m mkisofs ----------------------- 9369461 I: -input-charset not specified, using utf-8 (detected in locale settings) This size can only be represented in the UDF filesystem. Make sure that your clients support and use it. ISO9660, Joliet, RockRidge, HFS will display incorrect size. 0.01% done, estimate finish Fri Feb 24 18:27:12 2012 === last message repeated 2 times. === 0.02% done, estimate finish Fri Feb 24 18:27:12 2012 0.02% done, estimate finish Fri Feb 24 19:44:48 2012 0.03% done, estimate finish Fri Feb 24 19:29:27 2012 0.03% done, estimate finish Fri Feb 24 19:19:10 2012 0.04% done, estimate finish Fri Feb 24 19:11:48 2012 0.04% done, estimate finish Fri Feb 24 19:06:07 2012 0.05% done, estimate finish Fri Feb 24 19:01:50 2012 0.05% done, estimate finish Fri Feb 24 18:58:24 2012 0.06% done, estimate finish Fri Feb 24 18:55:35 2012 0.06% done, estimate finish Fri Feb 24 18:53:10 2012 0.07% done, estimate finish Fri Feb 24 18:51:11 2012 0.07% done, estimate finish Fri Feb 24 18:49:29 2012 0.08% done, estimate finish Fri Feb 24 18:48:01 2012 0.09% done, estimate finish Fri Feb 24 18:46:41 2012 0.09% done, estimate finish Fri Feb 24 18:45:33 2012 0.10% done, estimate finish Fri Feb 24 18:44:32 2012 0.10% done, estimate finish Fri Feb 24 18:43:38 2012 0.11% done, estimate finish Fri Feb 24 18:42:47 2012 0.11% done, estimate finish Fri Feb 24 18:42:03 2012 0.12% done, estimate finish Fri Feb 24 18:41:23 2012 0.12% done, estimate finish Fri Feb 24 18:40:46 2012 0.13% done, estimate finish Fri Feb 24 18:40:12 2012 0.13% done, estimate finish Fri Feb 24 18:39:41 2012 0.14% done, estimate finish Fri Feb 24 18:39:12 2012 0.14% done, estimate finish Fri Feb 24 18:38:46 2012 0.15% done, estimate finish Fri Feb 24 18:38:20 2012 0.15% done, estimate finish Fri Feb 24 18:37:57 2012 0.16% done, estimate finish Fri Feb 24 18:37:36 2012 0.17% done, estimate finish Fri Feb 24 18:37:16 2012 0.17% done, estimate finish Fri Feb 24 18:36:57 2012 0.18% done, estimate finish Fri Feb 24 18:36:39 2012 0.18% done, estimate finish Fri Feb 24 18:36:23 2012 0.19% done, estimate finish Fri Feb 24 18:36:07 2012 0.19% done, estimate finish Fri Feb 24 18:35:52 2012 0.20% done, estimate finish Fri Feb 24 18:35:38 2012 0.20% done, estimate finish Fri Feb 24 18:35:25 2012 0.21% done, estimate finish Fri Feb 24 18:43:12 2012 0.21% done, estimate finish Fri Feb 24 18:42:48 2012 0.22% done, estimate finish Fri Feb 24 18:42:25 2012 0.22% done, estimate finish Fri Feb 24 18:42:04 2012 0.23% done, estimate finish Fri Feb 24 18:41:43 2012 0.23% done, estimate finish Fri Feb 24 18:41:23 2012 0.24% done, estimate finish Fri Feb 24 18:41:04 2012 0.25% done, estimate finish Fri Feb 24 18:40:46 2012 0.25% done, estimate finish Fri Feb 24 18:40:29 2012 0.26% done, estimate finish Fri Feb 24 18:40:12 2012 0.26% done, estimate finish Fri Feb 24 18:39:56 2012 0.27% done, estimate finish Fri Feb 24 18:39:41 2012 0.27% done, estimate finish Fri Feb 24 18:39:26 2012 0.28% done, estimate finish Fri Feb 24 18:39:12 2012 0.28% done, estimate finish Fri Feb 24 18:38:58 2012 0.29% done, estimate finish Fri Feb 24 18:38:45 2012 0.29% done, estimate finish Fri Feb 24 18:38:33 2012 0.30% done, estimate finish Fri Feb 24 18:38:20 2012 0.30% done, estimate finish Fri Feb 24 18:38:09 2012 0.31% done, estimate finish Fri Feb 24 18:37:58 2012 0.31% done, estimate finish Fri Feb 24 18:37:47 2012 0.32% done, estimate finish Fri Feb 24 18:37:36 2012 0.33% done, estimate finish Fri Feb 24 18:37:26 2012 0.33% done, estimate finish Fri Feb 24 18:37:16 2012 0.34% done, estimate finish Fri Feb 24 18:37:06 2012 0.34% done, estimate finish Fri Feb 24 18:36:57 2012 0.35% done, estimate finish Fri Feb 24 18:36:48 2012 0.35% done, estimate finish Fri Feb 24 19:57:05 2012 0.36% done, estimate finish Fri Feb 24 19:55:46 2012 0.36% done, estimate finish Fri Feb 24 19:59:01 2012 0.37% done, estimate finish Fri Feb 24 19:57:42 2012 0.37% done, estimate finish Fri Feb 24 19:56:25 2012 0.38% done, estimate finish Fri Feb 24 19:55:10 2012 0.38% done, estimate finish Fri Feb 24 19:53:55 2012 0.39% done, estimate finish Fri Feb 24 19:52:44 2012 0.39% done, estimate finish Fri Feb 24 19:55:49 2012 0.40% done, estimate finish Fri Feb 24 19:54:38 2012 0.41% done, estimate finish Fri Feb 24 19:53:28 2012 0.41% done, estimate finish Fri Feb 24 19:52:21 2012 0.42% done, estimate finish Fri Feb 24 19:55:16 2012 0.42% done, estimate finish Fri Feb 24 19:54:10 2012 0.43% done, estimate finish Fri Feb 24 19:53:03 2012 0.43% done, estimate finish Fri Feb 24 19:52:00 2012 0.44% done, estimate finish Fri Feb 24 19:50:59 2012 0.44% done, estimate finish Fri Feb 24 19:49:58 2012 0.45% done, estimate finish Fri Feb 24 19:48:58 2012 0.45% done, estimate finish Fri Feb 24 19:48:01 2012 0.46% done, estimate finish Fri Feb 24 19:50:43 2012 0.46% done, estimate finish Fri Feb 24 19:49:45 2012 0.47% done, estimate finish Fri Feb 24 19:48:48 2012 0.48% done, estimate finish Fri Feb 24 19:47:53 2012 0.48% done, estimate finish Fri Feb 24 19:47:00 2012 0.49% done, estimate finish Fri Feb 24 19:46:08 2012 0.49% done, estimate finish Fri Feb 24 19:45:15 2012 0.50% done, estimate finish Fri Feb 24 19:44:25 2012 0.50% done, estimate finish Fri Feb 24 19:46:55 2012 0.51% done, estimate finish Fri Feb 24 19:46:06 2012 0.51% done, estimate finish Fri Feb 24 19:45:15 2012 0.52% done, estimate finish Fri Feb 24 19:44:27 2012 0.52% done, estimate finish Fri Feb 24 19:43:40 2012 0.53% done, estimate finish Fri Feb 24 19:42:54 2012 0.53% done, estimate finish Fri Feb 24 19:42:08 2012 0.54% done, estimate finish Fri Feb 24 19:41:24 2012 0.54% done, estimate finish Fri Feb 24 19:43:44 2012 0.55% done, estimate finish Fri Feb 24 19:43:00 2012 0.56% done, estimate finish Fri Feb 24 19:42:15 2012 0.56% done, estimate finish Fri Feb 24 19:41:32 2012 0.57% done, estimate finish Fri Feb 24 19:40:51 2012 0.57% done, estimate finish Fri Feb 24 19:40:10 2012 0.58% done, estimate finish Fri Feb 24 19:39:28 2012 0.58% done, estimate finish Fri Feb 24 19:38:49 2012 0.59% done, estimate finish Fri Feb 24 19:41:00 2012 0.59% done, estimate finish Fri Feb 24 19:40:21 2012 0.60% done, estimate finish Fri Feb 24 19:39:41 2012 0.60% done, estimate finish Fri Feb 24 19:39:02 2012 0.61% done, estimate finish Fri Feb 24 19:38:25 2012 0.61% done, estimate finish Fri Feb 24 19:37:48 2012 0.62% done, estimate finish Fri Feb 24 19:37:11 2012 0.62% done, estimate finish Fri Feb 24 19:36:35 2012 0.63% done, estimate finish Fri Feb 24 19:38:39 2012 0.64% done, estimate finish Fri Feb 24 19:38:03 2012 0.64% done, estimate finish Fri Feb 24 19:37:27 2012 0.65% done, estimate finish Fri Feb 24 19:36:52 2012 0.65% done, estimate finish Fri Feb 24 19:36:18 2012 0.66% done, estimate finish Fri Feb 24 19:35:45 2012 0.66% done, estimate finish Fri Feb 24 19:37:42 2012 0.67% done, estimate finish Fri Feb 24 19:37:08 2012 0.67% done, estimate finish Fri Feb 24 19:36:35 2012 0.68% done, estimate finish Fri Feb 24 19:36:03 2012 0.68% done, estimate finish Fri Feb 24 19:35:30 2012 0.69% done, estimate finish Fri Feb 24 19:34:58 2012 0.69% done, estimate finish Fri Feb 24 19:34:27 2012 0.70% done, estimate finish Fri Feb 24 19:33:57 2012 0.70% done, estimate finish Fri Feb 24 19:33:26 2012 0.71% done, estimate finish Fri Feb 24 19:32:56 2012 0.72% done, estimate finish Fri Feb 24 19:34:47 2012 0.72% done, estimate finish Fri Feb 24 19:34:17 2012 0.73% done, estimate finish Fri Feb 24 19:33:47 2012 0.73% done, estimate finish Fri Feb 24 19:33:18 2012 0.74% done, estimate finish Fri Feb 24 19:32:49 2012 0.74% done, estimate finish Fri Feb 24 19:32:21 2012 0.75% done, estimate finish Fri Feb 24 19:31:52 2012 0.75% done, estimate finish Fri Feb 24 19:31:25 2012 0.76% done, estimate finish Fri Feb 24 19:33:10 2012 0.76% done, estimate finish Fri Feb 24 19:32:43 2012 0.77% done, estimate finish Fri Feb 24 19:32:15 2012 0.77% done, estimate finish Fri Feb 24 19:31:48 2012 0.78% done, estimate finish Fri Feb 24 19:31:22 2012 0.78% done, estimate finish Fri Feb 24 19:30:56 2012 0.79% done, estimate finish Fri Feb 24 19:30:29 2012 0.80% done, estimate finish Fri Feb 24 19:32:10 2012 0.80% done, estimate finish Fri Feb 24 19:31:44 2012 0.81% done, estimate finish Fri Feb 24 19:31:19 2012 0.81% done, estimate finish Fri Feb 24 19:30:53 2012 0.82% done, estimate finish Fri Feb 24 19:30:28 2012 0.82% done, estimate finish Fri Feb 24 19:30:03 2012 0.83% done, estimate finish Fri Feb 24 19:29:39 2012 0.83% done, estimate finish Fri Feb 24 19:29:15 2012 0.84% done, estimate finish Fri Feb 24 19:30:51 2012 0.84% done, estimate finish Fri Feb 24 19:30:27 2012 0.85% done, estimate finish Fri Feb 24 19:30:03 2012 0.85% done, estimate finish Fri Feb 24 19:29:39 2012 0.86% done, estimate finish Fri Feb 24 19:29:16 2012 0.86% done, estimate finish Fri Feb 24 19:28:53 2012 0.87% done, estimate finish Fri Feb 24 19:28:30 2012 0.88% done, estimate finish Fri Feb 24 19:28:07 2012 0.88% done, estimate finish Fri Feb 24 19:29:39 2012 0.89% done, estimate finish Fri Feb 24 19:29:17 2012 0.89% done, estimate finish Fri Feb 24 19:28:54 2012 0.90% done, estimate finish Fri Feb 24 19:28:32 2012 0.90% done, estimate finish Fri Feb 24 19:28:10 2012 0.91% done, estimate finish Fri Feb 24 19:27:49 2012 0.91% done, estimate finish Fri Feb 24 19:27:28 2012 0.92% done, estimate finish Fri Feb 24 19:27:06 2012 0.92% done, estimate finish Fri Feb 24 19:28:34 2012 0.93% done, estimate finish Fri Feb 24 19:28:13 2012 0.93% done, estimate finish Fri Feb 24 19:27:52 2012 0.94% done, estimate finish Fri Feb 24 19:27:31 2012 0.94% done, estimate finish Fri Feb 24 19:27:11 2012 0.95% done, estimate finish Fri Feb 24 19:26:51 2012 0.96% done, estimate finish Fri Feb 24 19:26:31 2012 0.96% done, estimate finish Fri Feb 24 19:26:11 2012 0.97% done, estimate finish Fri Feb 24 19:27:35 2012 0.97% done, estimate finish Fri Feb 24 19:27:15 2012 0.98% done, estimate finish Fri Feb 24 19:26:55 2012 0.98% done, estimate finish Fri Feb 24 19:26:36 2012 0.99% done, estimate finish Fri Feb 24 19:26:16 2012 0.99% done, estimate finish Fri Feb 24 19:25:57 2012 1.00% done, estimate finish Fri Feb 24 19:25:39 2012 1.00% done, estimate finish Fri Feb 24 19:25:20 2012 1.01% done, estimate finish Fri Feb 24 19:26:41 2012 1.01% done, estimate finish Fri Feb 24 19:26:22 2012 1.02% done, estimate finish Fri Feb 24 19:26:03 2012 1.02% done, estimate finish Fri Feb 24 19:25:45 2012 1.03% done, estimate finish Fri Feb 24 19:25:27 2012 1.04% done, estimate finish Fri Feb 24 19:25:09 2012 1.04% done, estimate finish Fri Feb 24 19:24:51 2012 1.05% done, estimate finish Fri Feb 24 19:24:33 2012 1.05% done, estimate finish Fri Feb 24 19:25:51 2012 1.06% done, estimate finish Fri Feb 24 19:25:33 2012 1.06% done, estimate finish Fri Feb 24 19:25:16 2012 1.07% done, estimate finish Fri Feb 24 19:24:58 2012 1.07% done, estimate finish Fri Feb 24 19:24:41 2012 1.08% done, estimate finish Fri Feb 24 19:24:24 2012 1.08% done, estimate finish Fri Feb 24 19:24:07 2012 1.09% done, estimate finish Fri Feb 24 19:23:50 2012 1.09% done, estimate finish Fri Feb 24 19:25:05 2012 1.10% done, estimate finish Fri Feb 24 19:24:48 2012 1.10% done, estimate finish Fri Feb 24 19:24:31 2012 1.11% done, estimate finish Fri Feb 24 19:24:15 2012 1.12% done, estimate finish Fri Feb 24 19:23:58 2012 1.12% done, estimate finish Fri Feb 24 19:23:42 2012 1.13% done, estimate finish Fri Feb 24 19:23:26 2012 1.13% done, estimate finish Fri Feb 24 19:23:10 2012 1.14% done, estimate finish Fri Feb 24 19:24:22 2012 1.14% done, estimate finish Fri Feb 24 19:24:06 2012 1.15% done, estimate finish Fri Feb 24 19:23:51 2012 1.15% done, estimate finish Fri Feb 24 19:23:35 2012 1.16% done, estimate finish Fri Feb 24 19:23:19 2012 1.16% done, estimate finish Fri Feb 24 19:23:04 2012 1.17% done, estimate finish Fri Feb 24 19:22:49 2012 1.17% done, estimate finish Fri Feb 24 19:22:33 2012 1.18% done, estimate finish Fri Feb 24 19:23:43 2012 1.18% done, estimate finish Fri Feb 24 19:23:28 2012 1.19% done, estimate finish Fri Feb 24 19:23:13 2012 1.20% done, estimate finish Fri Feb 24 19:22:57 2012 1.20% done, estimate finish Fri Feb 24 19:22:43 2012 1.21% done, estimate finish Fri Feb 24 19:22:28 2012 1.21% done, estimate finish Fri Feb 24 19:22:14 2012 1.22% done, estimate finish Fri Feb 24 19:21:59 2012 1.22% done, estimate finish Fri Feb 24 19:23:06 2012 1.23% done, estimate finish Fri Feb 24 19:22:52 2012 1.23% done, estimate finish Fri Feb 24 19:22:37 2012 1.24% done, estimate finish Fri Feb 24 19:22:23 2012 1.24% done, estimate finish Fri Feb 24 19:22:09 2012 1.25% done, estimate finish Fri Feb 24 19:21:55 2012 1.25% done, estimate finish Fri Feb 24 19:21:41 2012 1.26% done, estimate finish Fri Feb 24 19:21:27 2012 1.26% done, estimate finish Fri Feb 24 19:22:32 2012 1.27% done, estimate finish Fri Feb 24 19:22:18 2012 1.28% done, estimate finish Fri Feb 24 19:22:05 2012 1.28% done, estimate finish Fri Feb 24 19:21:50 2012 1.29% done, estimate finish Fri Feb 24 19:21:37 2012 1.29% done, estimate finish Fri Feb 24 19:21:24 2012 1.30% done, estimate finish Fri Feb 24 19:21:10 2012 1.30% done, estimate finish Fri Feb 24 19:20:57 2012 1.31% done, estimate finish Fri Feb 24 19:22:00 2012 1.31% done, estimate finish Fri Feb 24 19:21:47 2012 1.32% done, estimate finish Fri Feb 24 19:21:34 2012 1.32% done, estimate finish Fri Feb 24 19:21:20 2012 1.33% done, estimate finish Fri Feb 24 19:21:07 2012 1.33% done, estimate finish Fri Feb 24 19:20:54 2012 1.34% done, estimate finish Fri Feb 24 19:20:42 2012 1.34% done, estimate finish Fri Feb 24 19:20:29 2012 1.35% done, estimate finish Fri Feb 24 19:21:30 2012 1.36% done, estimate finish Fri Feb 24 19:21:18 2012 1.36% done, estimate finish Fri Feb 24 19:21:05 2012 1.37% done, estimate finish Fri Feb 24 19:20:52 2012 1.37% done, estimate finish Fri Feb 24 19:20:40 2012 1.38% done, estimate finish Fri Feb 24 19:20:27 2012 1.38% done, estimate finish Fri Feb 24 19:20:15 2012 1.39% done, estimate finish Fri Feb 24 19:20:02 2012 1.39% done, estimate finish Fri Feb 24 19:21:02 2012 1.40% done, estimate finish Fri Feb 24 19:20:50 2012 1.40% done, estimate finish Fri Feb 24 19:20:38 2012 1.41% done, estimate finish Fri Feb 24 19:20:25 2012 1.41% done, estimate finish Fri Feb 24 19:20:13 2012 1.42% done, estimate finish Fri Feb 24 19:20:02 2012 1.42% done, estimate finish Fri Feb 24 19:19:50 2012 1.43% done, estimate finish Fri Feb 24 19:19:38 2012 1.44% done, estimate finish Fri Feb 24 19:20:36 2012 1.44% done, estimate finish Fri Feb 24 19:20:24 2012 1.45% done, estimate finish Fri Feb 24 19:20:12 2012 1.45% done, estimate finish Fri Feb 24 19:20:00 2012 1.46% done, estimate finish Fri Feb 24 19:19:49 2012 1.46% done, estimate finish Fri Feb 24 19:19:37 2012 1.47% done, estimate finish Fri Feb 24 19:19:26 2012 1.47% done, estimate finish Fri Feb 24 19:19:14 2012 1.48% done, estimate finish Fri Feb 24 19:20:11 2012 1.48% done, estimate finish Fri Feb 24 19:19:59 2012 1.49% done, estimate finish Fri Feb 24 19:19:48 2012 1.49% done, estimate finish Fri Feb 24 19:19:37 2012 1.50% done, estimate finish Fri Feb 24 19:19:26 2012 1.50% done, estimate finish Fri Feb 24 19:19:15 2012 1.51% done, estimate finish Fri Feb 24 19:19:04 2012 1.52% done, estimate finish Fri Feb 24 19:18:52 2012 1.52% done, estimate finish Fri Feb 24 19:19:47 2012 1.53% done, estimate finish Fri Feb 24 19:19:36 2012 1.53% done, estimate finish Fri Feb 24 19:19:26 2012 1.54% done, estimate finish Fri Feb 24 19:19:14 2012 1.54% done, estimate finish Fri Feb 24 19:19:04 2012 1.55% done, estimate finish Fri Feb 24 19:18:53 2012 1.55% done, estimate finish Fri Feb 24 19:18:42 2012 1.56% done, estimate finish Fri Feb 24 19:18:32 2012 1.56% done, estimate finish Fri Feb 24 19:19:25 2012 1.57% done, estimate finish Fri Feb 24 19:19:15 2012 1.57% done, estimate finish Fri Feb 24 19:19:04 2012 1.58% done, estimate finish Fri Feb 24 19:18:53 2012 1.59% done, estimate finish Fri Feb 24 19:18:43 2012 1.59% done, estimate finish Fri Feb 24 19:18:33 2012 1.60% done, estimate finish Fri Feb 24 19:18:22 2012 1.60% done, estimate finish Fri Feb 24 19:18:12 2012 1.61% done, estimate finish Fri Feb 24 19:19:04 2012 1.61% done, estimate finish Fri Feb 24 19:18:54 2012 1.62% done, estimate finish Fri Feb 24 19:18:44 2012 1.62% done, estimate finish Fri Feb 24 19:18:33 2012 1.63% done, estimate finish Fri Feb 24 19:18:23 2012 1.63% done, estimate finish Fri Feb 24 19:18:13 2012 1.64% done, estimate finish Fri Feb 24 19:18:03 2012 1.64% done, estimate finish Fri Feb 24 19:17:53 2012 1.65% done, estimate finish Fri Feb 24 19:18:44 2012 1.65% done, estimate finish Fri Feb 24 19:18:34 2012 1.66% done, estimate finish Fri Feb 24 19:18:24 2012 1.67% done, estimate finish Fri Feb 24 19:18:14 2012 1.67% done, estimate finish Fri Feb 24 19:18:05 2012 1.68% done, estimate finish Fri Feb 24 19:17:55 2012 1.68% done, estimate finish Fri Feb 24 19:17:45 2012 1.69% done, estimate finish Fri Feb 24 19:17:36 2012 1.69% done, estimate finish Fri Feb 24 19:18:25 2012 1.70% done, estimate finish Fri Feb 24 19:18:16 2012 1.70% done, estimate finish Fri Feb 24 19:18:06 2012 1.71% done, estimate finish Fri Feb 24 19:17:56 2012 1.71% done, estimate finish Fri Feb 24 19:17:47 2012 1.72% done, estimate finish Fri Feb 24 19:17:38 2012 1.72% done, estimate finish Fri Feb 24 19:17:28 2012 1.73% done, estimate finish Fri Feb 24 19:17:19 2012 1.73% done, estimate finish Fri Feb 24 19:18:07 2012 1.74% done, estimate finish Fri Feb 24 19:17:58 2012 1.75% done, estimate finish Fri Feb 24 19:17:49 2012 1.75% done, estimate finish Fri Feb 24 19:17:39 2012 1.76% done, estimate finish Fri Feb 24 19:17:30 2012 1.76% done, estimate finish Fri Feb 24 19:17:21 2012 1.77% done, estimate finish Fri Feb 24 19:17:12 2012 1.77% done, estimate finish Fri Feb 24 19:17:03 2012 1.78% done, estimate finish Fri Feb 24 19:17:50 2012 1.78% done, estimate finish Fri Feb 24 19:17:41 2012 1.79% done, estimate finish Fri Feb 24 19:17:32 2012 1.79% done, estimate finish Fri Feb 24 19:17:23 2012 1.80% done, estimate finish Fri Feb 24 19:17:14 2012 1.80% done, estimate finish Fri Feb 24 19:17:05 2012 1.81% done, estimate finish Fri Feb 24 19:16:56 2012 1.81% done, estimate finish Fri Feb 24 19:16:47 2012 1.82% done, estimate finish Fri Feb 24 19:17:34 2012 1.83% done, estimate finish Fri Feb 24 19:17:25 2012 1.83% done, estimate finish Fri Feb 24 19:17:16 2012 1.84% done, estimate finish Fri Feb 24 19:17:07 2012 1.84% done, estimate finish Fri Feb 24 19:16:59 2012 1.85% done, estimate finish Fri Feb 24 19:16:50 2012 1.85% done, estimate finish Fri Feb 24 19:16:42 2012 1.86% done, estimate finish Fri Feb 24 19:16:33 2012 1.86% done, estimate finish Fri Feb 24 19:17:18 2012 1.87% done, estimate finish Fri Feb 24 19:17:10 2012 1.87% done, estimate finish Fri Feb 24 19:17:01 2012 1.88% done, estimate finish Fri Feb 24 19:16:52 2012 1.88% done, estimate finish Fri Feb 24 19:16:44 2012 1.89% done, estimate finish Fri Feb 24 19:16:36 2012 1.89% done, estimate finish Fri Feb 24 19:16:27 2012 1.90% done, estimate finish Fri Feb 24 19:16:19 2012 1.91% done, estimate finish Fri Feb 24 19:17:03 2012 1.91% done, estimate finish Fri Feb 24 19:16:55 2012 1.92% done, estimate finish Fri Feb 24 19:16:47 2012 1.92% done, estimate finish Fri Feb 24 19:16:38 2012 1.93% done, estimate finish Fri Feb 24 19:16:30 2012 1.93% done, estimate finish Fri Feb 24 19:16:22 2012 1.94% done, estimate finish Fri Feb 24 19:16:14 2012 1.94% done, estimate finish Fri Feb 24 19:16:57 2012 1.95% done, estimate finish Fri Feb 24 19:16:49 2012 1.95% done, estimate finish Fri Feb 24 19:16:41 2012 1.96% done, estimate finish Fri Feb 24 19:16:33 2012 1.96% done, estimate finish Fri Feb 24 19:16:25 2012 1.97% done, estimate finish Fri Feb 24 19:16:17 2012 1.97% done, estimate finish Fri Feb 24 19:16:09 2012 1.98% done, estimate finish Fri Feb 24 19:16:01 2012 1.99% done, estimate finish Fri Feb 24 19:15:53 2012 1.99% done, estimate finish Fri Feb 24 19:16:35 2012 2.00% done, estimate finish Fri Feb 24 19:16:28 2012 2.00% done, estimate finish Fri Feb 24 19:16:20 2012 2.01% done, estimate finish Fri Feb 24 19:16:12 2012 2.01% done, estimate finish Fri Feb 24 19:16:04 2012 2.02% done, estimate finish Fri Feb 24 19:15:56 2012 2.02% done, estimate finish Fri Feb 24 19:15:49 2012 2.03% done, estimate finish Fri Feb 24 19:15:41 2012 2.03% done, estimate finish Fri Feb 24 19:16:22 2012 2.04% done, estimate finish Fri Feb 24 19:16:15 2012 2.04% done, estimate finish Fri Feb 24 19:16:07 2012 2.05% done, estimate finish Fri Feb 24 19:15:59 2012 2.05% done, estimate finish Fri Feb 24 19:15:52 2012 2.06% done, estimate finish Fri Feb 24 19:15:44 2012 2.07% done, estimate finish Fri Feb 24 19:15:37 2012 2.07% done, estimate finish Fri Feb 24 19:15:29 2012 2.08% done, estimate finish Fri Feb 24 19:16:10 2012 2.08% done, estimate finish Fri Feb 24 19:16:02 2012 2.09% done, estimate finish Fri Feb 24 19:15:55 2012 2.09% done, estimate finish Fri Feb 24 19:15:47 2012 2.10% done, estimate finish Fri Feb 24 19:15:40 2012 2.10% done, estimate finish Fri Feb 24 19:15:33 2012 2.11% done, estimate finish Fri Feb 24 19:15:25 2012 2.11% done, estimate finish Fri Feb 24 19:15:18 2012 2.12% done, estimate finish Fri Feb 24 19:15:58 2012 2.12% done, estimate finish Fri Feb 24 19:15:51 2012 2.13% done, estimate finish Fri Feb 24 19:15:43 2012 2.13% done, estimate finish Fri Feb 24 19:15:36 2012 2.14% done, estimate finish Fri Feb 24 19:15:29 2012 2.15% done, estimate finish Fri Feb 24 19:15:22 2012 2.15% done, estimate finish Fri Feb 24 19:15:14 2012 2.16% done, estimate finish Fri Feb 24 19:15:53 2012 2.16% done, estimate finish Fri Feb 24 19:15:46 2012 2.17% done, estimate finish Fri Feb 24 19:15:39 2012 2.17% done, estimate finish Fri Feb 24 19:15:32 2012 2.18% done, estimate finish Fri Feb 24 19:15:25 2012 2.18% done, estimate finish Fri Feb 24 19:15:18 2012 2.19% done, estimate finish Fri Feb 24 19:15:11 2012 2.19% done, estimate finish Fri Feb 24 19:15:04 2012 2.20% done, estimate finish Fri Feb 24 19:15:42 2012 2.20% done, estimate finish Fri Feb 24 19:15:35 2012 2.21% done, estimate finish Fri Feb 24 19:15:28 2012 2.21% done, estimate finish Fri Feb 24 19:15:21 2012 2.22% done, estimate finish Fri Feb 24 19:15:14 2012 2.23% done, estimate finish Fri Feb 24 19:15:07 2012 2.23% done, estimate finish Fri Feb 24 19:15:01 2012 2.24% done, estimate finish Fri Feb 24 19:14:54 2012 2.24% done, estimate finish Fri Feb 24 19:15:31 2012 2.25% done, estimate finish Fri Feb 24 19:15:25 2012 2.25% done, estimate finish Fri Feb 24 19:15:18 2012 2.26% done, estimate finish Fri Feb 24 19:15:11 2012 2.26% done, estimate finish Fri Feb 24 19:15:04 2012 2.27% done, estimate finish Fri Feb 24 19:14:57 2012 2.27% done, estimate finish Fri Feb 24 19:14:51 2012 2.28% done, estimate finish Fri Feb 24 19:14:44 2012 2.28% done, estimate finish Fri Feb 24 19:15:21 2012 2.29% done, estimate finish Fri Feb 24 19:15:14 2012 2.29% done, estimate finish Fri Feb 24 19:15:08 2012 2.30% done, estimate finish Fri Feb 24 19:15:01 2012 2.31% done, estimate finish Fri Feb 24 19:14:54 2012 2.31% done, estimate finish Fri Feb 24 19:14:48 2012 2.32% done, estimate finish Fri Feb 24 19:14:41 2012 2.32% done, estimate finish Fri Feb 24 19:14:35 2012 2.33% done, estimate finish Fri Feb 24 19:15:11 2012 2.33% done, estimate finish Fri Feb 24 19:15:04 2012 2.34% done, estimate finish Fri Feb 24 19:14:58 2012 2.34% done, estimate finish Fri Feb 24 19:14:51 2012 2.35% done, estimate finish Fri Feb 24 19:14:45 2012 2.35% done, estimate finish Fri Feb 24 19:14:38 2012 2.36% done, estimate finish Fri Feb 24 19:14:32 2012 2.36% done, estimate finish Fri Feb 24 19:14:26 2012 2.37% done, estimate finish Fri Feb 24 19:15:01 2012 2.37% done, estimate finish Fri Feb 24 19:14:55 2012 2.38% done, estimate finish Fri Feb 24 19:14:49 2012 2.39% done, estimate finish Fri Feb 24 19:14:42 2012 2.39% done, estimate finish Fri Feb 24 19:14:36 2012 2.40% done, estimate finish Fri Feb 24 19:14:29 2012 2.40% done, estimate finish Fri Feb 24 19:14:23 2012 2.41% done, estimate finish Fri Feb 24 19:14:17 2012 2.41% done, estimate finish Fri Feb 24 19:14:52 2012 2.42% done, estimate finish Fri Feb 24 19:14:46 2012 2.42% done, estimate finish Fri Feb 24 19:14:39 2012 2.43% done, estimate finish Fri Feb 24 19:14:33 2012 2.43% done, estimate finish Fri Feb 24 19:14:27 2012 2.44% done, estimate finish Fri Feb 24 19:14:21 2012 2.44% done, estimate finish Fri Feb 24 19:14:15 2012 2.45% done, estimate finish Fri Feb 24 19:14:08 2012 2.45% done, estimate finish Fri Feb 24 19:14:43 2012 2.46% done, estimate finish Fri Feb 24 19:14:37 2012 2.47% done, estimate finish Fri Feb 24 19:14:31 2012 2.47% done, estimate finish Fri Feb 24 19:14:25 2012 2.48% done, estimate finish Fri Feb 24 19:14:18 2012 2.48% done, estimate finish Fri Feb 24 19:14:12 2012 2.49% done, estimate finish Fri Feb 24 19:14:06 2012 2.49% done, estimate finish Fri Feb 24 19:14:40 2012 2.50% done, estimate finish Fri Feb 24 19:14:34 2012 2.50% done, estimate finish Fri Feb 24 19:14:28 2012 2.51% done, estimate finish Fri Feb 24 19:14:22 2012 2.51% done, estimate finish Fri Feb 24 19:14:16 2012 2.52% done, estimate finish Fri Feb 24 19:14:10 2012 2.52% done, estimate finish Fri Feb 24 19:14:04 2012 2.53% done, estimate finish Fri Feb 24 19:13:58 2012 2.53% done, estimate finish Fri Feb 24 19:14:32 2012 2.54% done, estimate finish Fri Feb 24 19:14:26 2012 2.55% done, estimate finish Fri Feb 24 19:14:20 2012 2.55% done, estimate finish Fri Feb 24 19:14:14 2012 2.56% done, estimate finish Fri Feb 24 19:14:08 2012 2.56% done, estimate finish Fri Feb 24 19:14:02 2012 2.57% done, estimate finish Fri Feb 24 19:13:56 2012 2.57% done, estimate finish Fri Feb 24 19:13:51 2012 2.58% done, estimate finish Fri Feb 24 19:14:24 2012 2.58% done, estimate finish Fri Feb 24 19:14:18 2012 2.59% done, estimate finish Fri Feb 24 19:14:12 2012 2.59% done, estimate finish Fri Feb 24 19:14:06 2012 2.60% done, estimate finish Fri Feb 24 19:14:00 2012 2.60% done, estimate finish Fri Feb 24 19:13:55 2012 2.61% done, estimate finish Fri Feb 24 19:13:49 2012 2.61% done, estimate finish Fri Feb 24 19:13:43 2012 2.62% done, estimate finish Fri Feb 24 19:14:16 2012 2.63% done, estimate finish Fri Feb 24 19:14:10 2012 2.63% done, estimate finish Fri Feb 24 19:14:04 2012 2.64% done, estimate finish Fri Feb 24 19:13:58 2012 2.64% done, estimate finish Fri Feb 24 19:13:53 2012 2.65% done, estimate finish Fri Feb 24 19:13:47 2012 2.65% done, estimate finish Fri Feb 24 19:13:42 2012 2.66% done, estimate finish Fri Feb 24 19:13:36 2012 2.66% done, estimate finish Fri Feb 24 19:14:08 2012 2.67% done, estimate finish Fri Feb 24 19:14:02 2012 2.67% done, estimate finish Fri Feb 24 19:13:57 2012 2.68% done, estimate finish Fri Feb 24 19:13:51 2012 2.68% done, estimate finish Fri Feb 24 19:13:46 2012 2.69% done, estimate finish Fri Feb 24 19:13:40 2012 2.70% done, estimate finish Fri Feb 24 19:13:34 2012 2.70% done, estimate finish Fri Feb 24 19:13:29 2012 2.71% done, estimate finish Fri Feb 24 19:14:00 2012 2.71% done, estimate finish Fri Feb 24 19:13:55 2012 2.72% done, estimate finish Fri Feb 24 19:13:49 2012 2.72% done, estimate finish Fri Feb 24 19:13:44 2012 2.73% done, estimate finish Fri Feb 24 19:13:39 2012 2.73% done, estimate finish Fri Feb 24 19:13:33 2012 2.74% done, estimate finish Fri Feb 24 19:13:28 2012 2.74% done, estimate finish Fri Feb 24 19:13:22 2012 2.75% done, estimate finish Fri Feb 24 19:13:53 2012 2.75% done, estimate finish Fri Feb 24 19:13:48 2012 2.76% done, estimate finish Fri Feb 24 19:13:42 2012 2.76% done, estimate finish Fri Feb 24 19:13:37 2012 2.77% done, estimate finish Fri Feb 24 19:13:32 2012 2.78% done, estimate finish Fri Feb 24 19:13:26 2012 2.78% done, estimate finish Fri Feb 24 19:13:21 2012 2.79% done, estimate finish Fri Feb 24 19:13:52 2012 2.79% done, estimate finish Fri Feb 24 19:13:46 2012 2.80% done, estimate finish Fri Feb 24 19:13:41 2012 2.80% done, estimate finish Fri Feb 24 19:13:35 2012 2.81% done, estimate finish Fri Feb 24 19:13:30 2012 2.81% done, estimate finish Fri Feb 24 19:13:25 2012 2.82% done, estimate finish Fri Feb 24 19:13:20 2012 2.82% done, estimate finish Fri Feb 24 19:13:14 2012 2.83% done, estimate finish Fri Feb 24 19:13:45 2012 2.83% done, estimate finish Fri Feb 24 19:13:39 2012 2.84% done, estimate finish Fri Feb 24 19:13:34 2012 2.84% done, estimate finish Fri Feb 24 19:13:29 2012 2.85% done, estimate finish Fri Feb 24 19:13:24 2012 2.86% done, estimate finish Fri Feb 24 19:13:19 2012 2.86% done, estimate finish Fri Feb 24 19:13:13 2012 2.87% done, estimate finish Fri Feb 24 19:13:08 2012 2.87% done, estimate finish Fri Feb 24 19:13:38 2012 2.88% done, estimate finish Fri Feb 24 19:13:33 2012 2.88% done, estimate finish Fri Feb 24 19:13:28 2012 2.89% done, estimate finish Fri Feb 24 19:13:22 2012 2.89% done, estimate finish Fri Feb 24 19:13:17 2012 2.90% done, estimate finish Fri Feb 24 19:13:12 2012 2.90% done, estimate finish Fri Feb 24 19:13:07 2012 2.91% done, estimate finish Fri Feb 24 19:13:02 2012 2.91% done, estimate finish Fri Feb 24 19:13:31 2012 2.92% done, estimate finish Fri Feb 24 19:13:26 2012 2.92% done, estimate finish Fri Feb 24 19:13:21 2012 2.93% done, estimate finish Fri Feb 24 19:13:16 2012 2.94% done, estimate finish Fri Feb 24 19:13:11 2012 2.94% done, estimate finish Fri Feb 24 19:13:06 2012 2.95% done, estimate finish Fri Feb 24 19:13:01 2012 2.95% done, estimate finish Fri Feb 24 19:12:56 2012 2.96% done, estimate finish Fri Feb 24 19:13:25 2012 2.96% done, estimate finish Fri Feb 24 19:13:20 2012 2.97% done, estimate finish Fri Feb 24 19:13:15 2012 2.97% done, estimate finish Fri Feb 24 19:13:10 2012 2.98% done, estimate finish Fri Feb 24 19:13:05 2012 2.98% done, estimate finish Fri Feb 24 19:13:00 2012 2.99% done, estimate finish Fri Feb 24 19:12:55 2012 2.99% done, estimate finish Fri Feb 24 19:12:50 2012 3.00% done, estimate finish Fri Feb 24 19:13:19 2012 3.00% done, estimate finish Fri Feb 24 19:13:14 2012 3.01% done, estimate finish Fri Feb 24 19:13:09 2012 3.02% done, estimate finish Fri Feb 24 19:13:04 2012 3.02% done, estimate finish Fri Feb 24 19:12:59 2012 3.03% done, estimate finish Fri Feb 24 19:12:55 2012 3.03% done, estimate finish Fri Feb 24 19:12:50 2012 3.04% done, estimate finish Fri Feb 24 19:12:45 2012 3.04% done, estimate finish Fri Feb 24 19:13:13 2012 3.05% done, estimate finish Fri Feb 24 19:13:08 2012 3.05% done, estimate finish Fri Feb 24 19:13:03 2012 3.06% done, estimate finish Fri Feb 24 19:12:58 2012 3.06% done, estimate finish Fri Feb 24 19:12:54 2012 3.07% done, estimate finish Fri Feb 24 19:12:49 2012 3.07% done, estimate finish Fri Feb 24 19:12:44 2012 3.08% done, estimate finish Fri Feb 24 19:12:39 2012 3.08% done, estimate finish Fri Feb 24 19:13:07 2012 3.09% done, estimate finish Fri Feb 24 19:13:02 2012 3.10% done, estimate finish Fri Feb 24 19:12:58 2012 3.10% done, estimate finish Fri Feb 24 19:12:53 2012 3.11% done, estimate finish Fri Feb 24 19:12:48 2012 3.11% done, estimate finish Fri Feb 24 19:12:44 2012 3.12% done, estimate finish Fri Feb 24 19:12:39 2012 3.12% done, estimate finish Fri Feb 24 19:12:34 2012 3.13% done, estimate finish Fri Feb 24 19:13:02 2012 3.13% done, estimate finish Fri Feb 24 19:12:57 2012 3.14% done, estimate finish Fri Feb 24 19:12:52 2012 3.14% done, estimate finish Fri Feb 24 19:12:47 2012 3.15% done, estimate finish Fri Feb 24 19:12:43 2012 3.15% done, estimate finish Fri Feb 24 19:12:38 2012 3.16% done, estimate finish Fri Feb 24 19:12:34 2012 3.16% done, estimate finish Fri Feb 24 19:12:29 2012 3.17% done, estimate finish Fri Feb 24 19:12:56 2012 3.18% done, estimate finish Fri Feb 24 19:12:51 2012 3.18% done, estimate finish Fri Feb 24 19:12:47 2012 3.19% done, estimate finish Fri Feb 24 19:12:42 2012 3.19% done, estimate finish Fri Feb 24 19:12:38 2012 3.20% done, estimate finish Fri Feb 24 19:12:33 2012 3.20% done, estimate finish Fri Feb 24 19:12:29 2012 3.21% done, estimate finish Fri Feb 24 19:12:24 2012 3.21% done, estimate finish Fri Feb 24 19:12:51 2012 3.22% done, estimate finish Fri Feb 24 19:12:46 2012 3.22% done, estimate finish Fri Feb 24 19:12:42 2012 3.23% done, estimate finish Fri Feb 24 19:12:37 2012 3.23% done, estimate finish Fri Feb 24 19:12:33 2012 3.24% done, estimate finish Fri Feb 24 19:12:28 2012 3.24% done, estimate finish Fri Feb 24 19:12:24 2012 3.25% done, estimate finish Fri Feb 24 19:12:19 2012 3.26% done, estimate finish Fri Feb 24 19:12:46 2012 3.26% done, estimate finish Fri Feb 24 19:12:41 2012 3.27% done, estimate finish Fri Feb 24 19:12:36 2012 3.27% done, estimate finish Fri Feb 24 19:12:32 2012 3.28% done, estimate finish Fri Feb 24 19:12:28 2012 3.28% done, estimate finish Fri Feb 24 19:12:23 2012 3.29% done, estimate finish Fri Feb 24 19:12:19 2012 3.29% done, estimate finish Fri Feb 24 19:12:14 2012 3.30% done, estimate finish Fri Feb 24 19:12:40 2012 3.30% done, estimate finish Fri Feb 24 19:12:36 2012 3.31% done, estimate finish Fri Feb 24 19:12:32 2012 3.31% done, estimate finish Fri Feb 24 19:12:27 2012 3.32% done, estimate finish Fri Feb 24 19:12:23 2012 3.32% done, estimate finish Fri Feb 24 19:12:19 2012 3.33% done, estimate finish Fri Feb 24 19:12:14 2012 3.34% done, estimate finish Fri Feb 24 19:12:40 2012 3.34% done, estimate finish Fri Feb 24 19:12:35 2012 3.35% done, estimate finish Fri Feb 24 19:12:31 2012 3.35% done, estimate finish Fri Feb 24 19:12:27 2012 3.36% done, estimate finish Fri Feb 24 19:12:22 2012 3.36% done, estimate finish Fri Feb 24 19:12:18 2012 3.37% done, estimate finish Fri Feb 24 19:12:14 2012 3.37% done, estimate finish Fri Feb 24 19:12:10 2012 3.38% done, estimate finish Fri Feb 24 19:12:35 2012 3.38% done, estimate finish Fri Feb 24 19:12:31 2012 3.39% done, estimate finish Fri Feb 24 19:12:26 2012 3.39% done, estimate finish Fri Feb 24 19:12:22 2012 3.40% done, estimate finish Fri Feb 24 19:12:18 2012 3.40% done, estimate finish Fri Feb 24 19:12:14 2012 3.41% done, estimate finish Fri Feb 24 19:12:09 2012 3.42% done, estimate finish Fri Feb 24 19:12:05 2012 3.42% done, estimate finish Fri Feb 24 19:12:30 2012 3.43% done, estimate finish Fri Feb 24 19:12:26 2012 3.43% done, estimate finish Fri Feb 24 19:12:22 2012 3.44% done, estimate finish Fri Feb 24 19:12:17 2012 3.44% done, estimate finish Fri Feb 24 19:12:13 2012 3.45% done, estimate finish Fri Feb 24 19:12:09 2012 3.45% done, estimate finish Fri Feb 24 19:12:05 2012 3.46% done, estimate finish Fri Feb 24 19:12:30 2012 3.46% done, estimate finish Fri Feb 24 19:12:26 2012 3.47% done, estimate finish Fri Feb 24 19:12:21 2012 3.47% done, estimate finish Fri Feb 24 19:12:17 2012 3.48% done, estimate finish Fri Feb 24 19:12:13 2012 3.48% done, estimate finish Fri Feb 24 19:12:09 2012 3.49% done, estimate finish Fri Feb 24 19:12:05 2012 3.50% done, estimate finish Fri Feb 24 19:12:01 2012 3.50% done, estimate finish Fri Feb 24 19:12:25 2012 3.51% done, estimate finish Fri Feb 24 19:12:21 2012 3.51% done, estimate finish Fri Feb 24 19:12:17 2012 3.52% done, estimate finish Fri Feb 24 19:12:13 2012 3.52% done, estimate finish Fri Feb 24 19:12:09 2012 3.53% done, estimate finish Fri Feb 24 19:12:05 2012 3.53% done, estimate finish Fri Feb 24 19:12:01 2012 3.54% done, estimate finish Fri Feb 24 19:11:57 2012 3.54% done, estimate finish Fri Feb 24 19:12:21 2012 3.55% done, estimate finish Fri Feb 24 19:12:17 2012 3.55% done, estimate finish Fri Feb 24 19:12:13 2012 3.56% done, estimate finish Fri Feb 24 19:12:09 2012 3.56% done, estimate finish Fri Feb 24 19:12:04 2012 3.57% done, estimate finish Fri Feb 24 19:12:00 2012 3.58% done, estimate finish Fri Feb 24 19:11:56 2012 3.58% done, estimate finish Fri Feb 24 19:11:52 2012 3.59% done, estimate finish Fri Feb 24 19:12:16 2012 3.59% done, estimate finish Fri Feb 24 19:12:12 2012 3.60% done, estimate finish Fri Feb 24 19:12:08 2012 3.60% done, estimate finish Fri Feb 24 19:12:04 2012 3.61% done, estimate finish Fri Feb 24 19:12:00 2012 3.61% done, estimate finish Fri Feb 24 19:11:56 2012 3.62% done, estimate finish Fri Feb 24 19:11:52 2012 3.62% done, estimate finish Fri Feb 24 19:12:16 2012 3.63% done, estimate finish Fri Feb 24 19:12:12 2012 3.63% done, estimate finish Fri Feb 24 19:12:08 2012 3.64% done, estimate finish Fri Feb 24 19:12:04 2012 3.64% done, estimate finish Fri Feb 24 19:12:00 2012 3.65% done, estimate finish Fri Feb 24 19:11:56 2012 3.66% done, estimate finish Fri Feb 24 19:11:52 2012 3.66% done, estimate finish Fri Feb 24 19:11:48 2012 3.67% done, estimate finish Fri Feb 24 19:12:12 2012 3.67% done, estimate finish Fri Feb 24 19:12:08 2012 3.68% done, estimate finish Fri Feb 24 19:12:04 2012 3.68% done, estimate finish Fri Feb 24 19:12:00 2012 3.69% done, estimate finish Fri Feb 24 19:11:56 2012 3.69% done, estimate finish Fri Feb 24 19:11:52 2012 3.70% done, estimate finish Fri Feb 24 19:11:48 2012 3.70% done, estimate finish Fri Feb 24 19:11:45 2012 3.71% done, estimate finish Fri Feb 24 19:12:08 2012 3.71% done, estimate finish Fri Feb 24 19:12:04 2012 3.72% done, estimate finish Fri Feb 24 19:12:00 2012 3.72% done, estimate finish Fri Feb 24 19:11:56 2012 3.73% done, estimate finish Fri Feb 24 19:11:52 2012 3.74% done, estimate finish Fri Feb 24 19:11:48 2012 3.74% done, estimate finish Fri Feb 24 19:11:45 2012 3.75% done, estimate finish Fri Feb 24 19:11:41 2012 3.75% done, estimate finish Fri Feb 24 19:12:04 2012 3.76% done, estimate finish Fri Feb 24 19:12:00 2012 3.76% done, estimate finish Fri Feb 24 19:11:56 2012 3.77% done, estimate finish Fri Feb 24 19:11:52 2012 3.77% done, estimate finish Fri Feb 24 19:11:48 2012 3.78% done, estimate finish Fri Feb 24 19:11:45 2012 3.78% done, estimate finish Fri Feb 24 19:11:41 2012 3.79% done, estimate finish Fri Feb 24 19:11:37 2012 3.79% done, estimate finish Fri Feb 24 19:12:00 2012 3.80% done, estimate finish Fri Feb 24 19:11:56 2012 3.81% done, estimate finish Fri Feb 24 19:11:52 2012 3.81% done, estimate finish Fri Feb 24 19:11:48 2012 3.82% done, estimate finish Fri Feb 24 19:11:45 2012 3.82% done, estimate finish Fri Feb 24 19:11:41 2012 3.83% done, estimate finish Fri Feb 24 19:11:37 2012 3.83% done, estimate finish Fri Feb 24 19:11:34 2012 3.84% done, estimate finish Fri Feb 24 19:11:56 2012 3.84% done, estimate finish Fri Feb 24 19:11:52 2012 3.85% done, estimate finish Fri Feb 24 19:11:48 2012 3.85% done, estimate finish Fri Feb 24 19:11:45 2012 3.86% done, estimate finish Fri Feb 24 19:11:41 2012 3.86% done, estimate finish Fri Feb 24 19:11:37 2012 3.87% done, estimate finish Fri Feb 24 19:11:34 2012 3.87% done, estimate finish Fri Feb 24 19:11:30 2012 3.88% done, estimate finish Fri Feb 24 19:11:52 2012 3.89% done, estimate finish Fri Feb 24 19:11:48 2012 3.89% done, estimate finish Fri Feb 24 19:11:45 2012 3.90% done, estimate finish Fri Feb 24 19:11:41 2012 3.90% done, estimate finish Fri Feb 24 19:11:38 2012 3.91% done, estimate finish Fri Feb 24 19:11:34 2012 3.91% done, estimate finish Fri Feb 24 19:11:30 2012 3.92% done, estimate finish Fri Feb 24 19:11:27 2012 3.92% done, estimate finish Fri Feb 24 19:11:48 2012 3.93% done, estimate finish Fri Feb 24 19:11:45 2012 3.93% done, estimate finish Fri Feb 24 19:11:41 2012 3.94% done, estimate finish Fri Feb 24 19:11:38 2012 3.94% done, estimate finish Fri Feb 24 19:11:34 2012 3.95% done, estimate finish Fri Feb 24 19:11:30 2012 3.95% done, estimate finish Fri Feb 24 19:11:27 2012 3.96% done, estimate finish Fri Feb 24 19:11:23 2012 3.97% done, estimate finish Fri Feb 24 19:11:45 2012 3.97% done, estimate finish Fri Feb 24 19:11:41 2012 3.98% done, estimate finish Fri Feb 24 19:11:38 2012 3.98% done, estimate finish Fri Feb 24 19:11:34 2012 3.99% done, estimate finish Fri Feb 24 19:11:31 2012 3.99% done, estimate finish Fri Feb 24 19:11:27 2012 4.00% done, estimate finish Fri Feb 24 19:11:23 2012 4.00% done, estimate finish Fri Feb 24 19:11:45 2012 4.01% done, estimate finish Fri Feb 24 19:11:41 2012 4.01% done, estimate finish Fri Feb 24 19:11:38 2012 4.02% done, estimate finish Fri Feb 24 19:11:34 2012 4.02% done, estimate finish Fri Feb 24 19:11:31 2012 4.03% done, estimate finish Fri Feb 24 19:11:27 2012 4.03% done, estimate finish Fri Feb 24 19:11:24 2012 4.04% done, estimate finish Fri Feb 24 19:11:20 2012 4.05% done, estimate finish Fri Feb 24 19:11:41 2012 4.05% done, estimate finish Fri Feb 24 19:11:38 2012 4.06% done, estimate finish Fri Feb 24 19:11:34 2012 4.06% done, estimate finish Fri Feb 24 19:11:31 2012 4.07% done, estimate finish Fri Feb 24 19:11:27 2012 4.07% done, estimate finish Fri Feb 24 19:11:24 2012 4.08% done, estimate finish Fri Feb 24 19:11:20 2012 4.08% done, estimate finish Fri Feb 24 19:11:17 2012 4.09% done, estimate finish Fri Feb 24 19:11:38 2012 4.09% done, estimate finish Fri Feb 24 19:11:35 2012 4.10% done, estimate finish Fri Feb 24 19:11:31 2012 4.10% done, estimate finish Fri Feb 24 19:11:28 2012 4.11% done, estimate finish Fri Feb 24 19:11:24 2012 4.11% done, estimate finish Fri Feb 24 19:11:21 2012 4.12% done, estimate finish Fri Feb 24 19:11:17 2012 4.13% done, estimate finish Fri Feb 24 19:11:14 2012 4.13% done, estimate finish Fri Feb 24 19:11:35 2012 4.14% done, estimate finish Fri Feb 24 19:11:31 2012 4.14% done, estimate finish Fri Feb 24 19:11:28 2012 4.15% done, estimate finish Fri Feb 24 19:11:24 2012 4.15% done, estimate finish Fri Feb 24 19:11:21 2012 4.16% done, estimate finish Fri Feb 24 19:11:18 2012 4.16% done, estimate finish Fri Feb 24 19:11:14 2012 4.17% done, estimate finish Fri Feb 24 19:11:35 2012 4.17% done, estimate finish Fri Feb 24 19:11:31 2012 4.18% done, estimate finish Fri Feb 24 19:11:28 2012 4.18% done, estimate finish Fri Feb 24 19:11:25 2012 4.19% done, estimate finish Fri Feb 24 19:11:21 2012 4.19% done, estimate finish Fri Feb 24 19:11:18 2012 4.20% done, estimate finish Fri Feb 24 19:11:14 2012 4.21% done, estimate finish Fri Feb 24 19:11:35 2012 4.21% done, estimate finish Fri Feb 24 19:11:31 2012 4.22% done, estimate finish Fri Feb 24 19:11:28 2012 4.22% done, estimate finish Fri Feb 24 19:11:25 2012 4.23% done, estimate finish Fri Feb 24 19:11:21 2012 4.23% done, estimate finish Fri Feb 24 19:11:18 2012 4.24% done, estimate finish Fri Feb 24 19:11:15 2012 4.24% done, estimate finish Fri Feb 24 19:11:11 2012 4.25% done, estimate finish Fri Feb 24 19:11:08 2012 4.25% done, estimate finish Fri Feb 24 19:11:05 2012 4.26% done, estimate finish Fri Feb 24 19:11:25 2012 4.26% done, estimate finish Fri Feb 24 19:11:22 2012 4.27% done, estimate finish Fri Feb 24 19:11:18 2012 4.27% done, estimate finish Fri Feb 24 19:11:15 2012 4.28% done, estimate finish Fri Feb 24 19:11:12 2012 4.29% done, estimate finish Fri Feb 24 19:11:08 2012 4.29% done, estimate finish Fri Feb 24 19:11:05 2012 4.30% done, estimate finish Fri Feb 24 19:11:02 2012 4.30% done, estimate finish Fri Feb 24 19:11:22 2012 4.31% done, estimate finish Fri Feb 24 19:11:19 2012 4.31% done, estimate finish Fri Feb 24 19:11:15 2012 4.32% done, estimate finish Fri Feb 24 19:11:12 2012 4.32% done, estimate finish Fri Feb 24 19:11:09 2012 4.33% done, estimate finish Fri Feb 24 19:11:06 2012 4.33% done, estimate finish Fri Feb 24 19:11:02 2012 4.34% done, estimate finish Fri Feb 24 19:10:59 2012 4.34% done, estimate finish Fri Feb 24 19:11:19 2012 4.35% done, estimate finish Fri Feb 24 19:11:16 2012 4.35% done, estimate finish Fri Feb 24 19:11:12 2012 4.36% done, estimate finish Fri Feb 24 19:11:09 2012 4.37% done, estimate finish Fri Feb 24 19:11:06 2012 4.37% done, estimate finish Fri Feb 24 19:11:03 2012 4.38% done, estimate finish Fri Feb 24 19:10:59 2012 4.38% done, estimate finish Fri Feb 24 19:10:56 2012 4.39% done, estimate finish Fri Feb 24 19:11:16 2012 4.39% done, estimate finish Fri Feb 24 19:11:13 2012 4.40% done, estimate finish Fri Feb 24 19:11:09 2012 4.40% done, estimate finish Fri Feb 24 19:11:06 2012 4.41% done, estimate finish Fri Feb 24 19:11:03 2012 4.41% done, estimate finish Fri Feb 24 19:11:00 2012 4.42% done, estimate finish Fri Feb 24 19:10:57 2012 4.42% done, estimate finish Fri Feb 24 19:10:54 2012 4.43% done, estimate finish Fri Feb 24 19:11:13 2012 4.43% done, estimate finish Fri Feb 24 19:11:10 2012 4.44% done, estimate finish Fri Feb 24 19:11:07 2012 4.45% done, estimate finish Fri Feb 24 19:11:03 2012 4.45% done, estimate finish Fri Feb 24 19:11:00 2012 4.46% done, estimate finish Fri Feb 24 19:10:57 2012 4.46% done, estimate finish Fri Feb 24 19:10:54 2012 4.47% done, estimate finish Fri Feb 24 19:10:51 2012 4.47% done, estimate finish Fri Feb 24 19:11:10 2012 4.48% done, estimate finish Fri Feb 24 19:11:07 2012 4.48% done, estimate finish Fri Feb 24 19:11:04 2012 4.49% done, estimate finish Fri Feb 24 19:11:01 2012 4.49% done, estimate finish Fri Feb 24 19:10:58 2012 4.50% done, estimate finish Fri Feb 24 19:10:55 2012 4.50% done, estimate finish Fri Feb 24 19:10:51 2012 4.51% done, estimate finish Fri Feb 24 19:10:48 2012 4.51% done, estimate finish Fri Feb 24 19:11:07 2012 4.52% done, estimate finish Fri Feb 24 19:11:04 2012 4.53% done, estimate finish Fri Feb 24 19:11:01 2012 4.53% done, estimate finish Fri Feb 24 19:10:58 2012 4.54% done, estimate finish Fri Feb 24 19:10:55 2012 4.54% done, estimate finish Fri Feb 24 19:10:52 2012 4.55% done, estimate finish Fri Feb 24 19:10:49 2012 4.55% done, estimate finish Fri Feb 24 19:10:46 2012 4.56% done, estimate finish Fri Feb 24 19:11:05 2012 4.56% done, estimate finish Fri Feb 24 19:11:02 2012 4.57% done, estimate finish Fri Feb 24 19:10:58 2012 4.57% done, estimate finish Fri Feb 24 19:10:55 2012 4.58% done, estimate finish Fri Feb 24 19:10:52 2012 4.58% done, estimate finish Fri Feb 24 19:11:11 2012 4.59% done, estimate finish Fri Feb 24 19:11:08 2012 4.59% done, estimate finish Fri Feb 24 19:11:05 2012 4.60% done, estimate finish Fri Feb 24 19:11:02 2012 4.61% done, estimate finish Fri Feb 24 19:10:59 2012 4.61% done, estimate finish Fri Feb 24 19:10:56 2012 4.62% done, estimate finish Fri Feb 24 19:10:53 2012 4.62% done, estimate finish Fri Feb 24 19:10:50 2012 4.63% done, estimate finish Fri Feb 24 19:11:08 2012 4.63% done, estimate finish Fri Feb 24 19:11:05 2012 4.64% done, estimate finish Fri Feb 24 19:11:02 2012 4.64% done, estimate finish Fri Feb 24 19:10:59 2012 4.65% done, estimate finish Fri Feb 24 19:10:56 2012 4.65% done, estimate finish Fri Feb 24 19:10:53 2012 4.66% done, estimate finish Fri Feb 24 19:10:50 2012 4.66% done, estimate finish Fri Feb 24 19:10:47 2012 4.67% done, estimate finish Fri Feb 24 19:11:06 2012 4.67% done, estimate finish Fri Feb 24 19:11:03 2012 4.68% done, estimate finish Fri Feb 24 19:11:00 2012 4.69% done, estimate finish Fri Feb 24 19:10:57 2012 4.69% done, estimate finish Fri Feb 24 19:10:54 2012 4.70% done, estimate finish Fri Feb 24 19:10:51 2012 4.70% done, estimate finish Fri Feb 24 19:10:48 2012 4.71% done, estimate finish Fri Feb 24 19:10:45 2012 4.71% done, estimate finish Fri Feb 24 19:11:03 2012 4.72% done, estimate finish Fri Feb 24 19:11:00 2012 4.72% done, estimate finish Fri Feb 24 19:10:57 2012 4.73% done, estimate finish Fri Feb 24 19:10:54 2012 4.73% done, estimate finish Fri Feb 24 19:10:51 2012 4.74% done, estimate finish Fri Feb 24 19:10:48 2012 4.74% done, estimate finish Fri Feb 24 19:10:45 2012 4.75% done, estimate finish Fri Feb 24 19:10:42 2012 4.75% done, estimate finish Fri Feb 24 19:11:00 2012 4.76% done, estimate finish Fri Feb 24 19:10:57 2012 4.77% done, estimate finish Fri Feb 24 19:10:54 2012 4.77% done, estimate finish Fri Feb 24 19:10:52 2012 4.78% done, estimate finish Fri Feb 24 19:10:49 2012 4.78% done, estimate finish Fri Feb 24 19:10:46 2012 4.79% done, estimate finish Fri Feb 24 19:10:43 2012 4.79% done, estimate finish Fri Feb 24 19:10:40 2012 4.80% done, estimate finish Fri Feb 24 19:10:58 2012 4.80% done, estimate finish Fri Feb 24 19:10:55 2012 4.81% done, estimate finish Fri Feb 24 19:10:52 2012 4.81% done, estimate finish Fri Feb 24 19:10:49 2012 4.82% done, estimate finish Fri Feb 24 19:10:46 2012 4.82% done, estimate finish Fri Feb 24 19:10:43 2012 4.83% done, estimate finish Fri Feb 24 19:10:40 2012 4.83% done, estimate finish Fri Feb 24 19:10:38 2012 4.84% done, estimate finish Fri Feb 24 19:10:55 2012 4.85% done, estimate finish Fri Feb 24 19:10:52 2012 4.85% done, estimate finish Fri Feb 24 19:10:50 2012 4.86% done, estimate finish Fri Feb 24 19:10:47 2012 4.86% done, estimate finish Fri Feb 24 19:10:44 2012 4.87% done, estimate finish Fri Feb 24 19:10:41 2012 4.87% done, estimate finish Fri Feb 24 19:10:38 2012 4.88% done, estimate finish Fri Feb 24 19:10:35 2012 4.88% done, estimate finish Fri Feb 24 19:10:53 2012 4.89% done, estimate finish Fri Feb 24 19:10:50 2012 4.89% done, estimate finish Fri Feb 24 19:10:47 2012 4.90% done, estimate finish Fri Feb 24 19:10:44 2012 4.90% done, estimate finish Fri Feb 24 19:10:41 2012 4.91% done, estimate finish Fri Feb 24 19:10:39 2012 4.91% done, estimate finish Fri Feb 24 19:10:36 2012 4.92% done, estimate finish Fri Feb 24 19:10:33 2012 4.93% done, estimate finish Fri Feb 24 19:10:50 2012 4.93% done, estimate finish Fri Feb 24 19:10:48 2012 4.94% done, estimate finish Fri Feb 24 19:10:45 2012 4.94% done, estimate finish Fri Feb 24 19:10:42 2012 4.95% done, estimate finish Fri Feb 24 19:10:39 2012 4.95% done, estimate finish Fri Feb 24 19:10:36 2012 4.96% done, estimate finish Fri Feb 24 19:10:34 2012 4.96% done, estimate finish Fri Feb 24 19:10:31 2012 4.97% done, estimate finish Fri Feb 24 19:10:48 2012 4.97% done, estimate finish Fri Feb 24 19:10:45 2012 4.98% done, estimate finish Fri Feb 24 19:10:42 2012 4.98% done, estimate finish Fri Feb 24 19:10:40 2012 4.99% done, estimate finish Fri Feb 24 19:10:37 2012 5.00% done, estimate finish Fri Feb 24 19:10:34 2012 5.00% done, estimate finish Fri Feb 24 19:10:31 2012 5.01% done, estimate finish Fri Feb 24 19:10:29 2012 5.01% done, estimate finish Fri Feb 24 19:10:46 2012 5.02% done, estimate finish Fri Feb 24 19:10:43 2012 5.02% done, estimate finish Fri Feb 24 19:10:40 2012 5.03% done, estimate finish Fri Feb 24 19:10:37 2012 5.03% done, estimate finish Fri Feb 24 19:10:35 2012 5.04% done, estimate finish Fri Feb 24 19:10:32 2012 5.04% done, estimate finish Fri Feb 24 19:10:29 2012 5.05% done, estimate finish Fri Feb 24 19:10:26 2012 5.05% done, estimate finish Fri Feb 24 19:10:43 2012 5.06% done, estimate finish Fri Feb 24 19:10:41 2012 5.06% done, estimate finish Fri Feb 24 19:10:38 2012 5.07% done, estimate finish Fri Feb 24 19:10:35 2012 5.07% done, estimate finish Fri Feb 24 19:10:32 2012 5.08% done, estimate finish Fri Feb 24 19:10:30 2012 5.09% done, estimate finish Fri Feb 24 19:10:27 2012 5.09% done, estimate finish Fri Feb 24 19:10:24 2012 5.10% done, estimate finish Fri Feb 24 19:10:41 2012 5.10% done, estimate finish Fri Feb 24 19:10:38 2012 5.11% done, estimate finish Fri Feb 24 19:10:36 2012 5.11% done, estimate finish Fri Feb 24 19:10:33 2012 5.12% done, estimate finish Fri Feb 24 19:10:30 2012 5.12% done, estimate finish Fri Feb 24 19:10:28 2012 5.13% done, estimate finish Fri Feb 24 19:10:25 2012 5.13% done, estimate finish Fri Feb 24 19:10:22 2012 5.14% done, estimate finish Fri Feb 24 19:10:39 2012 5.14% done, estimate finish Fri Feb 24 19:10:36 2012 5.15% done, estimate finish Fri Feb 24 19:10:34 2012 5.16% done, estimate finish Fri Feb 24 19:10:31 2012 5.16% done, estimate finish Fri Feb 24 19:10:28 2012 5.17% done, estimate finish Fri Feb 24 19:10:25 2012 5.17% done, estimate finish Fri Feb 24 19:10:23 2012 5.18% done, estimate finish Fri Feb 24 19:10:20 2012 5.18% done, estimate finish Fri Feb 24 19:10:37 2012 5.19% done, estimate finish Fri Feb 24 19:10:34 2012 5.19% done, estimate finish Fri Feb 24 19:10:31 2012 5.20% done, estimate finish Fri Feb 24 19:10:29 2012 5.20% done, estimate finish Fri Feb 24 19:10:26 2012 5.21% done, estimate finish Fri Feb 24 19:10:23 2012 5.21% done, estimate finish Fri Feb 24 19:10:21 2012 5.22% done, estimate finish Fri Feb 24 19:10:18 2012 5.22% done, estimate finish Fri Feb 24 19:10:35 2012 5.23% done, estimate finish Fri Feb 24 19:10:32 2012 5.24% done, estimate finish Fri Feb 24 19:10:29 2012 5.24% done, estimate finish Fri Feb 24 19:10:27 2012 5.25% done, estimate finish Fri Feb 24 19:10:24 2012 5.25% done, estimate finish Fri Feb 24 19:10:21 2012 5.26% done, estimate finish Fri Feb 24 19:10:19 2012 5.26% done, estimate finish Fri Feb 24 19:10:16 2012 5.27% done, estimate finish Fri Feb 24 19:10:33 2012 5.27% done, estimate finish Fri Feb 24 19:10:30 2012 5.28% done, estimate finish Fri Feb 24 19:10:27 2012 5.28% done, estimate finish Fri Feb 24 19:10:25 2012 5.29% done, estimate finish Fri Feb 24 19:10:22 2012 5.29% done, estimate finish Fri Feb 24 19:10:19 2012 5.30% done, estimate finish Fri Feb 24 19:10:17 2012 5.30% done, estimate finish Fri Feb 24 19:10:14 2012 5.31% done, estimate finish Fri Feb 24 19:10:30 2012 5.32% done, estimate finish Fri Feb 24 19:10:28 2012 5.32% done, estimate finish Fri Feb 24 19:10:25 2012 5.33% done, estimate finish Fri Feb 24 19:10:23 2012 5.33% done, estimate finish Fri Feb 24 19:10:20 2012 5.34% done, estimate finish Fri Feb 24 19:10:17 2012 5.34% done, estimate finish Fri Feb 24 19:10:15 2012 5.35% done, estimate finish Fri Feb 24 19:10:31 2012 5.35% done, estimate finish Fri Feb 24 19:10:28 2012 5.36% done, estimate finish Fri Feb 24 19:10:26 2012 5.36% done, estimate finish Fri Feb 24 19:10:23 2012 5.37% done, estimate finish Fri Feb 24 19:10:21 2012 5.37% done, estimate finish Fri Feb 24 19:10:18 2012 5.38% done, estimate finish Fri Feb 24 19:10:15 2012 5.38% done, estimate finish Fri Feb 24 19:10:13 2012 5.39% done, estimate finish Fri Feb 24 19:10:10 2012 5.40% done, estimate finish Fri Feb 24 19:10:26 2012 5.40% done, estimate finish Fri Feb 24 19:10:24 2012 5.41% done, estimate finish Fri Feb 24 19:10:21 2012 5.41% done, estimate finish Fri Feb 24 19:10:19 2012 5.42% done, estimate finish Fri Feb 24 19:10:16 2012 5.42% done, estimate finish Fri Feb 24 19:10:14 2012 5.43% done, estimate finish Fri Feb 24 19:10:11 2012 5.43% done, estimate finish Fri Feb 24 19:10:27 2012 5.44% done, estimate finish Fri Feb 24 19:10:24 2012 5.44% done, estimate finish Fri Feb 24 19:10:22 2012 5.45% done, estimate finish Fri Feb 24 19:10:19 2012 5.45% done, estimate finish Fri Feb 24 19:10:17 2012 5.46% done, estimate finish Fri Feb 24 19:10:14 2012 5.46% done, estimate finish Fri Feb 24 19:10:12 2012 5.47% done, estimate finish Fri Feb 24 19:10:09 2012 5.48% done, estimate finish Fri Feb 24 19:10:25 2012 5.48% done, estimate finish Fri Feb 24 19:10:22 2012 5.49% done, estimate finish Fri Feb 24 19:10:20 2012 5.49% done, estimate finish Fri Feb 24 19:10:17 2012 5.50% done, estimate finish Fri Feb 24 19:10:15 2012 5.50% done, estimate finish Fri Feb 24 19:10:12 2012 5.51% done, estimate finish Fri Feb 24 19:10:10 2012 5.51% done, estimate finish Fri Feb 24 19:10:07 2012 5.52% done, estimate finish Fri Feb 24 19:10:23 2012 5.52% done, estimate finish Fri Feb 24 19:10:21 2012 5.53% done, estimate finish Fri Feb 24 19:10:18 2012 5.53% done, estimate finish Fri Feb 24 19:10:16 2012 5.54% done, estimate finish Fri Feb 24 19:10:13 2012 5.54% done, estimate finish Fri Feb 24 19:10:11 2012 5.55% done, estimate finish Fri Feb 24 19:10:08 2012 5.56% done, estimate finish Fri Feb 24 19:10:06 2012 5.56% done, estimate finish Fri Feb 24 19:10:21 2012 5.57% done, estimate finish Fri Feb 24 19:10:19 2012 5.57% done, estimate finish Fri Feb 24 19:10:16 2012 5.58% done, estimate finish Fri Feb 24 19:10:14 2012 5.58% done, estimate finish Fri Feb 24 19:10:11 2012 5.59% done, estimate finish Fri Feb 24 19:10:09 2012 5.59% done, estimate finish Fri Feb 24 19:10:06 2012 5.60% done, estimate finish Fri Feb 24 19:10:04 2012 5.60% done, estimate finish Fri Feb 24 19:10:19 2012 5.61% done, estimate finish Fri Feb 24 19:10:17 2012 5.61% done, estimate finish Fri Feb 24 19:10:14 2012 5.62% done, estimate finish Fri Feb 24 19:10:12 2012 5.62% done, estimate finish Fri Feb 24 19:10:09 2012 5.63% done, estimate finish Fri Feb 24 19:10:07 2012 5.64% done, estimate finish Fri Feb 24 19:10:04 2012 5.64% done, estimate finish Fri Feb 24 19:10:02 2012 5.65% done, estimate finish Fri Feb 24 19:10:17 2012 5.65% done, estimate finish Fri Feb 24 19:10:15 2012 5.66% done, estimate finish Fri Feb 24 19:10:12 2012 5.66% done, estimate finish Fri Feb 24 19:10:10 2012 5.67% done, estimate finish Fri Feb 24 19:10:08 2012 5.67% done, estimate finish Fri Feb 24 19:10:05 2012 5.68% done, estimate finish Fri Feb 24 19:10:03 2012 5.68% done, estimate finish Fri Feb 24 19:10:00 2012 5.69% done, estimate finish Fri Feb 24 19:10:16 2012 5.69% done, estimate finish Fri Feb 24 19:10:13 2012 5.70% done, estimate finish Fri Feb 24 19:10:11 2012 5.70% done, estimate finish Fri Feb 24 19:10:08 2012 5.71% done, estimate finish Fri Feb 24 19:10:06 2012 5.72% done, estimate finish Fri Feb 24 19:10:04 2012 5.72% done, estimate finish Fri Feb 24 19:10:01 2012 5.73% done, estimate finish Fri Feb 24 19:09:59 2012 5.73% done, estimate finish Fri Feb 24 19:10:14 2012 5.74% done, estimate finish Fri Feb 24 19:10:11 2012 5.74% done, estimate finish Fri Feb 24 19:10:09 2012 5.75% done, estimate finish Fri Feb 24 19:10:07 2012 5.75% done, estimate finish Fri Feb 24 19:10:04 2012 5.76% done, estimate finish Fri Feb 24 19:10:02 2012 5.76% done, estimate finish Fri Feb 24 19:09:59 2012 5.77% done, estimate finish Fri Feb 24 19:09:57 2012 5.77% done, estimate finish Fri Feb 24 19:10:12 2012 5.78% done, estimate finish Fri Feb 24 19:10:10 2012 5.78% done, estimate finish Fri Feb 24 19:10:07 2012 5.79% done, estimate finish Fri Feb 24 19:10:05 2012 5.80% done, estimate finish Fri Feb 24 19:10:02 2012 5.80% done, estimate finish Fri Feb 24 19:10:00 2012 5.81% done, estimate finish Fri Feb 24 19:09:58 2012 5.81% done, estimate finish Fri Feb 24 19:09:55 2012 5.82% done, estimate finish Fri Feb 24 19:10:10 2012 5.82% done, estimate finish Fri Feb 24 19:10:08 2012 5.83% done, estimate finish Fri Feb 24 19:10:05 2012 5.83% done, estimate finish Fri Feb 24 19:10:03 2012 5.84% done, estimate finish Fri Feb 24 19:10:01 2012 5.84% done, estimate finish Fri Feb 24 19:09:58 2012 5.85% done, estimate finish Fri Feb 24 19:09:56 2012 5.85% done, estimate finish Fri Feb 24 19:09:54 2012 5.86% done, estimate finish Fri Feb 24 19:10:09 2012 5.86% done, estimate finish Fri Feb 24 19:10:06 2012 5.87% done, estimate finish Fri Feb 24 19:10:04 2012 5.88% done, estimate finish Fri Feb 24 19:10:01 2012 5.88% done, estimate finish Fri Feb 24 19:09:59 2012 5.89% done, estimate finish Fri Feb 24 19:09:57 2012 5.89% done, estimate finish Fri Feb 24 19:09:54 2012 5.90% done, estimate finish Fri Feb 24 19:09:52 2012 5.90% done, estimate finish Fri Feb 24 19:10:07 2012 5.91% done, estimate finish Fri Feb 24 19:10:05 2012 5.91% done, estimate finish Fri Feb 24 19:10:02 2012 5.92% done, estimate finish Fri Feb 24 19:10:00 2012 5.92% done, estimate finish Fri Feb 24 19:09:58 2012 5.93% done, estimate finish Fri Feb 24 19:09:55 2012 5.93% done, estimate finish Fri Feb 24 19:09:53 2012 5.94% done, estimate finish Fri Feb 24 19:09:51 2012 5.94% done, estimate finish Fri Feb 24 19:10:05 2012 5.95% done, estimate finish Fri Feb 24 19:10:03 2012 5.96% done, estimate finish Fri Feb 24 19:10:00 2012 5.96% done, estimate finish Fri Feb 24 19:09:58 2012 5.97% done, estimate finish Fri Feb 24 19:09:56 2012 5.97% done, estimate finish Fri Feb 24 19:09:54 2012 5.98% done, estimate finish Fri Feb 24 19:09:51 2012 5.98% done, estimate finish Fri Feb 24 19:09:49 2012 5.99% done, estimate finish Fri Feb 24 19:10:03 2012 5.99% done, estimate finish Fri Feb 24 19:10:01 2012 6.00% done, estimate finish Fri Feb 24 19:10:16 2012 6.00% done, estimate finish Fri Feb 24 19:10:13 2012 6.01% done, estimate finish Fri Feb 24 19:10:11 2012 6.01% done, estimate finish Fri Feb 24 19:10:09 2012 6.02% done, estimate finish Fri Feb 24 19:10:06 2012 6.02% done, estimate finish Fri Feb 24 19:10:04 2012 6.03% done, estimate finish Fri Feb 24 19:10:02 2012 6.04% done, estimate finish Fri Feb 24 19:10:00 2012 6.04% done, estimate finish Fri Feb 24 19:10:14 2012 6.05% done, estimate finish Fri Feb 24 19:10:12 2012 6.05% done, estimate finish Fri Feb 24 19:10:09 2012 6.06% done, estimate finish Fri Feb 24 19:10:07 2012 6.06% done, estimate finish Fri Feb 24 19:10:05 2012 6.07% done, estimate finish Fri Feb 24 19:10:03 2012 6.07% done, estimate finish Fri Feb 24 19:10:00 2012 6.08% done, estimate finish Fri Feb 24 19:09:58 2012 6.08% done, estimate finish Fri Feb 24 19:10:12 2012 6.09% done, estimate finish Fri Feb 24 19:10:10 2012 6.09% done, estimate finish Fri Feb 24 19:10:08 2012 6.10% done, estimate finish Fri Feb 24 19:10:05 2012 6.11% done, estimate finish Fri Feb 24 19:10:03 2012 6.11% done, estimate finish Fri Feb 24 19:10:01 2012 6.12% done, estimate finish Fri Feb 24 19:09:59 2012 6.12% done, estimate finish Fri Feb 24 19:10:13 2012 6.13% done, estimate finish Fri Feb 24 19:10:10 2012 6.13% done, estimate finish Fri Feb 24 19:10:08 2012 6.14% done, estimate finish Fri Feb 24 19:10:06 2012 6.14% done, estimate finish Fri Feb 24 19:10:04 2012 6.15% done, estimate finish Fri Feb 24 19:10:02 2012 6.15% done, estimate finish Fri Feb 24 19:09:59 2012 6.16% done, estimate finish Fri Feb 24 19:09:57 2012 6.16% done, estimate finish Fri Feb 24 19:10:11 2012 6.17% done, estimate finish Fri Feb 24 19:10:09 2012 6.17% done, estimate finish Fri Feb 24 19:10:07 2012 6.18% done, estimate finish Fri Feb 24 19:10:04 2012 6.18% done, estimate finish Fri Feb 24 19:10:02 2012 6.19% done, estimate finish Fri Feb 24 19:10:00 2012 6.20% done, estimate finish Fri Feb 24 19:09:58 2012 6.20% done, estimate finish Fri Feb 24 19:09:56 2012 6.21% done, estimate finish Fri Feb 24 19:10:10 2012 6.21% done, estimate finish Fri Feb 24 19:10:07 2012 6.22% done, estimate finish Fri Feb 24 19:10:05 2012 6.22% done, estimate finish Fri Feb 24 19:10:03 2012 6.23% done, estimate finish Fri Feb 24 19:10:01 2012 6.23% done, estimate finish Fri Feb 24 19:09:58 2012 6.24% done, estimate finish Fri Feb 24 19:09:56 2012 6.24% done, estimate finish Fri Feb 24 19:09:54 2012 6.25% done, estimate finish Fri Feb 24 19:10:08 2012 6.25% done, estimate finish Fri Feb 24 19:10:06 2012 6.26% done, estimate finish Fri Feb 24 19:10:03 2012 6.27% done, estimate finish Fri Feb 24 19:10:01 2012 6.27% done, estimate finish Fri Feb 24 19:09:59 2012 6.28% done, estimate finish Fri Feb 24 19:09:57 2012 6.28% done, estimate finish Fri Feb 24 19:09:55 2012 6.29% done, estimate finish Fri Feb 24 19:09:53 2012 6.29% done, estimate finish Fri Feb 24 19:10:06 2012 6.30% done, estimate finish Fri Feb 24 19:10:04 2012 6.30% done, estimate finish Fri Feb 24 19:10:02 2012 6.31% done, estimate finish Fri Feb 24 19:10:00 2012 6.31% done, estimate finish Fri Feb 24 19:09:58 2012 6.32% done, estimate finish Fri Feb 24 19:09:55 2012 6.32% done, estimate finish Fri Feb 24 19:09:53 2012 6.33% done, estimate finish Fri Feb 24 19:09:51 2012 6.33% done, estimate finish Fri Feb 24 19:10:05 2012 6.34% done, estimate finish Fri Feb 24 19:10:03 2012 6.35% done, estimate finish Fri Feb 24 19:10:00 2012 6.35% done, estimate finish Fri Feb 24 19:09:58 2012 6.36% done, estimate finish Fri Feb 24 19:09:56 2012 6.36% done, estimate finish Fri Feb 24 19:09:54 2012 6.37% done, estimate finish Fri Feb 24 19:09:52 2012 6.37% done, estimate finish Fri Feb 24 19:09:50 2012 6.38% done, estimate finish Fri Feb 24 19:10:03 2012 6.38% done, estimate finish Fri Feb 24 19:10:01 2012 6.39% done, estimate finish Fri Feb 24 19:09:59 2012 6.39% done, estimate finish Fri Feb 24 19:09:57 2012 6.40% done, estimate finish Fri Feb 24 19:09:55 2012 6.40% done, estimate finish Fri Feb 24 19:09:52 2012 6.41% done, estimate finish Fri Feb 24 19:09:50 2012 6.41% done, estimate finish Fri Feb 24 19:09:48 2012 6.42% done, estimate finish Fri Feb 24 19:10:02 2012 6.43% done, estimate finish Fri Feb 24 19:09:59 2012 6.43% done, estimate finish Fri Feb 24 19:09:57 2012 6.44% done, estimate finish Fri Feb 24 19:09:55 2012 6.44% done, estimate finish Fri Feb 24 19:09:53 2012 6.45% done, estimate finish Fri Feb 24 19:09:51 2012 6.45% done, estimate finish Fri Feb 24 19:09:49 2012 6.46% done, estimate finish Fri Feb 24 19:09:47 2012 6.46% done, estimate finish Fri Feb 24 19:10:00 2012 6.47% done, estimate finish Fri Feb 24 19:09:58 2012 6.47% done, estimate finish Fri Feb 24 19:09:56 2012 6.48% done, estimate finish Fri Feb 24 19:09:54 2012 6.48% done, estimate finish Fri Feb 24 19:09:52 2012 6.49% done, estimate finish Fri Feb 24 19:09:50 2012 6.49% done, estimate finish Fri Feb 24 19:09:47 2012 6.50% done, estimate finish Fri Feb 24 19:09:45 2012 6.51% done, estimate finish Fri Feb 24 19:09:59 2012 6.51% done, estimate finish Fri Feb 24 19:09:57 2012 6.52% done, estimate finish Fri Feb 24 19:09:54 2012 6.52% done, estimate finish Fri Feb 24 19:09:52 2012 6.53% done, estimate finish Fri Feb 24 19:09:50 2012 6.53% done, estimate finish Fri Feb 24 19:09:48 2012 6.54% done, estimate finish Fri Feb 24 19:09:46 2012 6.54% done, estimate finish Fri Feb 24 19:09:44 2012 6.55% done, estimate finish Fri Feb 24 19:09:57 2012 6.55% done, estimate finish Fri Feb 24 19:09:55 2012 6.56% done, estimate finish Fri Feb 24 19:09:53 2012 6.56% done, estimate finish Fri Feb 24 19:09:51 2012 6.57% done, estimate finish Fri Feb 24 19:09:49 2012 6.57% done, estimate finish Fri Feb 24 19:09:47 2012 6.58% done, estimate finish Fri Feb 24 19:09:45 2012 6.59% done, estimate finish Fri Feb 24 19:09:43 2012 6.59% done, estimate finish Fri Feb 24 19:09:56 2012 6.60% done, estimate finish Fri Feb 24 19:09:54 2012 6.60% done, estimate finish Fri Feb 24 19:09:52 2012 6.61% done, estimate finish Fri Feb 24 19:09:50 2012 6.61% done, estimate finish Fri Feb 24 19:09:47 2012 6.62% done, estimate finish Fri Feb 24 19:09:45 2012 6.62% done, estimate finish Fri Feb 24 19:09:43 2012 6.63% done, estimate finish Fri Feb 24 19:09:41 2012 6.63% done, estimate finish Fri Feb 24 19:09:54 2012 6.64% done, estimate finish Fri Feb 24 19:09:52 2012 6.64% done, estimate finish Fri Feb 24 19:09:50 2012 6.65% done, estimate finish Fri Feb 24 19:09:48 2012 6.65% done, estimate finish Fri Feb 24 19:09:46 2012 6.66% done, estimate finish Fri Feb 24 19:09:44 2012 6.67% done, estimate finish Fri Feb 24 19:09:42 2012 6.67% done, estimate finish Fri Feb 24 19:09:40 2012 6.68% done, estimate finish Fri Feb 24 19:09:53 2012 6.68% done, estimate finish Fri Feb 24 19:09:51 2012 6.69% done, estimate finish Fri Feb 24 19:09:49 2012 6.69% done, estimate finish Fri Feb 24 19:09:47 2012 6.70% done, estimate finish Fri Feb 24 19:09:45 2012 6.70% done, estimate finish Fri Feb 24 19:09:43 2012 6.71% done, estimate finish Fri Feb 24 19:09:41 2012 6.71% done, estimate finish Fri Feb 24 19:09:39 2012 6.72% done, estimate finish Fri Feb 24 19:09:52 2012 6.72% done, estimate finish Fri Feb 24 19:09:49 2012 6.73% done, estimate finish Fri Feb 24 19:09:47 2012 6.73% done, estimate finish Fri Feb 24 19:09:45 2012 6.74% done, estimate finish Fri Feb 24 19:09:43 2012 6.75% done, estimate finish Fri Feb 24 19:09:41 2012 6.75% done, estimate finish Fri Feb 24 19:09:39 2012 6.76% done, estimate finish Fri Feb 24 19:09:52 2012 6.76% done, estimate finish Fri Feb 24 19:09:50 2012 6.77% done, estimate finish Fri Feb 24 19:09:48 2012 6.77% done, estimate finish Fri Feb 24 19:09:46 2012 6.78% done, estimate finish Fri Feb 24 19:09:44 2012 6.78% done, estimate finish Fri Feb 24 19:09:42 2012 6.79% done, estimate finish Fri Feb 24 19:09:40 2012 6.79% done, estimate finish Fri Feb 24 19:09:38 2012 6.80% done, estimate finish Fri Feb 24 19:09:51 2012 6.80% done, estimate finish Fri Feb 24 19:09:49 2012 6.81% done, estimate finish Fri Feb 24 19:09:47 2012 6.81% done, estimate finish Fri Feb 24 19:09:45 2012 6.82% done, estimate finish Fri Feb 24 19:09:43 2012 6.83% done, estimate finish Fri Feb 24 19:09:41 2012 6.83% done, estimate finish Fri Feb 24 19:09:39 2012 6.84% done, estimate finish Fri Feb 24 19:09:37 2012 6.84% done, estimate finish Fri Feb 24 19:09:49 2012 6.85% done, estimate finish Fri Feb 24 19:09:47 2012 6.85% done, estimate finish Fri Feb 24 19:09:45 2012 6.86% done, estimate finish Fri Feb 24 19:09:43 2012 6.86% done, estimate finish Fri Feb 24 19:09:41 2012 6.87% done, estimate finish Fri Feb 24 19:09:40 2012 6.87% done, estimate finish Fri Feb 24 19:09:38 2012 6.88% done, estimate finish Fri Feb 24 19:09:36 2012 6.88% done, estimate finish Fri Feb 24 19:09:48 2012 6.89% done, estimate finish Fri Feb 24 19:09:46 2012 6.89% done, estimate finish Fri Feb 24 19:09:44 2012 6.90% done, estimate finish Fri Feb 24 19:09:42 2012 6.91% done, estimate finish Fri Feb 24 19:09:40 2012 6.91% done, estimate finish Fri Feb 24 19:09:38 2012 6.92% done, estimate finish Fri Feb 24 19:09:36 2012 6.92% done, estimate finish Fri Feb 24 19:09:34 2012 6.93% done, estimate finish Fri Feb 24 19:09:47 2012 6.93% done, estimate finish Fri Feb 24 19:09:45 2012 6.94% done, estimate finish Fri Feb 24 19:09:43 2012 6.94% done, estimate finish Fri Feb 24 19:09:41 2012 6.95% done, estimate finish Fri Feb 24 19:09:39 2012 6.95% done, estimate finish Fri Feb 24 19:09:37 2012 6.96% done, estimate finish Fri Feb 24 19:09:35 2012 6.96% done, estimate finish Fri Feb 24 19:09:33 2012 6.97% done, estimate finish Fri Feb 24 19:09:45 2012 6.97% done, estimate finish Fri Feb 24 19:09:44 2012 6.98% done, estimate finish Fri Feb 24 19:09:42 2012 6.99% done, estimate finish Fri Feb 24 19:09:40 2012 6.99% done, estimate finish Fri Feb 24 19:09:38 2012 7.00% done, estimate finish Fri Feb 24 19:09:36 2012 7.00% done, estimate finish Fri Feb 24 19:09:34 2012 7.01% done, estimate finish Fri Feb 24 19:09:32 2012 7.01% done, estimate finish Fri Feb 24 19:09:44 2012 7.02% done, estimate finish Fri Feb 24 19:09:42 2012 7.02% done, estimate finish Fri Feb 24 19:09:40 2012 7.03% done, estimate finish Fri Feb 24 19:09:38 2012 7.03% done, estimate finish Fri Feb 24 19:09:36 2012 7.04% done, estimate finish Fri Feb 24 19:09:35 2012 7.04% done, estimate finish Fri Feb 24 19:09:33 2012 7.05% done, estimate finish Fri Feb 24 19:09:45 2012 7.05% done, estimate finish Fri Feb 24 19:09:43 2012 7.06% done, estimate finish Fri Feb 24 19:09:41 2012 7.07% done, estimate finish Fri Feb 24 19:09:39 2012 7.07% done, estimate finish Fri Feb 24 19:09:37 2012 7.08% done, estimate finish Fri Feb 24 19:09:35 2012 7.08% done, estimate finish Fri Feb 24 19:09:33 2012 7.09% done, estimate finish Fri Feb 24 19:09:45 2012 7.09% done, estimate finish Fri Feb 24 19:09:44 2012 7.10% done, estimate finish Fri Feb 24 19:09:42 2012 7.10% done, estimate finish Fri Feb 24 19:09:40 2012 7.11% done, estimate finish Fri Feb 24 19:09:38 2012 7.11% done, estimate finish Fri Feb 24 19:09:36 2012 7.12% done, estimate finish Fri Feb 24 19:09:34 2012 7.12% done, estimate finish Fri Feb 24 19:09:32 2012 7.13% done, estimate finish Fri Feb 24 19:09:30 2012 7.13% done, estimate finish Fri Feb 24 19:09:42 2012 7.14% done, estimate finish Fri Feb 24 19:09:40 2012 7.15% done, estimate finish Fri Feb 24 19:09:39 2012 7.15% done, estimate finish Fri Feb 24 19:09:37 2012 7.16% done, estimate finish Fri Feb 24 19:09:35 2012 7.16% done, estimate finish Fri Feb 24 19:09:33 2012 7.17% done, estimate finish Fri Feb 24 19:09:31 2012 7.17% done, estimate finish Fri Feb 24 19:09:29 2012 7.18% done, estimate finish Fri Feb 24 19:09:41 2012 7.18% done, estimate finish Fri Feb 24 19:09:39 2012 7.19% done, estimate finish Fri Feb 24 19:09:37 2012 7.19% done, estimate finish Fri Feb 24 19:09:35 2012 7.20% done, estimate finish Fri Feb 24 19:09:34 2012 7.20% done, estimate finish Fri Feb 24 19:09:32 2012 7.21% done, estimate finish Fri Feb 24 19:09:30 2012 7.22% done, estimate finish Fri Feb 24 19:09:42 2012 7.22% done, estimate finish Fri Feb 24 19:09:40 2012 7.23% done, estimate finish Fri Feb 24 19:09:38 2012 7.23% done, estimate finish Fri Feb 24 19:09:36 2012 7.24% done, estimate finish Fri Feb 24 19:09:34 2012 7.24% done, estimate finish Fri Feb 24 19:09:32 2012 7.25% done, estimate finish Fri Feb 24 19:09:30 2012 7.25% done, estimate finish Fri Feb 24 19:09:29 2012 7.26% done, estimate finish Fri Feb 24 19:09:40 2012 7.26% done, estimate finish Fri Feb 24 19:09:39 2012 7.27% done, estimate finish Fri Feb 24 19:09:37 2012 7.27% done, estimate finish Fri Feb 24 19:09:35 2012 7.28% done, estimate finish Fri Feb 24 19:09:33 2012 7.28% done, estimate finish Fri Feb 24 19:09:31 2012 7.29% done, estimate finish Fri Feb 24 19:09:29 2012 7.29% done, estimate finish Fri Feb 24 19:09:27 2012 7.30% done, estimate finish Fri Feb 24 19:09:39 2012 7.31% done, estimate finish Fri Feb 24 19:09:37 2012 7.31% done, estimate finish Fri Feb 24 19:09:36 2012 7.32% done, estimate finish Fri Feb 24 19:09:34 2012 7.32% done, estimate finish Fri Feb 24 19:09:32 2012 7.33% done, estimate finish Fri Feb 24 19:09:30 2012 7.33% done, estimate finish Fri Feb 24 19:09:28 2012 7.34% done, estimate finish Fri Feb 24 19:09:26 2012 7.34% done, estimate finish Fri Feb 24 19:09:38 2012 7.35% done, estimate finish Fri Feb 24 19:09:36 2012 7.35% done, estimate finish Fri Feb 24 19:09:34 2012 7.36% done, estimate finish Fri Feb 24 19:09:33 2012 7.36% done, estimate finish Fri Feb 24 19:09:31 2012 7.37% done, estimate finish Fri Feb 24 19:09:29 2012 7.38% done, estimate finish Fri Feb 24 19:09:27 2012 7.38% done, estimate finish Fri Feb 24 19:09:25 2012 7.39% done, estimate finish Fri Feb 24 19:09:37 2012 7.39% done, estimate finish Fri Feb 24 19:09:35 2012 7.40% done, estimate finish Fri Feb 24 19:09:33 2012 7.40% done, estimate finish Fri Feb 24 19:09:31 2012 7.41% done, estimate finish Fri Feb 24 19:09:30 2012 7.41% done, estimate finish Fri Feb 24 19:09:28 2012 7.42% done, estimate finish Fri Feb 24 19:09:39 2012 7.42% done, estimate finish Fri Feb 24 19:09:38 2012 7.43% done, estimate finish Fri Feb 24 19:09:36 2012 7.43% done, estimate finish Fri Feb 24 19:09:34 2012 7.44% done, estimate finish Fri Feb 24 19:09:32 2012 7.44% done, estimate finish Fri Feb 24 19:09:30 2012 7.45% done, estimate finish Fri Feb 24 19:09:28 2012 7.46% done, estimate finish Fri Feb 24 19:09:27 2012 7.46% done, estimate finish Fri Feb 24 19:09:25 2012 7.47% done, estimate finish Fri Feb 24 19:09:36 2012 7.47% done, estimate finish Fri Feb 24 19:09:35 2012 7.48% done, estimate finish Fri Feb 24 19:09:33 2012 7.48% done, estimate finish Fri Feb 24 19:09:31 2012 7.49% done, estimate finish Fri Feb 24 19:09:29 2012 7.49% done, estimate finish Fri Feb 24 19:09:27 2012 7.50% done, estimate finish Fri Feb 24 19:09:26 2012 7.50% done, estimate finish Fri Feb 24 19:09:24 2012 7.51% done, estimate finish Fri Feb 24 19:09:35 2012 7.51% done, estimate finish Fri Feb 24 19:09:33 2012 7.52% done, estimate finish Fri Feb 24 19:09:32 2012 7.52% done, estimate finish Fri Feb 24 19:09:30 2012 7.53% done, estimate finish Fri Feb 24 19:09:28 2012 7.54% done, estimate finish Fri Feb 24 19:09:26 2012 7.54% done, estimate finish Fri Feb 24 19:09:24 2012 7.55% done, estimate finish Fri Feb 24 19:09:36 2012 7.55% done, estimate finish Fri Feb 24 19:09:34 2012 7.56% done, estimate finish Fri Feb 24 19:09:32 2012 7.56% done, estimate finish Fri Feb 24 19:09:31 2012 7.57% done, estimate finish Fri Feb 24 19:09:29 2012 7.57% done, estimate finish Fri Feb 24 19:09:27 2012 7.58% done, estimate finish Fri Feb 24 19:09:25 2012 7.58% done, estimate finish Fri Feb 24 19:09:23 2012 7.59% done, estimate finish Fri Feb 24 19:09:22 2012 7.59% done, estimate finish Fri Feb 24 19:09:33 2012 7.60% done, estimate finish Fri Feb 24 19:09:31 2012 7.60% done, estimate finish Fri Feb 24 19:09:29 2012 7.61% done, estimate finish Fri Feb 24 19:09:28 2012 7.62% done, estimate finish Fri Feb 24 19:09:26 2012 7.62% done, estimate finish Fri Feb 24 19:09:24 2012 7.63% done, estimate finish Fri Feb 24 19:09:22 2012 7.63% done, estimate finish Fri Feb 24 19:09:21 2012 7.64% done, estimate finish Fri Feb 24 19:09:32 2012 7.64% done, estimate finish Fri Feb 24 19:09:30 2012 7.65% done, estimate finish Fri Feb 24 19:09:28 2012 7.65% done, estimate finish Fri Feb 24 19:09:27 2012 7.66% done, estimate finish Fri Feb 24 19:09:25 2012 7.66% done, estimate finish Fri Feb 24 19:09:23 2012 7.67% done, estimate finish Fri Feb 24 19:09:21 2012 7.67% done, estimate finish Fri Feb 24 19:09:20 2012 7.68% done, estimate finish Fri Feb 24 19:09:31 2012 7.68% done, estimate finish Fri Feb 24 19:09:29 2012 7.69% done, estimate finish Fri Feb 24 19:09:27 2012 7.70% done, estimate finish Fri Feb 24 19:09:26 2012 7.70% done, estimate finish Fri Feb 24 19:09:24 2012 7.71% done, estimate finish Fri Feb 24 19:09:22 2012 7.71% done, estimate finish Fri Feb 24 19:09:20 2012 7.72% done, estimate finish Fri Feb 24 19:09:19 2012 7.72% done, estimate finish Fri Feb 24 19:09:30 2012 7.73% done, estimate finish Fri Feb 24 19:09:28 2012 7.73% done, estimate finish Fri Feb 24 19:09:26 2012 7.74% done, estimate finish Fri Feb 24 19:09:24 2012 7.74% done, estimate finish Fri Feb 24 19:09:23 2012 7.75% done, estimate finish Fri Feb 24 19:09:21 2012 7.75% done, estimate finish Fri Feb 24 19:09:19 2012 7.76% done, estimate finish Fri Feb 24 19:09:18 2012 7.76% done, estimate finish Fri Feb 24 19:09:29 2012 7.77% done, estimate finish Fri Feb 24 19:09:27 2012 7.78% done, estimate finish Fri Feb 24 19:09:25 2012 7.78% done, estimate finish Fri Feb 24 19:09:23 2012 7.79% done, estimate finish Fri Feb 24 19:09:22 2012 7.79% done, estimate finish Fri Feb 24 19:09:20 2012 7.80% done, estimate finish Fri Feb 24 19:09:18 2012 7.80% done, estimate finish Fri Feb 24 19:09:16 2012 7.81% done, estimate finish Fri Feb 24 19:09:28 2012 7.81% done, estimate finish Fri Feb 24 19:09:26 2012 7.82% done, estimate finish Fri Feb 24 19:09:24 2012 7.82% done, estimate finish Fri Feb 24 19:09:22 2012 7.83% done, estimate finish Fri Feb 24 19:09:21 2012 7.83% done, estimate finish Fri Feb 24 19:09:19 2012 7.84% done, estimate finish Fri Feb 24 19:09:17 2012 7.84% done, estimate finish Fri Feb 24 19:09:28 2012 7.85% done, estimate finish Fri Feb 24 19:09:27 2012 7.86% done, estimate finish Fri Feb 24 19:09:25 2012 7.86% done, estimate finish Fri Feb 24 19:09:23 2012 7.87% done, estimate finish Fri Feb 24 19:09:21 2012 7.87% done, estimate finish Fri Feb 24 19:09:20 2012 7.88% done, estimate finish Fri Feb 24 19:09:18 2012 7.88% done, estimate finish Fri Feb 24 19:09:16 2012 7.89% done, estimate finish Fri Feb 24 19:09:27 2012 7.89% done, estimate finish Fri Feb 24 19:09:25 2012 7.90% done, estimate finish Fri Feb 24 19:09:24 2012 7.90% done, estimate finish Fri Feb 24 19:09:22 2012 7.91% done, estimate finish Fri Feb 24 19:09:20 2012 7.91% done, estimate finish Fri Feb 24 19:09:19 2012 7.92% done, estimate finish Fri Feb 24 19:09:17 2012 7.92% done, estimate finish Fri Feb 24 19:09:28 2012 7.93% done, estimate finish Fri Feb 24 19:09:26 2012 7.94% done, estimate finish Fri Feb 24 19:09:24 2012 7.94% done, estimate finish Fri Feb 24 19:09:23 2012 7.95% done, estimate finish Fri Feb 24 19:09:21 2012 7.95% done, estimate finish Fri Feb 24 19:09:19 2012 7.96% done, estimate finish Fri Feb 24 19:09:18 2012 7.96% done, estimate finish Fri Feb 24 19:09:16 2012 7.97% done, estimate finish Fri Feb 24 19:09:27 2012 7.97% done, estimate finish Fri Feb 24 19:09:25 2012 7.98% done, estimate finish Fri Feb 24 19:09:23 2012 7.98% done, estimate finish Fri Feb 24 19:09:22 2012 7.99% done, estimate finish Fri Feb 24 19:09:20 2012 7.99% done, estimate finish Fri Feb 24 19:09:18 2012 8.00% done, estimate finish Fri Feb 24 19:09:17 2012 8.00% done, estimate finish Fri Feb 24 19:09:15 2012 8.01% done, estimate finish Fri Feb 24 19:09:26 2012 8.02% done, estimate finish Fri Feb 24 19:09:24 2012 8.02% done, estimate finish Fri Feb 24 19:09:22 2012 8.03% done, estimate finish Fri Feb 24 19:09:21 2012 8.03% done, estimate finish Fri Feb 24 19:09:19 2012 8.04% done, estimate finish Fri Feb 24 19:09:17 2012 8.04% done, estimate finish Fri Feb 24 19:09:16 2012 8.05% done, estimate finish Fri Feb 24 19:09:14 2012 8.05% done, estimate finish Fri Feb 24 19:09:25 2012 8.06% done, estimate finish Fri Feb 24 19:09:23 2012 8.06% done, estimate finish Fri Feb 24 19:09:21 2012 8.07% done, estimate finish Fri Feb 24 19:09:20 2012 8.07% done, estimate finish Fri Feb 24 19:09:18 2012 8.08% done, estimate finish Fri Feb 24 19:09:16 2012 8.08% done, estimate finish Fri Feb 24 19:09:15 2012 8.09% done, estimate finish Fri Feb 24 19:09:25 2012 8.10% done, estimate finish Fri Feb 24 19:09:24 2012 8.10% done, estimate finish Fri Feb 24 19:09:22 2012 8.11% done, estimate finish Fri Feb 24 19:09:20 2012 8.11% done, estimate finish Fri Feb 24 19:09:19 2012 8.12% done, estimate finish Fri Feb 24 19:09:17 2012 8.12% done, estimate finish Fri Feb 24 19:09:15 2012 8.13% done, estimate finish Fri Feb 24 19:09:14 2012 8.13% done, estimate finish Fri Feb 24 19:09:24 2012 8.14% done, estimate finish Fri Feb 24 19:09:23 2012 8.14% done, estimate finish Fri Feb 24 19:09:21 2012 8.15% done, estimate finish Fri Feb 24 19:09:19 2012 8.15% done, estimate finish Fri Feb 24 19:09:18 2012 8.16% done, estimate finish Fri Feb 24 19:09:16 2012 8.16% done, estimate finish Fri Feb 24 19:09:15 2012 8.17% done, estimate finish Fri Feb 24 19:09:13 2012 8.18% done, estimate finish Fri Feb 24 19:09:23 2012 8.18% done, estimate finish Fri Feb 24 19:09:22 2012 8.19% done, estimate finish Fri Feb 24 19:09:20 2012 8.19% done, estimate finish Fri Feb 24 19:09:19 2012 8.20% done, estimate finish Fri Feb 24 19:09:17 2012 8.20% done, estimate finish Fri Feb 24 19:09:15 2012 8.21% done, estimate finish Fri Feb 24 19:09:14 2012 8.21% done, estimate finish Fri Feb 24 19:09:12 2012 8.22% done, estimate finish Fri Feb 24 19:09:22 2012 8.22% done, estimate finish Fri Feb 24 19:09:21 2012 8.23% done, estimate finish Fri Feb 24 19:09:19 2012 8.23% done, estimate finish Fri Feb 24 19:09:18 2012 8.24% done, estimate finish Fri Feb 24 19:09:16 2012 8.24% done, estimate finish Fri Feb 24 19:09:14 2012 8.25% done, estimate finish Fri Feb 24 19:09:25 2012 8.26% done, estimate finish Fri Feb 24 19:09:23 2012 8.26% done, estimate finish Fri Feb 24 19:09:21 2012 8.27% done, estimate finish Fri Feb 24 19:09:20 2012 8.27% done, estimate finish Fri Feb 24 19:09:18 2012 8.28% done, estimate finish Fri Feb 24 19:09:17 2012 8.28% done, estimate finish Fri Feb 24 19:09:15 2012 8.29% done, estimate finish Fri Feb 24 19:09:13 2012 8.29% done, estimate finish Fri Feb 24 19:09:12 2012 8.30% done, estimate finish Fri Feb 24 19:09:10 2012 8.30% done, estimate finish Fri Feb 24 19:09:20 2012 8.31% done, estimate finish Fri Feb 24 19:09:19 2012 8.31% done, estimate finish Fri Feb 24 19:09:17 2012 8.32% done, estimate finish Fri Feb 24 19:09:16 2012 8.33% done, estimate finish Fri Feb 24 19:09:14 2012 8.33% done, estimate finish Fri Feb 24 19:09:12 2012 8.34% done, estimate finish Fri Feb 24 19:09:11 2012 8.34% done, estimate finish Fri Feb 24 19:09:09 2012 8.35% done, estimate finish Fri Feb 24 19:09:20 2012 8.35% done, estimate finish Fri Feb 24 19:09:18 2012 8.36% done, estimate finish Fri Feb 24 19:09:16 2012 8.36% done, estimate finish Fri Feb 24 19:09:15 2012 8.37% done, estimate finish Fri Feb 24 19:09:13 2012 8.37% done, estimate finish Fri Feb 24 19:09:11 2012 8.38% done, estimate finish Fri Feb 24 19:09:10 2012 8.38% done, estimate finish Fri Feb 24 19:09:08 2012 8.39% done, estimate finish Fri Feb 24 19:09:19 2012 8.39% done, estimate finish Fri Feb 24 19:09:17 2012 8.40% done, estimate finish Fri Feb 24 19:09:15 2012 8.40% done, estimate finish Fri Feb 24 19:09:14 2012 8.41% done, estimate finish Fri Feb 24 19:09:12 2012 8.42% done, estimate finish Fri Feb 24 19:09:11 2012 8.42% done, estimate finish Fri Feb 24 19:09:09 2012 8.43% done, estimate finish Fri Feb 24 19:09:07 2012 8.43% done, estimate finish Fri Feb 24 19:09:18 2012 8.44% done, estimate finish Fri Feb 24 19:09:16 2012 8.44% done, estimate finish Fri Feb 24 19:09:14 2012 8.45% done, estimate finish Fri Feb 24 19:09:13 2012 8.45% done, estimate finish Fri Feb 24 19:09:11 2012 8.46% done, estimate finish Fri Feb 24 19:09:10 2012 8.46% done, estimate finish Fri Feb 24 19:09:08 2012 8.47% done, estimate finish Fri Feb 24 19:09:07 2012 8.47% done, estimate finish Fri Feb 24 19:09:05 2012 8.48% done, estimate finish Fri Feb 24 19:09:15 2012 8.49% done, estimate finish Fri Feb 24 19:09:14 2012 8.49% done, estimate finish Fri Feb 24 19:09:12 2012 8.50% done, estimate finish Fri Feb 24 19:09:10 2012 8.50% done, estimate finish Fri Feb 24 19:09:09 2012 8.51% done, estimate finish Fri Feb 24 19:09:07 2012 8.51% done, estimate finish Fri Feb 24 19:09:06 2012 8.52% done, estimate finish Fri Feb 24 19:09:04 2012 8.52% done, estimate finish Fri Feb 24 19:09:14 2012 8.53% done, estimate finish Fri Feb 24 19:09:13 2012 8.53% done, estimate finish Fri Feb 24 19:09:11 2012 8.54% done, estimate finish Fri Feb 24 19:09:10 2012 8.54% done, estimate finish Fri Feb 24 19:09:08 2012 8.55% done, estimate finish Fri Feb 24 19:09:06 2012 8.55% done, estimate finish Fri Feb 24 19:09:05 2012 8.56% done, estimate finish Fri Feb 24 19:09:03 2012 8.57% done, estimate finish Fri Feb 24 19:09:13 2012 8.57% done, estimate finish Fri Feb 24 19:09:12 2012 8.58% done, estimate finish Fri Feb 24 19:09:10 2012 8.58% done, estimate finish Fri Feb 24 19:09:09 2012 8.59% done, estimate finish Fri Feb 24 19:09:07 2012 8.59% done, estimate finish Fri Feb 24 19:09:06 2012 8.60% done, estimate finish Fri Feb 24 19:09:04 2012 8.60% done, estimate finish Fri Feb 24 19:09:02 2012 8.61% done, estimate finish Fri Feb 24 19:09:12 2012 8.61% done, estimate finish Fri Feb 24 19:09:11 2012 8.62% done, estimate finish Fri Feb 24 19:09:09 2012 8.62% done, estimate finish Fri Feb 24 19:09:08 2012 8.63% done, estimate finish Fri Feb 24 19:09:06 2012 8.63% done, estimate finish Fri Feb 24 19:09:05 2012 8.64% done, estimate finish Fri Feb 24 19:09:03 2012 8.65% done, estimate finish Fri Feb 24 19:09:02 2012 8.65% done, estimate finish Fri Feb 24 19:09:12 2012 8.66% done, estimate finish Fri Feb 24 19:09:10 2012 8.66% done, estimate finish Fri Feb 24 19:09:08 2012 8.67% done, estimate finish Fri Feb 24 19:09:07 2012 8.67% done, estimate finish Fri Feb 24 19:09:05 2012 8.68% done, estimate finish Fri Feb 24 19:09:04 2012 8.68% done, estimate finish Fri Feb 24 19:09:02 2012 8.69% done, estimate finish Fri Feb 24 19:09:01 2012 8.69% done, estimate finish Fri Feb 24 19:09:11 2012 8.70% done, estimate finish Fri Feb 24 19:09:09 2012 8.70% done, estimate finish Fri Feb 24 19:09:08 2012 8.71% done, estimate finish Fri Feb 24 19:09:06 2012 8.71% done, estimate finish Fri Feb 24 19:09:05 2012 8.72% done, estimate finish Fri Feb 24 19:09:03 2012 8.73% done, estimate finish Fri Feb 24 19:09:01 2012 8.73% done, estimate finish Fri Feb 24 19:09:00 2012 8.74% done, estimate finish Fri Feb 24 19:09:10 2012 8.74% done, estimate finish Fri Feb 24 19:09:08 2012 8.75% done, estimate finish Fri Feb 24 19:09:07 2012 8.75% done, estimate finish Fri Feb 24 19:09:05 2012 8.76% done, estimate finish Fri Feb 24 19:09:04 2012 8.76% done, estimate finish Fri Feb 24 19:09:02 2012 8.77% done, estimate finish Fri Feb 24 19:09:01 2012 8.77% done, estimate finish Fri Feb 24 19:08:59 2012 8.78% done, estimate finish Fri Feb 24 19:09:09 2012 8.78% done, estimate finish Fri Feb 24 19:09:07 2012 8.79% done, estimate finish Fri Feb 24 19:09:06 2012 8.79% done, estimate finish Fri Feb 24 19:09:04 2012 8.80% done, estimate finish Fri Feb 24 19:09:03 2012 8.81% done, estimate finish Fri Feb 24 19:09:01 2012 8.81% done, estimate finish Fri Feb 24 19:09:00 2012 8.82% done, estimate finish Fri Feb 24 19:08:58 2012 8.82% done, estimate finish Fri Feb 24 19:09:08 2012 8.83% done, estimate finish Fri Feb 24 19:09:07 2012 8.83% done, estimate finish Fri Feb 24 19:09:05 2012 8.84% done, estimate finish Fri Feb 24 19:09:04 2012 8.84% done, estimate finish Fri Feb 24 19:09:02 2012 8.85% done, estimate finish Fri Feb 24 19:09:01 2012 8.85% done, estimate finish Fri Feb 24 19:08:59 2012 8.86% done, estimate finish Fri Feb 24 19:08:58 2012 8.86% done, estimate finish Fri Feb 24 19:09:07 2012 8.87% done, estimate finish Fri Feb 24 19:09:06 2012 8.87% done, estimate finish Fri Feb 24 19:09:04 2012 8.88% done, estimate finish Fri Feb 24 19:09:03 2012 8.89% done, estimate finish Fri Feb 24 19:09:01 2012 8.89% done, estimate finish Fri Feb 24 19:09:00 2012 8.90% done, estimate finish Fri Feb 24 19:08:58 2012 8.90% done, estimate finish Fri Feb 24 19:08:57 2012 8.91% done, estimate finish Fri Feb 24 19:09:06 2012 8.91% done, estimate finish Fri Feb 24 19:09:05 2012 8.92% done, estimate finish Fri Feb 24 19:09:03 2012 8.92% done, estimate finish Fri Feb 24 19:09:02 2012 8.93% done, estimate finish Fri Feb 24 19:09:00 2012 8.93% done, estimate finish Fri Feb 24 19:08:59 2012 8.94% done, estimate finish Fri Feb 24 19:08:57 2012 8.94% done, estimate finish Fri Feb 24 19:08:56 2012 8.95% done, estimate finish Fri Feb 24 19:09:06 2012 8.95% done, estimate finish Fri Feb 24 19:09:04 2012 8.96% done, estimate finish Fri Feb 24 19:09:03 2012 8.97% done, estimate finish Fri Feb 24 19:09:01 2012 8.97% done, estimate finish Fri Feb 24 19:09:00 2012 8.98% done, estimate finish Fri Feb 24 19:08:58 2012 8.98% done, estimate finish Fri Feb 24 19:08:57 2012 8.99% done, estimate finish Fri Feb 24 19:08:55 2012 8.99% done, estimate finish Fri Feb 24 19:09:05 2012 9.00% done, estimate finish Fri Feb 24 19:09:03 2012 9.00% done, estimate finish Fri Feb 24 19:09:02 2012 9.01% done, estimate finish Fri Feb 24 19:09:00 2012 9.01% done, estimate finish Fri Feb 24 19:08:59 2012 9.02% done, estimate finish Fri Feb 24 19:08:57 2012 9.02% done, estimate finish Fri Feb 24 19:08:56 2012 9.03% done, estimate finish Fri Feb 24 19:08:54 2012 9.03% done, estimate finish Fri Feb 24 19:09:04 2012 9.04% done, estimate finish Fri Feb 24 19:09:03 2012 9.05% done, estimate finish Fri Feb 24 19:09:01 2012 9.05% done, estimate finish Fri Feb 24 19:09:00 2012 9.06% done, estimate finish Fri Feb 24 19:08:58 2012 9.06% done, estimate finish Fri Feb 24 19:08:57 2012 9.07% done, estimate finish Fri Feb 24 19:08:55 2012 9.07% done, estimate finish Fri Feb 24 19:08:54 2012 9.08% done, estimate finish Fri Feb 24 19:09:03 2012 9.08% done, estimate finish Fri Feb 24 19:09:02 2012 9.09% done, estimate finish Fri Feb 24 19:09:00 2012 9.09% done, estimate finish Fri Feb 24 19:08:59 2012 9.10% done, estimate finish Fri Feb 24 19:08:57 2012 9.10% done, estimate finish Fri Feb 24 19:08:56 2012 9.11% done, estimate finish Fri Feb 24 19:08:54 2012 9.11% done, estimate finish Fri Feb 24 19:08:53 2012 9.12% done, estimate finish Fri Feb 24 19:09:02 2012 9.13% done, estimate finish Fri Feb 24 19:09:01 2012 9.13% done, estimate finish Fri Feb 24 19:09:00 2012 9.14% done, estimate finish Fri Feb 24 19:08:58 2012 9.14% done, estimate finish Fri Feb 24 19:08:57 2012 9.15% done, estimate finish Fri Feb 24 19:08:55 2012 9.15% done, estimate finish Fri Feb 24 19:08:54 2012 9.16% done, estimate finish Fri Feb 24 19:08:52 2012 9.16% done, estimate finish Fri Feb 24 19:09:02 2012 9.17% done, estimate finish Fri Feb 24 19:09:00 2012 9.17% done, estimate finish Fri Feb 24 19:08:59 2012 9.18% done, estimate finish Fri Feb 24 19:08:57 2012 9.18% done, estimate finish Fri Feb 24 19:08:56 2012 9.19% done, estimate finish Fri Feb 24 19:08:54 2012 9.19% done, estimate finish Fri Feb 24 19:08:53 2012 9.20% done, estimate finish Fri Feb 24 19:08:51 2012 9.21% done, estimate finish Fri Feb 24 19:09:01 2012 9.21% done, estimate finish Fri Feb 24 19:08:59 2012 9.22% done, estimate finish Fri Feb 24 19:08:58 2012 9.22% done, estimate finish Fri Feb 24 19:08:56 2012 9.23% done, estimate finish Fri Feb 24 19:08:55 2012 9.23% done, estimate finish Fri Feb 24 19:08:54 2012 9.24% done, estimate finish Fri Feb 24 19:08:52 2012 9.24% done, estimate finish Fri Feb 24 19:08:51 2012 9.25% done, estimate finish Fri Feb 24 19:09:00 2012 9.25% done, estimate finish Fri Feb 24 19:08:59 2012 9.26% done, estimate finish Fri Feb 24 19:08:57 2012 9.26% done, estimate finish Fri Feb 24 19:08:56 2012 9.27% done, estimate finish Fri Feb 24 19:08:54 2012 9.27% done, estimate finish Fri Feb 24 19:08:53 2012 9.28% done, estimate finish Fri Feb 24 19:08:51 2012 9.29% done, estimate finish Fri Feb 24 19:08:50 2012 9.29% done, estimate finish Fri Feb 24 19:08:59 2012 9.30% done, estimate finish Fri Feb 24 19:08:58 2012 9.30% done, estimate finish Fri Feb 24 19:08:56 2012 9.31% done, estimate finish Fri Feb 24 19:08:55 2012 9.31% done, estimate finish Fri Feb 24 19:08:54 2012 9.32% done, estimate finish Fri Feb 24 19:08:52 2012 9.32% done, estimate finish Fri Feb 24 19:08:51 2012 9.33% done, estimate finish Fri Feb 24 19:08:49 2012 9.33% done, estimate finish Fri Feb 24 19:08:59 2012 9.34% done, estimate finish Fri Feb 24 19:08:57 2012 9.34% done, estimate finish Fri Feb 24 19:08:56 2012 9.35% done, estimate finish Fri Feb 24 19:08:54 2012 9.35% done, estimate finish Fri Feb 24 19:08:53 2012 9.36% done, estimate finish Fri Feb 24 19:08:51 2012 9.37% done, estimate finish Fri Feb 24 19:08:50 2012 9.37% done, estimate finish Fri Feb 24 19:08:49 2012 9.38% done, estimate finish Fri Feb 24 19:08:58 2012 9.38% done, estimate finish Fri Feb 24 19:08:56 2012 9.39% done, estimate finish Fri Feb 24 19:08:55 2012 9.39% done, estimate finish Fri Feb 24 19:08:54 2012 9.40% done, estimate finish Fri Feb 24 19:08:52 2012 9.40% done, estimate finish Fri Feb 24 19:08:51 2012 9.41% done, estimate finish Fri Feb 24 19:08:49 2012 9.41% done, estimate finish Fri Feb 24 19:08:48 2012 9.42% done, estimate finish Fri Feb 24 19:08:57 2012 9.42% done, estimate finish Fri Feb 24 19:08:56 2012 9.43% done, estimate finish Fri Feb 24 19:08:54 2012 9.44% done, estimate finish Fri Feb 24 19:08:53 2012 9.44% done, estimate finish Fri Feb 24 19:08:51 2012 9.45% done, estimate finish Fri Feb 24 19:08:50 2012 9.45% done, estimate finish Fri Feb 24 19:08:49 2012 9.46% done, estimate finish Fri Feb 24 19:08:47 2012 9.46% done, estimate finish Fri Feb 24 19:08:56 2012 9.47% done, estimate finish Fri Feb 24 19:08:55 2012 9.47% done, estimate finish Fri Feb 24 19:08:54 2012 9.48% done, estimate finish Fri Feb 24 19:08:52 2012 9.48% done, estimate finish Fri Feb 24 19:08:51 2012 9.49% done, estimate finish Fri Feb 24 19:08:49 2012 9.49% done, estimate finish Fri Feb 24 19:08:48 2012 9.50% done, estimate finish Fri Feb 24 19:08:46 2012 9.50% done, estimate finish Fri Feb 24 19:08:56 2012 9.51% done, estimate finish Fri Feb 24 19:08:54 2012 9.51% done, estimate finish Fri Feb 24 19:08:53 2012 9.52% done, estimate finish Fri Feb 24 19:08:51 2012 9.53% done, estimate finish Fri Feb 24 19:08:50 2012 9.53% done, estimate finish Fri Feb 24 19:08:49 2012 9.54% done, estimate finish Fri Feb 24 19:08:47 2012 9.54% done, estimate finish Fri Feb 24 19:08:46 2012 9.55% done, estimate finish Fri Feb 24 19:08:55 2012 9.55% done, estimate finish Fri Feb 24 19:08:54 2012 9.56% done, estimate finish Fri Feb 24 19:08:52 2012 9.56% done, estimate finish Fri Feb 24 19:08:51 2012 9.57% done, estimate finish Fri Feb 24 19:08:49 2012 9.57% done, estimate finish Fri Feb 24 19:08:48 2012 9.58% done, estimate finish Fri Feb 24 19:08:47 2012 9.58% done, estimate finish Fri Feb 24 19:08:45 2012 9.59% done, estimate finish Fri Feb 24 19:08:54 2012 9.60% done, estimate finish Fri Feb 24 19:08:53 2012 9.60% done, estimate finish Fri Feb 24 19:08:51 2012 9.61% done, estimate finish Fri Feb 24 19:08:50 2012 9.61% done, estimate finish Fri Feb 24 19:08:49 2012 9.62% done, estimate finish Fri Feb 24 19:08:47 2012 9.62% done, estimate finish Fri Feb 24 19:08:46 2012 9.63% done, estimate finish Fri Feb 24 19:08:44 2012 9.63% done, estimate finish Fri Feb 24 19:08:53 2012 9.64% done, estimate finish Fri Feb 24 19:08:52 2012 9.64% done, estimate finish Fri Feb 24 19:08:51 2012 9.65% done, estimate finish Fri Feb 24 19:08:49 2012 9.65% done, estimate finish Fri Feb 24 19:08:48 2012 9.66% done, estimate finish Fri Feb 24 19:08:47 2012 9.66% done, estimate finish Fri Feb 24 19:08:45 2012 9.67% done, estimate finish Fri Feb 24 19:08:44 2012 9.68% done, estimate finish Fri Feb 24 19:08:53 2012 9.68% done, estimate finish Fri Feb 24 19:08:51 2012 9.69% done, estimate finish Fri Feb 24 19:08:50 2012 9.69% done, estimate finish Fri Feb 24 19:08:49 2012 9.70% done, estimate finish Fri Feb 24 19:08:47 2012 9.70% done, estimate finish Fri Feb 24 19:08:46 2012 9.71% done, estimate finish Fri Feb 24 19:08:45 2012 9.71% done, estimate finish Fri Feb 24 19:08:43 2012 9.72% done, estimate finish Fri Feb 24 19:08:52 2012 9.72% done, estimate finish Fri Feb 24 19:08:51 2012 9.73% done, estimate finish Fri Feb 24 19:08:49 2012 9.73% done, estimate finish Fri Feb 24 19:08:48 2012 9.74% done, estimate finish Fri Feb 24 19:08:47 2012 9.74% done, estimate finish Fri Feb 24 19:08:45 2012 9.75% done, estimate finish Fri Feb 24 19:08:44 2012 9.76% done, estimate finish Fri Feb 24 19:08:42 2012 9.76% done, estimate finish Fri Feb 24 19:08:51 2012 9.77% done, estimate finish Fri Feb 24 19:08:50 2012 9.77% done, estimate finish Fri Feb 24 19:08:49 2012 9.78% done, estimate finish Fri Feb 24 19:08:47 2012 9.78% done, estimate finish Fri Feb 24 19:08:46 2012 9.79% done, estimate finish Fri Feb 24 19:08:45 2012 9.79% done, estimate finish Fri Feb 24 19:08:43 2012 9.80% done, estimate finish Fri Feb 24 19:08:42 2012 9.80% done, estimate finish Fri Feb 24 19:08:51 2012 9.81% done, estimate finish Fri Feb 24 19:08:49 2012 9.81% done, estimate finish Fri Feb 24 19:08:48 2012 9.82% done, estimate finish Fri Feb 24 19:08:47 2012 9.82% done, estimate finish Fri Feb 24 19:08:45 2012 9.83% done, estimate finish Fri Feb 24 19:08:44 2012 9.84% done, estimate finish Fri Feb 24 19:08:43 2012 9.84% done, estimate finish Fri Feb 24 19:08:41 2012 9.85% done, estimate finish Fri Feb 24 19:08:50 2012 9.85% done, estimate finish Fri Feb 24 19:08:49 2012 9.86% done, estimate finish Fri Feb 24 19:08:47 2012 9.86% done, estimate finish Fri Feb 24 19:08:46 2012 9.87% done, estimate finish Fri Feb 24 19:08:45 2012 9.87% done, estimate finish Fri Feb 24 19:08:43 2012 9.88% done, estimate finish Fri Feb 24 19:08:42 2012 9.88% done, estimate finish Fri Feb 24 19:08:41 2012 9.89% done, estimate finish Fri Feb 24 19:08:49 2012 9.89% done, estimate finish Fri Feb 24 19:08:48 2012 9.90% done, estimate finish Fri Feb 24 19:08:47 2012 9.90% done, estimate finish Fri Feb 24 19:08:45 2012 9.91% done, estimate finish Fri Feb 24 19:08:44 2012 9.92% done, estimate finish Fri Feb 24 19:08:43 2012 9.92% done, estimate finish Fri Feb 24 19:08:41 2012 9.93% done, estimate finish Fri Feb 24 19:08:40 2012 9.93% done, estimate finish Fri Feb 24 19:08:49 2012 9.94% done, estimate finish Fri Feb 24 19:08:47 2012 9.94% done, estimate finish Fri Feb 24 19:08:46 2012 9.95% done, estimate finish Fri Feb 24 19:08:45 2012 9.95% done, estimate finish Fri Feb 24 19:08:43 2012 9.96% done, estimate finish Fri Feb 24 19:08:42 2012 9.96% done, estimate finish Fri Feb 24 19:08:41 2012 9.97% done, estimate finish Fri Feb 24 19:08:39 2012 9.97% done, estimate finish Fri Feb 24 19:08:48 2012 9.98% done, estimate finish Fri Feb 24 19:08:47 2012 9.98% done, estimate finish Fri Feb 24 19:08:45 2012 9.99% done, estimate finish Fri Feb 24 19:08:44 2012 10.00% done, estimate finish Fri Feb 24 19:08:43 2012 10.00% done, estimate finish Fri Feb 24 19:08:41 2012 10.01% done, estimate finish Fri Feb 24 19:08:40 2012 10.01% done, estimate finish Fri Feb 24 19:08:39 2012 10.02% done, estimate finish Fri Feb 24 19:08:47 2012 10.02% done, estimate finish Fri Feb 24 19:08:46 2012 10.03% done, estimate finish Fri Feb 24 19:08:45 2012 10.03% done, estimate finish Fri Feb 24 19:08:43 2012 10.04% done, estimate finish Fri Feb 24 19:08:42 2012 10.04% done, estimate finish Fri Feb 24 19:08:41 2012 10.05% done, estimate finish Fri Feb 24 19:08:39 2012 10.05% done, estimate finish Fri Feb 24 19:08:38 2012 10.06% done, estimate finish Fri Feb 24 19:08:47 2012 10.06% done, estimate finish Fri Feb 24 19:08:45 2012 10.07% done, estimate finish Fri Feb 24 19:08:44 2012 10.08% done, estimate finish Fri Feb 24 19:08:43 2012 10.08% done, estimate finish Fri Feb 24 19:08:41 2012 10.09% done, estimate finish Fri Feb 24 19:08:40 2012 10.09% done, estimate finish Fri Feb 24 19:08:39 2012 10.10% done, estimate finish Fri Feb 24 19:08:37 2012 10.10% done, estimate finish Fri Feb 24 19:08:46 2012 10.11% done, estimate finish Fri Feb 24 19:08:45 2012 10.11% done, estimate finish Fri Feb 24 19:08:43 2012 10.12% done, estimate finish Fri Feb 24 19:08:42 2012 10.12% done, estimate finish Fri Feb 24 19:08:41 2012 10.13% done, estimate finish Fri Feb 24 19:08:39 2012 10.13% done, estimate finish Fri Feb 24 19:08:38 2012 10.14% done, estimate finish Fri Feb 24 19:08:37 2012 10.14% done, estimate finish Fri Feb 24 19:08:45 2012 10.15% done, estimate finish Fri Feb 24 19:08:44 2012 10.16% done, estimate finish Fri Feb 24 19:08:43 2012 10.16% done, estimate finish Fri Feb 24 19:08:41 2012 10.17% done, estimate finish Fri Feb 24 19:08:50 2012 10.17% done, estimate finish Fri Feb 24 19:08:49 2012 10.18% done, estimate finish Fri Feb 24 19:08:47 2012 10.18% done, estimate finish Fri Feb 24 19:08:46 2012 10.19% done, estimate finish Fri Feb 24 19:08:45 2012 10.19% done, estimate finish Fri Feb 24 19:08:43 2012 10.20% done, estimate finish Fri Feb 24 19:08:42 2012 10.20% done, estimate finish Fri Feb 24 19:08:41 2012 10.21% done, estimate finish Fri Feb 24 19:08:49 2012 10.21% done, estimate finish Fri Feb 24 19:08:48 2012 10.22% done, estimate finish Fri Feb 24 19:08:47 2012 10.22% done, estimate finish Fri Feb 24 19:08:45 2012 10.23% done, estimate finish Fri Feb 24 19:08:44 2012 10.24% done, estimate finish Fri Feb 24 19:08:43 2012 10.24% done, estimate finish Fri Feb 24 19:08:42 2012 10.25% done, estimate finish Fri Feb 24 19:08:40 2012 10.25% done, estimate finish Fri Feb 24 19:08:49 2012 10.26% done, estimate finish Fri Feb 24 19:08:47 2012 10.26% done, estimate finish Fri Feb 24 19:08:46 2012 10.27% done, estimate finish Fri Feb 24 19:08:45 2012 10.27% done, estimate finish Fri Feb 24 19:08:44 2012 10.28% done, estimate finish Fri Feb 24 19:08:42 2012 10.28% done, estimate finish Fri Feb 24 19:08:41 2012 10.29% done, estimate finish Fri Feb 24 19:08:40 2012 10.29% done, estimate finish Fri Feb 24 19:08:48 2012 10.30% done, estimate finish Fri Feb 24 19:08:47 2012 10.30% done, estimate finish Fri Feb 24 19:08:45 2012 10.31% done, estimate finish Fri Feb 24 19:08:44 2012 10.32% done, estimate finish Fri Feb 24 19:08:43 2012 10.32% done, estimate finish Fri Feb 24 19:08:42 2012 10.33% done, estimate finish Fri Feb 24 19:08:40 2012 10.33% done, estimate finish Fri Feb 24 19:08:39 2012 10.34% done, estimate finish Fri Feb 24 19:08:47 2012 10.34% done, estimate finish Fri Feb 24 19:08:46 2012 10.35% done, estimate finish Fri Feb 24 19:08:45 2012 10.35% done, estimate finish Fri Feb 24 19:08:44 2012 10.36% done, estimate finish Fri Feb 24 19:08:42 2012 10.36% done, estimate finish Fri Feb 24 19:08:41 2012 10.37% done, estimate finish Fri Feb 24 19:08:40 2012 10.37% done, estimate finish Fri Feb 24 19:08:38 2012 10.38% done, estimate finish Fri Feb 24 19:08:47 2012 10.38% done, estimate finish Fri Feb 24 19:08:46 2012 10.39% done, estimate finish Fri Feb 24 19:08:44 2012 10.40% done, estimate finish Fri Feb 24 19:08:43 2012 10.40% done, estimate finish Fri Feb 24 19:08:42 2012 10.41% done, estimate finish Fri Feb 24 19:08:40 2012 10.41% done, estimate finish Fri Feb 24 19:08:39 2012 10.42% done, estimate finish Fri Feb 24 19:08:38 2012 10.42% done, estimate finish Fri Feb 24 19:08:46 2012 10.43% done, estimate finish Fri Feb 24 19:08:45 2012 10.43% done, estimate finish Fri Feb 24 19:08:44 2012 10.44% done, estimate finish Fri Feb 24 19:08:42 2012 10.44% done, estimate finish Fri Feb 24 19:08:41 2012 10.45% done, estimate finish Fri Feb 24 19:08:40 2012 10.45% done, estimate finish Fri Feb 24 19:08:39 2012 10.46% done, estimate finish Fri Feb 24 19:08:37 2012 10.46% done, estimate finish Fri Feb 24 19:08:46 2012 10.47% done, estimate finish Fri Feb 24 19:08:44 2012 10.48% done, estimate finish Fri Feb 24 19:08:43 2012 10.48% done, estimate finish Fri Feb 24 19:08:42 2012 10.49% done, estimate finish Fri Feb 24 19:08:40 2012 10.49% done, estimate finish Fri Feb 24 19:08:39 2012 10.50% done, estimate finish Fri Feb 24 19:08:38 2012 10.50% done, estimate finish Fri Feb 24 19:08:37 2012 10.51% done, estimate finish Fri Feb 24 19:08:45 2012 10.51% done, estimate finish Fri Feb 24 19:08:44 2012 10.52% done, estimate finish Fri Feb 24 19:08:42 2012 10.52% done, estimate finish Fri Feb 24 19:08:41 2012 10.53% done, estimate finish Fri Feb 24 19:08:40 2012 10.53% done, estimate finish Fri Feb 24 19:08:39 2012 10.54% done, estimate finish Fri Feb 24 19:08:47 2012 10.55% done, estimate finish Fri Feb 24 19:08:46 2012 10.55% done, estimate finish Fri Feb 24 19:08:44 2012 10.56% done, estimate finish Fri Feb 24 19:08:43 2012 10.56% done, estimate finish Fri Feb 24 19:08:42 2012 10.57% done, estimate finish Fri Feb 24 19:08:41 2012 10.57% done, estimate finish Fri Feb 24 19:08:39 2012 10.58% done, estimate finish Fri Feb 24 19:08:38 2012 10.58% done, estimate finish Fri Feb 24 19:08:37 2012 10.59% done, estimate finish Fri Feb 24 19:08:36 2012 10.59% done, estimate finish Fri Feb 24 19:08:44 2012 10.60% done, estimate finish Fri Feb 24 19:08:42 2012 10.60% done, estimate finish Fri Feb 24 19:08:41 2012 10.61% done, estimate finish Fri Feb 24 19:08:40 2012 10.61% done, estimate finish Fri Feb 24 19:08:39 2012 10.62% done, estimate finish Fri Feb 24 19:08:37 2012 10.62% done, estimate finish Fri Feb 24 19:08:36 2012 10.63% done, estimate finish Fri Feb 24 19:08:44 2012 10.64% done, estimate finish Fri Feb 24 19:08:43 2012 10.64% done, estimate finish Fri Feb 24 19:08:42 2012 10.65% done, estimate finish Fri Feb 24 19:08:41 2012 10.65% done, estimate finish Fri Feb 24 19:08:39 2012 10.66% done, estimate finish Fri Feb 24 19:08:38 2012 10.66% done, estimate finish Fri Feb 24 19:08:37 2012 10.67% done, estimate finish Fri Feb 24 19:08:36 2012 10.67% done, estimate finish Fri Feb 24 19:08:34 2012 10.68% done, estimate finish Fri Feb 24 19:08:43 2012 10.68% done, estimate finish Fri Feb 24 19:08:41 2012 10.69% done, estimate finish Fri Feb 24 19:08:40 2012 10.69% done, estimate finish Fri Feb 24 19:08:39 2012 10.70% done, estimate finish Fri Feb 24 19:08:38 2012 10.71% done, estimate finish Fri Feb 24 19:08:36 2012 10.71% done, estimate finish Fri Feb 24 19:08:35 2012 10.72% done, estimate finish Fri Feb 24 19:08:43 2012 10.72% done, estimate finish Fri Feb 24 19:08:42 2012 10.73% done, estimate finish Fri Feb 24 19:08:41 2012 10.73% done, estimate finish Fri Feb 24 19:08:39 2012 10.74% done, estimate finish Fri Feb 24 19:08:38 2012 10.74% done, estimate finish Fri Feb 24 19:08:37 2012 10.75% done, estimate finish Fri Feb 24 19:08:36 2012 10.75% done, estimate finish Fri Feb 24 19:08:35 2012 10.76% done, estimate finish Fri Feb 24 19:08:43 2012 10.76% done, estimate finish Fri Feb 24 19:08:41 2012 10.77% done, estimate finish Fri Feb 24 19:08:40 2012 10.77% done, estimate finish Fri Feb 24 19:08:39 2012 10.78% done, estimate finish Fri Feb 24 19:08:38 2012 10.79% done, estimate finish Fri Feb 24 19:08:36 2012 10.79% done, estimate finish Fri Feb 24 19:08:35 2012 10.80% done, estimate finish Fri Feb 24 19:08:34 2012 10.80% done, estimate finish Fri Feb 24 19:08:42 2012 10.81% done, estimate finish Fri Feb 24 19:08:41 2012 10.81% done, estimate finish Fri Feb 24 19:08:40 2012 10.82% done, estimate finish Fri Feb 24 19:08:38 2012 10.82% done, estimate finish Fri Feb 24 19:08:37 2012 10.83% done, estimate finish Fri Feb 24 19:08:36 2012 10.83% done, estimate finish Fri Feb 24 19:08:35 2012 10.84% done, estimate finish Fri Feb 24 19:08:33 2012 10.84% done, estimate finish Fri Feb 24 19:08:41 2012 10.85% done, estimate finish Fri Feb 24 19:08:40 2012 10.85% done, estimate finish Fri Feb 24 19:08:39 2012 10.86% done, estimate finish Fri Feb 24 19:08:38 2012 10.87% done, estimate finish Fri Feb 24 19:08:36 2012 10.87% done, estimate finish Fri Feb 24 19:08:35 2012 10.88% done, estimate finish Fri Feb 24 19:08:34 2012 10.88% done, estimate finish Fri Feb 24 19:08:33 2012 10.89% done, estimate finish Fri Feb 24 19:08:41 2012 10.89% done, estimate finish Fri Feb 24 19:08:40 2012 10.90% done, estimate finish Fri Feb 24 19:08:38 2012 10.90% done, estimate finish Fri Feb 24 19:08:37 2012 10.91% done, estimate finish Fri Feb 24 19:08:36 2012 10.91% done, estimate finish Fri Feb 24 19:08:35 2012 10.92% done, estimate finish Fri Feb 24 19:08:34 2012 10.92% done, estimate finish Fri Feb 24 19:08:32 2012 10.93% done, estimate finish Fri Feb 24 19:08:40 2012 10.93% done, estimate finish Fri Feb 24 19:08:39 2012 10.94% done, estimate finish Fri Feb 24 19:08:38 2012 10.95% done, estimate finish Fri Feb 24 19:08:37 2012 10.95% done, estimate finish Fri Feb 24 19:08:35 2012 10.96% done, estimate finish Fri Feb 24 19:08:34 2012 10.96% done, estimate finish Fri Feb 24 19:08:33 2012 10.97% done, estimate finish Fri Feb 24 19:08:32 2012 10.97% done, estimate finish Fri Feb 24 19:08:40 2012 10.98% done, estimate finish Fri Feb 24 19:08:38 2012 10.98% done, estimate finish Fri Feb 24 19:08:37 2012 10.99% done, estimate finish Fri Feb 24 19:08:36 2012 10.99% done, estimate finish Fri Feb 24 19:08:35 2012 11.00% done, estimate finish Fri Feb 24 19:08:34 2012 11.00% done, estimate finish Fri Feb 24 19:08:32 2012 11.01% done, estimate finish Fri Feb 24 19:08:31 2012 11.01% done, estimate finish Fri Feb 24 19:08:39 2012 11.02% done, estimate finish Fri Feb 24 19:08:38 2012 11.03% done, estimate finish Fri Feb 24 19:08:37 2012 11.03% done, estimate finish Fri Feb 24 19:08:36 2012 11.04% done, estimate finish Fri Feb 24 19:08:34 2012 11.04% done, estimate finish Fri Feb 24 19:08:33 2012 11.05% done, estimate finish Fri Feb 24 19:08:32 2012 11.05% done, estimate finish Fri Feb 24 19:08:31 2012 11.06% done, estimate finish Fri Feb 24 19:08:39 2012 11.06% done, estimate finish Fri Feb 24 19:08:37 2012 11.07% done, estimate finish Fri Feb 24 19:08:36 2012 11.07% done, estimate finish Fri Feb 24 19:08:35 2012 11.08% done, estimate finish Fri Feb 24 19:08:34 2012 11.08% done, estimate finish Fri Feb 24 19:08:33 2012 11.09% done, estimate finish Fri Feb 24 19:08:31 2012 11.09% done, estimate finish Fri Feb 24 19:08:30 2012 11.10% done, estimate finish Fri Feb 24 19:08:38 2012 11.11% done, estimate finish Fri Feb 24 19:08:37 2012 11.11% done, estimate finish Fri Feb 24 19:08:36 2012 11.12% done, estimate finish Fri Feb 24 19:08:34 2012 11.12% done, estimate finish Fri Feb 24 19:08:33 2012 11.13% done, estimate finish Fri Feb 24 19:08:32 2012 11.13% done, estimate finish Fri Feb 24 19:08:31 2012 11.14% done, estimate finish Fri Feb 24 19:08:30 2012 11.14% done, estimate finish Fri Feb 24 19:08:37 2012 11.15% done, estimate finish Fri Feb 24 19:08:36 2012 11.15% done, estimate finish Fri Feb 24 19:08:35 2012 11.16% done, estimate finish Fri Feb 24 19:08:34 2012 11.16% done, estimate finish Fri Feb 24 19:08:33 2012 11.17% done, estimate finish Fri Feb 24 19:08:32 2012 11.17% done, estimate finish Fri Feb 24 19:08:30 2012 11.18% done, estimate finish Fri Feb 24 19:08:29 2012 11.19% done, estimate finish Fri Feb 24 19:08:37 2012 11.19% done, estimate finish Fri Feb 24 19:08:36 2012 11.20% done, estimate finish Fri Feb 24 19:08:35 2012 11.20% done, estimate finish Fri Feb 24 19:08:33 2012 11.21% done, estimate finish Fri Feb 24 19:08:32 2012 11.21% done, estimate finish Fri Feb 24 19:08:31 2012 11.22% done, estimate finish Fri Feb 24 19:08:30 2012 11.22% done, estimate finish Fri Feb 24 19:08:38 2012 11.23% done, estimate finish Fri Feb 24 19:08:36 2012 11.23% done, estimate finish Fri Feb 24 19:08:35 2012 11.24% done, estimate finish Fri Feb 24 19:08:34 2012 11.24% done, estimate finish Fri Feb 24 19:08:33 2012 11.25% done, estimate finish Fri Feb 24 19:08:32 2012 11.25% done, estimate finish Fri Feb 24 19:08:30 2012 11.26% done, estimate finish Fri Feb 24 19:08:29 2012 11.27% done, estimate finish Fri Feb 24 19:08:37 2012 11.27% done, estimate finish Fri Feb 24 19:08:36 2012 11.28% done, estimate finish Fri Feb 24 19:08:35 2012 11.28% done, estimate finish Fri Feb 24 19:08:33 2012 11.29% done, estimate finish Fri Feb 24 19:08:32 2012 11.29% done, estimate finish Fri Feb 24 19:08:31 2012 11.30% done, estimate finish Fri Feb 24 19:08:30 2012 11.30% done, estimate finish Fri Feb 24 19:08:29 2012 11.31% done, estimate finish Fri Feb 24 19:08:36 2012 11.31% done, estimate finish Fri Feb 24 19:08:35 2012 11.32% done, estimate finish Fri Feb 24 19:08:34 2012 11.32% done, estimate finish Fri Feb 24 19:08:33 2012 11.33% done, estimate finish Fri Feb 24 19:08:32 2012 11.33% done, estimate finish Fri Feb 24 19:08:31 2012 11.34% done, estimate finish Fri Feb 24 19:08:29 2012 11.35% done, estimate finish Fri Feb 24 19:08:28 2012 11.35% done, estimate finish Fri Feb 24 19:08:36 2012 11.36% done, estimate finish Fri Feb 24 19:08:35 2012 11.36% done, estimate finish Fri Feb 24 19:08:34 2012 11.37% done, estimate finish Fri Feb 24 19:08:32 2012 11.37% done, estimate finish Fri Feb 24 19:08:31 2012 11.38% done, estimate finish Fri Feb 24 19:08:30 2012 11.38% done, estimate finish Fri Feb 24 19:08:29 2012 11.39% done, estimate finish Fri Feb 24 19:08:28 2012 11.39% done, estimate finish Fri Feb 24 19:08:35 2012 11.40% done, estimate finish Fri Feb 24 19:08:34 2012 11.40% done, estimate finish Fri Feb 24 19:08:33 2012 11.41% done, estimate finish Fri Feb 24 19:08:32 2012 11.41% done, estimate finish Fri Feb 24 19:08:31 2012 11.42% done, estimate finish Fri Feb 24 19:08:30 2012 11.43% done, estimate finish Fri Feb 24 19:08:28 2012 11.43% done, estimate finish Fri Feb 24 19:08:27 2012 11.44% done, estimate finish Fri Feb 24 19:08:35 2012 11.44% done, estimate finish Fri Feb 24 19:08:34 2012 11.45% done, estimate finish Fri Feb 24 19:08:33 2012 11.45% done, estimate finish Fri Feb 24 19:08:31 2012 11.46% done, estimate finish Fri Feb 24 19:08:30 2012 11.46% done, estimate finish Fri Feb 24 19:08:29 2012 11.47% done, estimate finish Fri Feb 24 19:08:28 2012 11.47% done, estimate finish Fri Feb 24 19:08:35 2012 11.48% done, estimate finish Fri Feb 24 19:08:34 2012 11.48% done, estimate finish Fri Feb 24 19:08:33 2012 11.49% done, estimate finish Fri Feb 24 19:08:32 2012 11.49% done, estimate finish Fri Feb 24 19:08:31 2012 11.50% done, estimate finish Fri Feb 24 19:08:30 2012 11.51% done, estimate finish Fri Feb 24 19:08:29 2012 11.51% done, estimate finish Fri Feb 24 19:08:27 2012 11.52% done, estimate finish Fri Feb 24 19:08:35 2012 11.52% done, estimate finish Fri Feb 24 19:08:34 2012 11.53% done, estimate finish Fri Feb 24 19:08:33 2012 11.53% done, estimate finish Fri Feb 24 19:08:32 2012 11.54% done, estimate finish Fri Feb 24 19:08:30 2012 11.54% done, estimate finish Fri Feb 24 19:08:29 2012 11.55% done, estimate finish Fri Feb 24 19:08:28 2012 11.55% done, estimate finish Fri Feb 24 19:08:36 2012 11.56% done, estimate finish Fri Feb 24 19:08:34 2012 11.56% done, estimate finish Fri Feb 24 19:08:33 2012 11.57% done, estimate finish Fri Feb 24 19:08:32 2012 11.57% done, estimate finish Fri Feb 24 19:08:31 2012 11.58% done, estimate finish Fri Feb 24 19:08:30 2012 11.59% done, estimate finish Fri Feb 24 19:08:29 2012 11.59% done, estimate finish Fri Feb 24 19:08:28 2012 11.60% done, estimate finish Fri Feb 24 19:08:35 2012 11.60% done, estimate finish Fri Feb 24 19:08:34 2012 11.61% done, estimate finish Fri Feb 24 19:08:33 2012 11.61% done, estimate finish Fri Feb 24 19:08:32 2012 11.62% done, estimate finish Fri Feb 24 19:08:39 2012 11.62% done, estimate finish Fri Feb 24 19:08:38 2012 11.63% done, estimate finish Fri Feb 24 19:08:37 2012 11.63% done, estimate finish Fri Feb 24 19:08:36 2012 11.64% done, estimate finish Fri Feb 24 19:08:35 2012 11.64% done, estimate finish Fri Feb 24 19:08:33 2012 11.65% done, estimate finish Fri Feb 24 19:08:32 2012 11.66% done, estimate finish Fri Feb 24 19:08:31 2012 11.66% done, estimate finish Fri Feb 24 19:08:39 2012 11.67% done, estimate finish Fri Feb 24 19:08:37 2012 11.67% done, estimate finish Fri Feb 24 19:08:36 2012 11.68% done, estimate finish Fri Feb 24 19:08:35 2012 11.68% done, estimate finish Fri Feb 24 19:08:34 2012 11.69% done, estimate finish Fri Feb 24 19:08:33 2012 11.69% done, estimate finish Fri Feb 24 19:08:32 2012 11.70% done, estimate finish Fri Feb 24 19:08:31 2012 11.70% done, estimate finish Fri Feb 24 19:08:38 2012 11.71% done, estimate finish Fri Feb 24 19:08:37 2012 11.71% done, estimate finish Fri Feb 24 19:08:36 2012 11.72% done, estimate finish Fri Feb 24 19:08:35 2012 11.72% done, estimate finish Fri Feb 24 19:08:34 2012 11.73% done, estimate finish Fri Feb 24 19:08:32 2012 11.73% done, estimate finish Fri Feb 24 19:08:31 2012 11.74% done, estimate finish Fri Feb 24 19:08:30 2012 11.75% done, estimate finish Fri Feb 24 19:08:38 2012 11.75% done, estimate finish Fri Feb 24 19:08:36 2012 11.76% done, estimate finish Fri Feb 24 19:08:35 2012 11.76% done, estimate finish Fri Feb 24 19:08:34 2012 11.77% done, estimate finish Fri Feb 24 19:08:33 2012 11.77% done, estimate finish Fri Feb 24 19:08:32 2012 11.78% done, estimate finish Fri Feb 24 19:08:31 2012 11.78% done, estimate finish Fri Feb 24 19:08:38 2012 11.79% done, estimate finish Fri Feb 24 19:08:37 2012 11.79% done, estimate finish Fri Feb 24 19:08:36 2012 11.80% done, estimate finish Fri Feb 24 19:08:35 2012 11.80% done, estimate finish Fri Feb 24 19:08:34 2012 11.81% done, estimate finish Fri Feb 24 19:08:33 2012 11.82% done, estimate finish Fri Feb 24 19:08:31 2012 11.82% done, estimate finish Fri Feb 24 19:08:30 2012 11.83% done, estimate finish Fri Feb 24 19:08:38 2012 11.83% done, estimate finish Fri Feb 24 19:08:36 2012 11.84% done, estimate finish Fri Feb 24 19:08:35 2012 11.84% done, estimate finish Fri Feb 24 19:08:34 2012 11.85% done, estimate finish Fri Feb 24 19:08:33 2012 11.85% done, estimate finish Fri Feb 24 19:08:32 2012 11.86% done, estimate finish Fri Feb 24 19:08:31 2012 11.86% done, estimate finish Fri Feb 24 19:08:30 2012 11.87% done, estimate finish Fri Feb 24 19:08:37 2012 11.87% done, estimate finish Fri Feb 24 19:08:36 2012 11.88% done, estimate finish Fri Feb 24 19:08:35 2012 11.88% done, estimate finish Fri Feb 24 19:08:34 2012 11.89% done, estimate finish Fri Feb 24 19:08:33 2012 11.90% done, estimate finish Fri Feb 24 19:08:32 2012 11.90% done, estimate finish Fri Feb 24 19:08:30 2012 11.91% done, estimate finish Fri Feb 24 19:08:29 2012 11.91% done, estimate finish Fri Feb 24 19:08:37 2012 11.92% done, estimate finish Fri Feb 24 19:08:35 2012 11.92% done, estimate finish Fri Feb 24 19:08:34 2012 11.93% done, estimate finish Fri Feb 24 19:08:33 2012 11.93% done, estimate finish Fri Feb 24 19:08:32 2012 11.94% done, estimate finish Fri Feb 24 19:08:31 2012 11.94% done, estimate finish Fri Feb 24 19:08:30 2012 11.95% done, estimate finish Fri Feb 24 19:08:37 2012 11.95% done, estimate finish Fri Feb 24 19:08:36 2012 11.96% done, estimate finish Fri Feb 24 19:08:35 2012 11.96% done, estimate finish Fri Feb 24 19:08:34 2012 11.97% done, estimate finish Fri Feb 24 19:08:33 2012 11.98% done, estimate finish Fri Feb 24 19:08:32 2012 11.98% done, estimate finish Fri Feb 24 19:08:31 2012 11.99% done, estimate finish Fri Feb 24 19:08:29 2012 11.99% done, estimate finish Fri Feb 24 19:08:37 2012 12.00% done, estimate finish Fri Feb 24 19:08:36 2012 12.00% done, estimate finish Fri Feb 24 19:08:34 2012 12.01% done, estimate finish Fri Feb 24 19:08:33 2012 12.01% done, estimate finish Fri Feb 24 19:08:32 2012 12.02% done, estimate finish Fri Feb 24 19:08:31 2012 12.02% done, estimate finish Fri Feb 24 19:08:30 2012 12.03% done, estimate finish Fri Feb 24 19:08:29 2012 12.03% done, estimate finish Fri Feb 24 19:08:36 2012 12.04% done, estimate finish Fri Feb 24 19:08:35 2012 12.04% done, estimate finish Fri Feb 24 19:08:34 2012 12.05% done, estimate finish Fri Feb 24 19:08:33 2012 12.06% done, estimate finish Fri Feb 24 19:08:32 2012 12.06% done, estimate finish Fri Feb 24 19:08:31 2012 12.07% done, estimate finish Fri Feb 24 19:08:30 2012 12.07% done, estimate finish Fri Feb 24 19:08:28 2012 12.08% done, estimate finish Fri Feb 24 19:08:36 2012 12.08% done, estimate finish Fri Feb 24 19:08:35 2012 12.09% done, estimate finish Fri Feb 24 19:08:33 2012 12.09% done, estimate finish Fri Feb 24 19:08:32 2012 12.10% done, estimate finish Fri Feb 24 19:08:31 2012 12.10% done, estimate finish Fri Feb 24 19:08:30 2012 12.11% done, estimate finish Fri Feb 24 19:08:29 2012 12.11% done, estimate finish Fri Feb 24 19:08:36 2012 12.12% done, estimate finish Fri Feb 24 19:08:35 2012 12.12% done, estimate finish Fri Feb 24 19:08:34 2012 12.13% done, estimate finish Fri Feb 24 19:08:33 2012 12.14% done, estimate finish Fri Feb 24 19:08:32 2012 12.14% done, estimate finish Fri Feb 24 19:08:31 2012 12.15% done, estimate finish Fri Feb 24 19:08:30 2012 12.15% done, estimate finish Fri Feb 24 19:08:29 2012 12.16% done, estimate finish Fri Feb 24 19:08:36 2012 12.16% done, estimate finish Fri Feb 24 19:08:35 2012 12.17% done, estimate finish Fri Feb 24 19:08:34 2012 12.17% done, estimate finish Fri Feb 24 19:08:32 2012 12.18% done, estimate finish Fri Feb 24 19:08:31 2012 12.18% done, estimate finish Fri Feb 24 19:08:30 2012 12.19% done, estimate finish Fri Feb 24 19:08:29 2012 12.19% done, estimate finish Fri Feb 24 19:08:36 2012 12.20% done, estimate finish Fri Feb 24 19:08:35 2012 12.20% done, estimate finish Fri Feb 24 19:08:34 2012 12.21% done, estimate finish Fri Feb 24 19:08:33 2012 12.22% done, estimate finish Fri Feb 24 19:08:32 2012 12.22% done, estimate finish Fri Feb 24 19:08:31 2012 12.23% done, estimate finish Fri Feb 24 19:08:30 2012 12.23% done, estimate finish Fri Feb 24 19:08:29 2012 12.24% done, estimate finish Fri Feb 24 19:08:28 2012 12.24% done, estimate finish Fri Feb 24 19:08:35 2012 12.25% done, estimate finish Fri Feb 24 19:08:34 2012 12.25% done, estimate finish Fri Feb 24 19:08:33 2012 12.26% done, estimate finish Fri Feb 24 19:08:32 2012 12.26% done, estimate finish Fri Feb 24 19:08:30 2012 12.27% done, estimate finish Fri Feb 24 19:08:29 2012 12.27% done, estimate finish Fri Feb 24 19:08:28 2012 12.28% done, estimate finish Fri Feb 24 19:08:27 2012 12.28% done, estimate finish Fri Feb 24 19:08:34 2012 12.29% done, estimate finish Fri Feb 24 19:08:33 2012 12.30% done, estimate finish Fri Feb 24 19:08:32 2012 12.30% done, estimate finish Fri Feb 24 19:08:31 2012 12.31% done, estimate finish Fri Feb 24 19:08:30 2012 12.31% done, estimate finish Fri Feb 24 19:08:29 2012 12.32% done, estimate finish Fri Feb 24 19:08:28 2012 12.32% done, estimate finish Fri Feb 24 19:08:27 2012 12.33% done, estimate finish Fri Feb 24 19:08:34 2012 12.33% done, estimate finish Fri Feb 24 19:08:33 2012 12.34% done, estimate finish Fri Feb 24 19:08:32 2012 12.34% done, estimate finish Fri Feb 24 19:08:31 2012 12.35% done, estimate finish Fri Feb 24 19:08:29 2012 12.35% done, estimate finish Fri Feb 24 19:08:28 2012 12.36% done, estimate finish Fri Feb 24 19:08:27 2012 12.36% done, estimate finish Fri Feb 24 19:08:26 2012 12.37% done, estimate finish Fri Feb 24 19:08:33 2012 12.38% done, estimate finish Fri Feb 24 19:08:32 2012 12.38% done, estimate finish Fri Feb 24 19:08:31 2012 12.39% done, estimate finish Fri Feb 24 19:08:30 2012 12.39% done, estimate finish Fri Feb 24 19:08:29 2012 12.40% done, estimate finish Fri Feb 24 19:08:28 2012 12.40% done, estimate finish Fri Feb 24 19:08:27 2012 12.41% done, estimate finish Fri Feb 24 19:08:26 2012 12.41% done, estimate finish Fri Feb 24 19:08:33 2012 12.42% done, estimate finish Fri Feb 24 19:08:32 2012 12.42% done, estimate finish Fri Feb 24 19:08:31 2012 12.43% done, estimate finish Fri Feb 24 19:08:30 2012 12.43% done, estimate finish Fri Feb 24 19:08:29 2012 12.44% done, estimate finish Fri Feb 24 19:08:28 2012 12.44% done, estimate finish Fri Feb 24 19:08:26 2012 12.45% done, estimate finish Fri Feb 24 19:08:25 2012 12.46% done, estimate finish Fri Feb 24 19:08:32 2012 12.46% done, estimate finish Fri Feb 24 19:08:31 2012 12.47% done, estimate finish Fri Feb 24 19:08:30 2012 12.47% done, estimate finish Fri Feb 24 19:08:29 2012 12.48% done, estimate finish Fri Feb 24 19:08:28 2012 12.48% done, estimate finish Fri Feb 24 19:08:27 2012 12.49% done, estimate finish Fri Feb 24 19:08:26 2012 12.49% done, estimate finish Fri Feb 24 19:08:25 2012 12.50% done, estimate finish Fri Feb 24 19:08:32 2012 12.50% done, estimate finish Fri Feb 24 19:08:31 2012 12.51% done, estimate finish Fri Feb 24 19:08:30 2012 12.51% done, estimate finish Fri Feb 24 19:08:29 2012 12.52% done, estimate finish Fri Feb 24 19:08:28 2012 12.52% done, estimate finish Fri Feb 24 19:08:27 2012 12.53% done, estimate finish Fri Feb 24 19:08:26 2012 12.54% done, estimate finish Fri Feb 24 19:08:24 2012 12.54% done, estimate finish Fri Feb 24 19:08:31 2012 12.55% done, estimate finish Fri Feb 24 19:08:30 2012 12.55% done, estimate finish Fri Feb 24 19:08:29 2012 12.56% done, estimate finish Fri Feb 24 19:08:28 2012 12.56% done, estimate finish Fri Feb 24 19:08:27 2012 12.57% done, estimate finish Fri Feb 24 19:08:26 2012 12.57% done, estimate finish Fri Feb 24 19:08:25 2012 12.58% done, estimate finish Fri Feb 24 19:08:24 2012 12.58% done, estimate finish Fri Feb 24 19:08:31 2012 12.59% done, estimate finish Fri Feb 24 19:08:30 2012 12.59% done, estimate finish Fri Feb 24 19:08:29 2012 12.60% done, estimate finish Fri Feb 24 19:08:28 2012 12.60% done, estimate finish Fri Feb 24 19:08:27 2012 12.61% done, estimate finish Fri Feb 24 19:08:26 2012 12.62% done, estimate finish Fri Feb 24 19:08:25 2012 12.62% done, estimate finish Fri Feb 24 19:08:32 2012 12.63% done, estimate finish Fri Feb 24 19:08:30 2012 12.63% done, estimate finish Fri Feb 24 19:08:29 2012 12.64% done, estimate finish Fri Feb 24 19:08:28 2012 12.64% done, estimate finish Fri Feb 24 19:08:27 2012 12.65% done, estimate finish Fri Feb 24 19:08:26 2012 12.65% done, estimate finish Fri Feb 24 19:08:25 2012 12.66% done, estimate finish Fri Feb 24 19:08:24 2012 12.66% done, estimate finish Fri Feb 24 19:08:31 2012 12.67% done, estimate finish Fri Feb 24 19:08:30 2012 12.67% done, estimate finish Fri Feb 24 19:08:29 2012 12.68% done, estimate finish Fri Feb 24 19:08:28 2012 12.68% done, estimate finish Fri Feb 24 19:08:27 2012 12.69% done, estimate finish Fri Feb 24 19:08:26 2012 12.70% done, estimate finish Fri Feb 24 19:08:25 2012 12.70% done, estimate finish Fri Feb 24 19:08:24 2012 12.71% done, estimate finish Fri Feb 24 19:08:31 2012 12.71% done, estimate finish Fri Feb 24 19:08:30 2012 12.72% done, estimate finish Fri Feb 24 19:08:29 2012 12.72% done, estimate finish Fri Feb 24 19:08:27 2012 12.73% done, estimate finish Fri Feb 24 19:08:26 2012 12.73% done, estimate finish Fri Feb 24 19:08:25 2012 12.74% done, estimate finish Fri Feb 24 19:08:24 2012 12.74% done, estimate finish Fri Feb 24 19:08:31 2012 12.75% done, estimate finish Fri Feb 24 19:08:30 2012 12.75% done, estimate finish Fri Feb 24 19:08:29 2012 12.76% done, estimate finish Fri Feb 24 19:08:28 2012 12.77% done, estimate finish Fri Feb 24 19:08:27 2012 12.77% done, estimate finish Fri Feb 24 19:08:26 2012 12.78% done, estimate finish Fri Feb 24 19:08:25 2012 12.78% done, estimate finish Fri Feb 24 19:08:24 2012 12.79% done, estimate finish Fri Feb 24 19:08:31 2012 12.79% done, estimate finish Fri Feb 24 19:08:30 2012 12.80% done, estimate finish Fri Feb 24 19:08:29 2012 12.80% done, estimate finish Fri Feb 24 19:08:28 2012 12.81% done, estimate finish Fri Feb 24 19:08:27 2012 12.81% done, estimate finish Fri Feb 24 19:08:26 2012 12.82% done, estimate finish Fri Feb 24 19:08:25 2012 12.82% done, estimate finish Fri Feb 24 19:08:31 2012 12.83% done, estimate finish Fri Feb 24 19:08:30 2012 12.83% done, estimate finish Fri Feb 24 19:08:29 2012 12.84% done, estimate finish Fri Feb 24 19:08:28 2012 12.84% done, estimate finish Fri Feb 24 19:08:27 2012 12.85% done, estimate finish Fri Feb 24 19:08:26 2012 12.86% done, estimate finish Fri Feb 24 19:08:25 2012 12.86% done, estimate finish Fri Feb 24 19:08:24 2012 12.87% done, estimate finish Fri Feb 24 19:08:31 2012 12.87% done, estimate finish Fri Feb 24 19:08:30 2012 12.88% done, estimate finish Fri Feb 24 19:08:29 2012 12.88% done, estimate finish Fri Feb 24 19:08:28 2012 12.89% done, estimate finish Fri Feb 24 19:08:27 2012 12.89% done, estimate finish Fri Feb 24 19:08:26 2012 12.90% done, estimate finish Fri Feb 24 19:08:25 2012 12.90% done, estimate finish Fri Feb 24 19:08:24 2012 12.91% done, estimate finish Fri Feb 24 19:08:30 2012 12.91% done, estimate finish Fri Feb 24 19:08:29 2012 12.92% done, estimate finish Fri Feb 24 19:08:28 2012 12.93% done, estimate finish Fri Feb 24 19:08:27 2012 12.93% done, estimate finish Fri Feb 24 19:08:26 2012 12.94% done, estimate finish Fri Feb 24 19:08:25 2012 12.94% done, estimate finish Fri Feb 24 19:08:24 2012 12.95% done, estimate finish Fri Feb 24 19:08:23 2012 12.95% done, estimate finish Fri Feb 24 19:08:30 2012 12.96% done, estimate finish Fri Feb 24 19:08:29 2012 12.96% done, estimate finish Fri Feb 24 19:08:28 2012 12.97% done, estimate finish Fri Feb 24 19:08:27 2012 12.97% done, estimate finish Fri Feb 24 19:08:26 2012 12.98% done, estimate finish Fri Feb 24 19:08:25 2012 12.98% done, estimate finish Fri Feb 24 19:08:24 2012 12.99% done, estimate finish Fri Feb 24 19:08:23 2012 12.99% done, estimate finish Fri Feb 24 19:08:30 2012 13.00% done, estimate finish Fri Feb 24 19:08:28 2012 13.01% done, estimate finish Fri Feb 24 19:08:27 2012 13.01% done, estimate finish Fri Feb 24 19:08:26 2012 13.02% done, estimate finish Fri Feb 24 19:08:25 2012 13.02% done, estimate finish Fri Feb 24 19:08:24 2012 13.03% done, estimate finish Fri Feb 24 19:08:23 2012 13.03% done, estimate finish Fri Feb 24 19:08:22 2012 13.04% done, estimate finish Fri Feb 24 19:08:29 2012 13.04% done, estimate finish Fri Feb 24 19:08:28 2012 13.05% done, estimate finish Fri Feb 24 19:08:27 2012 13.05% done, estimate finish Fri Feb 24 19:08:26 2012 13.06% done, estimate finish Fri Feb 24 19:08:25 2012 13.06% done, estimate finish Fri Feb 24 19:08:24 2012 13.07% done, estimate finish Fri Feb 24 19:08:23 2012 13.07% done, estimate finish Fri Feb 24 19:08:22 2012 13.08% done, estimate finish Fri Feb 24 19:08:29 2012 13.09% done, estimate finish Fri Feb 24 19:08:28 2012 13.09% done, estimate finish Fri Feb 24 19:08:27 2012 13.10% done, estimate finish Fri Feb 24 19:08:26 2012 13.10% done, estimate finish Fri Feb 24 19:08:25 2012 13.11% done, estimate finish Fri Feb 24 19:08:24 2012 13.11% done, estimate finish Fri Feb 24 19:08:23 2012 13.12% done, estimate finish Fri Feb 24 19:08:22 2012 13.12% done, estimate finish Fri Feb 24 19:08:28 2012 13.13% done, estimate finish Fri Feb 24 19:08:27 2012 13.13% done, estimate finish Fri Feb 24 19:08:26 2012 13.14% done, estimate finish Fri Feb 24 19:08:25 2012 13.14% done, estimate finish Fri Feb 24 19:08:24 2012 13.15% done, estimate finish Fri Feb 24 19:08:23 2012 13.15% done, estimate finish Fri Feb 24 19:08:22 2012 13.16% done, estimate finish Fri Feb 24 19:08:21 2012 13.17% done, estimate finish Fri Feb 24 19:08:28 2012 13.17% done, estimate finish Fri Feb 24 19:08:27 2012 13.18% done, estimate finish Fri Feb 24 19:08:26 2012 13.18% done, estimate finish Fri Feb 24 19:08:25 2012 13.19% done, estimate finish Fri Feb 24 19:08:24 2012 13.19% done, estimate finish Fri Feb 24 19:08:23 2012 13.20% done, estimate finish Fri Feb 24 19:08:22 2012 13.20% done, estimate finish Fri Feb 24 19:08:21 2012 13.21% done, estimate finish Fri Feb 24 19:08:27 2012 13.21% done, estimate finish Fri Feb 24 19:08:26 2012 13.22% done, estimate finish Fri Feb 24 19:08:25 2012 13.22% done, estimate finish Fri Feb 24 19:08:24 2012 13.23% done, estimate finish Fri Feb 24 19:08:23 2012 13.23% done, estimate finish Fri Feb 24 19:08:22 2012 13.24% done, estimate finish Fri Feb 24 19:08:21 2012 13.25% done, estimate finish Fri Feb 24 19:08:20 2012 13.25% done, estimate finish Fri Feb 24 19:08:27 2012 13.26% done, estimate finish Fri Feb 24 19:08:26 2012 13.26% done, estimate finish Fri Feb 24 19:08:25 2012 13.27% done, estimate finish Fri Feb 24 19:08:24 2012 13.27% done, estimate finish Fri Feb 24 19:08:23 2012 13.28% done, estimate finish Fri Feb 24 19:08:22 2012 13.28% done, estimate finish Fri Feb 24 19:08:21 2012 13.29% done, estimate finish Fri Feb 24 19:08:20 2012 13.29% done, estimate finish Fri Feb 24 19:08:26 2012 13.30% done, estimate finish Fri Feb 24 19:08:25 2012 13.30% done, estimate finish Fri Feb 24 19:08:24 2012 13.31% done, estimate finish Fri Feb 24 19:08:23 2012 13.31% done, estimate finish Fri Feb 24 19:08:22 2012 13.32% done, estimate finish Fri Feb 24 19:08:21 2012 13.33% done, estimate finish Fri Feb 24 19:08:20 2012 === last message repeated 2 times. === 13.34% done, estimate finish Fri Feb 24 19:08:26 2012 13.34% done, estimate finish Fri Feb 24 19:08:25 2012 13.35% done, estimate finish Fri Feb 24 19:08:24 2012 13.35% done, estimate finish Fri Feb 24 19:08:23 2012 13.36% done, estimate finish Fri Feb 24 19:08:22 2012 13.36% done, estimate finish Fri Feb 24 19:08:21 2012 13.37% done, estimate finish Fri Feb 24 19:08:20 2012 13.37% done, estimate finish Fri Feb 24 19:08:27 2012 13.38% done, estimate finish Fri Feb 24 19:08:26 2012 13.38% done, estimate finish Fri Feb 24 19:08:25 2012 13.39% done, estimate finish Fri Feb 24 19:08:24 2012 13.39% done, estimate finish Fri Feb 24 19:08:23 2012 13.40% done, estimate finish Fri Feb 24 19:08:22 2012 13.41% done, estimate finish Fri Feb 24 19:08:21 2012 13.41% done, estimate finish Fri Feb 24 19:08:20 2012 13.42% done, estimate finish Fri Feb 24 19:08:26 2012 13.42% done, estimate finish Fri Feb 24 19:08:25 2012 13.43% done, estimate finish Fri Feb 24 19:08:24 2012 13.43% done, estimate finish Fri Feb 24 19:08:23 2012 13.44% done, estimate finish Fri Feb 24 19:08:22 2012 13.44% done, estimate finish Fri Feb 24 19:08:21 2012 13.45% done, estimate finish Fri Feb 24 19:08:20 2012 13.45% done, estimate finish Fri Feb 24 19:08:19 2012 13.46% done, estimate finish Fri Feb 24 19:08:26 2012 13.46% done, estimate finish Fri Feb 24 19:08:25 2012 13.47% done, estimate finish Fri Feb 24 19:08:24 2012 13.47% done, estimate finish Fri Feb 24 19:08:23 2012 13.48% done, estimate finish Fri Feb 24 19:08:22 2012 13.49% done, estimate finish Fri Feb 24 19:08:21 2012 13.49% done, estimate finish Fri Feb 24 19:08:20 2012 13.50% done, estimate finish Fri Feb 24 19:08:19 2012 13.50% done, estimate finish Fri Feb 24 19:08:25 2012 13.51% done, estimate finish Fri Feb 24 19:08:24 2012 13.51% done, estimate finish Fri Feb 24 19:08:23 2012 13.52% done, estimate finish Fri Feb 24 19:08:22 2012 13.52% done, estimate finish Fri Feb 24 19:08:21 2012 13.53% done, estimate finish Fri Feb 24 19:08:20 2012 13.53% done, estimate finish Fri Feb 24 19:08:19 2012 13.54% done, estimate finish Fri Feb 24 19:08:18 2012 13.54% done, estimate finish Fri Feb 24 19:08:25 2012 13.55% done, estimate finish Fri Feb 24 19:08:24 2012 13.55% done, estimate finish Fri Feb 24 19:08:23 2012 13.56% done, estimate finish Fri Feb 24 19:08:22 2012 13.57% done, estimate finish Fri Feb 24 19:08:21 2012 13.57% done, estimate finish Fri Feb 24 19:08:20 2012 13.58% done, estimate finish Fri Feb 24 19:08:19 2012 13.58% done, estimate finish Fri Feb 24 19:08:18 2012 13.59% done, estimate finish Fri Feb 24 19:08:25 2012 13.59% done, estimate finish Fri Feb 24 19:08:24 2012 13.60% done, estimate finish Fri Feb 24 19:08:23 2012 13.60% done, estimate finish Fri Feb 24 19:08:22 2012 13.61% done, estimate finish Fri Feb 24 19:08:21 2012 13.61% done, estimate finish Fri Feb 24 19:08:20 2012 13.62% done, estimate finish Fri Feb 24 19:08:19 2012 13.62% done, estimate finish Fri Feb 24 19:08:18 2012 13.63% done, estimate finish Fri Feb 24 19:08:17 2012 13.63% done, estimate finish Fri Feb 24 19:08:23 2012 13.64% done, estimate finish Fri Feb 24 19:08:22 2012 13.65% done, estimate finish Fri Feb 24 19:08:21 2012 13.65% done, estimate finish Fri Feb 24 19:08:20 2012 13.66% done, estimate finish Fri Feb 24 19:08:19 2012 13.66% done, estimate finish Fri Feb 24 19:08:18 2012 13.67% done, estimate finish Fri Feb 24 19:08:17 2012 13.67% done, estimate finish Fri Feb 24 19:08:16 2012 13.68% done, estimate finish Fri Feb 24 19:08:23 2012 13.68% done, estimate finish Fri Feb 24 19:08:22 2012 13.69% done, estimate finish Fri Feb 24 19:08:21 2012 13.69% done, estimate finish Fri Feb 24 19:08:20 2012 13.70% done, estimate finish Fri Feb 24 19:08:19 2012 13.70% done, estimate finish Fri Feb 24 19:08:18 2012 13.71% done, estimate finish Fri Feb 24 19:08:17 2012 13.71% done, estimate finish Fri Feb 24 19:08:16 2012 13.72% done, estimate finish Fri Feb 24 19:08:22 2012 13.73% done, estimate finish Fri Feb 24 19:08:21 2012 13.73% done, estimate finish Fri Feb 24 19:08:20 2012 13.74% done, estimate finish Fri Feb 24 19:08:19 2012 13.74% done, estimate finish Fri Feb 24 19:08:18 2012 13.75% done, estimate finish Fri Feb 24 19:08:18 2012 13.75% done, estimate finish Fri Feb 24 19:08:17 2012 13.76% done, estimate finish Fri Feb 24 19:08:16 2012 13.76% done, estimate finish Fri Feb 24 19:08:22 2012 13.77% done, estimate finish Fri Feb 24 19:08:21 2012 13.77% done, estimate finish Fri Feb 24 19:08:20 2012 13.78% done, estimate finish Fri Feb 24 19:08:19 2012 13.78% done, estimate finish Fri Feb 24 19:08:18 2012 13.79% done, estimate finish Fri Feb 24 19:08:17 2012 13.79% done, estimate finish Fri Feb 24 19:08:16 2012 13.80% done, estimate finish Fri Feb 24 19:08:15 2012 13.81% done, estimate finish Fri Feb 24 19:08:22 2012 13.81% done, estimate finish Fri Feb 24 19:08:21 2012 13.82% done, estimate finish Fri Feb 24 19:08:20 2012 13.82% done, estimate finish Fri Feb 24 19:08:19 2012 13.83% done, estimate finish Fri Feb 24 19:08:18 2012 13.83% done, estimate finish Fri Feb 24 19:08:17 2012 13.84% done, estimate finish Fri Feb 24 19:08:16 2012 13.84% done, estimate finish Fri Feb 24 19:08:15 2012 13.85% done, estimate finish Fri Feb 24 19:08:14 2012 13.85% done, estimate finish Fri Feb 24 19:08:20 2012 13.86% done, estimate finish Fri Feb 24 19:08:19 2012 13.86% done, estimate finish Fri Feb 24 19:08:18 2012 13.87% done, estimate finish Fri Feb 24 19:08:17 2012 13.87% done, estimate finish Fri Feb 24 19:08:16 2012 13.88% done, estimate finish Fri Feb 24 19:08:15 2012 13.89% done, estimate finish Fri Feb 24 19:08:14 2012 === last message repeated 2 times. === 13.90% done, estimate finish Fri Feb 24 19:08:20 2012 13.90% done, estimate finish Fri Feb 24 19:08:19 2012 13.91% done, estimate finish Fri Feb 24 19:08:18 2012 13.91% done, estimate finish Fri Feb 24 19:08:17 2012 13.92% done, estimate finish Fri Feb 24 19:08:16 2012 13.92% done, estimate finish Fri Feb 24 19:08:15 2012 13.93% done, estimate finish Fri Feb 24 19:08:14 2012 13.93% done, estimate finish Fri Feb 24 19:08:13 2012 13.94% done, estimate finish Fri Feb 24 19:08:19 2012 13.94% done, estimate finish Fri Feb 24 19:08:18 2012 13.95% done, estimate finish Fri Feb 24 19:08:18 2012 13.95% done, estimate finish Fri Feb 24 19:08:17 2012 13.96% done, estimate finish Fri Feb 24 19:08:16 2012 13.97% done, estimate finish Fri Feb 24 19:08:15 2012 13.97% done, estimate finish Fri Feb 24 19:08:14 2012 13.98% done, estimate finish Fri Feb 24 19:08:13 2012 13.98% done, estimate finish Fri Feb 24 19:08:19 2012 13.99% done, estimate finish Fri Feb 24 19:08:18 2012 13.99% done, estimate finish Fri Feb 24 19:08:17 2012 14.00% done, estimate finish Fri Feb 24 19:08:16 2012 14.00% done, estimate finish Fri Feb 24 19:08:15 2012 14.01% done, estimate finish Fri Feb 24 19:08:14 2012 14.01% done, estimate finish Fri Feb 24 19:08:13 2012 14.02% done, estimate finish Fri Feb 24 19:08:12 2012 14.02% done, estimate finish Fri Feb 24 19:08:19 2012 14.03% done, estimate finish Fri Feb 24 19:08:18 2012 14.04% done, estimate finish Fri Feb 24 19:08:17 2012 14.04% done, estimate finish Fri Feb 24 19:08:16 2012 14.05% done, estimate finish Fri Feb 24 19:08:15 2012 14.05% done, estimate finish Fri Feb 24 19:08:14 2012 14.06% done, estimate finish Fri Feb 24 19:08:13 2012 14.06% done, estimate finish Fri Feb 24 19:08:19 2012 14.07% done, estimate finish Fri Feb 24 19:08:18 2012 14.07% done, estimate finish Fri Feb 24 19:08:17 2012 14.08% done, estimate finish Fri Feb 24 19:08:16 2012 14.08% done, estimate finish Fri Feb 24 19:08:15 2012 14.09% done, estimate finish Fri Feb 24 19:08:15 2012 14.09% done, estimate finish Fri Feb 24 19:08:14 2012 14.10% done, estimate finish Fri Feb 24 19:08:13 2012 14.10% done, estimate finish Fri Feb 24 19:08:19 2012 14.11% done, estimate finish Fri Feb 24 19:08:18 2012 14.12% done, estimate finish Fri Feb 24 19:08:17 2012 14.12% done, estimate finish Fri Feb 24 19:08:16 2012 14.13% done, estimate finish Fri Feb 24 19:08:15 2012 14.13% done, estimate finish Fri Feb 24 19:08:14 2012 14.14% done, estimate finish Fri Feb 24 19:08:13 2012 14.14% done, estimate finish Fri Feb 24 19:08:12 2012 14.15% done, estimate finish Fri Feb 24 19:08:18 2012 14.15% done, estimate finish Fri Feb 24 19:08:17 2012 14.16% done, estimate finish Fri Feb 24 19:08:17 2012 14.16% done, estimate finish Fri Feb 24 19:08:16 2012 14.17% done, estimate finish Fri Feb 24 19:08:15 2012 14.17% done, estimate finish Fri Feb 24 19:08:14 2012 14.18% done, estimate finish Fri Feb 24 19:08:13 2012 14.18% done, estimate finish Fri Feb 24 19:08:12 2012 14.19% done, estimate finish Fri Feb 24 19:08:18 2012 14.20% done, estimate finish Fri Feb 24 19:08:17 2012 14.20% done, estimate finish Fri Feb 24 19:08:16 2012 14.21% done, estimate finish Fri Feb 24 19:08:15 2012 14.21% done, estimate finish Fri Feb 24 19:08:14 2012 14.22% done, estimate finish Fri Feb 24 19:08:13 2012 === last message repeated 2 times. === 14.23% done, estimate finish Fri Feb 24 19:08:12 2012 14.23% done, estimate finish Fri Feb 24 19:08:18 2012 14.24% done, estimate finish Fri Feb 24 19:08:17 2012 14.24% done, estimate finish Fri Feb 24 19:08:16 2012 14.25% done, estimate finish Fri Feb 24 19:08:15 2012 14.25% done, estimate finish Fri Feb 24 19:08:14 2012 14.26% done, estimate finish Fri Feb 24 19:08:13 2012 14.26% done, estimate finish Fri Feb 24 19:08:12 2012 14.27% done, estimate finish Fri Feb 24 19:08:11 2012 14.28% done, estimate finish Fri Feb 24 19:08:17 2012 14.28% done, estimate finish Fri Feb 24 19:08:16 2012 14.29% done, estimate finish Fri Feb 24 19:08:15 2012 === last message repeated 2 times. === 14.30% done, estimate finish Fri Feb 24 19:08:14 2012 14.30% done, estimate finish Fri Feb 24 19:08:13 2012 14.31% done, estimate finish Fri Feb 24 19:08:12 2012 14.31% done, estimate finish Fri Feb 24 19:08:11 2012 14.32% done, estimate finish Fri Feb 24 19:08:17 2012 14.32% done, estimate finish Fri Feb 24 19:08:16 2012 14.33% done, estimate finish Fri Feb 24 19:08:15 2012 14.33% done, estimate finish Fri Feb 24 19:08:14 2012 14.34% done, estimate finish Fri Feb 24 19:08:13 2012 14.34% done, estimate finish Fri Feb 24 19:08:12 2012 14.35% done, estimate finish Fri Feb 24 19:08:11 2012 14.36% done, estimate finish Fri Feb 24 19:08:11 2012 14.36% done, estimate finish Fri Feb 24 19:08:17 2012 14.37% done, estimate finish Fri Feb 24 19:08:16 2012 14.37% done, estimate finish Fri Feb 24 19:08:15 2012 14.38% done, estimate finish Fri Feb 24 19:08:14 2012 14.38% done, estimate finish Fri Feb 24 19:08:13 2012 14.39% done, estimate finish Fri Feb 24 19:08:12 2012 14.39% done, estimate finish Fri Feb 24 19:08:11 2012 14.40% done, estimate finish Fri Feb 24 19:08:10 2012 14.40% done, estimate finish Fri Feb 24 19:08:16 2012 14.41% done, estimate finish Fri Feb 24 19:08:15 2012 14.41% done, estimate finish Fri Feb 24 19:08:14 2012 14.42% done, estimate finish Fri Feb 24 19:08:13 2012 === last message repeated 2 times. === 14.43% done, estimate finish Fri Feb 24 19:08:12 2012 14.44% done, estimate finish Fri Feb 24 19:08:11 2012 14.44% done, estimate finish Fri Feb 24 19:08:10 2012 14.45% done, estimate finish Fri Feb 24 19:08:16 2012 14.45% done, estimate finish Fri Feb 24 19:08:15 2012 14.46% done, estimate finish Fri Feb 24 19:08:14 2012 14.46% done, estimate finish Fri Feb 24 19:08:13 2012 14.47% done, estimate finish Fri Feb 24 19:08:12 2012 14.47% done, estimate finish Fri Feb 24 19:08:11 2012 14.48% done, estimate finish Fri Feb 24 19:08:10 2012 === last message repeated 2 times. === 14.49% done, estimate finish Fri Feb 24 19:08:09 2012 14.49% done, estimate finish Fri Feb 24 19:08:15 2012 14.50% done, estimate finish Fri Feb 24 19:08:14 2012 14.50% done, estimate finish Fri Feb 24 19:08:13 2012 14.51% done, estimate finish Fri Feb 24 19:08:12 2012 14.52% done, estimate finish Fri Feb 24 19:08:11 2012 14.52% done, estimate finish Fri Feb 24 19:08:10 2012 14.53% done, estimate finish Fri Feb 24 19:08:09 2012 14.53% done, estimate finish Fri Feb 24 19:08:08 2012 14.54% done, estimate finish Fri Feb 24 19:08:14 2012 14.54% done, estimate finish Fri Feb 24 19:08:13 2012 14.55% done, estimate finish Fri Feb 24 19:08:12 2012 === last message repeated 2 times. === 14.56% done, estimate finish Fri Feb 24 19:08:11 2012 14.56% done, estimate finish Fri Feb 24 19:08:10 2012 14.57% done, estimate finish Fri Feb 24 19:08:09 2012 14.57% done, estimate finish Fri Feb 24 19:08:08 2012 14.58% done, estimate finish Fri Feb 24 19:08:14 2012 14.58% done, estimate finish Fri Feb 24 19:08:13 2012 14.59% done, estimate finish Fri Feb 24 19:08:12 2012 14.60% done, estimate finish Fri Feb 24 19:08:11 2012 14.60% done, estimate finish Fri Feb 24 19:08:10 2012 14.61% done, estimate finish Fri Feb 24 19:08:09 2012 14.61% done, estimate finish Fri Feb 24 19:08:08 2012 14.62% done, estimate finish Fri Feb 24 19:08:08 2012 14.62% done, estimate finish Fri Feb 24 19:08:14 2012 14.63% done, estimate finish Fri Feb 24 19:08:13 2012 14.63% done, estimate finish Fri Feb 24 19:08:12 2012 14.64% done, estimate finish Fri Feb 24 19:08:11 2012 14.64% done, estimate finish Fri Feb 24 19:08:10 2012 14.65% done, estimate finish Fri Feb 24 19:08:09 2012 14.65% done, estimate finish Fri Feb 24 19:08:08 2012 14.66% done, estimate finish Fri Feb 24 19:08:07 2012 14.66% done, estimate finish Fri Feb 24 19:08:13 2012 14.67% done, estimate finish Fri Feb 24 19:08:12 2012 14.68% done, estimate finish Fri Feb 24 19:08:11 2012 === last message repeated 2 times. === 14.69% done, estimate finish Fri Feb 24 19:08:10 2012 14.69% done, estimate finish Fri Feb 24 19:08:09 2012 14.70% done, estimate finish Fri Feb 24 19:08:08 2012 14.70% done, estimate finish Fri Feb 24 19:08:07 2012 14.71% done, estimate finish Fri Feb 24 19:08:13 2012 14.71% done, estimate finish Fri Feb 24 19:08:12 2012 14.72% done, estimate finish Fri Feb 24 19:08:11 2012 14.72% done, estimate finish Fri Feb 24 19:08:10 2012 14.73% done, estimate finish Fri Feb 24 19:08:09 2012 14.73% done, estimate finish Fri Feb 24 19:08:08 2012 14.74% done, estimate finish Fri Feb 24 19:08:07 2012 === last message repeated 2 times. === 14.75% done, estimate finish Fri Feb 24 19:08:12 2012 14.76% done, estimate finish Fri Feb 24 19:08:12 2012 14.76% done, estimate finish Fri Feb 24 19:08:11 2012 14.77% done, estimate finish Fri Feb 24 19:08:10 2012 14.77% done, estimate finish Fri Feb 24 19:08:09 2012 14.78% done, estimate finish Fri Feb 24 19:08:08 2012 14.78% done, estimate finish Fri Feb 24 19:08:07 2012 14.79% done, estimate finish Fri Feb 24 19:08:06 2012 14.79% done, estimate finish Fri Feb 24 19:08:12 2012 14.80% done, estimate finish Fri Feb 24 19:08:11 2012 14.80% done, estimate finish Fri Feb 24 19:08:10 2012 14.81% done, estimate finish Fri Feb 24 19:08:10 2012 14.81% done, estimate finish Fri Feb 24 19:08:09 2012 14.82% done, estimate finish Fri Feb 24 19:08:08 2012 14.82% done, estimate finish Fri Feb 24 19:08:07 2012 14.83% done, estimate finish Fri Feb 24 19:08:06 2012 14.84% done, estimate finish Fri Feb 24 19:08:12 2012 14.84% done, estimate finish Fri Feb 24 19:08:11 2012 14.85% done, estimate finish Fri Feb 24 19:08:10 2012 14.85% done, estimate finish Fri Feb 24 19:08:09 2012 14.86% done, estimate finish Fri Feb 24 19:08:08 2012 14.86% done, estimate finish Fri Feb 24 19:08:07 2012 14.87% done, estimate finish Fri Feb 24 19:08:07 2012 14.87% done, estimate finish Fri Feb 24 19:08:06 2012 14.88% done, estimate finish Fri Feb 24 19:08:11 2012 === last message repeated 2 times. === 14.89% done, estimate finish Fri Feb 24 19:08:10 2012 14.89% done, estimate finish Fri Feb 24 19:08:09 2012 14.90% done, estimate finish Fri Feb 24 19:08:08 2012 14.90% done, estimate finish Fri Feb 24 19:08:07 2012 14.91% done, estimate finish Fri Feb 24 19:08:06 2012 14.92% done, estimate finish Fri Feb 24 19:08:05 2012 14.92% done, estimate finish Fri Feb 24 19:08:11 2012 14.93% done, estimate finish Fri Feb 24 19:08:10 2012 14.93% done, estimate finish Fri Feb 24 19:08:09 2012 14.94% done, estimate finish Fri Feb 24 19:08:09 2012 14.94% done, estimate finish Fri Feb 24 19:08:08 2012 14.95% done, estimate finish Fri Feb 24 19:08:07 2012 14.95% done, estimate finish Fri Feb 24 19:08:06 2012 14.96% done, estimate finish Fri Feb 24 19:08:05 2012 14.96% done, estimate finish Fri Feb 24 19:08:11 2012 14.97% done, estimate finish Fri Feb 24 19:08:10 2012 14.97% done, estimate finish Fri Feb 24 19:08:09 2012 14.98% done, estimate finish Fri Feb 24 19:08:08 2012 14.98% done, estimate finish Fri Feb 24 19:08:07 2012 14.99% done, estimate finish Fri Feb 24 19:08:06 2012 15.00% done, estimate finish Fri Feb 24 19:08:06 2012 15.00% done, estimate finish Fri Feb 24 19:08:05 2012 15.01% done, estimate finish Fri Feb 24 19:08:10 2012 === last message repeated 2 times. === 15.02% done, estimate finish Fri Feb 24 19:08:09 2012 15.02% done, estimate finish Fri Feb 24 19:08:08 2012 15.03% done, estimate finish Fri Feb 24 19:08:07 2012 15.03% done, estimate finish Fri Feb 24 19:08:06 2012 15.04% done, estimate finish Fri Feb 24 19:08:05 2012 15.04% done, estimate finish Fri Feb 24 19:08:04 2012 15.05% done, estimate finish Fri Feb 24 19:08:10 2012 15.05% done, estimate finish Fri Feb 24 19:08:09 2012 15.06% done, estimate finish Fri Feb 24 19:08:08 2012 === last message repeated 2 times. === 15.07% done, estimate finish Fri Feb 24 19:08:07 2012 15.08% done, estimate finish Fri Feb 24 19:08:06 2012 15.08% done, estimate finish Fri Feb 24 19:08:05 2012 15.09% done, estimate finish Fri Feb 24 19:08:04 2012 15.09% done, estimate finish Fri Feb 24 19:08:10 2012 15.10% done, estimate finish Fri Feb 24 19:08:09 2012 15.10% done, estimate finish Fri Feb 24 19:08:08 2012 15.11% done, estimate finish Fri Feb 24 19:08:07 2012 15.11% done, estimate finish Fri Feb 24 19:08:06 2012 15.12% done, estimate finish Fri Feb 24 19:08:05 2012 === last message repeated 2 times. === 15.13% done, estimate finish Fri Feb 24 19:08:04 2012 15.13% done, estimate finish Fri Feb 24 19:08:09 2012 15.14% done, estimate finish Fri Feb 24 19:08:09 2012 15.14% done, estimate finish Fri Feb 24 19:08:08 2012 15.15% done, estimate finish Fri Feb 24 19:08:07 2012 15.16% done, estimate finish Fri Feb 24 19:08:06 2012 15.16% done, estimate finish Fri Feb 24 19:08:05 2012 15.17% done, estimate finish Fri Feb 24 19:08:04 2012 15.17% done, estimate finish Fri Feb 24 19:08:03 2012 15.18% done, estimate finish Fri Feb 24 19:08:09 2012 15.18% done, estimate finish Fri Feb 24 19:08:08 2012 15.19% done, estimate finish Fri Feb 24 19:08:07 2012 === last message repeated 2 times. === 15.20% done, estimate finish Fri Feb 24 19:08:06 2012 15.20% done, estimate finish Fri Feb 24 19:08:05 2012 15.21% done, estimate finish Fri Feb 24 19:08:04 2012 15.21% done, estimate finish Fri Feb 24 19:08:03 2012 15.22% done, estimate finish Fri Feb 24 19:08:09 2012 15.23% done, estimate finish Fri Feb 24 19:08:08 2012 15.23% done, estimate finish Fri Feb 24 19:08:07 2012 15.24% done, estimate finish Fri Feb 24 19:08:06 2012 15.24% done, estimate finish Fri Feb 24 19:08:05 2012 15.25% done, estimate finish Fri Feb 24 19:08:05 2012 15.25% done, estimate finish Fri Feb 24 19:08:04 2012 15.26% done, estimate finish Fri Feb 24 19:08:03 2012 15.26% done, estimate finish Fri Feb 24 19:08:09 2012 15.27% done, estimate finish Fri Feb 24 19:08:08 2012 15.27% done, estimate finish Fri Feb 24 19:08:07 2012 15.28% done, estimate finish Fri Feb 24 19:08:06 2012 15.28% done, estimate finish Fri Feb 24 19:08:05 2012 15.29% done, estimate finish Fri Feb 24 19:08:04 2012 15.29% done, estimate finish Fri Feb 24 19:08:03 2012 15.30% done, estimate finish Fri Feb 24 19:08:03 2012 15.31% done, estimate finish Fri Feb 24 19:08:08 2012 15.31% done, estimate finish Fri Feb 24 19:08:07 2012 15.32% done, estimate finish Fri Feb 24 19:08:06 2012 === last message repeated 2 times. === 15.33% done, estimate finish Fri Feb 24 19:08:05 2012 15.33% done, estimate finish Fri Feb 24 19:08:04 2012 15.34% done, estimate finish Fri Feb 24 19:08:03 2012 15.34% done, estimate finish Fri Feb 24 19:08:02 2012 15.35% done, estimate finish Fri Feb 24 19:08:08 2012 15.35% done, estimate finish Fri Feb 24 19:08:07 2012 15.36% done, estimate finish Fri Feb 24 19:08:06 2012 15.36% done, estimate finish Fri Feb 24 19:08:05 2012 15.37% done, estimate finish Fri Feb 24 19:08:04 2012 === last message repeated 2 times. === 15.38% done, estimate finish Fri Feb 24 19:08:03 2012 15.39% done, estimate finish Fri Feb 24 19:08:08 2012 === last message repeated 2 times. === 15.40% done, estimate finish Fri Feb 24 19:08:07 2012 15.40% done, estimate finish Fri Feb 24 19:08:06 2012 15.41% done, estimate finish Fri Feb 24 19:08:05 2012 15.41% done, estimate finish Fri Feb 24 19:08:04 2012 15.42% done, estimate finish Fri Feb 24 19:08:03 2012 15.42% done, estimate finish Fri Feb 24 19:08:02 2012 15.43% done, estimate finish Fri Feb 24 19:08:08 2012 15.43% done, estimate finish Fri Feb 24 19:08:07 2012 15.44% done, estimate finish Fri Feb 24 19:08:06 2012 === last message repeated 2 times. === 15.45% done, estimate finish Fri Feb 24 19:08:05 2012 15.45% done, estimate finish Fri Feb 24 19:08:04 2012 15.46% done, estimate finish Fri Feb 24 19:08:03 2012 15.47% done, estimate finish Fri Feb 24 19:08:02 2012 15.47% done, estimate finish Fri Feb 24 19:08:08 2012 15.48% done, estimate finish Fri Feb 24 19:08:07 2012 15.48% done, estimate finish Fri Feb 24 19:08:06 2012 15.49% done, estimate finish Fri Feb 24 19:08:05 2012 15.49% done, estimate finish Fri Feb 24 19:08:04 2012 15.50% done, estimate finish Fri Feb 24 19:08:04 2012 15.50% done, estimate finish Fri Feb 24 19:08:03 2012 15.51% done, estimate finish Fri Feb 24 19:08:02 2012 15.51% done, estimate finish Fri Feb 24 19:08:07 2012 15.52% done, estimate finish Fri Feb 24 19:08:07 2012 15.52% done, estimate finish Fri Feb 24 19:08:06 2012 15.53% done, estimate finish Fri Feb 24 19:08:05 2012 15.53% done, estimate finish Fri Feb 24 19:08:04 2012 15.54% done, estimate finish Fri Feb 24 19:08:03 2012 15.55% done, estimate finish Fri Feb 24 19:08:02 2012 === last message repeated 2 times. === 15.56% done, estimate finish Fri Feb 24 19:08:07 2012 15.56% done, estimate finish Fri Feb 24 19:08:06 2012 15.57% done, estimate finish Fri Feb 24 19:08:05 2012 === last message repeated 2 times. === 15.58% done, estimate finish Fri Feb 24 19:08:04 2012 15.58% done, estimate finish Fri Feb 24 19:08:03 2012 15.59% done, estimate finish Fri Feb 24 19:08:02 2012 15.59% done, estimate finish Fri Feb 24 19:08:01 2012 15.60% done, estimate finish Fri Feb 24 19:08:07 2012 15.60% done, estimate finish Fri Feb 24 19:08:06 2012 15.61% done, estimate finish Fri Feb 24 19:08:05 2012 15.61% done, estimate finish Fri Feb 24 19:08:04 2012 15.62% done, estimate finish Fri Feb 24 19:08:04 2012 15.63% done, estimate finish Fri Feb 24 19:08:03 2012 15.63% done, estimate finish Fri Feb 24 19:08:02 2012 15.64% done, estimate finish Fri Feb 24 19:08:01 2012 15.64% done, estimate finish Fri Feb 24 19:08:07 2012 15.65% done, estimate finish Fri Feb 24 19:08:06 2012 15.65% done, estimate finish Fri Feb 24 19:08:05 2012 15.66% done, estimate finish Fri Feb 24 19:08:04 2012 15.66% done, estimate finish Fri Feb 24 19:08:03 2012 15.67% done, estimate finish Fri Feb 24 19:08:02 2012 === last message repeated 2 times. === 15.68% done, estimate finish Fri Feb 24 19:08:01 2012 15.68% done, estimate finish Fri Feb 24 19:08:06 2012 15.69% done, estimate finish Fri Feb 24 19:08:05 2012 === last message repeated 2 times. === 15.70% done, estimate finish Fri Feb 24 19:08:04 2012 15.71% done, estimate finish Fri Feb 24 19:08:03 2012 15.71% done, estimate finish Fri Feb 24 19:08:02 2012 15.72% done, estimate finish Fri Feb 24 19:08:01 2012 15.72% done, estimate finish Fri Feb 24 19:08:00 2012 15.73% done, estimate finish Fri Feb 24 19:08:06 2012 15.73% done, estimate finish Fri Feb 24 19:08:05 2012 15.74% done, estimate finish Fri Feb 24 19:08:04 2012 15.74% done, estimate finish Fri Feb 24 19:08:03 2012 15.75% done, estimate finish Fri Feb 24 19:08:03 2012 15.75% done, estimate finish Fri Feb 24 19:08:02 2012 15.76% done, estimate finish Fri Feb 24 19:08:01 2012 15.76% done, estimate finish Fri Feb 24 19:08:00 2012 15.77% done, estimate finish Fri Feb 24 19:08:06 2012 15.77% done, estimate finish Fri Feb 24 19:08:05 2012 15.78% done, estimate finish Fri Feb 24 19:08:04 2012 15.79% done, estimate finish Fri Feb 24 19:08:03 2012 15.79% done, estimate finish Fri Feb 24 19:08:02 2012 15.80% done, estimate finish Fri Feb 24 19:08:01 2012 === last message repeated 2 times. === 15.81% done, estimate finish Fri Feb 24 19:08:00 2012 15.81% done, estimate finish Fri Feb 24 19:08:05 2012 15.82% done, estimate finish Fri Feb 24 19:08:04 2012 === last message repeated 2 times. === 15.83% done, estimate finish Fri Feb 24 19:08:03 2012 15.83% done, estimate finish Fri Feb 24 19:08:02 2012 15.84% done, estimate finish Fri Feb 24 19:08:01 2012 15.84% done, estimate finish Fri Feb 24 19:08:00 2012 15.85% done, estimate finish Fri Feb 24 19:08:00 2012 15.85% done, estimate finish Fri Feb 24 19:08:05 2012 15.86% done, estimate finish Fri Feb 24 19:08:04 2012 15.87% done, estimate finish Fri Feb 24 19:08:03 2012 === last message repeated 2 times. === 15.88% done, estimate finish Fri Feb 24 19:08:02 2012 15.88% done, estimate finish Fri Feb 24 19:08:01 2012 15.89% done, estimate finish Fri Feb 24 19:08:00 2012 15.89% done, estimate finish Fri Feb 24 19:07:59 2012 15.90% done, estimate finish Fri Feb 24 19:08:05 2012 15.90% done, estimate finish Fri Feb 24 19:08:04 2012 15.91% done, estimate finish Fri Feb 24 19:08:03 2012 15.91% done, estimate finish Fri Feb 24 19:08:02 2012 15.92% done, estimate finish Fri Feb 24 19:08:01 2012 === last message repeated 2 times. === 15.93% done, estimate finish Fri Feb 24 19:08:00 2012 15.93% done, estimate finish Fri Feb 24 19:07:59 2012 15.94% done, estimate finish Fri Feb 24 19:08:04 2012 15.95% done, estimate finish Fri Feb 24 19:08:04 2012 15.95% done, estimate finish Fri Feb 24 19:08:03 2012 15.96% done, estimate finish Fri Feb 24 19:08:02 2012 15.96% done, estimate finish Fri Feb 24 19:08:01 2012 15.97% done, estimate finish Fri Feb 24 19:08:00 2012 === last message repeated 2 times. === 15.98% done, estimate finish Fri Feb 24 19:07:59 2012 15.98% done, estimate finish Fri Feb 24 19:08:04 2012 15.99% done, estimate finish Fri Feb 24 19:08:03 2012 15.99% done, estimate finish Fri Feb 24 19:08:02 2012 16.00% done, estimate finish Fri Feb 24 19:08:02 2012 16.00% done, estimate finish Fri Feb 24 19:08:01 2012 16.01% done, estimate finish Fri Feb 24 19:08:00 2012 16.01% done, estimate finish Fri Feb 24 19:07:59 2012 16.02% done, estimate finish Fri Feb 24 19:08:05 2012 16.03% done, estimate finish Fri Feb 24 19:08:04 2012 16.03% done, estimate finish Fri Feb 24 19:08:03 2012 16.04% done, estimate finish Fri Feb 24 19:08:02 2012 16.04% done, estimate finish Fri Feb 24 19:08:01 2012 16.05% done, estimate finish Fri Feb 24 19:08:01 2012 16.05% done, estimate finish Fri Feb 24 19:08:00 2012 16.06% done, estimate finish Fri Feb 24 19:07:59 2012 16.06% done, estimate finish Fri Feb 24 19:08:04 2012 16.07% done, estimate finish Fri Feb 24 19:08:04 2012 16.07% done, estimate finish Fri Feb 24 19:08:03 2012 16.08% done, estimate finish Fri Feb 24 19:08:02 2012 16.08% done, estimate finish Fri Feb 24 19:08:01 2012 16.09% done, estimate finish Fri Feb 24 19:08:00 2012 16.09% done, estimate finish Fri Feb 24 19:07:59 2012 16.10% done, estimate finish Fri Feb 24 19:07:59 2012 16.11% done, estimate finish Fri Feb 24 19:08:04 2012 16.11% done, estimate finish Fri Feb 24 19:08:03 2012 16.12% done, estimate finish Fri Feb 24 19:08:02 2012 === last message repeated 2 times. === 16.13% done, estimate finish Fri Feb 24 19:08:01 2012 16.13% done, estimate finish Fri Feb 24 19:08:00 2012 16.14% done, estimate finish Fri Feb 24 19:07:59 2012 16.14% done, estimate finish Fri Feb 24 19:07:58 2012 16.15% done, estimate finish Fri Feb 24 19:08:04 2012 16.15% done, estimate finish Fri Feb 24 19:08:03 2012 16.16% done, estimate finish Fri Feb 24 19:08:02 2012 16.16% done, estimate finish Fri Feb 24 19:08:01 2012 16.17% done, estimate finish Fri Feb 24 19:08:01 2012 16.17% done, estimate finish Fri Feb 24 19:08:00 2012 16.18% done, estimate finish Fri Feb 24 19:07:59 2012 16.19% done, estimate finish Fri Feb 24 19:07:58 2012 16.19% done, estimate finish Fri Feb 24 19:08:03 2012 16.20% done, estimate finish Fri Feb 24 19:08:03 2012 16.20% done, estimate finish Fri Feb 24 19:08:02 2012 16.21% done, estimate finish Fri Feb 24 19:08:01 2012 16.21% done, estimate finish Fri Feb 24 19:08:00 2012 16.22% done, estimate finish Fri Feb 24 19:07:59 2012 === last message repeated 2 times. === 16.23% done, estimate finish Fri Feb 24 19:07:58 2012 16.23% done, estimate finish Fri Feb 24 19:08:03 2012 16.24% done, estimate finish Fri Feb 24 19:08:02 2012 === last message repeated 2 times. === 16.25% done, estimate finish Fri Feb 24 19:08:01 2012 16.25% done, estimate finish Fri Feb 24 19:08:00 2012 16.26% done, estimate finish Fri Feb 24 19:07:59 2012 16.27% done, estimate finish Fri Feb 24 19:07:58 2012 === last message repeated 2 times. === 16.28% done, estimate finish Fri Feb 24 19:08:03 2012 16.28% done, estimate finish Fri Feb 24 19:08:02 2012 16.29% done, estimate finish Fri Feb 24 19:08:01 2012 16.29% done, estimate finish Fri Feb 24 19:08:00 2012 16.30% done, estimate finish Fri Feb 24 19:08:00 2012 16.30% done, estimate finish Fri Feb 24 19:07:59 2012 16.31% done, estimate finish Fri Feb 24 19:07:58 2012 16.31% done, estimate finish Fri Feb 24 19:07:57 2012 16.32% done, estimate finish Fri Feb 24 19:08:03 2012 16.32% done, estimate finish Fri Feb 24 19:08:02 2012 16.33% done, estimate finish Fri Feb 24 19:08:01 2012 16.34% done, estimate finish Fri Feb 24 19:08:00 2012 16.34% done, estimate finish Fri Feb 24 19:07:59 2012 16.35% done, estimate finish Fri Feb 24 19:07:59 2012 16.35% done, estimate finish Fri Feb 24 19:07:58 2012 16.36% done, estimate finish Fri Feb 24 19:07:57 2012 16.36% done, estimate finish Fri Feb 24 19:08:02 2012 16.37% done, estimate finish Fri Feb 24 19:08:02 2012 16.37% done, estimate finish Fri Feb 24 19:08:01 2012 16.38% done, estimate finish Fri Feb 24 19:08:00 2012 16.38% done, estimate finish Fri Feb 24 19:07:59 2012 16.39% done, estimate finish Fri Feb 24 19:07:58 2012 === last message repeated 2 times. === 16.40% done, estimate finish Fri Feb 24 19:07:57 2012 16.40% done, estimate finish Fri Feb 24 19:08:02 2012 16.41% done, estimate finish Fri Feb 24 19:08:01 2012 16.42% done, estimate finish Fri Feb 24 19:08:00 2012 === last message repeated 2 times. === 16.43% done, estimate finish Fri Feb 24 19:07:59 2012 16.43% done, estimate finish Fri Feb 24 19:07:58 2012 16.44% done, estimate finish Fri Feb 24 19:07:57 2012 16.44% done, estimate finish Fri Feb 24 19:07:56 2012 16.45% done, estimate finish Fri Feb 24 19:08:02 2012 16.45% done, estimate finish Fri Feb 24 19:08:01 2012 16.46% done, estimate finish Fri Feb 24 19:08:00 2012 16.46% done, estimate finish Fri Feb 24 19:07:59 2012 16.47% done, estimate finish Fri Feb 24 19:07:59 2012 16.47% done, estimate finish Fri Feb 24 19:07:58 2012 16.48% done, estimate finish Fri Feb 24 19:07:57 2012 16.48% done, estimate finish Fri Feb 24 19:07:56 2012 16.49% done, estimate finish Fri Feb 24 19:08:02 2012 16.50% done, estimate finish Fri Feb 24 19:08:01 2012 16.50% done, estimate finish Fri Feb 24 19:08:00 2012 16.51% done, estimate finish Fri Feb 24 19:07:59 2012 16.51% done, estimate finish Fri Feb 24 19:07:58 2012 16.52% done, estimate finish Fri Feb 24 19:07:58 2012 16.52% done, estimate finish Fri Feb 24 19:07:57 2012 16.53% done, estimate finish Fri Feb 24 19:07:56 2012 16.53% done, estimate finish Fri Feb 24 19:08:01 2012 16.54% done, estimate finish Fri Feb 24 19:08:00 2012 === last message repeated 2 times. === 16.55% done, estimate finish Fri Feb 24 19:07:59 2012 16.55% done, estimate finish Fri Feb 24 19:07:58 2012 16.56% done, estimate finish Fri Feb 24 19:07:57 2012 16.56% done, estimate finish Fri Feb 24 19:07:56 2012 16.57% done, estimate finish Fri Feb 24 19:07:56 2012 16.58% done, estimate finish Fri Feb 24 19:08:01 2012 16.58% done, estimate finish Fri Feb 24 19:08:00 2012 16.59% done, estimate finish Fri Feb 24 19:07:59 2012 === last message repeated 2 times. === 16.60% done, estimate finish Fri Feb 24 19:07:58 2012 16.60% done, estimate finish Fri Feb 24 19:07:57 2012 16.61% done, estimate finish Fri Feb 24 19:07:56 2012 16.61% done, estimate finish Fri Feb 24 19:07:55 2012 16.62% done, estimate finish Fri Feb 24 19:08:01 2012 16.62% done, estimate finish Fri Feb 24 19:08:00 2012 16.63% done, estimate finish Fri Feb 24 19:07:59 2012 16.63% done, estimate finish Fri Feb 24 19:07:58 2012 16.64% done, estimate finish Fri Feb 24 19:07:58 2012 16.64% done, estimate finish Fri Feb 24 19:07:57 2012 16.65% done, estimate finish Fri Feb 24 19:07:56 2012 16.66% done, estimate finish Fri Feb 24 19:07:55 2012 16.66% done, estimate finish Fri Feb 24 19:08:00 2012 16.67% done, estimate finish Fri Feb 24 19:08:00 2012 16.67% done, estimate finish Fri Feb 24 19:07:59 2012 16.68% done, estimate finish Fri Feb 24 19:07:58 2012 16.68% done, estimate finish Fri Feb 24 19:07:57 2012 16.69% done, estimate finish Fri Feb 24 19:07:56 2012 === last message repeated 2 times. === 16.70% done, estimate finish Fri Feb 24 19:08:01 2012 16.70% done, estimate finish Fri Feb 24 19:08:00 2012 16.71% done, estimate finish Fri Feb 24 19:07:59 2012 === last message repeated 2 times. === 16.72% done, estimate finish Fri Feb 24 19:07:58 2012 16.72% done, estimate finish Fri Feb 24 19:07:57 2012 16.73% done, estimate finish Fri Feb 24 19:07:56 2012 16.74% done, estimate finish Fri Feb 24 19:07:55 2012 16.74% done, estimate finish Fri Feb 24 19:08:01 2012 16.75% done, estimate finish Fri Feb 24 19:08:00 2012 16.75% done, estimate finish Fri Feb 24 19:07:59 2012 16.76% done, estimate finish Fri Feb 24 19:07:58 2012 === last message repeated 2 times. === 16.77% done, estimate finish Fri Feb 24 19:07:57 2012 16.77% done, estimate finish Fri Feb 24 19:07:56 2012 16.78% done, estimate finish Fri Feb 24 19:07:55 2012 16.78% done, estimate finish Fri Feb 24 19:08:00 2012 16.79% done, estimate finish Fri Feb 24 19:08:00 2012 16.79% done, estimate finish Fri Feb 24 19:07:59 2012 16.80% done, estimate finish Fri Feb 24 19:07:58 2012 16.80% done, estimate finish Fri Feb 24 19:07:57 2012 16.81% done, estimate finish Fri Feb 24 19:07:56 2012 16.82% done, estimate finish Fri Feb 24 19:07:56 2012 16.82% done, estimate finish Fri Feb 24 19:07:55 2012 16.83% done, estimate finish Fri Feb 24 19:08:00 2012 16.83% done, estimate finish Fri Feb 24 19:07:59 2012 16.84% done, estimate finish Fri Feb 24 19:07:59 2012 16.84% done, estimate finish Fri Feb 24 19:07:58 2012 16.85% done, estimate finish Fri Feb 24 19:07:57 2012 16.85% done, estimate finish Fri Feb 24 19:07:56 2012 16.86% done, estimate finish Fri Feb 24 19:07:55 2012 === last message repeated 2 times. === 16.87% done, estimate finish Fri Feb 24 19:08:00 2012 16.87% done, estimate finish Fri Feb 24 19:07:59 2012 16.88% done, estimate finish Fri Feb 24 19:07:58 2012 16.88% done, estimate finish Fri Feb 24 19:07:57 2012 16.89% done, estimate finish Fri Feb 24 19:07:57 2012 16.90% done, estimate finish Fri Feb 24 19:07:56 2012 16.90% done, estimate finish Fri Feb 24 19:07:55 2012 16.91% done, estimate finish Fri Feb 24 19:07:54 2012 16.91% done, estimate finish Fri Feb 24 19:08:00 2012 16.92% done, estimate finish Fri Feb 24 19:07:59 2012 16.92% done, estimate finish Fri Feb 24 19:07:58 2012 16.93% done, estimate finish Fri Feb 24 19:07:57 2012 16.93% done, estimate finish Fri Feb 24 19:07:56 2012 16.94% done, estimate finish Fri Feb 24 19:07:56 2012 16.94% done, estimate finish Fri Feb 24 19:07:55 2012 16.95% done, estimate finish Fri Feb 24 19:07:54 2012 16.95% done, estimate finish Fri Feb 24 19:07:59 2012 16.96% done, estimate finish Fri Feb 24 19:07:59 2012 16.96% done, estimate finish Fri Feb 24 19:07:58 2012 16.97% done, estimate finish Fri Feb 24 19:07:57 2012 16.98% done, estimate finish Fri Feb 24 19:07:56 2012 16.98% done, estimate finish Fri Feb 24 19:07:55 2012 16.99% done, estimate finish Fri Feb 24 19:07:55 2012 16.99% done, estimate finish Fri Feb 24 19:07:54 2012 17.00% done, estimate finish Fri Feb 24 19:07:59 2012 17.00% done, estimate finish Fri Feb 24 19:07:58 2012 17.01% done, estimate finish Fri Feb 24 19:07:57 2012 === last message repeated 2 times. === 17.02% done, estimate finish Fri Feb 24 19:07:56 2012 17.02% done, estimate finish Fri Feb 24 19:07:55 2012 17.03% done, estimate finish Fri Feb 24 19:07:54 2012 === last message repeated 2 times. === 17.04% done, estimate finish Fri Feb 24 19:07:59 2012 17.04% done, estimate finish Fri Feb 24 19:07:58 2012 17.05% done, estimate finish Fri Feb 24 19:07:57 2012 17.06% done, estimate finish Fri Feb 24 19:07:56 2012 === last message repeated 2 times. === 17.07% done, estimate finish Fri Feb 24 19:07:55 2012 17.07% done, estimate finish Fri Feb 24 19:07:54 2012 17.08% done, estimate finish Fri Feb 24 19:07:53 2012 17.08% done, estimate finish Fri Feb 24 19:07:58 2012 17.09% done, estimate finish Fri Feb 24 19:07:58 2012 17.09% done, estimate finish Fri Feb 24 19:07:57 2012 17.10% done, estimate finish Fri Feb 24 19:07:56 2012 17.10% done, estimate finish Fri Feb 24 19:07:55 2012 17.11% done, estimate finish Fri Feb 24 19:07:55 2012 17.11% done, estimate finish Fri Feb 24 19:07:54 2012 17.12% done, estimate finish Fri Feb 24 19:07:53 2012 17.12% done, estimate finish Fri Feb 24 19:07:58 2012 17.13% done, estimate finish Fri Feb 24 19:07:57 2012 17.14% done, estimate finish Fri Feb 24 19:07:57 2012 17.14% done, estimate finish Fri Feb 24 19:07:56 2012 17.15% done, estimate finish Fri Feb 24 19:07:55 2012 17.15% done, estimate finish Fri Feb 24 19:07:54 2012 17.16% done, estimate finish Fri Feb 24 19:07:54 2012 17.16% done, estimate finish Fri Feb 24 19:07:53 2012 17.17% done, estimate finish Fri Feb 24 19:07:58 2012 17.17% done, estimate finish Fri Feb 24 19:07:57 2012 17.18% done, estimate finish Fri Feb 24 19:07:56 2012 === last message repeated 2 times. === 17.19% done, estimate finish Fri Feb 24 19:07:55 2012 17.19% done, estimate finish Fri Feb 24 19:07:54 2012 17.20% done, estimate finish Fri Feb 24 19:07:59 2012 17.20% done, estimate finish Fri Feb 24 19:07:58 2012 17.21% done, estimate finish Fri Feb 24 19:07:58 2012 17.22% done, estimate finish Fri Feb 24 19:07:57 2012 17.22% done, estimate finish Fri Feb 24 19:08:02 2012 17.23% done, estimate finish Fri Feb 24 19:08:01 2012 17.23% done, estimate finish Fri Feb 24 19:08:00 2012 17.24% done, estimate finish Fri Feb 24 19:08:00 2012 17.24% done, estimate finish Fri Feb 24 19:07:59 2012 17.25% done, estimate finish Fri Feb 24 19:07:58 2012 17.25% done, estimate finish Fri Feb 24 19:07:57 2012 17.26% done, estimate finish Fri Feb 24 19:07:57 2012 17.26% done, estimate finish Fri Feb 24 19:08:02 2012 17.27% done, estimate finish Fri Feb 24 19:08:01 2012 17.27% done, estimate finish Fri Feb 24 19:08:00 2012 17.28% done, estimate finish Fri Feb 24 19:07:59 2012 === last message repeated 2 times. === 17.29% done, estimate finish Fri Feb 24 19:07:58 2012 17.30% done, estimate finish Fri Feb 24 19:07:57 2012 17.30% done, estimate finish Fri Feb 24 19:07:56 2012 17.31% done, estimate finish Fri Feb 24 19:08:01 2012 === last message repeated 2 times. === 17.32% done, estimate finish Fri Feb 24 19:08:00 2012 17.32% done, estimate finish Fri Feb 24 19:07:59 2012 17.33% done, estimate finish Fri Feb 24 19:07:58 2012 === last message repeated 2 times. === 17.34% done, estimate finish Fri Feb 24 19:07:57 2012 17.34% done, estimate finish Fri Feb 24 19:08:02 2012 17.35% done, estimate finish Fri Feb 24 19:08:01 2012 17.35% done, estimate finish Fri Feb 24 19:08:00 2012 17.36% done, estimate finish Fri Feb 24 19:08:00 2012 17.36% done, estimate finish Fri Feb 24 19:07:59 2012 17.37% done, estimate finish Fri Feb 24 19:07:58 2012 17.38% done, estimate finish Fri Feb 24 19:07:57 2012 === last message repeated 2 times. === 17.39% done, estimate finish Fri Feb 24 19:08:02 2012 17.39% done, estimate finish Fri Feb 24 19:08:01 2012 17.40% done, estimate finish Fri Feb 24 19:08:00 2012 17.40% done, estimate finish Fri Feb 24 19:07:59 2012 17.41% done, estimate finish Fri Feb 24 19:07:59 2012 17.41% done, estimate finish Fri Feb 24 19:07:58 2012 17.42% done, estimate finish Fri Feb 24 19:07:57 2012 17.42% done, estimate finish Fri Feb 24 19:07:56 2012 17.43% done, estimate finish Fri Feb 24 19:08:01 2012 === last message repeated 2 times. === 17.44% done, estimate finish Fri Feb 24 19:08:00 2012 17.45% done, estimate finish Fri Feb 24 19:07:59 2012 17.45% done, estimate finish Fri Feb 24 19:07:58 2012 17.46% done, estimate finish Fri Feb 24 19:07:58 2012 17.46% done, estimate finish Fri Feb 24 19:07:57 2012 17.47% done, estimate finish Fri Feb 24 19:07:56 2012 17.47% done, estimate finish Fri Feb 24 19:08:01 2012 17.48% done, estimate finish Fri Feb 24 19:08:00 2012 === last message repeated 2 times. === 17.49% done, estimate finish Fri Feb 24 19:07:59 2012 17.49% done, estimate finish Fri Feb 24 19:07:58 2012 17.50% done, estimate finish Fri Feb 24 19:07:57 2012 === last message repeated 2 times. === 17.51% done, estimate finish Fri Feb 24 19:07:56 2012 17.51% done, estimate finish Fri Feb 24 19:08:01 2012 17.52% done, estimate finish Fri Feb 24 19:08:00 2012 17.53% done, estimate finish Fri Feb 24 19:07:59 2012 === last message repeated 2 times. === 17.54% done, estimate finish Fri Feb 24 19:07:58 2012 17.54% done, estimate finish Fri Feb 24 19:07:57 2012 17.55% done, estimate finish Fri Feb 24 19:07:56 2012 === last message repeated 2 times. === 17.56% done, estimate finish Fri Feb 24 19:08:01 2012 17.56% done, estimate finish Fri Feb 24 19:08:00 2012 17.57% done, estimate finish Fri Feb 24 19:07:59 2012 17.57% done, estimate finish Fri Feb 24 19:07:58 2012 17.58% done, estimate finish Fri Feb 24 19:07:58 2012 17.58% done, estimate finish Fri Feb 24 19:07:57 2012 17.59% done, estimate finish Fri Feb 24 19:07:56 2012 17.59% done, estimate finish Fri Feb 24 19:07:55 2012 17.60% done, estimate finish Fri Feb 24 19:08:00 2012 17.61% done, estimate finish Fri Feb 24 19:08:00 2012 17.61% done, estimate finish Fri Feb 24 19:07:59 2012 17.62% done, estimate finish Fri Feb 24 19:07:58 2012 17.62% done, estimate finish Fri Feb 24 19:07:57 2012 17.63% done, estimate finish Fri Feb 24 19:07:57 2012 17.63% done, estimate finish Fri Feb 24 19:07:56 2012 17.64% done, estimate finish Fri Feb 24 19:07:55 2012 17.64% done, estimate finish Fri Feb 24 19:08:00 2012 17.65% done, estimate finish Fri Feb 24 19:07:59 2012 === last message repeated 2 times. === 17.66% done, estimate finish Fri Feb 24 19:07:58 2012 17.66% done, estimate finish Fri Feb 24 19:07:57 2012 17.67% done, estimate finish Fri Feb 24 19:07:56 2012 === last message repeated 2 times. === 17.68% done, estimate finish Fri Feb 24 19:07:55 2012 17.69% done, estimate finish Fri Feb 24 19:08:00 2012 17.69% done, estimate finish Fri Feb 24 19:07:59 2012 17.70% done, estimate finish Fri Feb 24 19:07:58 2012 === last message repeated 2 times. === 17.71% done, estimate finish Fri Feb 24 19:07:57 2012 17.71% done, estimate finish Fri Feb 24 19:07:56 2012 17.72% done, estimate finish Fri Feb 24 19:07:55 2012 === last message repeated 2 times. === 17.73% done, estimate finish Fri Feb 24 19:08:00 2012 17.73% done, estimate finish Fri Feb 24 19:07:59 2012 17.74% done, estimate finish Fri Feb 24 19:07:58 2012 17.74% done, estimate finish Fri Feb 24 19:07:57 2012 17.75% done, estimate finish Fri Feb 24 19:07:57 2012 17.75% done, estimate finish Fri Feb 24 19:07:56 2012 17.76% done, estimate finish Fri Feb 24 19:07:55 2012 17.77% done, estimate finish Fri Feb 24 19:07:54 2012 17.77% done, estimate finish Fri Feb 24 19:07:59 2012 17.78% done, estimate finish Fri Feb 24 19:07:59 2012 17.78% done, estimate finish Fri Feb 24 19:07:58 2012 17.79% done, estimate finish Fri Feb 24 19:07:57 2012 17.79% done, estimate finish Fri Feb 24 19:07:56 2012 17.80% done, estimate finish Fri Feb 24 19:07:56 2012 17.80% done, estimate finish Fri Feb 24 19:07:55 2012 17.81% done, estimate finish Fri Feb 24 19:07:54 2012 17.81% done, estimate finish Fri Feb 24 19:07:59 2012 17.82% done, estimate finish Fri Feb 24 19:07:58 2012 === last message repeated 2 times. === 17.83% done, estimate finish Fri Feb 24 19:07:57 2012 17.83% done, estimate finish Fri Feb 24 19:07:56 2012 17.84% done, estimate finish Fri Feb 24 19:07:55 2012 17.85% done, estimate finish Fri Feb 24 19:07:55 2012 17.85% done, estimate finish Fri Feb 24 19:07:54 2012 17.86% done, estimate finish Fri Feb 24 19:07:59 2012 17.86% done, estimate finish Fri Feb 24 19:07:58 2012 17.87% done, estimate finish Fri Feb 24 19:07:57 2012 === last message repeated 2 times. === 17.88% done, estimate finish Fri Feb 24 19:07:56 2012 17.88% done, estimate finish Fri Feb 24 19:07:55 2012 17.89% done, estimate finish Fri Feb 24 19:07:54 2012 17.89% done, estimate finish Fri Feb 24 19:07:59 2012 17.90% done, estimate finish Fri Feb 24 19:07:59 2012 17.90% done, estimate finish Fri Feb 24 19:07:58 2012 17.91% done, estimate finish Fri Feb 24 19:07:57 2012 17.91% done, estimate finish Fri Feb 24 19:07:56 2012 17.92% done, estimate finish Fri Feb 24 19:07:56 2012 17.93% done, estimate finish Fri Feb 24 19:07:55 2012 17.93% done, estimate finish Fri Feb 24 19:07:54 2012 17.94% done, estimate finish Fri Feb 24 19:07:59 2012 17.94% done, estimate finish Fri Feb 24 19:07:58 2012 17.95% done, estimate finish Fri Feb 24 19:07:58 2012 17.95% done, estimate finish Fri Feb 24 19:07:57 2012 17.96% done, estimate finish Fri Feb 24 19:07:56 2012 17.96% done, estimate finish Fri Feb 24 19:07:55 2012 17.97% done, estimate finish Fri Feb 24 19:07:55 2012 17.97% done, estimate finish Fri Feb 24 19:07:54 2012 17.98% done, estimate finish Fri Feb 24 19:07:59 2012 17.98% done, estimate finish Fri Feb 24 19:07:58 2012 17.99% done, estimate finish Fri Feb 24 19:07:57 2012 === last message repeated 2 times. === 18.00% done, estimate finish Fri Feb 24 19:07:56 2012 18.01% done, estimate finish Fri Feb 24 19:07:55 2012 === last message repeated 2 times. === 18.02% done, estimate finish Fri Feb 24 19:07:54 2012 18.02% done, estimate finish Fri Feb 24 19:07:59 2012 18.03% done, estimate finish Fri Feb 24 19:07:58 2012 18.03% done, estimate finish Fri Feb 24 19:07:57 2012 18.04% done, estimate finish Fri Feb 24 19:07:56 2012 === last message repeated 2 times. === 18.05% done, estimate finish Fri Feb 24 19:07:55 2012 18.05% done, estimate finish Fri Feb 24 19:07:54 2012 18.06% done, estimate finish Fri Feb 24 19:07:59 2012 18.06% done, estimate finish Fri Feb 24 19:07:58 2012 18.07% done, estimate finish Fri Feb 24 19:07:58 2012 18.07% done, estimate finish Fri Feb 24 19:07:57 2012 18.08% done, estimate finish Fri Feb 24 19:07:56 2012 18.09% done, estimate finish Fri Feb 24 19:07:55 2012 === last message repeated 2 times. === 18.10% done, estimate finish Fri Feb 24 19:07:54 2012 18.10% done, estimate finish Fri Feb 24 19:07:59 2012 18.11% done, estimate finish Fri Feb 24 19:07:58 2012 18.11% done, estimate finish Fri Feb 24 19:07:57 2012 18.12% done, estimate finish Fri Feb 24 19:07:57 2012 18.12% done, estimate finish Fri Feb 24 19:07:56 2012 18.13% done, estimate finish Fri Feb 24 19:07:55 2012 === last message repeated 2 times. === 18.14% done, estimate finish Fri Feb 24 19:07:54 2012 18.14% done, estimate finish Fri Feb 24 19:07:59 2012 18.15% done, estimate finish Fri Feb 24 19:07:58 2012 18.15% done, estimate finish Fri Feb 24 19:07:57 2012 18.16% done, estimate finish Fri Feb 24 19:07:56 2012 18.17% done, estimate finish Fri Feb 24 19:07:56 2012 18.17% done, estimate finish Fri Feb 24 19:07:55 2012 18.18% done, estimate finish Fri Feb 24 19:07:54 2012 18.18% done, estimate finish Fri Feb 24 19:07:59 2012 18.19% done, estimate finish Fri Feb 24 19:07:58 2012 === last message repeated 2 times. === 18.20% done, estimate finish Fri Feb 24 19:07:57 2012 18.20% done, estimate finish Fri Feb 24 19:07:56 2012 18.21% done, estimate finish Fri Feb 24 19:07:55 2012 === last message repeated 2 times. === 18.22% done, estimate finish Fri Feb 24 19:07:54 2012 18.22% done, estimate finish Fri Feb 24 19:07:59 2012 18.23% done, estimate finish Fri Feb 24 19:07:58 2012 18.23% done, estimate finish Fri Feb 24 19:07:57 2012 18.24% done, estimate finish Fri Feb 24 19:07:57 2012 18.25% done, estimate finish Fri Feb 24 19:07:56 2012 18.25% done, estimate finish Fri Feb 24 19:07:55 2012 18.26% done, estimate finish Fri Feb 24 19:07:55 2012 18.26% done, estimate finish Fri Feb 24 19:07:54 2012 18.27% done, estimate finish Fri Feb 24 19:07:59 2012 18.27% done, estimate finish Fri Feb 24 19:07:58 2012 18.28% done, estimate finish Fri Feb 24 19:07:57 2012 18.28% done, estimate finish Fri Feb 24 19:07:56 2012 18.29% done, estimate finish Fri Feb 24 19:07:56 2012 18.29% done, estimate finish Fri Feb 24 19:07:55 2012 18.30% done, estimate finish Fri Feb 24 19:07:54 2012 === last message repeated 2 times. === 18.31% done, estimate finish Fri Feb 24 19:07:58 2012 === last message repeated 2 times. === 18.32% done, estimate finish Fri Feb 24 19:07:57 2012 18.33% done, estimate finish Fri Feb 24 19:07:56 2012 18.33% done, estimate finish Fri Feb 24 19:07:55 2012 18.34% done, estimate finish Fri Feb 24 19:07:55 2012 18.34% done, estimate finish Fri Feb 24 19:07:54 2012 18.35% done, estimate finish Fri Feb 24 19:07:53 2012 18.35% done, estimate finish Fri Feb 24 19:07:58 2012 18.36% done, estimate finish Fri Feb 24 19:07:57 2012 === last message repeated 2 times. === 18.37% done, estimate finish Fri Feb 24 19:07:56 2012 18.37% done, estimate finish Fri Feb 24 19:07:55 2012 18.38% done, estimate finish Fri Feb 24 19:07:55 2012 18.38% done, estimate finish Fri Feb 24 19:07:54 2012 18.39% done, estimate finish Fri Feb 24 19:07:53 2012 18.39% done, estimate finish Fri Feb 24 19:07:58 2012 18.40% done, estimate finish Fri Feb 24 19:07:57 2012 18.41% done, estimate finish Fri Feb 24 19:07:56 2012 === last message repeated 2 times. === 18.42% done, estimate finish Fri Feb 24 19:07:55 2012 18.42% done, estimate finish Fri Feb 24 19:07:54 2012 18.43% done, estimate finish Fri Feb 24 19:07:54 2012 18.43% done, estimate finish Fri Feb 24 19:07:53 2012 18.44% done, estimate finish Fri Feb 24 19:07:58 2012 18.44% done, estimate finish Fri Feb 24 19:07:57 2012 18.45% done, estimate finish Fri Feb 24 19:07:56 2012 18.45% done, estimate finish Fri Feb 24 19:07:55 2012 18.46% done, estimate finish Fri Feb 24 19:07:55 2012 18.46% done, estimate finish Fri Feb 24 19:07:54 2012 18.47% done, estimate finish Fri Feb 24 19:07:59 2012 18.47% done, estimate finish Fri Feb 24 19:07:58 2012 18.48% done, estimate finish Fri Feb 24 19:07:57 2012 18.49% done, estimate finish Fri Feb 24 19:07:57 2012 18.49% done, estimate finish Fri Feb 24 19:07:56 2012 18.50% done, estimate finish Fri Feb 24 19:07:55 2012 === last message repeated 2 times. === 18.51% done, estimate finish Fri Feb 24 19:07:54 2012 18.51% done, estimate finish Fri Feb 24 19:07:53 2012 18.52% done, estimate finish Fri Feb 24 19:07:58 2012 18.52% done, estimate finish Fri Feb 24 19:07:57 2012 18.53% done, estimate finish Fri Feb 24 19:07:56 2012 === last message repeated 2 times. === 18.54% done, estimate finish Fri Feb 24 19:07:55 2012 18.54% done, estimate finish Fri Feb 24 19:07:54 2012 18.55% done, estimate finish Fri Feb 24 19:07:54 2012 18.56% done, estimate finish Fri Feb 24 19:07:53 2012 18.56% done, estimate finish Fri Feb 24 19:07:52 2012 18.57% done, estimate finish Fri Feb 24 19:07:57 2012 18.57% done, estimate finish Fri Feb 24 19:07:56 2012 18.58% done, estimate finish Fri Feb 24 19:07:55 2012 === last message repeated 2 times. === 18.59% done, estimate finish Fri Feb 24 19:07:54 2012 18.59% done, estimate finish Fri Feb 24 19:07:53 2012 18.60% done, estimate finish Fri Feb 24 19:07:53 2012 18.60% done, estimate finish Fri Feb 24 19:07:52 2012 18.61% done, estimate finish Fri Feb 24 19:07:57 2012 18.61% done, estimate finish Fri Feb 24 19:07:56 2012 18.62% done, estimate finish Fri Feb 24 19:07:55 2012 === last message repeated 2 times. === 18.63% done, estimate finish Fri Feb 24 19:07:54 2012 18.64% done, estimate finish Fri Feb 24 19:07:53 2012 18.64% done, estimate finish Fri Feb 24 19:07:58 2012 18.65% done, estimate finish Fri Feb 24 19:07:57 2012 18.65% done, estimate finish Fri Feb 24 19:07:56 2012 18.66% done, estimate finish Fri Feb 24 19:07:56 2012 18.66% done, estimate finish Fri Feb 24 19:07:55 2012 18.67% done, estimate finish Fri Feb 24 19:07:54 2012 === last message repeated 2 times. === 18.68% done, estimate finish Fri Feb 24 19:07:53 2012 18.68% done, estimate finish Fri Feb 24 19:07:52 2012 18.69% done, estimate finish Fri Feb 24 19:07:57 2012 18.69% done, estimate finish Fri Feb 24 19:07:56 2012 18.70% done, estimate finish Fri Feb 24 19:07:55 2012 === last message repeated 2 times. === 18.71% done, estimate finish Fri Feb 24 19:07:54 2012 18.72% done, estimate finish Fri Feb 24 19:07:53 2012 === last message repeated 2 times. === 18.73% done, estimate finish Fri Feb 24 19:07:52 2012 18.73% done, estimate finish Fri Feb 24 19:07:57 2012 18.74% done, estimate finish Fri Feb 24 19:07:56 2012 18.74% done, estimate finish Fri Feb 24 19:07:55 2012 18.75% done, estimate finish Fri Feb 24 19:07:55 2012 18.75% done, estimate finish Fri Feb 24 19:07:54 2012 18.76% done, estimate finish Fri Feb 24 19:07:53 2012 18.76% done, estimate finish Fri Feb 24 19:07:52 2012 18.77% done, estimate finish Fri Feb 24 19:07:52 2012 18.77% done, estimate finish Fri Feb 24 19:07:56 2012 18.78% done, estimate finish Fri Feb 24 19:07:56 2012 18.78% done, estimate finish Fri Feb 24 19:07:55 2012 18.79% done, estimate finish Fri Feb 24 19:07:54 2012 18.80% done, estimate finish Fri Feb 24 19:07:54 2012 18.80% done, estimate finish Fri Feb 24 19:07:53 2012 18.81% done, estimate finish Fri Feb 24 19:07:52 2012 18.81% done, estimate finish Fri Feb 24 19:07:57 2012 18.82% done, estimate finish Fri Feb 24 19:07:56 2012 18.82% done, estimate finish Fri Feb 24 19:07:55 2012 18.83% done, estimate finish Fri Feb 24 19:07:55 2012 18.83% done, estimate finish Fri Feb 24 19:07:54 2012 18.84% done, estimate finish Fri Feb 24 19:07:53 2012 === last message repeated 2 times. === 18.85% done, estimate finish Fri Feb 24 19:07:52 2012 18.85% done, estimate finish Fri Feb 24 19:07:57 2012 18.86% done, estimate finish Fri Feb 24 19:07:56 2012 18.86% done, estimate finish Fri Feb 24 19:07:55 2012 18.87% done, estimate finish Fri Feb 24 19:07:55 2012 18.88% done, estimate finish Fri Feb 24 19:07:54 2012 18.88% done, estimate finish Fri Feb 24 19:07:53 2012 18.89% done, estimate finish Fri Feb 24 19:07:52 2012 18.89% done, estimate finish Fri Feb 24 19:07:57 2012 18.90% done, estimate finish Fri Feb 24 19:07:56 2012 === last message repeated 2 times. === 18.91% done, estimate finish Fri Feb 24 19:07:55 2012 18.91% done, estimate finish Fri Feb 24 19:07:54 2012 18.92% done, estimate finish Fri Feb 24 19:07:54 2012 18.92% done, estimate finish Fri Feb 24 19:07:53 2012 18.93% done, estimate finish Fri Feb 24 19:07:52 2012 18.93% done, estimate finish Fri Feb 24 19:07:57 2012 18.94% done, estimate finish Fri Feb 24 19:07:56 2012 18.94% done, estimate finish Fri Feb 24 19:07:55 2012 18.95% done, estimate finish Fri Feb 24 19:07:55 2012 18.96% done, estimate finish Fri Feb 24 19:07:54 2012 18.96% done, estimate finish Fri Feb 24 19:07:53 2012 18.97% done, estimate finish Fri Feb 24 19:07:53 2012 18.97% done, estimate finish Fri Feb 24 19:07:52 2012 18.98% done, estimate finish Fri Feb 24 19:07:57 2012 18.98% done, estimate finish Fri Feb 24 19:07:56 2012 18.99% done, estimate finish Fri Feb 24 19:07:55 2012 === last message repeated 2 times. === 19.00% done, estimate finish Fri Feb 24 19:07:54 2012 19.00% done, estimate finish Fri Feb 24 19:07:53 2012 19.01% done, estimate finish Fri Feb 24 19:07:52 2012 === last message repeated 2 times. === 19.02% done, estimate finish Fri Feb 24 19:07:56 2012 === last message repeated 2 times. === 19.03% done, estimate finish Fri Feb 24 19:07:55 2012 19.04% done, estimate finish Fri Feb 24 19:07:54 2012 === last message repeated 2 times. === 19.05% done, estimate finish Fri Feb 24 19:07:53 2012 19.05% done, estimate finish Fri Feb 24 19:07:52 2012 19.06% done, estimate finish Fri Feb 24 19:07:52 2012 19.06% done, estimate finish Fri Feb 24 19:07:56 2012 19.07% done, estimate finish Fri Feb 24 19:07:55 2012 === last message repeated 2 times. === 19.08% done, estimate finish Fri Feb 24 19:07:54 2012 19.08% done, estimate finish Fri Feb 24 19:07:53 2012 19.09% done, estimate finish Fri Feb 24 19:07:53 2012 19.09% done, estimate finish Fri Feb 24 19:07:52 2012 19.10% done, estimate finish Fri Feb 24 19:07:51 2012 19.10% done, estimate finish Fri Feb 24 19:07:56 2012 19.11% done, estimate finish Fri Feb 24 19:07:55 2012 19.12% done, estimate finish Fri Feb 24 19:07:55 2012 19.12% done, estimate finish Fri Feb 24 19:07:54 2012 19.13% done, estimate finish Fri Feb 24 19:07:53 2012 === last message repeated 2 times. === 19.14% done, estimate finish Fri Feb 24 19:07:52 2012 19.14% done, estimate finish Fri Feb 24 19:07:51 2012 19.15% done, estimate finish Fri Feb 24 19:07:56 2012 19.15% done, estimate finish Fri Feb 24 19:07:55 2012 19.16% done, estimate finish Fri Feb 24 19:07:54 2012 === last message repeated 2 times. === 19.17% done, estimate finish Fri Feb 24 19:07:53 2012 19.17% done, estimate finish Fri Feb 24 19:07:52 2012 19.18% done, estimate finish Fri Feb 24 19:07:52 2012 19.18% done, estimate finish Fri Feb 24 19:07:51 2012 19.19% done, estimate finish Fri Feb 24 19:07:55 2012 19.20% done, estimate finish Fri Feb 24 19:07:55 2012 19.20% done, estimate finish Fri Feb 24 19:07:54 2012 19.21% done, estimate finish Fri Feb 24 19:07:53 2012 === last message repeated 2 times. === 19.22% done, estimate finish Fri Feb 24 19:07:52 2012 19.22% done, estimate finish Fri Feb 24 19:07:51 2012 19.23% done, estimate finish Fri Feb 24 19:07:51 2012 19.23% done, estimate finish Fri Feb 24 19:07:55 2012 19.24% done, estimate finish Fri Feb 24 19:07:55 2012 19.24% done, estimate finish Fri Feb 24 19:07:54 2012 19.25% done, estimate finish Fri Feb 24 19:07:53 2012 === last message repeated 2 times. === 19.26% done, estimate finish Fri Feb 24 19:07:52 2012 19.26% done, estimate finish Fri Feb 24 19:07:51 2012 19.27% done, estimate finish Fri Feb 24 19:07:51 2012 19.28% done, estimate finish Fri Feb 24 19:07:55 2012 19.28% done, estimate finish Fri Feb 24 19:07:54 2012 19.29% done, estimate finish Fri Feb 24 19:07:54 2012 19.29% done, estimate finish Fri Feb 24 19:07:53 2012 19.30% done, estimate finish Fri Feb 24 19:07:52 2012 === last message repeated 2 times. === 19.31% done, estimate finish Fri Feb 24 19:07:51 2012 19.31% done, estimate finish Fri Feb 24 19:07:55 2012 19.32% done, estimate finish Fri Feb 24 19:07:55 2012 19.32% done, estimate finish Fri Feb 24 19:07:54 2012 19.33% done, estimate finish Fri Feb 24 19:07:53 2012 === last message repeated 2 times. === 19.34% done, estimate finish Fri Feb 24 19:07:52 2012 19.34% done, estimate finish Fri Feb 24 19:07:51 2012 19.35% done, estimate finish Fri Feb 24 19:07:51 2012 19.36% done, estimate finish Fri Feb 24 19:07:55 2012 === last message repeated 2 times. === 19.37% done, estimate finish Fri Feb 24 19:07:54 2012 19.37% done, estimate finish Fri Feb 24 19:07:53 2012 19.38% done, estimate finish Fri Feb 24 19:07:53 2012 19.38% done, estimate finish Fri Feb 24 19:07:52 2012 19.39% done, estimate finish Fri Feb 24 19:07:51 2012 19.39% done, estimate finish Fri Feb 24 19:07:56 2012 19.40% done, estimate finish Fri Feb 24 19:07:55 2012 19.40% done, estimate finish Fri Feb 24 19:07:54 2012 19.41% done, estimate finish Fri Feb 24 19:07:54 2012 19.41% done, estimate finish Fri Feb 24 19:07:53 2012 19.42% done, estimate finish Fri Feb 24 19:07:52 2012 === last message repeated 2 times. === 19.43% done, estimate finish Fri Feb 24 19:07:51 2012 19.44% done, estimate finish Fri Feb 24 19:07:55 2012 === last message repeated 2 times. === 19.45% done, estimate finish Fri Feb 24 19:07:54 2012 19.45% done, estimate finish Fri Feb 24 19:07:53 2012 19.46% done, estimate finish Fri Feb 24 19:07:53 2012 19.46% done, estimate finish Fri Feb 24 19:07:52 2012 19.47% done, estimate finish Fri Feb 24 19:07:51 2012 === last message repeated 2 times. === 19.48% done, estimate finish Fri Feb 24 19:07:55 2012 === last message repeated 2 times. === 19.49% done, estimate finish Fri Feb 24 19:07:54 2012 19.49% done, estimate finish Fri Feb 24 19:07:53 2012 19.50% done, estimate finish Fri Feb 24 19:07:53 2012 19.50% done, estimate finish Fri Feb 24 19:07:52 2012 19.51% done, estimate finish Fri Feb 24 19:07:51 2012 19.52% done, estimate finish Fri Feb 24 19:07:51 2012 19.52% done, estimate finish Fri Feb 24 19:07:55 2012 19.53% done, estimate finish Fri Feb 24 19:07:54 2012 === last message repeated 2 times. === 19.54% done, estimate finish Fri Feb 24 19:07:53 2012 19.54% done, estimate finish Fri Feb 24 19:07:52 2012 19.55% done, estimate finish Fri Feb 24 19:07:52 2012 19.55% done, estimate finish Fri Feb 24 19:07:51 2012 19.56% done, estimate finish Fri Feb 24 19:07:50 2012 === last message repeated 2 times. === 19.57% done, estimate finish Fri Feb 24 19:07:54 2012 19.57% done, estimate finish Fri Feb 24 19:07:53 2012 19.58% done, estimate finish Fri Feb 24 19:07:53 2012 19.58% done, estimate finish Fri Feb 24 19:07:52 2012 19.59% done, estimate finish Fri Feb 24 19:07:51 2012 19.60% done, estimate finish Fri Feb 24 19:07:51 2012 19.60% done, estimate finish Fri Feb 24 19:07:50 2012 19.61% done, estimate finish Fri Feb 24 19:07:49 2012 19.61% done, estimate finish Fri Feb 24 19:07:54 2012 19.62% done, estimate finish Fri Feb 24 19:07:53 2012 === last message repeated 2 times. === 19.63% done, estimate finish Fri Feb 24 19:07:52 2012 19.63% done, estimate finish Fri Feb 24 19:07:51 2012 19.64% done, estimate finish Fri Feb 24 19:07:51 2012 19.64% done, estimate finish Fri Feb 24 19:07:50 2012 19.65% done, estimate finish Fri Feb 24 19:07:49 2012 19.65% done, estimate finish Fri Feb 24 19:07:54 2012 19.66% done, estimate finish Fri Feb 24 19:07:53 2012 19.67% done, estimate finish Fri Feb 24 19:07:52 2012 === last message repeated 2 times. === 19.68% done, estimate finish Fri Feb 24 19:07:51 2012 19.68% done, estimate finish Fri Feb 24 19:07:50 2012 19.69% done, estimate finish Fri Feb 24 19:07:50 2012 19.69% done, estimate finish Fri Feb 24 19:07:49 2012 19.70% done, estimate finish Fri Feb 24 19:07:53 2012 === last message repeated 2 times. === 19.71% done, estimate finish Fri Feb 24 19:07:52 2012 === last message repeated 2 times. === 19.72% done, estimate finish Fri Feb 24 19:07:51 2012 19.72% done, estimate finish Fri Feb 24 19:07:50 2012 19.73% done, estimate finish Fri Feb 24 19:07:50 2012 19.73% done, estimate finish Fri Feb 24 19:07:49 2012 19.74% done, estimate finish Fri Feb 24 19:07:53 2012 19.75% done, estimate finish Fri Feb 24 19:07:53 2012 19.75% done, estimate finish Fri Feb 24 19:07:52 2012 19.76% done, estimate finish Fri Feb 24 19:07:51 2012 === last message repeated 2 times. === 19.77% done, estimate finish Fri Feb 24 19:07:50 2012 19.77% done, estimate finish Fri Feb 24 19:07:49 2012 19.78% done, estimate finish Fri Feb 24 19:07:49 2012 19.78% done, estimate finish Fri Feb 24 19:07:53 2012 19.79% done, estimate finish Fri Feb 24 19:07:52 2012 === last message repeated 2 times. === 19.80% done, estimate finish Fri Feb 24 19:07:51 2012 19.80% done, estimate finish Fri Feb 24 19:07:50 2012 19.81% done, estimate finish Fri Feb 24 19:07:50 2012 19.81% done, estimate finish Fri Feb 24 19:07:49 2012 19.82% done, estimate finish Fri Feb 24 19:07:48 2012 19.83% done, estimate finish Fri Feb 24 19:07:53 2012 19.83% done, estimate finish Fri Feb 24 19:07:52 2012 19.84% done, estimate finish Fri Feb 24 19:07:52 2012 19.84% done, estimate finish Fri Feb 24 19:07:51 2012 19.85% done, estimate finish Fri Feb 24 19:07:50 2012 === last message repeated 2 times. === 19.86% done, estimate finish Fri Feb 24 19:07:49 2012 19.86% done, estimate finish Fri Feb 24 19:07:48 2012 19.87% done, estimate finish Fri Feb 24 19:07:53 2012 19.87% done, estimate finish Fri Feb 24 19:07:52 2012 19.88% done, estimate finish Fri Feb 24 19:07:51 2012 === last message repeated 2 times. === 19.89% done, estimate finish Fri Feb 24 19:07:50 2012 19.89% done, estimate finish Fri Feb 24 19:07:49 2012 19.90% done, estimate finish Fri Feb 24 19:07:49 2012 19.91% done, estimate finish Fri Feb 24 19:07:48 2012 19.91% done, estimate finish Fri Feb 24 19:07:52 2012 19.92% done, estimate finish Fri Feb 24 19:07:52 2012 19.92% done, estimate finish Fri Feb 24 19:07:51 2012 19.93% done, estimate finish Fri Feb 24 19:07:50 2012 === last message repeated 2 times. === 19.94% done, estimate finish Fri Feb 24 19:07:49 2012 === last message repeated 2 times. === 19.95% done, estimate finish Fri Feb 24 19:07:48 2012 19.95% done, estimate finish Fri Feb 24 19:07:52 2012 19.96% done, estimate finish Fri Feb 24 19:07:52 2012 19.96% done, estimate finish Fri Feb 24 19:07:51 2012 19.97% done, estimate finish Fri Feb 24 19:07:50 2012 === last message repeated 2 times. === 19.98% done, estimate finish Fri Feb 24 19:07:49 2012 19.99% done, estimate finish Fri Feb 24 19:07:48 2012 === last message repeated 2 times. === 20.00% done, estimate finish Fri Feb 24 19:07:52 2012 20.00% done, estimate finish Fri Feb 24 19:07:51 2012 20.01% done, estimate finish Fri Feb 24 19:07:51 2012 20.01% done, estimate finish Fri Feb 24 19:07:50 2012 20.02% done, estimate finish Fri Feb 24 19:07:49 2012 === last message repeated 2 times. === 20.03% done, estimate finish Fri Feb 24 19:07:48 2012 20.03% done, estimate finish Fri Feb 24 19:07:47 2012 20.04% done, estimate finish Fri Feb 24 19:07:52 2012 20.04% done, estimate finish Fri Feb 24 19:07:51 2012 20.05% done, estimate finish Fri Feb 24 19:07:50 2012 === last message repeated 2 times. === 20.06% done, estimate finish Fri Feb 24 19:07:49 2012 20.07% done, estimate finish Fri Feb 24 19:07:49 2012 20.07% done, estimate finish Fri Feb 24 19:07:48 2012 20.08% done, estimate finish Fri Feb 24 19:07:47 2012 20.08% done, estimate finish Fri Feb 24 19:07:52 2012 20.09% done, estimate finish Fri Feb 24 19:07:51 2012 20.09% done, estimate finish Fri Feb 24 19:07:50 2012 20.10% done, estimate finish Fri Feb 24 19:07:50 2012 20.10% done, estimate finish Fri Feb 24 19:07:49 2012 20.11% done, estimate finish Fri Feb 24 19:07:48 2012 === last message repeated 2 times. === 20.12% done, estimate finish Fri Feb 24 19:07:47 2012 20.12% done, estimate finish Fri Feb 24 19:07:46 2012 20.13% done, estimate finish Fri Feb 24 19:07:51 2012 20.13% done, estimate finish Fri Feb 24 19:07:50 2012 20.14% done, estimate finish Fri Feb 24 19:07:49 2012 20.15% done, estimate finish Fri Feb 24 19:07:49 2012 20.15% done, estimate finish Fri Feb 24 19:07:48 2012 20.16% done, estimate finish Fri Feb 24 19:07:47 2012 === last message repeated 2 times. === 20.17% done, estimate finish Fri Feb 24 19:07:46 2012 20.17% done, estimate finish Fri Feb 24 19:07:51 2012 20.18% done, estimate finish Fri Feb 24 19:07:50 2012 20.18% done, estimate finish Fri Feb 24 19:07:49 2012 20.19% done, estimate finish Fri Feb 24 19:07:49 2012 20.19% done, estimate finish Fri Feb 24 19:07:48 2012 20.20% done, estimate finish Fri Feb 24 19:07:47 2012 === last message repeated 2 times. === 20.21% done, estimate finish Fri Feb 24 19:07:46 2012 20.21% done, estimate finish Fri Feb 24 19:07:50 2012 20.22% done, estimate finish Fri Feb 24 19:07:50 2012 20.23% done, estimate finish Fri Feb 24 19:07:49 2012 20.23% done, estimate finish Fri Feb 24 19:07:48 2012 20.24% done, estimate finish Fri Feb 24 19:07:48 2012 20.24% done, estimate finish Fri Feb 24 19:07:47 2012 20.25% done, estimate finish Fri Feb 24 19:07:46 2012 === last message repeated 2 times. === 20.26% done, estimate finish Fri Feb 24 19:07:50 2012 20.26% done, estimate finish Fri Feb 24 19:07:49 2012 20.27% done, estimate finish Fri Feb 24 19:07:49 2012 20.27% done, estimate finish Fri Feb 24 19:07:48 2012 20.28% done, estimate finish Fri Feb 24 19:07:48 2012 20.28% done, estimate finish Fri Feb 24 19:07:47 2012 20.29% done, estimate finish Fri Feb 24 19:07:46 2012 === last message repeated 2 times. === 20.30% done, estimate finish Fri Feb 24 19:07:50 2012 20.31% done, estimate finish Fri Feb 24 19:07:49 2012 === last message repeated 2 times. === 20.32% done, estimate finish Fri Feb 24 19:07:48 2012 20.32% done, estimate finish Fri Feb 24 19:07:47 2012 20.33% done, estimate finish Fri Feb 24 19:07:47 2012 20.33% done, estimate finish Fri Feb 24 19:07:46 2012 20.34% done, estimate finish Fri Feb 24 19:07:45 2012 20.34% done, estimate finish Fri Feb 24 19:07:50 2012 20.35% done, estimate finish Fri Feb 24 19:07:49 2012 20.35% done, estimate finish Fri Feb 24 19:07:48 2012 20.36% done, estimate finish Fri Feb 24 19:07:48 2012 20.36% done, estimate finish Fri Feb 24 19:07:47 2012 20.37% done, estimate finish Fri Feb 24 19:07:47 2012 20.37% done, estimate finish Fri Feb 24 19:07:46 2012 20.38% done, estimate finish Fri Feb 24 19:07:45 2012 20.39% done, estimate finish Fri Feb 24 19:07:50 2012 20.39% done, estimate finish Fri Feb 24 19:07:49 2012 20.40% done, estimate finish Fri Feb 24 19:07:48 2012 === last message repeated 2 times. === 20.41% done, estimate finish Fri Feb 24 19:07:47 2012 20.41% done, estimate finish Fri Feb 24 19:07:46 2012 20.42% done, estimate finish Fri Feb 24 19:07:46 2012 20.42% done, estimate finish Fri Feb 24 19:07:45 2012 20.43% done, estimate finish Fri Feb 24 19:07:49 2012 === last message repeated 2 times. === 20.44% done, estimate finish Fri Feb 24 19:07:48 2012 20.44% done, estimate finish Fri Feb 24 19:07:47 2012 20.45% done, estimate finish Fri Feb 24 19:07:47 2012 20.45% done, estimate finish Fri Feb 24 19:07:46 2012 20.46% done, estimate finish Fri Feb 24 19:07:46 2012 20.47% done, estimate finish Fri Feb 24 19:07:45 2012 20.47% done, estimate finish Fri Feb 24 19:07:49 2012 20.48% done, estimate finish Fri Feb 24 19:07:48 2012 === last message repeated 2 times. === 20.49% done, estimate finish Fri Feb 24 19:07:47 2012 === last message repeated 2 times. === 20.50% done, estimate finish Fri Feb 24 19:07:46 2012 20.50% done, estimate finish Fri Feb 24 19:07:45 2012 20.51% done, estimate finish Fri Feb 24 19:07:45 2012 20.51% done, estimate finish Fri Feb 24 19:07:49 2012 20.52% done, estimate finish Fri Feb 24 19:07:48 2012 === last message repeated 2 times. === 20.53% done, estimate finish Fri Feb 24 19:07:47 2012 20.53% done, estimate finish Fri Feb 24 19:07:46 2012 20.54% done, estimate finish Fri Feb 24 19:07:46 2012 20.55% done, estimate finish Fri Feb 24 19:07:45 2012 20.55% done, estimate finish Fri Feb 24 19:07:44 2012 20.56% done, estimate finish Fri Feb 24 19:07:49 2012 20.56% done, estimate finish Fri Feb 24 19:07:48 2012 20.57% done, estimate finish Fri Feb 24 19:07:47 2012 === last message repeated 2 times. === 20.58% done, estimate finish Fri Feb 24 19:07:46 2012 === last message repeated 2 times. === 20.59% done, estimate finish Fri Feb 24 19:07:45 2012 20.59% done, estimate finish Fri Feb 24 19:07:44 2012 20.60% done, estimate finish Fri Feb 24 19:07:49 2012 20.60% done, estimate finish Fri Feb 24 19:07:48 2012 20.61% done, estimate finish Fri Feb 24 19:07:47 2012 === last message repeated 2 times. === 20.62% done, estimate finish Fri Feb 24 19:07:46 2012 20.63% done, estimate finish Fri Feb 24 19:07:45 2012 === last message repeated 2 times. === 20.64% done, estimate finish Fri Feb 24 19:07:44 2012 20.64% done, estimate finish Fri Feb 24 19:07:48 2012 20.65% done, estimate finish Fri Feb 24 19:07:48 2012 20.65% done, estimate finish Fri Feb 24 19:07:47 2012 20.66% done, estimate finish Fri Feb 24 19:07:46 2012 === last message repeated 2 times. === 20.67% done, estimate finish Fri Feb 24 19:07:45 2012 === last message repeated 2 times. === 20.68% done, estimate finish Fri Feb 24 19:07:44 2012 20.68% done, estimate finish Fri Feb 24 19:07:48 2012 20.69% done, estimate finish Fri Feb 24 19:07:48 2012 20.69% done, estimate finish Fri Feb 24 19:07:47 2012 20.70% done, estimate finish Fri Feb 24 19:07:46 2012 20.71% done, estimate finish Fri Feb 24 19:07:46 2012 20.71% done, estimate finish Fri Feb 24 19:07:45 2012 20.72% done, estimate finish Fri Feb 24 19:07:44 2012 === last message repeated 2 times. === 20.73% done, estimate finish Fri Feb 24 19:07:48 2012 20.73% done, estimate finish Fri Feb 24 19:07:47 2012 20.74% done, estimate finish Fri Feb 24 19:07:47 2012 20.74% done, estimate finish Fri Feb 24 19:07:46 2012 20.75% done, estimate finish Fri Feb 24 19:07:45 2012 === last message repeated 2 times. === 20.76% done, estimate finish Fri Feb 24 19:07:44 2012 === last message repeated 2 times. === 20.77% done, estimate finish Fri Feb 24 19:07:48 2012 20.78% done, estimate finish Fri Feb 24 19:07:47 2012 20.78% done, estimate finish Fri Feb 24 19:07:46 2012 20.79% done, estimate finish Fri Feb 24 19:07:46 2012 20.79% done, estimate finish Fri Feb 24 19:07:45 2012 20.80% done, estimate finish Fri Feb 24 19:07:45 2012 20.80% done, estimate finish Fri Feb 24 19:07:44 2012 20.81% done, estimate finish Fri Feb 24 19:07:43 2012 20.81% done, estimate finish Fri Feb 24 19:07:48 2012 20.82% done, estimate finish Fri Feb 24 19:07:47 2012 20.82% done, estimate finish Fri Feb 24 19:07:46 2012 20.83% done, estimate finish Fri Feb 24 19:07:46 2012 20.83% done, estimate finish Fri Feb 24 19:07:45 2012 20.84% done, estimate finish Fri Feb 24 19:07:44 2012 === last message repeated 2 times. === 20.85% done, estimate finish Fri Feb 24 19:07:43 2012 20.86% done, estimate finish Fri Feb 24 19:07:43 2012 20.86% done, estimate finish Fri Feb 24 19:07:47 2012 20.87% done, estimate finish Fri Feb 24 19:07:46 2012 20.87% done, estimate finish Fri Feb 24 19:07:45 2012 20.88% done, estimate finish Fri Feb 24 19:07:45 2012 20.88% done, estimate finish Fri Feb 24 19:07:44 2012 20.89% done, estimate finish Fri Feb 24 19:07:44 2012 20.89% done, estimate finish Fri Feb 24 19:07:43 2012 20.90% done, estimate finish Fri Feb 24 19:07:42 2012 20.90% done, estimate finish Fri Feb 24 19:07:47 2012 20.91% done, estimate finish Fri Feb 24 19:07:46 2012 20.91% done, estimate finish Fri Feb 24 19:07:45 2012 20.92% done, estimate finish Fri Feb 24 19:07:45 2012 20.92% done, estimate finish Fri Feb 24 19:07:44 2012 20.93% done, estimate finish Fri Feb 24 19:07:43 2012 20.94% done, estimate finish Fri Feb 24 19:07:43 2012 20.94% done, estimate finish Fri Feb 24 19:07:42 2012 20.95% done, estimate finish Fri Feb 24 19:07:46 2012 === last message repeated 2 times. === 20.96% done, estimate finish Fri Feb 24 19:07:45 2012 20.96% done, estimate finish Fri Feb 24 19:07:44 2012 20.97% done, estimate finish Fri Feb 24 19:07:44 2012 20.97% done, estimate finish Fri Feb 24 19:07:43 2012 20.98% done, estimate finish Fri Feb 24 19:07:43 2012 20.98% done, estimate finish Fri Feb 24 19:07:42 2012 20.99% done, estimate finish Fri Feb 24 19:07:46 2012 === last message repeated 2 times. === 21.00% done, estimate finish Fri Feb 24 19:07:45 2012 21.00% done, estimate finish Fri Feb 24 19:07:44 2012 21.01% done, estimate finish Fri Feb 24 19:07:44 2012 21.02% done, estimate finish Fri Feb 24 19:07:43 2012 21.02% done, estimate finish Fri Feb 24 19:07:42 2012 21.03% done, estimate finish Fri Feb 24 19:07:42 2012 21.03% done, estimate finish Fri Feb 24 19:07:46 2012 21.04% done, estimate finish Fri Feb 24 19:07:45 2012 === last message repeated 2 times. === 21.05% done, estimate finish Fri Feb 24 19:07:44 2012 === last message repeated 2 times. === 21.06% done, estimate finish Fri Feb 24 19:07:43 2012 21.06% done, estimate finish Fri Feb 24 19:07:42 2012 21.07% done, estimate finish Fri Feb 24 19:07:42 2012 21.07% done, estimate finish Fri Feb 24 19:07:46 2012 21.08% done, estimate finish Fri Feb 24 19:07:45 2012 === last message repeated 2 times. === 21.09% done, estimate finish Fri Feb 24 19:07:44 2012 21.10% done, estimate finish Fri Feb 24 19:07:43 2012 === last message repeated 2 times. === 21.11% done, estimate finish Fri Feb 24 19:07:42 2012 21.11% done, estimate finish Fri Feb 24 19:07:41 2012 21.12% done, estimate finish Fri Feb 24 19:07:46 2012 21.12% done, estimate finish Fri Feb 24 19:07:45 2012 21.13% done, estimate finish Fri Feb 24 19:07:44 2012 === last message repeated 2 times. === 21.14% done, estimate finish Fri Feb 24 19:07:43 2012 === last message repeated 2 times. === 21.15% done, estimate finish Fri Feb 24 19:07:42 2012 21.15% done, estimate finish Fri Feb 24 19:07:41 2012 21.16% done, estimate finish Fri Feb 24 19:07:45 2012 === last message repeated 2 times. === 21.17% done, estimate finish Fri Feb 24 19:07:44 2012 21.18% done, estimate finish Fri Feb 24 19:07:44 2012 21.18% done, estimate finish Fri Feb 24 19:07:43 2012 21.19% done, estimate finish Fri Feb 24 19:07:42 2012 === last message repeated 2 times. === 21.20% done, estimate finish Fri Feb 24 19:07:41 2012 21.20% done, estimate finish Fri Feb 24 19:07:45 2012 21.21% done, estimate finish Fri Feb 24 19:07:45 2012 21.21% done, estimate finish Fri Feb 24 19:07:44 2012 21.22% done, estimate finish Fri Feb 24 19:07:43 2012 === last message repeated 2 times. === 21.23% done, estimate finish Fri Feb 24 19:07:42 2012 === last message repeated 2 times. === 21.24% done, estimate finish Fri Feb 24 19:07:41 2012 21.24% done, estimate finish Fri Feb 24 19:07:45 2012 21.25% done, estimate finish Fri Feb 24 19:07:44 2012 21.26% done, estimate finish Fri Feb 24 19:07:44 2012 21.26% done, estimate finish Fri Feb 24 19:07:43 2012 21.27% done, estimate finish Fri Feb 24 19:07:43 2012 21.27% done, estimate finish Fri Feb 24 19:07:42 2012 21.28% done, estimate finish Fri Feb 24 19:07:41 2012 === last message repeated 2 times. === 21.29% done, estimate finish Fri Feb 24 19:07:45 2012 21.29% done, estimate finish Fri Feb 24 19:07:44 2012 21.30% done, estimate finish Fri Feb 24 19:07:44 2012 21.30% done, estimate finish Fri Feb 24 19:07:43 2012 21.31% done, estimate finish Fri Feb 24 19:07:42 2012 === last message repeated 2 times. === 21.32% done, estimate finish Fri Feb 24 19:07:41 2012 21.32% done, estimate finish Fri Feb 24 19:07:45 2012 21.33% done, estimate finish Fri Feb 24 19:07:45 2012 21.34% done, estimate finish Fri Feb 24 19:07:44 2012 21.34% done, estimate finish Fri Feb 24 19:07:43 2012 21.35% done, estimate finish Fri Feb 24 19:07:43 2012 21.35% done, estimate finish Fri Feb 24 19:07:42 2012 21.36% done, estimate finish Fri Feb 24 19:07:42 2012 21.36% done, estimate finish Fri Feb 24 19:07:41 2012 21.37% done, estimate finish Fri Feb 24 19:07:45 2012 === last message repeated 2 times. === 21.38% done, estimate finish Fri Feb 24 19:07:44 2012 21.38% done, estimate finish Fri Feb 24 19:07:43 2012 21.39% done, estimate finish Fri Feb 24 19:07:43 2012 21.39% done, estimate finish Fri Feb 24 19:07:42 2012 21.40% done, estimate finish Fri Feb 24 19:07:41 2012 === last message repeated 2 times. === 21.41% done, estimate finish Fri Feb 24 19:07:45 2012 21.42% done, estimate finish Fri Feb 24 19:07:44 2012 === last message repeated 2 times. === 21.43% done, estimate finish Fri Feb 24 19:07:43 2012 === last message repeated 2 times. === 21.44% done, estimate finish Fri Feb 24 19:07:42 2012 21.44% done, estimate finish Fri Feb 24 19:07:41 2012 21.45% done, estimate finish Fri Feb 24 19:07:41 2012 21.45% done, estimate finish Fri Feb 24 19:07:45 2012 21.46% done, estimate finish Fri Feb 24 19:07:44 2012 === last message repeated 2 times. === 21.47% done, estimate finish Fri Feb 24 19:07:43 2012 21.47% done, estimate finish Fri Feb 24 19:07:42 2012 21.48% done, estimate finish Fri Feb 24 19:07:42 2012 21.48% done, estimate finish Fri Feb 24 19:07:41 2012 21.49% done, estimate finish Fri Feb 24 19:07:41 2012 21.50% done, estimate finish Fri Feb 24 19:07:45 2012 21.50% done, estimate finish Fri Feb 24 19:07:44 2012 21.51% done, estimate finish Fri Feb 24 19:07:43 2012 === last message repeated 2 times. === 21.52% done, estimate finish Fri Feb 24 19:07:42 2012 === last message repeated 2 times. === 21.53% done, estimate finish Fri Feb 24 19:07:41 2012 21.53% done, estimate finish Fri Feb 24 19:07:40 2012 21.54% done, estimate finish Fri Feb 24 19:07:44 2012 === last message repeated 2 times. === 21.55% done, estimate finish Fri Feb 24 19:07:43 2012 === last message repeated 2 times. === 21.56% done, estimate finish Fri Feb 24 19:07:42 2012 21.56% done, estimate finish Fri Feb 24 19:07:41 2012 21.57% done, estimate finish Fri Feb 24 19:07:41 2012 21.58% done, estimate finish Fri Feb 24 19:07:40 2012 21.58% done, estimate finish Fri Feb 24 19:07:44 2012 21.59% done, estimate finish Fri Feb 24 19:07:44 2012 21.59% done, estimate finish Fri Feb 24 19:07:43 2012 21.60% done, estimate finish Fri Feb 24 19:07:42 2012 === last message repeated 2 times. === 21.61% done, estimate finish Fri Feb 24 19:07:41 2012 === last message repeated 2 times. === 21.62% done, estimate finish Fri Feb 24 19:07:40 2012 21.62% done, estimate finish Fri Feb 24 19:07:44 2012 21.63% done, estimate finish Fri Feb 24 19:07:43 2012 === last message repeated 2 times. === 21.64% done, estimate finish Fri Feb 24 19:07:42 2012 === last message repeated 2 times. === 21.65% done, estimate finish Fri Feb 24 19:07:41 2012 21.66% done, estimate finish Fri Feb 24 19:07:40 2012 === last message repeated 2 times. === 21.67% done, estimate finish Fri Feb 24 19:07:44 2012 21.67% done, estimate finish Fri Feb 24 19:07:43 2012 21.68% done, estimate finish Fri Feb 24 19:07:43 2012 21.68% done, estimate finish Fri Feb 24 19:07:42 2012 21.69% done, estimate finish Fri Feb 24 19:07:41 2012 === last message repeated 2 times. === 21.70% done, estimate finish Fri Feb 24 19:07:40 2012 === last message repeated 2 times. === 21.71% done, estimate finish Fri Feb 24 19:07:39 2012 21.71% done, estimate finish Fri Feb 24 19:07:43 2012 21.72% done, estimate finish Fri Feb 24 19:07:42 2012 === last message repeated 2 times. === 21.73% done, estimate finish Fri Feb 24 19:07:41 2012 21.74% done, estimate finish Fri Feb 24 19:07:41 2012 21.74% done, estimate finish Fri Feb 24 19:07:40 2012 21.75% done, estimate finish Fri Feb 24 19:07:40 2012 21.75% done, estimate finish Fri Feb 24 19:07:39 2012 21.76% done, estimate finish Fri Feb 24 19:07:43 2012 21.76% done, estimate finish Fri Feb 24 19:07:42 2012 21.77% done, estimate finish Fri Feb 24 19:07:42 2012 21.77% done, estimate finish Fri Feb 24 19:07:41 2012 21.78% done, estimate finish Fri Feb 24 19:07:41 2012 21.78% done, estimate finish Fri Feb 24 19:07:40 2012 21.79% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 21.80% done, estimate finish Fri Feb 24 19:07:43 2012 21.80% done, estimate finish Fri Feb 24 19:07:42 2012 21.81% done, estimate finish Fri Feb 24 19:07:42 2012 21.82% done, estimate finish Fri Feb 24 19:07:41 2012 21.82% done, estimate finish Fri Feb 24 19:07:40 2012 21.83% done, estimate finish Fri Feb 24 19:07:40 2012 21.83% done, estimate finish Fri Feb 24 19:07:39 2012 21.84% done, estimate finish Fri Feb 24 19:07:39 2012 21.84% done, estimate finish Fri Feb 24 19:07:43 2012 21.85% done, estimate finish Fri Feb 24 19:07:42 2012 21.85% done, estimate finish Fri Feb 24 19:07:41 2012 21.86% done, estimate finish Fri Feb 24 19:07:41 2012 21.86% done, estimate finish Fri Feb 24 19:07:40 2012 21.87% done, estimate finish Fri Feb 24 19:07:40 2012 21.87% done, estimate finish Fri Feb 24 19:07:39 2012 21.88% done, estimate finish Fri Feb 24 19:07:38 2012 21.89% done, estimate finish Fri Feb 24 19:07:42 2012 === last message repeated 2 times. === 21.90% done, estimate finish Fri Feb 24 19:07:41 2012 === last message repeated 2 times. === 21.91% done, estimate finish Fri Feb 24 19:07:40 2012 21.91% done, estimate finish Fri Feb 24 19:07:39 2012 21.92% done, estimate finish Fri Feb 24 19:07:39 2012 21.92% done, estimate finish Fri Feb 24 19:07:38 2012 21.93% done, estimate finish Fri Feb 24 19:07:42 2012 === last message repeated 2 times. === 21.94% done, estimate finish Fri Feb 24 19:07:41 2012 21.94% done, estimate finish Fri Feb 24 19:07:40 2012 21.95% done, estimate finish Fri Feb 24 19:07:40 2012 21.95% done, estimate finish Fri Feb 24 19:07:39 2012 21.96% done, estimate finish Fri Feb 24 19:07:39 2012 21.97% done, estimate finish Fri Feb 24 19:07:38 2012 21.97% done, estimate finish Fri Feb 24 19:07:42 2012 21.98% done, estimate finish Fri Feb 24 19:07:41 2012 === last message repeated 2 times. === 21.99% done, estimate finish Fri Feb 24 19:07:40 2012 === last message repeated 2 times. === 22.00% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 22.01% done, estimate finish Fri Feb 24 19:07:38 2012 22.01% done, estimate finish Fri Feb 24 19:07:42 2012 22.02% done, estimate finish Fri Feb 24 19:07:41 2012 === last message repeated 2 times. === 22.03% done, estimate finish Fri Feb 24 19:07:40 2012 === last message repeated 2 times. === 22.04% done, estimate finish Fri Feb 24 19:07:39 2012 22.05% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 22.06% done, estimate finish Fri Feb 24 19:07:42 2012 22.06% done, estimate finish Fri Feb 24 19:07:41 2012 22.07% done, estimate finish Fri Feb 24 19:07:41 2012 22.07% done, estimate finish Fri Feb 24 19:07:40 2012 22.08% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 22.09% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 22.10% done, estimate finish Fri Feb 24 19:07:42 2012 22.10% done, estimate finish Fri Feb 24 19:07:41 2012 22.11% done, estimate finish Fri Feb 24 19:07:40 2012 === last message repeated 2 times. === 22.12% done, estimate finish Fri Feb 24 19:07:39 2012 22.13% done, estimate finish Fri Feb 24 19:07:39 2012 22.13% done, estimate finish Fri Feb 24 19:07:38 2012 22.14% done, estimate finish Fri Feb 24 19:07:37 2012 22.14% done, estimate finish Fri Feb 24 19:07:41 2012 22.15% done, estimate finish Fri Feb 24 19:07:41 2012 22.15% done, estimate finish Fri Feb 24 19:07:40 2012 22.16% done, estimate finish Fri Feb 24 19:07:40 2012 22.16% done, estimate finish Fri Feb 24 19:07:39 2012 22.17% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 22.18% done, estimate finish Fri Feb 24 19:07:37 2012 22.18% done, estimate finish Fri Feb 24 19:07:41 2012 22.19% done, estimate finish Fri Feb 24 19:07:41 2012 22.19% done, estimate finish Fri Feb 24 19:07:40 2012 22.20% done, estimate finish Fri Feb 24 19:07:39 2012 22.21% done, estimate finish Fri Feb 24 19:07:39 2012 22.21% done, estimate finish Fri Feb 24 19:07:38 2012 22.22% done, estimate finish Fri Feb 24 19:07:38 2012 22.22% done, estimate finish Fri Feb 24 19:07:37 2012 22.23% done, estimate finish Fri Feb 24 19:07:41 2012 22.23% done, estimate finish Fri Feb 24 19:07:40 2012 22.24% done, estimate finish Fri Feb 24 19:07:40 2012 22.24% done, estimate finish Fri Feb 24 19:07:39 2012 22.25% done, estimate finish Fri Feb 24 19:07:39 2012 22.25% done, estimate finish Fri Feb 24 19:07:38 2012 22.26% done, estimate finish Fri Feb 24 19:07:38 2012 22.26% done, estimate finish Fri Feb 24 19:07:37 2012 22.27% done, estimate finish Fri Feb 24 19:07:41 2012 22.27% done, estimate finish Fri Feb 24 19:07:40 2012 22.28% done, estimate finish Fri Feb 24 19:07:40 2012 22.29% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 22.30% done, estimate finish Fri Feb 24 19:07:38 2012 22.30% done, estimate finish Fri Feb 24 19:07:37 2012 22.31% done, estimate finish Fri Feb 24 19:07:37 2012 22.31% done, estimate finish Fri Feb 24 19:07:41 2012 22.32% done, estimate finish Fri Feb 24 19:07:40 2012 === last message repeated 2 times. === 22.33% done, estimate finish Fri Feb 24 19:07:39 2012 22.33% done, estimate finish Fri Feb 24 19:07:38 2012 22.34% done, estimate finish Fri Feb 24 19:07:38 2012 22.34% done, estimate finish Fri Feb 24 19:07:37 2012 22.35% done, estimate finish Fri Feb 24 19:07:37 2012 22.35% done, estimate finish Fri Feb 24 19:07:41 2012 22.36% done, estimate finish Fri Feb 24 19:07:40 2012 22.37% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 22.38% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 22.39% done, estimate finish Fri Feb 24 19:07:37 2012 22.39% done, estimate finish Fri Feb 24 19:07:36 2012 22.40% done, estimate finish Fri Feb 24 19:07:40 2012 === last message repeated 2 times. === 22.41% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 22.42% done, estimate finish Fri Feb 24 19:07:38 2012 22.42% done, estimate finish Fri Feb 24 19:07:37 2012 22.43% done, estimate finish Fri Feb 24 19:07:37 2012 22.43% done, estimate finish Fri Feb 24 19:07:36 2012 22.44% done, estimate finish Fri Feb 24 19:07:40 2012 22.45% done, estimate finish Fri Feb 24 19:07:40 2012 22.45% done, estimate finish Fri Feb 24 19:07:39 2012 22.46% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 22.47% done, estimate finish Fri Feb 24 19:07:37 2012 === last message repeated 2 times. === 22.48% done, estimate finish Fri Feb 24 19:07:36 2012 22.48% done, estimate finish Fri Feb 24 19:07:40 2012 22.49% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 22.50% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 22.51% done, estimate finish Fri Feb 24 19:07:37 2012 === last message repeated 2 times. === 22.52% done, estimate finish Fri Feb 24 19:07:36 2012 22.53% done, estimate finish Fri Feb 24 19:07:40 2012 22.53% done, estimate finish Fri Feb 24 19:07:39 2012 22.54% done, estimate finish Fri Feb 24 19:07:39 2012 22.54% done, estimate finish Fri Feb 24 19:07:38 2012 22.55% done, estimate finish Fri Feb 24 19:07:38 2012 22.55% done, estimate finish Fri Feb 24 19:07:37 2012 22.56% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 22.57% done, estimate finish Fri Feb 24 19:07:40 2012 22.57% done, estimate finish Fri Feb 24 19:07:39 2012 22.58% done, estimate finish Fri Feb 24 19:07:39 2012 22.58% done, estimate finish Fri Feb 24 19:07:38 2012 22.59% done, estimate finish Fri Feb 24 19:07:37 2012 === last message repeated 2 times. === 22.60% done, estimate finish Fri Feb 24 19:07:36 2012 22.61% done, estimate finish Fri Feb 24 19:07:36 2012 22.61% done, estimate finish Fri Feb 24 19:07:40 2012 22.62% done, estimate finish Fri Feb 24 19:07:39 2012 22.62% done, estimate finish Fri Feb 24 19:07:38 2012 22.63% done, estimate finish Fri Feb 24 19:07:38 2012 22.63% done, estimate finish Fri Feb 24 19:07:37 2012 22.64% done, estimate finish Fri Feb 24 19:07:37 2012 22.64% done, estimate finish Fri Feb 24 19:07:36 2012 22.65% done, estimate finish Fri Feb 24 19:07:40 2012 22.65% done, estimate finish Fri Feb 24 19:07:39 2012 22.66% done, estimate finish Fri Feb 24 19:07:39 2012 22.66% done, estimate finish Fri Feb 24 19:07:38 2012 22.67% done, estimate finish Fri Feb 24 19:07:38 2012 22.67% done, estimate finish Fri Feb 24 19:07:37 2012 22.68% done, estimate finish Fri Feb 24 19:07:37 2012 22.69% done, estimate finish Fri Feb 24 19:07:36 2012 22.69% done, estimate finish Fri Feb 24 19:07:40 2012 22.70% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 22.71% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 22.72% done, estimate finish Fri Feb 24 19:07:37 2012 22.72% done, estimate finish Fri Feb 24 19:07:36 2012 22.73% done, estimate finish Fri Feb 24 19:07:36 2012 22.73% done, estimate finish Fri Feb 24 19:07:40 2012 22.74% done, estimate finish Fri Feb 24 19:07:39 2012 22.74% done, estimate finish Fri Feb 24 19:07:38 2012 22.75% done, estimate finish Fri Feb 24 19:07:38 2012 22.75% done, estimate finish Fri Feb 24 19:07:37 2012 22.76% done, estimate finish Fri Feb 24 19:07:37 2012 22.77% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 22.78% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 22.79% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 22.80% done, estimate finish Fri Feb 24 19:07:42 2012 22.80% done, estimate finish Fri Feb 24 19:07:41 2012 22.81% done, estimate finish Fri Feb 24 19:07:40 2012 === last message repeated 2 times. === 22.82% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 22.83% done, estimate finish Fri Feb 24 19:07:43 2012 22.83% done, estimate finish Fri Feb 24 19:07:42 2012 22.84% done, estimate finish Fri Feb 24 19:07:41 2012 22.85% done, estimate finish Fri Feb 24 19:07:41 2012 22.85% done, estimate finish Fri Feb 24 19:07:40 2012 22.86% done, estimate finish Fri Feb 24 19:07:40 2012 22.86% done, estimate finish Fri Feb 24 19:07:39 2012 22.87% done, estimate finish Fri Feb 24 19:07:39 2012 22.87% done, estimate finish Fri Feb 24 19:07:42 2012 22.88% done, estimate finish Fri Feb 24 19:07:42 2012 22.88% done, estimate finish Fri Feb 24 19:07:41 2012 22.89% done, estimate finish Fri Feb 24 19:07:41 2012 22.89% done, estimate finish Fri Feb 24 19:07:40 2012 22.90% done, estimate finish Fri Feb 24 19:07:40 2012 22.90% done, estimate finish Fri Feb 24 19:07:39 2012 22.91% done, estimate finish Fri Feb 24 19:07:38 2012 22.91% done, estimate finish Fri Feb 24 19:07:42 2012 22.92% done, estimate finish Fri Feb 24 19:07:42 2012 22.93% done, estimate finish Fri Feb 24 19:07:41 2012 === last message repeated 2 times. === 22.94% done, estimate finish Fri Feb 24 19:07:40 2012 22.94% done, estimate finish Fri Feb 24 19:07:39 2012 22.95% done, estimate finish Fri Feb 24 19:07:39 2012 22.95% done, estimate finish Fri Feb 24 19:07:38 2012 22.96% done, estimate finish Fri Feb 24 19:07:42 2012 === last message repeated 2 times. === 22.97% done, estimate finish Fri Feb 24 19:07:41 2012 22.97% done, estimate finish Fri Feb 24 19:07:40 2012 22.98% done, estimate finish Fri Feb 24 19:07:40 2012 22.98% done, estimate finish Fri Feb 24 19:07:39 2012 22.99% done, estimate finish Fri Feb 24 19:07:39 2012 23.00% done, estimate finish Fri Feb 24 19:07:38 2012 23.00% done, estimate finish Fri Feb 24 19:07:42 2012 23.01% done, estimate finish Fri Feb 24 19:07:41 2012 === last message repeated 2 times. === 23.02% done, estimate finish Fri Feb 24 19:07:40 2012 === last message repeated 2 times. === 23.03% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 23.04% done, estimate finish Fri Feb 24 19:07:38 2012 23.04% done, estimate finish Fri Feb 24 19:07:42 2012 23.05% done, estimate finish Fri Feb 24 19:07:41 2012 === last message repeated 2 times. === 23.06% done, estimate finish Fri Feb 24 19:07:40 2012 23.06% done, estimate finish Fri Feb 24 19:07:39 2012 23.07% done, estimate finish Fri Feb 24 19:07:39 2012 23.08% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 23.09% done, estimate finish Fri Feb 24 19:07:42 2012 23.09% done, estimate finish Fri Feb 24 19:07:41 2012 23.10% done, estimate finish Fri Feb 24 19:07:40 2012 === last message repeated 2 times. === 23.11% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 23.12% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 23.13% done, estimate finish Fri Feb 24 19:07:41 2012 === last message repeated 2 times. === 23.14% done, estimate finish Fri Feb 24 19:07:40 2012 === last message repeated 2 times. === 23.15% done, estimate finish Fri Feb 24 19:07:39 2012 23.16% done, estimate finish Fri Feb 24 19:07:39 2012 23.16% done, estimate finish Fri Feb 24 19:07:38 2012 23.17% done, estimate finish Fri Feb 24 19:07:37 2012 23.17% done, estimate finish Fri Feb 24 19:07:41 2012 23.18% done, estimate finish Fri Feb 24 19:07:41 2012 23.18% done, estimate finish Fri Feb 24 19:07:40 2012 23.19% done, estimate finish Fri Feb 24 19:07:40 2012 23.19% done, estimate finish Fri Feb 24 19:07:39 2012 23.20% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 23.21% done, estimate finish Fri Feb 24 19:07:37 2012 23.21% done, estimate finish Fri Feb 24 19:07:41 2012 23.22% done, estimate finish Fri Feb 24 19:07:41 2012 23.22% done, estimate finish Fri Feb 24 19:07:40 2012 23.23% done, estimate finish Fri Feb 24 19:07:39 2012 23.24% done, estimate finish Fri Feb 24 19:07:39 2012 23.24% done, estimate finish Fri Feb 24 19:07:38 2012 23.25% done, estimate finish Fri Feb 24 19:07:38 2012 23.25% done, estimate finish Fri Feb 24 19:07:37 2012 23.26% done, estimate finish Fri Feb 24 19:07:41 2012 23.26% done, estimate finish Fri Feb 24 19:07:40 2012 23.27% done, estimate finish Fri Feb 24 19:07:40 2012 23.27% done, estimate finish Fri Feb 24 19:07:39 2012 23.28% done, estimate finish Fri Feb 24 19:07:39 2012 23.28% done, estimate finish Fri Feb 24 19:07:38 2012 23.29% done, estimate finish Fri Feb 24 19:07:38 2012 23.29% done, estimate finish Fri Feb 24 19:07:37 2012 23.30% done, estimate finish Fri Feb 24 19:07:41 2012 23.30% done, estimate finish Fri Feb 24 19:07:40 2012 23.31% done, estimate finish Fri Feb 24 19:07:40 2012 23.32% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 23.33% done, estimate finish Fri Feb 24 19:07:38 2012 23.33% done, estimate finish Fri Feb 24 19:07:37 2012 23.34% done, estimate finish Fri Feb 24 19:07:37 2012 23.34% done, estimate finish Fri Feb 24 19:07:41 2012 23.35% done, estimate finish Fri Feb 24 19:07:40 2012 23.35% done, estimate finish Fri Feb 24 19:07:39 2012 23.36% done, estimate finish Fri Feb 24 19:07:39 2012 23.36% done, estimate finish Fri Feb 24 19:07:38 2012 23.37% done, estimate finish Fri Feb 24 19:07:38 2012 23.37% done, estimate finish Fri Feb 24 19:07:37 2012 23.38% done, estimate finish Fri Feb 24 19:07:41 2012 23.38% done, estimate finish Fri Feb 24 19:07:40 2012 23.39% done, estimate finish Fri Feb 24 19:07:40 2012 23.40% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 23.41% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 23.42% done, estimate finish Fri Feb 24 19:07:37 2012 23.42% done, estimate finish Fri Feb 24 19:07:41 2012 23.43% done, estimate finish Fri Feb 24 19:07:40 2012 === last message repeated 2 times. === 23.44% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 23.45% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 23.46% done, estimate finish Fri Feb 24 19:07:37 2012 23.46% done, estimate finish Fri Feb 24 19:07:41 2012 23.47% done, estimate finish Fri Feb 24 19:07:40 2012 23.48% done, estimate finish Fri Feb 24 19:07:40 2012 23.48% done, estimate finish Fri Feb 24 19:07:39 2012 23.49% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 23.50% done, estimate finish Fri Feb 24 19:07:37 2012 === last message repeated 2 times. === 23.51% done, estimate finish Fri Feb 24 19:07:41 2012 23.51% done, estimate finish Fri Feb 24 19:07:40 2012 23.52% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 23.53% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 23.54% done, estimate finish Fri Feb 24 19:07:37 2012 === last message repeated 2 times. === 23.55% done, estimate finish Fri Feb 24 19:07:40 2012 23.56% done, estimate finish Fri Feb 24 19:07:40 2012 23.56% done, estimate finish Fri Feb 24 19:07:39 2012 23.57% done, estimate finish Fri Feb 24 19:07:39 2012 23.57% done, estimate finish Fri Feb 24 19:07:38 2012 23.58% done, estimate finish Fri Feb 24 19:07:38 2012 23.58% done, estimate finish Fri Feb 24 19:07:37 2012 23.59% done, estimate finish Fri Feb 24 19:07:37 2012 23.59% done, estimate finish Fri Feb 24 19:07:40 2012 23.60% done, estimate finish Fri Feb 24 19:07:40 2012 23.60% done, estimate finish Fri Feb 24 19:07:39 2012 23.61% done, estimate finish Fri Feb 24 19:07:39 2012 23.61% done, estimate finish Fri Feb 24 19:07:38 2012 23.62% done, estimate finish Fri Feb 24 19:07:37 2012 === last message repeated 2 times. === 23.63% done, estimate finish Fri Feb 24 19:07:36 2012 23.64% done, estimate finish Fri Feb 24 19:07:40 2012 === last message repeated 2 times. === 23.65% done, estimate finish Fri Feb 24 19:07:39 2012 23.65% done, estimate finish Fri Feb 24 19:07:38 2012 23.66% done, estimate finish Fri Feb 24 19:07:38 2012 23.66% done, estimate finish Fri Feb 24 19:07:37 2012 23.67% done, estimate finish Fri Feb 24 19:07:37 2012 23.67% done, estimate finish Fri Feb 24 19:07:36 2012 23.68% done, estimate finish Fri Feb 24 19:07:40 2012 23.68% done, estimate finish Fri Feb 24 19:07:39 2012 23.69% done, estimate finish Fri Feb 24 19:07:39 2012 23.69% done, estimate finish Fri Feb 24 19:07:38 2012 23.70% done, estimate finish Fri Feb 24 19:07:38 2012 23.70% done, estimate finish Fri Feb 24 19:07:37 2012 23.71% done, estimate finish Fri Feb 24 19:07:37 2012 23.72% done, estimate finish Fri Feb 24 19:07:36 2012 23.72% done, estimate finish Fri Feb 24 19:07:40 2012 23.73% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 23.74% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 23.75% done, estimate finish Fri Feb 24 19:07:37 2012 23.75% done, estimate finish Fri Feb 24 19:07:36 2012 23.76% done, estimate finish Fri Feb 24 19:07:40 2012 === last message repeated 2 times. === 23.77% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 23.78% done, estimate finish Fri Feb 24 19:07:38 2012 23.78% done, estimate finish Fri Feb 24 19:07:37 2012 23.79% done, estimate finish Fri Feb 24 19:07:37 2012 23.80% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 23.81% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 23.82% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 23.83% done, estimate finish Fri Feb 24 19:07:37 2012 === last message repeated 2 times. === 23.84% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 23.85% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 23.86% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 23.87% done, estimate finish Fri Feb 24 19:07:37 2012 23.88% done, estimate finish Fri Feb 24 19:07:37 2012 23.88% done, estimate finish Fri Feb 24 19:07:36 2012 23.89% done, estimate finish Fri Feb 24 19:07:35 2012 23.89% done, estimate finish Fri Feb 24 19:07:39 2012 23.90% done, estimate finish Fri Feb 24 19:07:39 2012 23.90% done, estimate finish Fri Feb 24 19:07:38 2012 23.91% done, estimate finish Fri Feb 24 19:07:38 2012 23.91% done, estimate finish Fri Feb 24 19:07:37 2012 23.92% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 23.93% done, estimate finish Fri Feb 24 19:07:35 2012 23.93% done, estimate finish Fri Feb 24 19:07:39 2012 23.94% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 23.95% done, estimate finish Fri Feb 24 19:07:37 2012 23.96% done, estimate finish Fri Feb 24 19:07:37 2012 23.96% done, estimate finish Fri Feb 24 19:07:36 2012 23.97% done, estimate finish Fri Feb 24 19:07:36 2012 23.97% done, estimate finish Fri Feb 24 19:07:39 2012 23.98% done, estimate finish Fri Feb 24 19:07:39 2012 23.98% done, estimate finish Fri Feb 24 19:07:38 2012 23.99% done, estimate finish Fri Feb 24 19:07:38 2012 23.99% done, estimate finish Fri Feb 24 19:07:37 2012 24.00% done, estimate finish Fri Feb 24 19:07:37 2012 24.00% done, estimate finish Fri Feb 24 19:07:36 2012 24.01% done, estimate finish Fri Feb 24 19:07:36 2012 24.01% done, estimate finish Fri Feb 24 19:07:39 2012 24.02% done, estimate finish Fri Feb 24 19:07:39 2012 24.02% done, estimate finish Fri Feb 24 19:07:38 2012 24.03% done, estimate finish Fri Feb 24 19:07:38 2012 24.04% done, estimate finish Fri Feb 24 19:07:37 2012 === last message repeated 2 times. === 24.05% done, estimate finish Fri Feb 24 19:07:36 2012 24.05% done, estimate finish Fri Feb 24 19:07:35 2012 24.06% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 24.07% done, estimate finish Fri Feb 24 19:07:38 2012 24.07% done, estimate finish Fri Feb 24 19:07:37 2012 24.08% done, estimate finish Fri Feb 24 19:07:37 2012 24.08% done, estimate finish Fri Feb 24 19:07:36 2012 24.09% done, estimate finish Fri Feb 24 19:07:36 2012 24.09% done, estimate finish Fri Feb 24 19:07:35 2012 24.10% done, estimate finish Fri Feb 24 19:07:39 2012 24.10% done, estimate finish Fri Feb 24 19:07:38 2012 24.11% done, estimate finish Fri Feb 24 19:07:38 2012 24.12% done, estimate finish Fri Feb 24 19:07:37 2012 === last message repeated 2 times. === 24.13% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 24.14% done, estimate finish Fri Feb 24 19:07:35 2012 24.14% done, estimate finish Fri Feb 24 19:07:39 2012 24.15% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 24.16% done, estimate finish Fri Feb 24 19:07:37 2012 === last message repeated 2 times. === 24.17% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 24.18% done, estimate finish Fri Feb 24 19:07:35 2012 24.19% done, estimate finish Fri Feb 24 19:07:39 2012 24.19% done, estimate finish Fri Feb 24 19:07:38 2012 24.20% done, estimate finish Fri Feb 24 19:07:38 2012 24.20% done, estimate finish Fri Feb 24 19:07:37 2012 24.21% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 24.22% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 24.23% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 24.24% done, estimate finish Fri Feb 24 19:07:37 2012 === last message repeated 2 times. === 24.25% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 24.26% done, estimate finish Fri Feb 24 19:07:35 2012 24.27% done, estimate finish Fri Feb 24 19:07:35 2012 24.27% done, estimate finish Fri Feb 24 19:07:38 2012 24.28% done, estimate finish Fri Feb 24 19:07:38 2012 24.28% done, estimate finish Fri Feb 24 19:07:37 2012 24.29% done, estimate finish Fri Feb 24 19:07:37 2012 24.29% done, estimate finish Fri Feb 24 19:07:36 2012 24.30% done, estimate finish Fri Feb 24 19:07:36 2012 24.30% done, estimate finish Fri Feb 24 19:07:35 2012 24.31% done, estimate finish Fri Feb 24 19:07:35 2012 24.31% done, estimate finish Fri Feb 24 19:07:38 2012 24.32% done, estimate finish Fri Feb 24 19:07:38 2012 24.32% done, estimate finish Fri Feb 24 19:07:37 2012 24.33% done, estimate finish Fri Feb 24 19:07:37 2012 24.33% done, estimate finish Fri Feb 24 19:07:36 2012 24.34% done, estimate finish Fri Feb 24 19:07:36 2012 24.35% done, estimate finish Fri Feb 24 19:07:35 2012 24.35% done, estimate finish Fri Feb 24 19:07:34 2012 24.36% done, estimate finish Fri Feb 24 19:07:38 2012 24.36% done, estimate finish Fri Feb 24 19:07:37 2012 24.37% done, estimate finish Fri Feb 24 19:07:37 2012 24.37% done, estimate finish Fri Feb 24 19:07:36 2012 24.38% done, estimate finish Fri Feb 24 19:07:36 2012 24.38% done, estimate finish Fri Feb 24 19:07:35 2012 24.39% done, estimate finish Fri Feb 24 19:07:35 2012 24.39% done, estimate finish Fri Feb 24 19:07:34 2012 24.40% done, estimate finish Fri Feb 24 19:07:38 2012 24.40% done, estimate finish Fri Feb 24 19:07:37 2012 24.41% done, estimate finish Fri Feb 24 19:07:37 2012 24.41% done, estimate finish Fri Feb 24 19:07:36 2012 24.42% done, estimate finish Fri Feb 24 19:07:36 2012 24.43% done, estimate finish Fri Feb 24 19:07:35 2012 24.43% done, estimate finish Fri Feb 24 19:07:39 2012 24.44% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 24.45% done, estimate finish Fri Feb 24 19:07:37 2012 === last message repeated 2 times. === 24.46% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 24.47% done, estimate finish Fri Feb 24 19:07:35 2012 24.47% done, estimate finish Fri Feb 24 19:07:39 2012 24.48% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 24.49% done, estimate finish Fri Feb 24 19:07:37 2012 === last message repeated 2 times. === 24.50% done, estimate finish Fri Feb 24 19:07:36 2012 24.51% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 24.52% done, estimate finish Fri Feb 24 19:07:39 2012 24.52% done, estimate finish Fri Feb 24 19:07:38 2012 24.53% done, estimate finish Fri Feb 24 19:07:37 2012 === last message repeated 2 times. === 24.54% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 24.55% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 24.56% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 24.57% done, estimate finish Fri Feb 24 19:07:37 2012 === last message repeated 2 times. === 24.58% done, estimate finish Fri Feb 24 19:07:36 2012 24.59% done, estimate finish Fri Feb 24 19:07:36 2012 24.59% done, estimate finish Fri Feb 24 19:07:35 2012 24.60% done, estimate finish Fri Feb 24 19:07:39 2012 24.60% done, estimate finish Fri Feb 24 19:07:38 2012 24.61% done, estimate finish Fri Feb 24 19:07:38 2012 24.61% done, estimate finish Fri Feb 24 19:07:37 2012 24.62% done, estimate finish Fri Feb 24 19:07:37 2012 24.62% done, estimate finish Fri Feb 24 19:07:36 2012 24.63% done, estimate finish Fri Feb 24 19:07:36 2012 24.63% done, estimate finish Fri Feb 24 19:07:35 2012 24.64% done, estimate finish Fri Feb 24 19:07:35 2012 24.64% done, estimate finish Fri Feb 24 19:07:38 2012 24.65% done, estimate finish Fri Feb 24 19:07:38 2012 24.65% done, estimate finish Fri Feb 24 19:07:37 2012 24.66% done, estimate finish Fri Feb 24 19:07:36 2012 24.67% done, estimate finish Fri Feb 24 19:07:40 2012 24.67% done, estimate finish Fri Feb 24 19:07:39 2012 24.68% done, estimate finish Fri Feb 24 19:07:39 2012 24.68% done, estimate finish Fri Feb 24 19:07:38 2012 24.69% done, estimate finish Fri Feb 24 19:07:38 2012 24.69% done, estimate finish Fri Feb 24 19:07:37 2012 24.70% done, estimate finish Fri Feb 24 19:07:37 2012 24.70% done, estimate finish Fri Feb 24 19:07:36 2012 24.71% done, estimate finish Fri Feb 24 19:07:36 2012 24.71% done, estimate finish Fri Feb 24 19:07:35 2012 24.72% done, estimate finish Fri Feb 24 19:07:35 2012 24.72% done, estimate finish Fri Feb 24 19:07:34 2012 24.73% done, estimate finish Fri Feb 24 19:07:34 2012 24.73% done, estimate finish Fri Feb 24 19:07:37 2012 24.74% done, estimate finish Fri Feb 24 19:07:37 2012 24.75% done, estimate finish Fri Feb 24 19:07:36 2012 24.75% done, estimate finish Fri Feb 24 19:07:40 2012 24.76% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 24.77% done, estimate finish Fri Feb 24 19:07:38 2012 === last message repeated 2 times. === 24.78% done, estimate finish Fri Feb 24 19:07:37 2012 === last message repeated 2 times. === 24.79% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 24.80% done, estimate finish Fri Feb 24 19:07:39 2012 === last message repeated 2 times. === 24.81% done, estimate finish Fri Feb 24 19:07:38 2012 24.81% done, estimate finish Fri Feb 24 19:07:37 2012 24.82% done, estimate finish Fri Feb 24 19:07:37 2012 24.83% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 24.84% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 24.85% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 24.86% done, estimate finish Fri Feb 24 19:07:37 2012 === last message repeated 2 times. === 24.87% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 24.88% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 24.89% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 24.90% done, estimate finish Fri Feb 24 19:07:37 2012 24.91% done, estimate finish Fri Feb 24 19:07:37 2012 24.91% done, estimate finish Fri Feb 24 19:07:36 2012 24.92% done, estimate finish Fri Feb 24 19:07:36 2012 24.92% done, estimate finish Fri Feb 24 19:07:35 2012 24.93% done, estimate finish Fri Feb 24 19:07:35 2012 24.93% done, estimate finish Fri Feb 24 19:07:34 2012 24.94% done, estimate finish Fri Feb 24 19:07:34 2012 24.94% done, estimate finish Fri Feb 24 19:07:37 2012 24.95% done, estimate finish Fri Feb 24 19:07:37 2012 24.95% done, estimate finish Fri Feb 24 19:07:36 2012 24.96% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 24.97% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 24.98% done, estimate finish Fri Feb 24 19:07:37 2012 24.99% done, estimate finish Fri Feb 24 19:07:37 2012 24.99% done, estimate finish Fri Feb 24 19:07:36 2012 25.00% done, estimate finish Fri Feb 24 19:07:36 2012 25.00% done, estimate finish Fri Feb 24 19:07:35 2012 25.01% done, estimate finish Fri Feb 24 19:07:35 2012 25.01% done, estimate finish Fri Feb 24 19:07:34 2012 25.02% done, estimate finish Fri Feb 24 19:07:34 2012 25.02% done, estimate finish Fri Feb 24 19:07:37 2012 25.03% done, estimate finish Fri Feb 24 19:07:37 2012 25.03% done, estimate finish Fri Feb 24 19:07:36 2012 25.04% done, estimate finish Fri Feb 24 19:07:36 2012 25.04% done, estimate finish Fri Feb 24 19:07:35 2012 25.05% done, estimate finish Fri Feb 24 19:07:35 2012 25.05% done, estimate finish Fri Feb 24 19:07:34 2012 25.06% done, estimate finish Fri Feb 24 19:07:34 2012 25.07% done, estimate finish Fri Feb 24 19:07:37 2012 === last message repeated 2 times. === 25.08% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 25.09% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 25.10% done, estimate finish Fri Feb 24 19:07:34 2012 25.10% done, estimate finish Fri Feb 24 19:07:38 2012 25.11% done, estimate finish Fri Feb 24 19:07:37 2012 25.11% done, estimate finish Fri Feb 24 19:07:36 2012 25.12% done, estimate finish Fri Feb 24 19:07:36 2012 25.12% done, estimate finish Fri Feb 24 19:07:35 2012 25.13% done, estimate finish Fri Feb 24 19:07:35 2012 25.13% done, estimate finish Fri Feb 24 19:07:34 2012 25.14% done, estimate finish Fri Feb 24 19:07:34 2012 25.15% done, estimate finish Fri Feb 24 19:07:33 2012 25.15% done, estimate finish Fri Feb 24 19:07:37 2012 25.16% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 25.17% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 25.18% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 25.19% done, estimate finish Fri Feb 24 19:07:33 2012 25.19% done, estimate finish Fri Feb 24 19:07:37 2012 25.20% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 25.21% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 25.22% done, estimate finish Fri Feb 24 19:07:34 2012 25.23% done, estimate finish Fri Feb 24 19:07:34 2012 25.23% done, estimate finish Fri Feb 24 19:07:33 2012 25.24% done, estimate finish Fri Feb 24 19:07:37 2012 25.24% done, estimate finish Fri Feb 24 19:07:36 2012 25.25% done, estimate finish Fri Feb 24 19:07:36 2012 25.25% done, estimate finish Fri Feb 24 19:07:35 2012 25.26% done, estimate finish Fri Feb 24 19:07:35 2012 25.26% done, estimate finish Fri Feb 24 19:07:34 2012 25.27% done, estimate finish Fri Feb 24 19:07:34 2012 25.27% done, estimate finish Fri Feb 24 19:07:37 2012 25.28% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 25.29% done, estimate finish Fri Feb 24 19:07:35 2012 25.30% done, estimate finish Fri Feb 24 19:07:35 2012 25.30% done, estimate finish Fri Feb 24 19:07:34 2012 25.31% done, estimate finish Fri Feb 24 19:07:34 2012 25.31% done, estimate finish Fri Feb 24 19:07:33 2012 25.32% done, estimate finish Fri Feb 24 19:07:37 2012 25.32% done, estimate finish Fri Feb 24 19:07:36 2012 25.33% done, estimate finish Fri Feb 24 19:07:36 2012 25.33% done, estimate finish Fri Feb 24 19:07:35 2012 25.34% done, estimate finish Fri Feb 24 19:07:35 2012 25.34% done, estimate finish Fri Feb 24 19:07:34 2012 25.35% done, estimate finish Fri Feb 24 19:07:34 2012 25.35% done, estimate finish Fri Feb 24 19:07:33 2012 25.36% done, estimate finish Fri Feb 24 19:07:37 2012 25.36% done, estimate finish Fri Feb 24 19:07:36 2012 25.37% done, estimate finish Fri Feb 24 19:07:36 2012 25.37% done, estimate finish Fri Feb 24 19:07:35 2012 25.38% done, estimate finish Fri Feb 24 19:07:35 2012 25.39% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 25.40% done, estimate finish Fri Feb 24 19:07:33 2012 25.40% done, estimate finish Fri Feb 24 19:07:37 2012 25.41% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 25.42% done, estimate finish Fri Feb 24 19:07:35 2012 25.42% done, estimate finish Fri Feb 24 19:07:34 2012 25.43% done, estimate finish Fri Feb 24 19:07:34 2012 25.43% done, estimate finish Fri Feb 24 19:07:33 2012 25.44% done, estimate finish Fri Feb 24 19:07:33 2012 25.44% done, estimate finish Fri Feb 24 19:07:36 2012 25.45% done, estimate finish Fri Feb 24 19:07:36 2012 25.46% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 25.47% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 25.48% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 25.49% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 25.50% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 25.51% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 25.52% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 25.53% done, estimate finish Fri Feb 24 19:07:36 2012 25.54% done, estimate finish Fri Feb 24 19:07:36 2012 25.54% done, estimate finish Fri Feb 24 19:07:35 2012 25.55% done, estimate finish Fri Feb 24 19:07:35 2012 25.55% done, estimate finish Fri Feb 24 19:07:34 2012 25.56% done, estimate finish Fri Feb 24 19:07:34 2012 25.56% done, estimate finish Fri Feb 24 19:07:33 2012 25.57% done, estimate finish Fri Feb 24 19:07:33 2012 25.57% done, estimate finish Fri Feb 24 19:07:36 2012 25.58% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 25.59% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 25.60% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 25.61% done, estimate finish Fri Feb 24 19:07:32 2012 25.62% done, estimate finish Fri Feb 24 19:07:36 2012 25.62% done, estimate finish Fri Feb 24 19:07:35 2012 25.63% done, estimate finish Fri Feb 24 19:07:35 2012 25.63% done, estimate finish Fri Feb 24 19:07:34 2012 25.64% done, estimate finish Fri Feb 24 19:07:34 2012 25.64% done, estimate finish Fri Feb 24 19:07:33 2012 25.65% done, estimate finish Fri Feb 24 19:07:33 2012 25.65% done, estimate finish Fri Feb 24 19:07:36 2012 25.66% done, estimate finish Fri Feb 24 19:07:36 2012 25.66% done, estimate finish Fri Feb 24 19:07:35 2012 25.67% done, estimate finish Fri Feb 24 19:07:35 2012 25.67% done, estimate finish Fri Feb 24 19:07:34 2012 25.68% done, estimate finish Fri Feb 24 19:07:34 2012 25.68% done, estimate finish Fri Feb 24 19:07:33 2012 25.69% done, estimate finish Fri Feb 24 19:07:33 2012 25.70% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 25.71% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 25.72% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 25.73% done, estimate finish Fri Feb 24 19:07:33 2012 25.73% done, estimate finish Fri Feb 24 19:07:36 2012 25.74% done, estimate finish Fri Feb 24 19:07:36 2012 25.74% done, estimate finish Fri Feb 24 19:07:35 2012 25.75% done, estimate finish Fri Feb 24 19:07:35 2012 25.75% done, estimate finish Fri Feb 24 19:07:34 2012 25.76% done, estimate finish Fri Feb 24 19:07:34 2012 25.76% done, estimate finish Fri Feb 24 19:07:33 2012 25.77% done, estimate finish Fri Feb 24 19:07:33 2012 25.78% done, estimate finish Fri Feb 24 19:07:32 2012 25.78% done, estimate finish Fri Feb 24 19:07:36 2012 25.79% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 25.80% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 25.81% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 25.82% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 25.83% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 25.84% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 25.85% done, estimate finish Fri Feb 24 19:07:33 2012 25.86% done, estimate finish Fri Feb 24 19:07:33 2012 25.86% done, estimate finish Fri Feb 24 19:07:36 2012 25.87% done, estimate finish Fri Feb 24 19:07:36 2012 25.87% done, estimate finish Fri Feb 24 19:07:35 2012 25.88% done, estimate finish Fri Feb 24 19:07:35 2012 25.88% done, estimate finish Fri Feb 24 19:07:34 2012 25.89% done, estimate finish Fri Feb 24 19:07:34 2012 25.89% done, estimate finish Fri Feb 24 19:07:33 2012 25.90% done, estimate finish Fri Feb 24 19:07:33 2012 25.90% done, estimate finish Fri Feb 24 19:07:36 2012 25.91% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 25.92% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 25.93% done, estimate finish Fri Feb 24 19:07:33 2012 25.94% done, estimate finish Fri Feb 24 19:07:33 2012 25.94% done, estimate finish Fri Feb 24 19:07:32 2012 25.95% done, estimate finish Fri Feb 24 19:07:36 2012 25.95% done, estimate finish Fri Feb 24 19:07:35 2012 25.96% done, estimate finish Fri Feb 24 19:07:35 2012 25.96% done, estimate finish Fri Feb 24 19:07:34 2012 25.97% done, estimate finish Fri Feb 24 19:07:34 2012 25.97% done, estimate finish Fri Feb 24 19:07:33 2012 25.98% done, estimate finish Fri Feb 24 19:07:33 2012 25.98% done, estimate finish Fri Feb 24 19:07:32 2012 25.99% done, estimate finish Fri Feb 24 19:07:36 2012 25.99% done, estimate finish Fri Feb 24 19:07:35 2012 26.00% done, estimate finish Fri Feb 24 19:07:35 2012 26.00% done, estimate finish Fri Feb 24 19:07:34 2012 26.01% done, estimate finish Fri Feb 24 19:07:34 2012 26.02% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 26.03% done, estimate finish Fri Feb 24 19:07:36 2012 26.03% done, estimate finish Fri Feb 24 19:07:35 2012 26.04% done, estimate finish Fri Feb 24 19:07:35 2012 26.04% done, estimate finish Fri Feb 24 19:07:34 2012 26.05% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 26.06% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 26.07% done, estimate finish Fri Feb 24 19:07:36 2012 26.07% done, estimate finish Fri Feb 24 19:07:35 2012 26.08% done, estimate finish Fri Feb 24 19:07:35 2012 26.08% done, estimate finish Fri Feb 24 19:07:34 2012 26.09% done, estimate finish Fri Feb 24 19:07:34 2012 26.10% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 26.11% done, estimate finish Fri Feb 24 19:07:32 2012 26.11% done, estimate finish Fri Feb 24 19:07:36 2012 26.12% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 26.13% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 26.14% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 26.15% done, estimate finish Fri Feb 24 19:07:36 2012 === last message repeated 2 times. === 26.16% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 26.17% done, estimate finish Fri Feb 24 19:07:34 2012 26.18% done, estimate finish Fri Feb 24 19:07:34 2012 26.18% done, estimate finish Fri Feb 24 19:07:33 2012 26.19% done, estimate finish Fri Feb 24 19:07:33 2012 26.19% done, estimate finish Fri Feb 24 19:07:32 2012 26.20% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 26.21% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 26.22% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 26.23% done, estimate finish Fri Feb 24 19:07:33 2012 26.23% done, estimate finish Fri Feb 24 19:07:32 2012 26.24% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 26.25% done, estimate finish Fri Feb 24 19:07:34 2012 26.26% done, estimate finish Fri Feb 24 19:07:34 2012 26.26% done, estimate finish Fri Feb 24 19:07:33 2012 26.27% done, estimate finish Fri Feb 24 19:07:33 2012 26.27% done, estimate finish Fri Feb 24 19:07:36 2012 26.28% done, estimate finish Fri Feb 24 19:07:36 2012 26.28% done, estimate finish Fri Feb 24 19:07:35 2012 26.29% done, estimate finish Fri Feb 24 19:07:35 2012 26.29% done, estimate finish Fri Feb 24 19:07:34 2012 26.30% done, estimate finish Fri Feb 24 19:07:34 2012 26.30% done, estimate finish Fri Feb 24 19:07:33 2012 26.31% done, estimate finish Fri Feb 24 19:07:33 2012 26.31% done, estimate finish Fri Feb 24 19:07:32 2012 26.32% done, estimate finish Fri Feb 24 19:07:32 2012 26.32% done, estimate finish Fri Feb 24 19:07:35 2012 26.33% done, estimate finish Fri Feb 24 19:07:35 2012 26.34% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 26.35% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 26.36% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 26.37% done, estimate finish Fri Feb 24 19:07:35 2012 26.37% done, estimate finish Fri Feb 24 19:07:34 2012 26.38% done, estimate finish Fri Feb 24 19:07:34 2012 26.38% done, estimate finish Fri Feb 24 19:07:33 2012 26.39% done, estimate finish Fri Feb 24 19:07:33 2012 26.39% done, estimate finish Fri Feb 24 19:07:32 2012 26.40% done, estimate finish Fri Feb 24 19:07:36 2012 26.41% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 26.42% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 26.43% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 26.44% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 26.45% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 26.46% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 26.47% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 26.48% done, estimate finish Fri Feb 24 19:07:32 2012 26.48% done, estimate finish Fri Feb 24 19:07:36 2012 26.49% done, estimate finish Fri Feb 24 19:07:35 2012 26.50% done, estimate finish Fri Feb 24 19:07:35 2012 26.50% done, estimate finish Fri Feb 24 19:07:34 2012 26.51% done, estimate finish Fri Feb 24 19:07:34 2012 26.51% done, estimate finish Fri Feb 24 19:07:33 2012 26.52% done, estimate finish Fri Feb 24 19:07:33 2012 26.52% done, estimate finish Fri Feb 24 19:07:32 2012 26.53% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 26.54% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 26.55% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 26.56% done, estimate finish Fri Feb 24 19:07:32 2012 26.57% done, estimate finish Fri Feb 24 19:07:32 2012 26.57% done, estimate finish Fri Feb 24 19:07:35 2012 26.58% done, estimate finish Fri Feb 24 19:07:35 2012 26.58% done, estimate finish Fri Feb 24 19:07:34 2012 26.59% done, estimate finish Fri Feb 24 19:07:34 2012 26.59% done, estimate finish Fri Feb 24 19:07:33 2012 26.60% done, estimate finish Fri Feb 24 19:07:33 2012 26.60% done, estimate finish Fri Feb 24 19:07:32 2012 26.61% done, estimate finish Fri Feb 24 19:07:32 2012 26.61% done, estimate finish Fri Feb 24 19:07:35 2012 26.62% done, estimate finish Fri Feb 24 19:07:35 2012 26.62% done, estimate finish Fri Feb 24 19:07:34 2012 26.63% done, estimate finish Fri Feb 24 19:07:34 2012 26.63% done, estimate finish Fri Feb 24 19:07:33 2012 26.64% done, estimate finish Fri Feb 24 19:07:33 2012 26.65% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 26.66% done, estimate finish Fri Feb 24 19:07:35 2012 26.66% done, estimate finish Fri Feb 24 19:07:34 2012 26.67% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 26.68% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 26.69% done, estimate finish Fri Feb 24 19:07:32 2012 26.69% done, estimate finish Fri Feb 24 19:07:35 2012 26.70% done, estimate finish Fri Feb 24 19:07:35 2012 26.70% done, estimate finish Fri Feb 24 19:07:34 2012 26.71% done, estimate finish Fri Feb 24 19:07:34 2012 26.71% done, estimate finish Fri Feb 24 19:07:33 2012 26.72% done, estimate finish Fri Feb 24 19:07:33 2012 26.73% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 26.74% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 26.75% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 26.76% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 26.77% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 26.78% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 26.79% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 26.80% done, estimate finish Fri Feb 24 19:07:33 2012 26.81% done, estimate finish Fri Feb 24 19:07:33 2012 26.81% done, estimate finish Fri Feb 24 19:07:32 2012 26.82% done, estimate finish Fri Feb 24 19:07:32 2012 26.82% done, estimate finish Fri Feb 24 19:07:35 2012 26.83% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 26.84% done, estimate finish Fri Feb 24 19:07:34 2012 26.84% done, estimate finish Fri Feb 24 19:07:33 2012 26.85% done, estimate finish Fri Feb 24 19:07:33 2012 26.85% done, estimate finish Fri Feb 24 19:07:32 2012 26.86% done, estimate finish Fri Feb 24 19:07:32 2012 26.86% done, estimate finish Fri Feb 24 19:07:35 2012 26.87% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 26.88% done, estimate finish Fri Feb 24 19:07:33 2012 26.89% done, estimate finish Fri Feb 24 19:07:33 2012 26.89% done, estimate finish Fri Feb 24 19:07:32 2012 26.90% done, estimate finish Fri Feb 24 19:07:32 2012 26.90% done, estimate finish Fri Feb 24 19:07:31 2012 26.91% done, estimate finish Fri Feb 24 19:07:35 2012 26.91% done, estimate finish Fri Feb 24 19:07:34 2012 26.92% done, estimate finish Fri Feb 24 19:07:34 2012 26.92% done, estimate finish Fri Feb 24 19:07:33 2012 26.93% done, estimate finish Fri Feb 24 19:07:33 2012 26.93% done, estimate finish Fri Feb 24 19:07:32 2012 26.94% done, estimate finish Fri Feb 24 19:07:32 2012 26.94% done, estimate finish Fri Feb 24 19:07:31 2012 26.95% done, estimate finish Fri Feb 24 19:07:35 2012 26.95% done, estimate finish Fri Feb 24 19:07:34 2012 26.96% done, estimate finish Fri Feb 24 19:07:34 2012 26.97% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 26.98% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 26.99% done, estimate finish Fri Feb 24 19:07:31 2012 26.99% done, estimate finish Fri Feb 24 19:07:34 2012 27.00% done, estimate finish Fri Feb 24 19:07:34 2012 27.00% done, estimate finish Fri Feb 24 19:07:33 2012 27.01% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 27.02% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 27.03% done, estimate finish Fri Feb 24 19:07:35 2012 27.03% done, estimate finish Fri Feb 24 19:07:34 2012 27.04% done, estimate finish Fri Feb 24 19:07:34 2012 27.05% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 27.06% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 27.07% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 27.08% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 27.09% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 27.10% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 27.11% done, estimate finish Fri Feb 24 19:07:35 2012 === last message repeated 2 times. === 27.12% done, estimate finish Fri Feb 24 19:07:34 2012 27.13% done, estimate finish Fri Feb 24 19:07:34 2012 27.13% done, estimate finish Fri Feb 24 19:07:33 2012 27.14% done, estimate finish Fri Feb 24 19:07:33 2012 27.14% done, estimate finish Fri Feb 24 19:07:32 2012 27.15% done, estimate finish Fri Feb 24 19:07:32 2012 27.15% done, estimate finish Fri Feb 24 19:07:35 2012 27.16% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 27.17% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 27.18% done, estimate finish Fri Feb 24 19:07:33 2012 27.18% done, estimate finish Fri Feb 24 19:07:32 2012 27.19% done, estimate finish Fri Feb 24 19:07:32 2012 27.19% done, estimate finish Fri Feb 24 19:07:35 2012 27.20% done, estimate finish Fri Feb 24 19:07:34 2012 27.21% done, estimate finish Fri Feb 24 19:07:34 2012 27.21% done, estimate finish Fri Feb 24 19:07:33 2012 27.22% done, estimate finish Fri Feb 24 19:07:33 2012 27.22% done, estimate finish Fri Feb 24 19:07:32 2012 27.23% done, estimate finish Fri Feb 24 19:07:32 2012 27.23% done, estimate finish Fri Feb 24 19:07:31 2012 27.24% done, estimate finish Fri Feb 24 19:07:35 2012 27.24% done, estimate finish Fri Feb 24 19:07:34 2012 27.25% done, estimate finish Fri Feb 24 19:07:34 2012 27.25% done, estimate finish Fri Feb 24 19:07:33 2012 27.26% done, estimate finish Fri Feb 24 19:07:33 2012 27.26% done, estimate finish Fri Feb 24 19:07:32 2012 27.27% done, estimate finish Fri Feb 24 19:07:32 2012 27.27% done, estimate finish Fri Feb 24 19:07:31 2012 27.28% done, estimate finish Fri Feb 24 19:07:34 2012 27.29% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 27.30% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 27.31% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 27.32% done, estimate finish Fri Feb 24 19:07:31 2012 27.32% done, estimate finish Fri Feb 24 19:07:34 2012 27.33% done, estimate finish Fri Feb 24 19:07:34 2012 27.33% done, estimate finish Fri Feb 24 19:07:33 2012 27.34% done, estimate finish Fri Feb 24 19:07:33 2012 27.34% done, estimate finish Fri Feb 24 19:07:32 2012 27.35% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 27.36% done, estimate finish Fri Feb 24 19:07:31 2012 27.37% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 27.38% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 27.39% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 27.40% done, estimate finish Fri Feb 24 19:07:31 2012 === last message repeated 2 times. === 27.41% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 27.42% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 27.43% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 27.44% done, estimate finish Fri Feb 24 19:07:31 2012 27.45% done, estimate finish Fri Feb 24 19:07:34 2012 === last message repeated 2 times. === 27.46% done, estimate finish Fri Feb 24 19:07:34 2012 27.46% done, estimate finish Fri Feb 24 19:07:33 2012 27.47% done, estimate finish Fri Feb 24 19:07:33 2012 27.47% done, estimate finish Fri Feb 24 19:07:32 2012 27.48% done, estimate finish Fri Feb 24 19:07:32 2012 27.48% done, estimate finish Fri Feb 24 19:07:31 2012 27.49% done, estimate finish Fri Feb 24 19:07:31 2012 27.49% done, estimate finish Fri Feb 24 19:07:34 2012 27.50% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 27.51% done, estimate finish Fri Feb 24 19:07:32 2012 27.52% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 27.53% done, estimate finish Fri Feb 24 19:07:31 2012 === last message repeated 2 times. === 27.54% done, estimate finish Fri Feb 24 19:07:30 2012 27.54% done, estimate finish Fri Feb 24 19:07:33 2012 27.55% done, estimate finish Fri Feb 24 19:07:33 2012 27.55% done, estimate finish Fri Feb 24 19:07:32 2012 27.56% done, estimate finish Fri Feb 24 19:07:32 2012 27.56% done, estimate finish Fri Feb 24 19:07:31 2012 27.57% done, estimate finish Fri Feb 24 19:07:31 2012 27.57% done, estimate finish Fri Feb 24 19:07:30 2012 27.58% done, estimate finish Fri Feb 24 19:07:30 2012 27.58% done, estimate finish Fri Feb 24 19:07:33 2012 27.59% done, estimate finish Fri Feb 24 19:07:33 2012 27.59% done, estimate finish Fri Feb 24 19:07:32 2012 27.60% done, estimate finish Fri Feb 24 19:07:32 2012 27.61% done, estimate finish Fri Feb 24 19:07:31 2012 === last message repeated 2 times. === 27.62% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 27.63% done, estimate finish Fri Feb 24 19:07:33 2012 === last message repeated 2 times. === 27.64% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 27.65% done, estimate finish Fri Feb 24 19:07:31 2012 === last message repeated 2 times. === 27.66% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 27.67% done, estimate finish Fri Feb 24 19:07:33 2012 27.68% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 27.69% done, estimate finish Fri Feb 24 19:07:32 2012 27.69% done, estimate finish Fri Feb 24 19:07:31 2012 27.70% done, estimate finish Fri Feb 24 19:07:31 2012 27.70% done, estimate finish Fri Feb 24 19:07:30 2012 27.71% done, estimate finish Fri Feb 24 19:07:30 2012 27.71% done, estimate finish Fri Feb 24 19:07:33 2012 27.72% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 27.73% done, estimate finish Fri Feb 24 19:07:31 2012 === last message repeated 2 times. === 27.74% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 27.75% done, estimate finish Fri Feb 24 19:07:30 2012 27.76% done, estimate finish Fri Feb 24 19:07:33 2012 27.76% done, estimate finish Fri Feb 24 19:07:32 2012 27.77% done, estimate finish Fri Feb 24 19:07:32 2012 27.77% done, estimate finish Fri Feb 24 19:07:31 2012 27.78% done, estimate finish Fri Feb 24 19:07:31 2012 27.78% done, estimate finish Fri Feb 24 19:07:30 2012 27.79% done, estimate finish Fri Feb 24 19:07:30 2012 27.79% done, estimate finish Fri Feb 24 19:07:29 2012 27.80% done, estimate finish Fri Feb 24 19:07:33 2012 27.80% done, estimate finish Fri Feb 24 19:07:32 2012 27.81% done, estimate finish Fri Feb 24 19:07:32 2012 27.81% done, estimate finish Fri Feb 24 19:07:31 2012 27.82% done, estimate finish Fri Feb 24 19:07:31 2012 27.82% done, estimate finish Fri Feb 24 19:07:30 2012 27.83% done, estimate finish Fri Feb 24 19:07:30 2012 27.84% done, estimate finish Fri Feb 24 19:07:29 2012 27.84% done, estimate finish Fri Feb 24 19:07:32 2012 27.85% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 27.86% done, estimate finish Fri Feb 24 19:07:31 2012 === last message repeated 2 times. === 27.87% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 27.88% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 27.89% done, estimate finish Fri Feb 24 19:07:32 2012 27.89% done, estimate finish Fri Feb 24 19:07:31 2012 27.90% done, estimate finish Fri Feb 24 19:07:31 2012 27.90% done, estimate finish Fri Feb 24 19:07:30 2012 27.91% done, estimate finish Fri Feb 24 19:07:30 2012 27.92% done, estimate finish Fri Feb 24 19:07:30 2012 27.92% done, estimate finish Fri Feb 24 19:07:29 2012 27.93% done, estimate finish Fri Feb 24 19:07:29 2012 27.93% done, estimate finish Fri Feb 24 19:07:32 2012 27.94% done, estimate finish Fri Feb 24 19:07:31 2012 === last message repeated 2 times. === 27.95% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 27.96% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 27.97% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 27.98% done, estimate finish Fri Feb 24 19:07:31 2012 === last message repeated 2 times. === 27.99% done, estimate finish Fri Feb 24 19:07:30 2012 28.00% done, estimate finish Fri Feb 24 19:07:30 2012 28.00% done, estimate finish Fri Feb 24 19:07:29 2012 28.01% done, estimate finish Fri Feb 24 19:07:29 2012 28.01% done, estimate finish Fri Feb 24 19:07:28 2012 28.02% done, estimate finish Fri Feb 24 19:07:31 2012 === last message repeated 2 times. === 28.03% done, estimate finish Fri Feb 24 19:07:31 2012 28.03% done, estimate finish Fri Feb 24 19:07:30 2012 28.04% done, estimate finish Fri Feb 24 19:07:30 2012 28.04% done, estimate finish Fri Feb 24 19:07:29 2012 28.05% done, estimate finish Fri Feb 24 19:07:29 2012 28.05% done, estimate finish Fri Feb 24 19:07:28 2012 28.06% done, estimate finish Fri Feb 24 19:07:31 2012 === last message repeated 2 times. === 28.07% done, estimate finish Fri Feb 24 19:07:30 2012 28.08% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 28.09% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 28.10% done, estimate finish Fri Feb 24 19:07:28 2012 28.10% done, estimate finish Fri Feb 24 19:07:31 2012 28.11% done, estimate finish Fri Feb 24 19:07:31 2012 28.11% done, estimate finish Fri Feb 24 19:07:30 2012 28.12% done, estimate finish Fri Feb 24 19:07:30 2012 28.12% done, estimate finish Fri Feb 24 19:07:29 2012 28.13% done, estimate finish Fri Feb 24 19:07:29 2012 28.13% done, estimate finish Fri Feb 24 19:07:28 2012 28.14% done, estimate finish Fri Feb 24 19:07:28 2012 28.14% done, estimate finish Fri Feb 24 19:07:31 2012 28.15% done, estimate finish Fri Feb 24 19:07:31 2012 28.16% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 28.17% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 28.18% done, estimate finish Fri Feb 24 19:07:28 2012 === last message repeated 2 times. === 28.19% done, estimate finish Fri Feb 24 19:07:31 2012 === last message repeated 2 times. === 28.20% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 28.21% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 28.22% done, estimate finish Fri Feb 24 19:07:28 2012 === last message repeated 2 times. === 28.23% done, estimate finish Fri Feb 24 19:07:31 2012 28.24% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 28.25% done, estimate finish Fri Feb 24 19:07:30 2012 28.25% done, estimate finish Fri Feb 24 19:07:29 2012 28.26% done, estimate finish Fri Feb 24 19:07:29 2012 28.26% done, estimate finish Fri Feb 24 19:07:28 2012 28.27% done, estimate finish Fri Feb 24 19:07:28 2012 28.27% done, estimate finish Fri Feb 24 19:07:31 2012 28.28% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 28.29% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 28.30% done, estimate finish Fri Feb 24 19:07:29 2012 28.30% done, estimate finish Fri Feb 24 19:07:28 2012 28.31% done, estimate finish Fri Feb 24 19:07:28 2012 28.32% done, estimate finish Fri Feb 24 19:07:31 2012 28.32% done, estimate finish Fri Feb 24 19:07:30 2012 28.33% done, estimate finish Fri Feb 24 19:07:30 2012 28.33% done, estimate finish Fri Feb 24 19:07:29 2012 28.34% done, estimate finish Fri Feb 24 19:07:29 2012 28.34% done, estimate finish Fri Feb 24 19:07:28 2012 28.35% done, estimate finish Fri Feb 24 19:07:28 2012 28.35% done, estimate finish Fri Feb 24 19:07:27 2012 28.36% done, estimate finish Fri Feb 24 19:07:31 2012 28.36% done, estimate finish Fri Feb 24 19:07:30 2012 28.37% done, estimate finish Fri Feb 24 19:07:30 2012 28.37% done, estimate finish Fri Feb 24 19:07:29 2012 28.38% done, estimate finish Fri Feb 24 19:07:29 2012 28.38% done, estimate finish Fri Feb 24 19:07:28 2012 28.39% done, estimate finish Fri Feb 24 19:07:28 2012 28.40% done, estimate finish Fri Feb 24 19:07:27 2012 28.40% done, estimate finish Fri Feb 24 19:07:30 2012 28.41% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 28.42% done, estimate finish Fri Feb 24 19:07:29 2012 28.42% done, estimate finish Fri Feb 24 19:07:32 2012 28.43% done, estimate finish Fri Feb 24 19:07:32 2012 28.43% done, estimate finish Fri Feb 24 19:07:31 2012 28.44% done, estimate finish Fri Feb 24 19:07:31 2012 28.44% done, estimate finish Fri Feb 24 19:07:30 2012 28.45% done, estimate finish Fri Feb 24 19:07:30 2012 28.45% done, estimate finish Fri Feb 24 19:07:29 2012 28.46% done, estimate finish Fri Feb 24 19:07:29 2012 28.46% done, estimate finish Fri Feb 24 19:07:32 2012 28.47% done, estimate finish Fri Feb 24 19:07:32 2012 28.48% done, estimate finish Fri Feb 24 19:07:31 2012 === last message repeated 2 times. === 28.49% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 28.50% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 28.51% done, estimate finish Fri Feb 24 19:07:32 2012 28.51% done, estimate finish Fri Feb 24 19:07:31 2012 28.52% done, estimate finish Fri Feb 24 19:07:31 2012 === last message repeated 2 times. === 28.53% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 28.54% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 28.55% done, estimate finish Fri Feb 24 19:07:32 2012 28.56% done, estimate finish Fri Feb 24 19:07:31 2012 === last message repeated 2 times. === 28.57% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 28.58% done, estimate finish Fri Feb 24 19:07:30 2012 28.58% done, estimate finish Fri Feb 24 19:07:29 2012 28.59% done, estimate finish Fri Feb 24 19:07:32 2012 === last message repeated 2 times. === 28.60% done, estimate finish Fri Feb 24 19:07:31 2012 === last message repeated 2 times. === 28.61% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 28.62% done, estimate finish Fri Feb 24 19:07:29 2012 28.63% done, estimate finish Fri Feb 24 19:07:29 2012 28.63% done, estimate finish Fri Feb 24 19:07:32 2012 28.64% done, estimate finish Fri Feb 24 19:07:32 2012 28.64% done, estimate finish Fri Feb 24 19:07:31 2012 28.65% done, estimate finish Fri Feb 24 19:07:31 2012 28.65% done, estimate finish Fri Feb 24 19:07:30 2012 28.66% done, estimate finish Fri Feb 24 19:07:30 2012 28.66% done, estimate finish Fri Feb 24 19:07:29 2012 28.67% done, estimate finish Fri Feb 24 19:07:29 2012 28.67% done, estimate finish Fri Feb 24 19:07:32 2012 28.68% done, estimate finish Fri Feb 24 19:07:31 2012 === last message repeated 2 times. === 28.69% done, estimate finish Fri Feb 24 19:07:31 2012 28.69% done, estimate finish Fri Feb 24 19:07:30 2012 28.70% done, estimate finish Fri Feb 24 19:07:30 2012 28.70% done, estimate finish Fri Feb 24 19:07:29 2012 28.71% done, estimate finish Fri Feb 24 19:07:29 2012 28.72% done, estimate finish Fri Feb 24 19:07:32 2012 28.72% done, estimate finish Fri Feb 24 19:07:31 2012 28.73% done, estimate finish Fri Feb 24 19:07:31 2012 28.73% done, estimate finish Fri Feb 24 19:07:30 2012 28.74% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 28.75% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 28.76% done, estimate finish Fri Feb 24 19:07:32 2012 28.76% done, estimate finish Fri Feb 24 19:07:31 2012 28.77% done, estimate finish Fri Feb 24 19:07:31 2012 28.77% done, estimate finish Fri Feb 24 19:07:30 2012 28.78% done, estimate finish Fri Feb 24 19:07:30 2012 28.79% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 28.80% done, estimate finish Fri Feb 24 19:07:29 2012 28.80% done, estimate finish Fri Feb 24 19:07:32 2012 28.81% done, estimate finish Fri Feb 24 19:07:31 2012 === last message repeated 2 times. === 28.82% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 28.83% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 28.84% done, estimate finish Fri Feb 24 19:07:28 2012 28.84% done, estimate finish Fri Feb 24 19:07:31 2012 28.85% done, estimate finish Fri Feb 24 19:07:31 2012 === last message repeated 2 times. === 28.86% done, estimate finish Fri Feb 24 19:07:30 2012 28.87% done, estimate finish Fri Feb 24 19:07:30 2012 28.87% done, estimate finish Fri Feb 24 19:07:29 2012 28.88% done, estimate finish Fri Feb 24 19:07:29 2012 28.88% done, estimate finish Fri Feb 24 19:07:28 2012 28.89% done, estimate finish Fri Feb 24 19:07:31 2012 === last message repeated 2 times. === 28.90% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 28.91% done, estimate finish Fri Feb 24 19:07:30 2012 28.91% done, estimate finish Fri Feb 24 19:07:29 2012 28.92% done, estimate finish Fri Feb 24 19:07:29 2012 28.92% done, estimate finish Fri Feb 24 19:07:28 2012 28.93% done, estimate finish Fri Feb 24 19:07:28 2012 28.93% done, estimate finish Fri Feb 24 19:07:31 2012 28.94% done, estimate finish Fri Feb 24 19:07:30 2012 28.95% done, estimate finish Fri Feb 24 19:07:30 2012 28.95% done, estimate finish Fri Feb 24 19:07:29 2012 28.96% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 28.97% done, estimate finish Fri Feb 24 19:07:28 2012 28.97% done, estimate finish Fri Feb 24 19:07:31 2012 28.98% done, estimate finish Fri Feb 24 19:07:31 2012 28.98% done, estimate finish Fri Feb 24 19:07:30 2012 28.99% done, estimate finish Fri Feb 24 19:07:30 2012 28.99% done, estimate finish Fri Feb 24 19:07:29 2012 29.00% done, estimate finish Fri Feb 24 19:07:29 2012 29.00% done, estimate finish Fri Feb 24 19:07:28 2012 29.01% done, estimate finish Fri Feb 24 19:07:28 2012 === last message repeated 2 times. === 29.02% done, estimate finish Fri Feb 24 19:07:31 2012 29.03% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 29.04% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 29.05% done, estimate finish Fri Feb 24 19:07:28 2012 === last message repeated 2 times. === 29.06% done, estimate finish Fri Feb 24 19:07:31 2012 29.06% done, estimate finish Fri Feb 24 19:07:30 2012 29.07% done, estimate finish Fri Feb 24 19:07:30 2012 === last message repeated 2 times. === 29.08% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 29.09% done, estimate finish Fri Feb 24 19:07:28 2012 === last message repeated 2 times. === 29.10% done, estimate finish Fri Feb 24 19:07:27 2012 29.11% done, estimate finish Fri Feb 24 19:07:27 2012 29.11% done, estimate finish Fri Feb 24 19:07:30 2012 29.12% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 29.13% done, estimate finish Fri Feb 24 19:07:29 2012 29.13% done, estimate finish Fri Feb 24 19:07:28 2012 29.14% done, estimate finish Fri Feb 24 19:07:28 2012 29.14% done, estimate finish Fri Feb 24 19:07:27 2012 29.15% done, estimate finish Fri Feb 24 19:07:27 2012 29.15% done, estimate finish Fri Feb 24 19:07:30 2012 29.16% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 29.17% done, estimate finish Fri Feb 24 19:07:28 2012 === last message repeated 2 times. === 29.18% done, estimate finish Fri Feb 24 19:07:28 2012 29.19% done, estimate finish Fri Feb 24 19:07:27 2012 29.19% done, estimate finish Fri Feb 24 19:07:30 2012 29.20% done, estimate finish Fri Feb 24 19:07:30 2012 29.20% done, estimate finish Fri Feb 24 19:07:29 2012 29.21% done, estimate finish Fri Feb 24 19:07:29 2012 29.21% done, estimate finish Fri Feb 24 19:07:28 2012 29.22% done, estimate finish Fri Feb 24 19:07:28 2012 29.22% done, estimate finish Fri Feb 24 19:07:27 2012 29.23% done, estimate finish Fri Feb 24 19:07:27 2012 === last message repeated 2 times. === 29.24% done, estimate finish Fri Feb 24 19:07:30 2012 29.24% done, estimate finish Fri Feb 24 19:07:29 2012 29.25% done, estimate finish Fri Feb 24 19:07:29 2012 29.25% done, estimate finish Fri Feb 24 19:07:28 2012 29.26% done, estimate finish Fri Feb 24 19:07:28 2012 29.27% done, estimate finish Fri Feb 24 19:07:27 2012 === last message repeated 2 times. === 29.28% done, estimate finish Fri Feb 24 19:07:30 2012 29.28% done, estimate finish Fri Feb 24 19:07:29 2012 29.29% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 29.30% done, estimate finish Fri Feb 24 19:07:28 2012 === last message repeated 2 times. === 29.31% done, estimate finish Fri Feb 24 19:07:27 2012 === last message repeated 2 times. === 29.32% done, estimate finish Fri Feb 24 19:07:30 2012 29.32% done, estimate finish Fri Feb 24 19:07:29 2012 29.33% done, estimate finish Fri Feb 24 19:07:29 2012 29.33% done, estimate finish Fri Feb 24 19:07:28 2012 29.34% done, estimate finish Fri Feb 24 19:07:28 2012 29.35% done, estimate finish Fri Feb 24 19:07:28 2012 29.35% done, estimate finish Fri Feb 24 19:07:27 2012 29.36% done, estimate finish Fri Feb 24 19:07:27 2012 29.36% done, estimate finish Fri Feb 24 19:07:30 2012 29.37% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 29.38% done, estimate finish Fri Feb 24 19:07:28 2012 === last message repeated 2 times. === 29.39% done, estimate finish Fri Feb 24 19:07:27 2012 === last message repeated 2 times. === 29.40% done, estimate finish Fri Feb 24 19:07:27 2012 29.40% done, estimate finish Fri Feb 24 19:07:30 2012 29.41% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 29.42% done, estimate finish Fri Feb 24 19:07:28 2012 29.43% done, estimate finish Fri Feb 24 19:07:28 2012 29.43% done, estimate finish Fri Feb 24 19:07:27 2012 29.44% done, estimate finish Fri Feb 24 19:07:27 2012 29.44% done, estimate finish Fri Feb 24 19:07:26 2012 29.45% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 29.46% done, estimate finish Fri Feb 24 19:07:29 2012 29.46% done, estimate finish Fri Feb 24 19:07:28 2012 29.47% done, estimate finish Fri Feb 24 19:07:28 2012 29.47% done, estimate finish Fri Feb 24 19:07:27 2012 29.48% done, estimate finish Fri Feb 24 19:07:27 2012 29.48% done, estimate finish Fri Feb 24 19:07:26 2012 29.49% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 29.50% done, estimate finish Fri Feb 24 19:07:28 2012 29.51% done, estimate finish Fri Feb 24 19:07:28 2012 === last message repeated 2 times. === 29.52% done, estimate finish Fri Feb 24 19:07:27 2012 === last message repeated 2 times. === 29.53% done, estimate finish Fri Feb 24 19:07:30 2012 29.53% done, estimate finish Fri Feb 24 19:07:29 2012 29.54% done, estimate finish Fri Feb 24 19:07:29 2012 29.54% done, estimate finish Fri Feb 24 19:07:28 2012 29.55% done, estimate finish Fri Feb 24 19:07:28 2012 29.55% done, estimate finish Fri Feb 24 19:07:27 2012 29.56% done, estimate finish Fri Feb 24 19:07:27 2012 === last message repeated 2 times. === 29.57% done, estimate finish Fri Feb 24 19:07:26 2012 29.57% done, estimate finish Fri Feb 24 19:07:29 2012 29.58% done, estimate finish Fri Feb 24 19:07:29 2012 29.59% done, estimate finish Fri Feb 24 19:07:28 2012 === last message repeated 2 times. === 29.60% done, estimate finish Fri Feb 24 19:07:27 2012 === last message repeated 2 times. === 29.61% done, estimate finish Fri Feb 24 19:07:26 2012 === last message repeated 2 times. === 29.62% done, estimate finish Fri Feb 24 19:07:29 2012 === last message repeated 2 times. === 29.63% done, estimate finish Fri Feb 24 19:07:28 2012 === last message repeated 2 times. === 29.64% done, estimate finish Fri Feb 24 19:07:27 2012 === last message repeated 2 times. === 29.65% done, estimate finish Fri Feb 24 19:07:26 2012 === last message repeated 2 times. === 29.66% done, estimate finish Fri Feb 24 19:07:29 2012 29.67% done, estimate finish Fri Feb 24 19:07:28 2012 === last message repeated 2 times. === 29.68% done, estimate finish Fri Feb 24 19:07:28 2012 29.68% done, estimate finish Fri Feb 24 19:07:27 2012 29.69% done, estimate finish Fri Feb 24 19:07:27 2012 29.69% done, estimate finish Fri Feb 24 19:07:26 2012 29.70% done, estimate finish Fri Feb 24 19:07:26 2012 29.70% done, estimate finish Fri Feb 24 19:07:29 2012 29.71% done, estimate finish Fri Feb 24 19:07:28 2012 === last message repeated 2 times. === 29.72% done, estimate finish Fri Feb 24 19:07:27 2012 === last message repeated 2 times. === 29.73% done, estimate finish Fri Feb 24 19:07:27 2012 29.74% done, estimate finish Fri Feb 24 19:07:26 2012 === last message repeated 2 times. === 29.75% done, estimate finish Fri Feb 24 19:07:29 2012 29.75% done, estimate finish Fri Feb 24 19:07:28 2012 29.76% done, estimate finish Fri Feb 24 19:07:28 2012 29.76% done, estimate finish Fri Feb 24 19:07:27 2012 29.77% done, estimate finish Fri Feb 24 19:07:27 2012 29.77% done, estimate finish Fri Feb 24 19:07:26 2012 29.78% done, estimate finish Fri Feb 24 19:07:26 2012 === last message repeated 2 times. === 29.79% done, estimate finish Fri Feb 24 19:07:29 2012 29.79% done, estimate finish Fri Feb 24 19:07:28 2012 29.80% done, estimate finish Fri Feb 24 19:07:28 2012 29.80% done, estimate finish Fri Feb 24 19:07:27 2012 29.81% done, estimate finish Fri Feb 24 19:07:27 2012 29.81% done, estimate finish Fri Feb 24 19:07:26 2012 29.82% done, estimate finish Fri Feb 24 19:07:26 2012 29.83% done, estimate finish Fri Feb 24 19:07:26 2012 29.83% done, estimate finish Fri Feb 24 19:07:28 2012 29.84% done, estimate finish Fri Feb 24 19:07:28 2012 === last message repeated 2 times. === 29.85% done, estimate finish Fri Feb 24 19:07:27 2012 === last message repeated 2 times. === 29.86% done, estimate finish Fri Feb 24 19:07:26 2012 === last message repeated 2 times. === 29.87% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 29.88% done, estimate finish Fri Feb 24 19:07:28 2012 29.88% done, estimate finish Fri Feb 24 19:07:27 2012 29.89% done, estimate finish Fri Feb 24 19:07:27 2012 29.90% done, estimate finish Fri Feb 24 19:07:27 2012 29.90% done, estimate finish Fri Feb 24 19:07:26 2012 29.91% done, estimate finish Fri Feb 24 19:07:26 2012 29.91% done, estimate finish Fri Feb 24 19:07:25 2012 29.92% done, estimate finish Fri Feb 24 19:07:28 2012 === last message repeated 2 times. === 29.93% done, estimate finish Fri Feb 24 19:07:27 2012 === last message repeated 2 times. === 29.94% done, estimate finish Fri Feb 24 19:07:27 2012 29.94% done, estimate finish Fri Feb 24 19:07:26 2012 29.95% done, estimate finish Fri Feb 24 19:07:26 2012 29.95% done, estimate finish Fri Feb 24 19:07:25 2012 29.96% done, estimate finish Fri Feb 24 19:07:28 2012 === last message repeated 2 times. === 29.97% done, estimate finish Fri Feb 24 19:07:27 2012 29.98% done, estimate finish Fri Feb 24 19:07:27 2012 29.98% done, estimate finish Fri Feb 24 19:07:26 2012 29.99% done, estimate finish Fri Feb 24 19:07:26 2012 === last message repeated 2 times. === 30.00% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 30.01% done, estimate finish Fri Feb 24 19:07:28 2012 30.01% done, estimate finish Fri Feb 24 19:07:27 2012 30.02% done, estimate finish Fri Feb 24 19:07:27 2012 30.02% done, estimate finish Fri Feb 24 19:07:26 2012 30.03% done, estimate finish Fri Feb 24 19:07:26 2012 30.03% done, estimate finish Fri Feb 24 19:07:25 2012 30.04% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 30.05% done, estimate finish Fri Feb 24 19:07:27 2012 30.06% done, estimate finish Fri Feb 24 19:07:27 2012 === last message repeated 2 times. === 30.07% done, estimate finish Fri Feb 24 19:07:26 2012 === last message repeated 2 times. === 30.08% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 30.09% done, estimate finish Fri Feb 24 19:07:24 2012 30.09% done, estimate finish Fri Feb 24 19:07:27 2012 30.10% done, estimate finish Fri Feb 24 19:07:27 2012 === last message repeated 2 times. === 30.11% done, estimate finish Fri Feb 24 19:07:26 2012 === last message repeated 2 times. === 30.12% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 30.13% done, estimate finish Fri Feb 24 19:07:24 2012 30.14% done, estimate finish Fri Feb 24 19:07:27 2012 === last message repeated 2 times. === 30.15% done, estimate finish Fri Feb 24 19:07:26 2012 === last message repeated 2 times. === 30.16% done, estimate finish Fri Feb 24 19:07:26 2012 30.16% done, estimate finish Fri Feb 24 19:07:25 2012 30.17% done, estimate finish Fri Feb 24 19:07:25 2012 30.17% done, estimate finish Fri Feb 24 19:07:24 2012 30.18% done, estimate finish Fri Feb 24 19:07:27 2012 === last message repeated 2 times. === 30.19% done, estimate finish Fri Feb 24 19:07:26 2012 === last message repeated 2 times. === 30.20% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 30.21% done, estimate finish Fri Feb 24 19:07:25 2012 30.22% done, estimate finish Fri Feb 24 19:07:28 2012 30.22% done, estimate finish Fri Feb 24 19:07:27 2012 30.23% done, estimate finish Fri Feb 24 19:07:27 2012 30.23% done, estimate finish Fri Feb 24 19:07:26 2012 30.24% done, estimate finish Fri Feb 24 19:07:26 2012 30.24% done, estimate finish Fri Feb 24 19:07:25 2012 30.25% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 30.26% done, estimate finish Fri Feb 24 19:07:24 2012 30.26% done, estimate finish Fri Feb 24 19:07:27 2012 30.27% done, estimate finish Fri Feb 24 19:07:27 2012 30.27% done, estimate finish Fri Feb 24 19:07:26 2012 30.28% done, estimate finish Fri Feb 24 19:07:26 2012 30.28% done, estimate finish Fri Feb 24 19:07:25 2012 30.29% done, estimate finish Fri Feb 24 19:07:25 2012 30.30% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 30.31% done, estimate finish Fri Feb 24 19:07:27 2012 30.31% done, estimate finish Fri Feb 24 19:07:26 2012 30.32% done, estimate finish Fri Feb 24 19:07:26 2012 === last message repeated 2 times. === 30.33% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 30.34% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 30.35% done, estimate finish Fri Feb 24 19:07:27 2012 30.35% done, estimate finish Fri Feb 24 19:07:26 2012 30.36% done, estimate finish Fri Feb 24 19:07:26 2012 30.36% done, estimate finish Fri Feb 24 19:07:25 2012 30.37% done, estimate finish Fri Feb 24 19:07:25 2012 30.38% done, estimate finish Fri Feb 24 19:07:25 2012 30.38% done, estimate finish Fri Feb 24 19:07:24 2012 30.39% done, estimate finish Fri Feb 24 19:07:24 2012 30.39% done, estimate finish Fri Feb 24 19:07:27 2012 30.40% done, estimate finish Fri Feb 24 19:07:26 2012 === last message repeated 2 times. === 30.41% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 30.42% done, estimate finish Fri Feb 24 19:07:25 2012 30.42% done, estimate finish Fri Feb 24 19:07:24 2012 30.43% done, estimate finish Fri Feb 24 19:07:24 2012 30.43% done, estimate finish Fri Feb 24 19:07:27 2012 30.44% done, estimate finish Fri Feb 24 19:07:26 2012 === last message repeated 2 times. === 30.45% done, estimate finish Fri Feb 24 19:07:25 2012 30.46% done, estimate finish Fri Feb 24 19:07:25 2012 30.46% done, estimate finish Fri Feb 24 19:07:24 2012 30.47% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 30.48% done, estimate finish Fri Feb 24 19:07:26 2012 === last message repeated 2 times. === 30.49% done, estimate finish Fri Feb 24 19:07:26 2012 30.49% done, estimate finish Fri Feb 24 19:07:25 2012 30.50% done, estimate finish Fri Feb 24 19:07:25 2012 30.50% done, estimate finish Fri Feb 24 19:07:24 2012 30.51% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 30.52% done, estimate finish Fri Feb 24 19:07:26 2012 === last message repeated 2 times. === 30.53% done, estimate finish Fri Feb 24 19:07:26 2012 30.54% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 30.55% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 30.56% done, estimate finish Fri Feb 24 19:07:23 2012 30.56% done, estimate finish Fri Feb 24 19:07:26 2012 30.57% done, estimate finish Fri Feb 24 19:07:26 2012 30.57% done, estimate finish Fri Feb 24 19:07:25 2012 30.58% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 30.59% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 30.60% done, estimate finish Fri Feb 24 19:07:27 2012 30.60% done, estimate finish Fri Feb 24 19:07:26 2012 30.61% done, estimate finish Fri Feb 24 19:07:26 2012 30.62% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 30.63% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 30.64% done, estimate finish Fri Feb 24 19:07:27 2012 30.64% done, estimate finish Fri Feb 24 19:07:26 2012 30.65% done, estimate finish Fri Feb 24 19:07:26 2012 === last message repeated 2 times. === 30.66% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 30.67% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 30.68% done, estimate finish Fri Feb 24 19:07:24 2012 30.68% done, estimate finish Fri Feb 24 19:07:26 2012 30.69% done, estimate finish Fri Feb 24 19:07:26 2012 30.70% done, estimate finish Fri Feb 24 19:07:26 2012 30.70% done, estimate finish Fri Feb 24 19:07:25 2012 30.71% done, estimate finish Fri Feb 24 19:07:25 2012 30.71% done, estimate finish Fri Feb 24 19:07:24 2012 30.72% done, estimate finish Fri Feb 24 19:07:24 2012 30.72% done, estimate finish Fri Feb 24 19:07:23 2012 30.73% done, estimate finish Fri Feb 24 19:07:26 2012 === last message repeated 2 times. === 30.74% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 30.75% done, estimate finish Fri Feb 24 19:07:25 2012 30.75% done, estimate finish Fri Feb 24 19:07:24 2012 30.76% done, estimate finish Fri Feb 24 19:07:24 2012 30.76% done, estimate finish Fri Feb 24 19:07:23 2012 30.77% done, estimate finish Fri Feb 24 19:07:26 2012 30.78% done, estimate finish Fri Feb 24 19:07:26 2012 30.78% done, estimate finish Fri Feb 24 19:07:25 2012 30.79% done, estimate finish Fri Feb 24 19:07:25 2012 30.79% done, estimate finish Fri Feb 24 19:07:24 2012 30.80% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 30.81% done, estimate finish Fri Feb 24 19:07:23 2012 30.81% done, estimate finish Fri Feb 24 19:07:26 2012 30.82% done, estimate finish Fri Feb 24 19:07:26 2012 30.82% done, estimate finish Fri Feb 24 19:07:25 2012 30.83% done, estimate finish Fri Feb 24 19:07:25 2012 30.83% done, estimate finish Fri Feb 24 19:07:24 2012 30.84% done, estimate finish Fri Feb 24 19:07:24 2012 30.85% done, estimate finish Fri Feb 24 19:07:24 2012 30.85% done, estimate finish Fri Feb 24 19:07:23 2012 30.86% done, estimate finish Fri Feb 24 19:07:26 2012 === last message repeated 2 times. === 30.87% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 30.88% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 30.89% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 30.90% done, estimate finish Fri Feb 24 19:07:26 2012 30.90% done, estimate finish Fri Feb 24 19:07:25 2012 30.91% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 30.92% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 30.93% done, estimate finish Fri Feb 24 19:07:23 2012 30.94% done, estimate finish Fri Feb 24 19:07:23 2012 30.94% done, estimate finish Fri Feb 24 19:07:26 2012 30.95% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 30.96% done, estimate finish Fri Feb 24 19:07:25 2012 30.96% done, estimate finish Fri Feb 24 19:07:24 2012 30.97% done, estimate finish Fri Feb 24 19:07:24 2012 30.97% done, estimate finish Fri Feb 24 19:07:23 2012 30.98% done, estimate finish Fri Feb 24 19:07:23 2012 30.98% done, estimate finish Fri Feb 24 19:07:22 2012 30.99% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 31.00% done, estimate finish Fri Feb 24 19:07:24 2012 31.01% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 31.02% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 31.03% done, estimate finish Fri Feb 24 19:07:22 2012 31.03% done, estimate finish Fri Feb 24 19:07:25 2012 31.04% done, estimate finish Fri Feb 24 19:07:25 2012 31.04% done, estimate finish Fri Feb 24 19:07:24 2012 31.05% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 31.06% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 31.07% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 31.08% done, estimate finish Fri Feb 24 19:07:25 2012 31.09% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 31.10% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 31.11% done, estimate finish Fri Feb 24 19:07:23 2012 31.11% done, estimate finish Fri Feb 24 19:07:25 2012 31.12% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 31.13% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 31.14% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 31.15% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 31.16% done, estimate finish Fri Feb 24 19:07:25 2012 31.17% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 31.18% done, estimate finish Fri Feb 24 19:07:24 2012 31.18% done, estimate finish Fri Feb 24 19:07:23 2012 31.19% done, estimate finish Fri Feb 24 19:07:23 2012 31.19% done, estimate finish Fri Feb 24 19:07:22 2012 31.20% done, estimate finish Fri Feb 24 19:07:25 2012 === last message repeated 2 times. === 31.21% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 31.22% done, estimate finish Fri Feb 24 19:07:24 2012 31.22% done, estimate finish Fri Feb 24 19:07:23 2012 31.23% done, estimate finish Fri Feb 24 19:07:23 2012 31.23% done, estimate finish Fri Feb 24 19:07:22 2012 31.24% done, estimate finish Fri Feb 24 19:07:25 2012 31.25% done, estimate finish Fri Feb 24 19:07:25 2012 31.25% done, estimate finish Fri Feb 24 19:07:24 2012 31.26% done, estimate finish Fri Feb 24 19:07:24 2012 31.26% done, estimate finish Fri Feb 24 19:07:23 2012 31.27% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 31.28% done, estimate finish Fri Feb 24 19:07:22 2012 31.28% done, estimate finish Fri Feb 24 19:07:25 2012 31.29% done, estimate finish Fri Feb 24 19:07:25 2012 31.29% done, estimate finish Fri Feb 24 19:07:24 2012 31.30% done, estimate finish Fri Feb 24 19:07:24 2012 31.30% done, estimate finish Fri Feb 24 19:07:23 2012 31.31% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 31.32% done, estimate finish Fri Feb 24 19:07:22 2012 31.33% done, estimate finish Fri Feb 24 19:07:22 2012 31.33% done, estimate finish Fri Feb 24 19:07:24 2012 31.34% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 31.35% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 31.36% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 31.37% done, estimate finish Fri Feb 24 19:07:25 2012 31.37% done, estimate finish Fri Feb 24 19:07:24 2012 31.38% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 31.39% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 31.40% done, estimate finish Fri Feb 24 19:07:22 2012 31.41% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 31.42% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 31.43% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 31.44% done, estimate finish Fri Feb 24 19:07:23 2012 31.44% done, estimate finish Fri Feb 24 19:07:22 2012 31.45% done, estimate finish Fri Feb 24 19:07:22 2012 31.45% done, estimate finish Fri Feb 24 19:07:21 2012 31.46% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 31.47% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 31.48% done, estimate finish Fri Feb 24 19:07:23 2012 31.49% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 31.50% done, estimate finish Fri Feb 24 19:07:25 2012 31.50% done, estimate finish Fri Feb 24 19:07:24 2012 31.51% done, estimate finish Fri Feb 24 19:07:24 2012 31.51% done, estimate finish Fri Feb 24 19:07:23 2012 31.52% done, estimate finish Fri Feb 24 19:07:23 2012 31.52% done, estimate finish Fri Feb 24 19:07:22 2012 31.53% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 31.54% done, estimate finish Fri Feb 24 19:07:21 2012 31.54% done, estimate finish Fri Feb 24 19:07:24 2012 31.55% done, estimate finish Fri Feb 24 19:07:24 2012 31.55% done, estimate finish Fri Feb 24 19:07:23 2012 31.56% done, estimate finish Fri Feb 24 19:07:23 2012 31.57% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 31.58% done, estimate finish Fri Feb 24 19:07:22 2012 31.58% done, estimate finish Fri Feb 24 19:07:21 2012 31.59% done, estimate finish Fri Feb 24 19:07:24 2012 31.59% done, estimate finish Fri Feb 24 19:07:23 2012 31.60% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 31.61% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 31.62% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 31.63% done, estimate finish Fri Feb 24 19:07:24 2012 31.63% done, estimate finish Fri Feb 24 19:07:23 2012 31.64% done, estimate finish Fri Feb 24 19:07:23 2012 31.65% done, estimate finish Fri Feb 24 19:07:23 2012 31.65% done, estimate finish Fri Feb 24 19:07:22 2012 31.66% done, estimate finish Fri Feb 24 19:07:22 2012 31.66% done, estimate finish Fri Feb 24 19:07:21 2012 31.67% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 31.68% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 31.69% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 31.70% done, estimate finish Fri Feb 24 19:07:22 2012 31.70% done, estimate finish Fri Feb 24 19:07:21 2012 31.71% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 31.72% done, estimate finish Fri Feb 24 19:07:23 2012 31.73% done, estimate finish Fri Feb 24 19:07:23 2012 31.73% done, estimate finish Fri Feb 24 19:07:22 2012 31.74% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 31.75% done, estimate finish Fri Feb 24 19:07:21 2012 31.75% done, estimate finish Fri Feb 24 19:07:24 2012 31.76% done, estimate finish Fri Feb 24 19:07:24 2012 31.76% done, estimate finish Fri Feb 24 19:07:23 2012 31.77% done, estimate finish Fri Feb 24 19:07:23 2012 31.77% done, estimate finish Fri Feb 24 19:07:22 2012 31.78% done, estimate finish Fri Feb 24 19:07:22 2012 31.78% done, estimate finish Fri Feb 24 19:07:21 2012 31.79% done, estimate finish Fri Feb 24 19:07:21 2012 31.79% done, estimate finish Fri Feb 24 19:07:24 2012 31.80% done, estimate finish Fri Feb 24 19:07:23 2012 31.81% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 31.82% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 31.83% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 31.84% done, estimate finish Fri Feb 24 19:07:24 2012 31.84% done, estimate finish Fri Feb 24 19:07:23 2012 31.85% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 31.86% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 31.87% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 31.88% done, estimate finish Fri Feb 24 19:07:24 2012 31.89% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 31.90% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 31.91% done, estimate finish Fri Feb 24 19:07:22 2012 31.91% done, estimate finish Fri Feb 24 19:07:21 2012 31.92% done, estimate finish Fri Feb 24 19:07:24 2012 === last message repeated 2 times. === 31.93% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 31.94% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 31.95% done, estimate finish Fri Feb 24 19:07:22 2012 31.96% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 31.97% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 31.98% done, estimate finish Fri Feb 24 19:07:23 2012 31.98% done, estimate finish Fri Feb 24 19:07:22 2012 31.99% done, estimate finish Fri Feb 24 19:07:22 2012 31.99% done, estimate finish Fri Feb 24 19:07:21 2012 32.00% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 32.01% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 32.02% done, estimate finish Fri Feb 24 19:07:23 2012 32.02% done, estimate finish Fri Feb 24 19:07:22 2012 32.03% done, estimate finish Fri Feb 24 19:07:22 2012 32.03% done, estimate finish Fri Feb 24 19:07:21 2012 32.04% done, estimate finish Fri Feb 24 19:07:21 2012 32.05% done, estimate finish Fri Feb 24 19:07:24 2012 32.05% done, estimate finish Fri Feb 24 19:07:23 2012 32.06% done, estimate finish Fri Feb 24 19:07:23 2012 32.06% done, estimate finish Fri Feb 24 19:07:22 2012 32.07% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 32.08% done, estimate finish Fri Feb 24 19:07:21 2012 32.08% done, estimate finish Fri Feb 24 19:07:24 2012 32.09% done, estimate finish Fri Feb 24 19:07:24 2012 32.09% done, estimate finish Fri Feb 24 19:07:23 2012 32.10% done, estimate finish Fri Feb 24 19:07:23 2012 32.10% done, estimate finish Fri Feb 24 19:07:22 2012 32.11% done, estimate finish Fri Feb 24 19:07:22 2012 32.12% done, estimate finish Fri Feb 24 19:07:22 2012 32.12% done, estimate finish Fri Feb 24 19:07:21 2012 32.13% done, estimate finish Fri Feb 24 19:07:21 2012 32.13% done, estimate finish Fri Feb 24 19:07:20 2012 32.14% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 32.15% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 32.16% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 32.17% done, estimate finish Fri Feb 24 19:07:21 2012 32.17% done, estimate finish Fri Feb 24 19:07:23 2012 32.18% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 32.19% done, estimate finish Fri Feb 24 19:07:22 2012 32.20% done, estimate finish Fri Feb 24 19:07:22 2012 32.20% done, estimate finish Fri Feb 24 19:07:21 2012 32.21% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 32.22% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 32.23% done, estimate finish Fri Feb 24 19:07:23 2012 32.23% done, estimate finish Fri Feb 24 19:07:22 2012 32.24% done, estimate finish Fri Feb 24 19:07:22 2012 32.24% done, estimate finish Fri Feb 24 19:07:21 2012 32.25% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 32.26% done, estimate finish Fri Feb 24 19:07:20 2012 32.26% done, estimate finish Fri Feb 24 19:07:23 2012 32.27% done, estimate finish Fri Feb 24 19:07:22 2012 32.28% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 32.29% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 32.30% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 32.31% done, estimate finish Fri Feb 24 19:07:23 2012 32.31% done, estimate finish Fri Feb 24 19:07:22 2012 32.32% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 32.33% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 32.34% done, estimate finish Fri Feb 24 19:07:20 2012 32.34% done, estimate finish Fri Feb 24 19:07:23 2012 32.35% done, estimate finish Fri Feb 24 19:07:23 2012 32.36% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 32.37% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 32.38% done, estimate finish Fri Feb 24 19:07:21 2012 32.38% done, estimate finish Fri Feb 24 19:07:23 2012 32.39% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 32.40% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 32.41% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 32.42% done, estimate finish Fri Feb 24 19:07:21 2012 32.42% done, estimate finish Fri Feb 24 19:07:20 2012 32.43% done, estimate finish Fri Feb 24 19:07:23 2012 32.44% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 32.45% done, estimate finish Fri Feb 24 19:07:22 2012 32.45% done, estimate finish Fri Feb 24 19:07:21 2012 32.46% done, estimate finish Fri Feb 24 19:07:21 2012 32.46% done, estimate finish Fri Feb 24 19:07:20 2012 32.47% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 32.48% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 32.49% done, estimate finish Fri Feb 24 19:07:22 2012 32.49% done, estimate finish Fri Feb 24 19:07:21 2012 32.50% done, estimate finish Fri Feb 24 19:07:21 2012 32.50% done, estimate finish Fri Feb 24 19:07:20 2012 32.51% done, estimate finish Fri Feb 24 19:07:23 2012 32.52% done, estimate finish Fri Feb 24 19:07:23 2012 32.52% done, estimate finish Fri Feb 24 19:07:22 2012 32.53% done, estimate finish Fri Feb 24 19:07:22 2012 32.53% done, estimate finish Fri Feb 24 19:07:21 2012 32.54% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 32.55% done, estimate finish Fri Feb 24 19:07:20 2012 32.55% done, estimate finish Fri Feb 24 19:07:23 2012 32.56% done, estimate finish Fri Feb 24 19:07:23 2012 32.56% done, estimate finish Fri Feb 24 19:07:22 2012 32.57% done, estimate finish Fri Feb 24 19:07:22 2012 32.57% done, estimate finish Fri Feb 24 19:07:21 2012 32.58% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 32.59% done, estimate finish Fri Feb 24 19:07:20 2012 32.60% done, estimate finish Fri Feb 24 19:07:23 2012 32.60% done, estimate finish Fri Feb 24 19:07:22 2012 32.61% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 32.62% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 32.63% done, estimate finish Fri Feb 24 19:07:24 2012 32.63% done, estimate finish Fri Feb 24 19:07:23 2012 32.64% done, estimate finish Fri Feb 24 19:07:23 2012 32.64% done, estimate finish Fri Feb 24 19:07:22 2012 32.65% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 32.66% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 32.67% done, estimate finish Fri Feb 24 19:07:20 2012 32.68% done, estimate finish Fri Feb 24 19:07:20 2012 32.68% done, estimate finish Fri Feb 24 19:07:23 2012 32.69% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 32.70% done, estimate finish Fri Feb 24 19:07:22 2012 32.70% done, estimate finish Fri Feb 24 19:07:21 2012 32.71% done, estimate finish Fri Feb 24 19:07:21 2012 32.71% done, estimate finish Fri Feb 24 19:07:20 2012 32.72% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 32.73% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 32.74% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 32.75% done, estimate finish Fri Feb 24 19:07:21 2012 32.76% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 32.77% done, estimate finish Fri Feb 24 19:07:23 2012 32.77% done, estimate finish Fri Feb 24 19:07:22 2012 32.78% done, estimate finish Fri Feb 24 19:07:22 2012 32.78% done, estimate finish Fri Feb 24 19:07:21 2012 32.79% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 32.80% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 32.81% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 32.82% done, estimate finish Fri Feb 24 19:07:22 2012 32.82% done, estimate finish Fri Feb 24 19:07:21 2012 32.83% done, estimate finish Fri Feb 24 19:07:21 2012 32.84% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 32.85% done, estimate finish Fri Feb 24 19:07:23 2012 32.85% done, estimate finish Fri Feb 24 19:07:22 2012 32.86% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 32.87% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 32.88% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 32.89% done, estimate finish Fri Feb 24 19:07:23 2012 32.89% done, estimate finish Fri Feb 24 19:07:22 2012 32.90% done, estimate finish Fri Feb 24 19:07:22 2012 32.90% done, estimate finish Fri Feb 24 19:07:21 2012 32.91% done, estimate finish Fri Feb 24 19:07:21 2012 32.92% done, estimate finish Fri Feb 24 19:07:21 2012 32.92% done, estimate finish Fri Feb 24 19:07:20 2012 32.93% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 32.94% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 32.95% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 32.96% done, estimate finish Fri Feb 24 19:07:21 2012 32.96% done, estimate finish Fri Feb 24 19:07:20 2012 32.97% done, estimate finish Fri Feb 24 19:07:20 2012 32.97% done, estimate finish Fri Feb 24 19:07:22 2012 32.98% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 32.99% done, estimate finish Fri Feb 24 19:07:21 2012 33.00% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 33.01% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 33.02% done, estimate finish Fri Feb 24 19:07:19 2012 33.02% done, estimate finish Fri Feb 24 19:07:22 2012 33.03% done, estimate finish Fri Feb 24 19:07:22 2012 33.03% done, estimate finish Fri Feb 24 19:07:21 2012 33.04% done, estimate finish Fri Feb 24 19:07:21 2012 33.04% done, estimate finish Fri Feb 24 19:07:20 2012 33.05% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 33.06% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 33.07% done, estimate finish Fri Feb 24 19:07:22 2012 33.08% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 33.09% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 33.10% done, estimate finish Fri Feb 24 19:07:20 2012 33.10% done, estimate finish Fri Feb 24 19:07:22 2012 33.11% done, estimate finish Fri Feb 24 19:07:22 2012 33.11% done, estimate finish Fri Feb 24 19:07:21 2012 33.12% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 33.13% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 33.14% done, estimate finish Fri Feb 24 19:07:19 2012 33.14% done, estimate finish Fri Feb 24 19:07:22 2012 33.15% done, estimate finish Fri Feb 24 19:07:22 2012 33.16% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 33.17% done, estimate finish Fri Feb 24 19:07:21 2012 33.17% done, estimate finish Fri Feb 24 19:07:20 2012 33.18% done, estimate finish Fri Feb 24 19:07:20 2012 33.18% done, estimate finish Fri Feb 24 19:07:19 2012 33.19% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 33.20% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 33.21% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 33.22% done, estimate finish Fri Feb 24 19:07:20 2012 33.23% done, estimate finish Fri Feb 24 19:07:19 2012 33.23% done, estimate finish Fri Feb 24 19:07:22 2012 33.24% done, estimate finish Fri Feb 24 19:07:22 2012 33.24% done, estimate finish Fri Feb 24 19:07:21 2012 33.25% done, estimate finish Fri Feb 24 19:07:21 2012 33.25% done, estimate finish Fri Feb 24 19:07:20 2012 33.26% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 33.27% done, estimate finish Fri Feb 24 19:07:19 2012 33.27% done, estimate finish Fri Feb 24 19:07:22 2012 33.28% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 33.29% done, estimate finish Fri Feb 24 19:07:21 2012 33.29% done, estimate finish Fri Feb 24 19:07:20 2012 33.30% done, estimate finish Fri Feb 24 19:07:20 2012 33.31% done, estimate finish Fri Feb 24 19:07:20 2012 33.31% done, estimate finish Fri Feb 24 19:07:19 2012 33.32% done, estimate finish Fri Feb 24 19:07:22 2012 33.32% done, estimate finish Fri Feb 24 19:07:21 2012 33.33% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 33.34% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 33.35% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 33.36% done, estimate finish Fri Feb 24 19:07:22 2012 33.36% done, estimate finish Fri Feb 24 19:07:21 2012 33.37% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 33.38% done, estimate finish Fri Feb 24 19:07:20 2012 33.39% done, estimate finish Fri Feb 24 19:07:20 2012 33.39% done, estimate finish Fri Feb 24 19:07:19 2012 33.40% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 33.41% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 33.42% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 33.43% done, estimate finish Fri Feb 24 19:07:20 2012 33.43% done, estimate finish Fri Feb 24 19:07:19 2012 33.44% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 33.45% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 33.46% done, estimate finish Fri Feb 24 19:07:20 2012 33.47% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 33.48% done, estimate finish Fri Feb 24 19:07:19 2012 33.48% done, estimate finish Fri Feb 24 19:07:22 2012 33.49% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 33.50% done, estimate finish Fri Feb 24 19:07:21 2012 33.50% done, estimate finish Fri Feb 24 19:07:20 2012 33.51% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 33.52% done, estimate finish Fri Feb 24 19:07:19 2012 33.52% done, estimate finish Fri Feb 24 19:07:22 2012 33.53% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 33.54% done, estimate finish Fri Feb 24 19:07:21 2012 33.55% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 33.56% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 33.57% done, estimate finish Fri Feb 24 19:07:22 2012 33.57% done, estimate finish Fri Feb 24 19:07:21 2012 33.58% done, estimate finish Fri Feb 24 19:07:21 2012 33.58% done, estimate finish Fri Feb 24 19:07:20 2012 33.59% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 33.60% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 33.61% done, estimate finish Fri Feb 24 19:07:22 2012 33.61% done, estimate finish Fri Feb 24 19:07:21 2012 33.62% done, estimate finish Fri Feb 24 19:07:21 2012 33.63% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 33.64% done, estimate finish Fri Feb 24 19:07:20 2012 33.64% done, estimate finish Fri Feb 24 19:07:19 2012 33.65% done, estimate finish Fri Feb 24 19:07:19 2012 33.65% done, estimate finish Fri Feb 24 19:07:21 2012 33.66% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 33.67% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 33.68% done, estimate finish Fri Feb 24 19:07:20 2012 33.68% done, estimate finish Fri Feb 24 19:07:19 2012 33.69% done, estimate finish Fri Feb 24 19:07:19 2012 33.69% done, estimate finish Fri Feb 24 19:07:21 2012 33.70% done, estimate finish Fri Feb 24 19:07:21 2012 33.71% done, estimate finish Fri Feb 24 19:07:21 2012 33.71% done, estimate finish Fri Feb 24 19:07:20 2012 33.72% done, estimate finish Fri Feb 24 19:07:20 2012 33.72% done, estimate finish Fri Feb 24 19:07:19 2012 33.73% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 33.74% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 33.75% done, estimate finish Fri Feb 24 19:07:21 2012 33.75% done, estimate finish Fri Feb 24 19:07:20 2012 33.76% done, estimate finish Fri Feb 24 19:07:20 2012 33.76% done, estimate finish Fri Feb 24 19:07:19 2012 33.77% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 33.78% done, estimate finish Fri Feb 24 19:07:21 2012 33.79% done, estimate finish Fri Feb 24 19:07:21 2012 33.79% done, estimate finish Fri Feb 24 19:07:20 2012 33.80% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 33.81% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 33.82% done, estimate finish Fri Feb 24 19:07:19 2012 33.82% done, estimate finish Fri Feb 24 19:07:21 2012 33.83% done, estimate finish Fri Feb 24 19:07:21 2012 33.83% done, estimate finish Fri Feb 24 19:07:20 2012 33.84% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 33.85% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 33.86% done, estimate finish Fri Feb 24 19:07:21 2012 33.87% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 33.88% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 33.89% done, estimate finish Fri Feb 24 19:07:20 2012 33.89% done, estimate finish Fri Feb 24 19:07:19 2012 33.90% done, estimate finish Fri Feb 24 19:07:19 2012 33.90% done, estimate finish Fri Feb 24 19:07:21 2012 33.91% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 33.92% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 33.93% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 33.94% done, estimate finish Fri Feb 24 19:07:19 2012 33.95% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 33.96% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 33.97% done, estimate finish Fri Feb 24 19:07:20 2012 33.97% done, estimate finish Fri Feb 24 19:07:19 2012 33.98% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 33.99% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 34.00% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 34.01% done, estimate finish Fri Feb 24 19:07:23 2012 34.01% done, estimate finish Fri Feb 24 19:07:22 2012 34.02% done, estimate finish Fri Feb 24 19:07:22 2012 34.03% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 34.04% done, estimate finish Fri Feb 24 19:07:21 2012 34.04% done, estimate finish Fri Feb 24 19:07:23 2012 34.05% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 34.06% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 34.07% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 34.08% done, estimate finish Fri Feb 24 19:07:21 2012 34.08% done, estimate finish Fri Feb 24 19:07:23 2012 34.09% done, estimate finish Fri Feb 24 19:07:23 2012 34.09% done, estimate finish Fri Feb 24 19:07:22 2012 34.10% done, estimate finish Fri Feb 24 19:07:22 2012 34.11% done, estimate finish Fri Feb 24 19:07:22 2012 34.11% done, estimate finish Fri Feb 24 19:07:21 2012 34.12% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 34.13% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 34.14% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 34.15% done, estimate finish Fri Feb 24 19:07:22 2012 34.15% done, estimate finish Fri Feb 24 19:07:21 2012 34.16% done, estimate finish Fri Feb 24 19:07:21 2012 34.16% done, estimate finish Fri Feb 24 19:07:20 2012 34.17% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 34.18% done, estimate finish Fri Feb 24 19:07:22 2012 34.19% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 34.20% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 34.21% done, estimate finish Fri Feb 24 19:07:20 2012 34.21% done, estimate finish Fri Feb 24 19:07:23 2012 34.22% done, estimate finish Fri Feb 24 19:07:23 2012 34.22% done, estimate finish Fri Feb 24 19:07:22 2012 34.23% done, estimate finish Fri Feb 24 19:07:22 2012 34.23% done, estimate finish Fri Feb 24 19:07:21 2012 34.24% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 34.25% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 34.26% done, estimate finish Fri Feb 24 19:07:22 2012 34.27% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 34.28% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 34.29% done, estimate finish Fri Feb 24 19:07:21 2012 34.29% done, estimate finish Fri Feb 24 19:07:20 2012 34.30% done, estimate finish Fri Feb 24 19:07:23 2012 34.30% done, estimate finish Fri Feb 24 19:07:22 2012 34.31% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 34.32% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 34.33% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 34.34% done, estimate finish Fri Feb 24 19:07:23 2012 34.35% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 34.36% done, estimate finish Fri Feb 24 19:07:22 2012 34.36% done, estimate finish Fri Feb 24 19:07:21 2012 34.37% done, estimate finish Fri Feb 24 19:07:21 2012 34.37% done, estimate finish Fri Feb 24 19:07:23 2012 34.38% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 34.39% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 34.40% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 34.41% done, estimate finish Fri Feb 24 19:07:21 2012 34.42% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 34.43% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 34.44% done, estimate finish Fri Feb 24 19:07:22 2012 34.44% done, estimate finish Fri Feb 24 19:07:21 2012 34.45% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 34.46% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 34.47% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 34.48% done, estimate finish Fri Feb 24 19:07:22 2012 34.48% done, estimate finish Fri Feb 24 19:07:21 2012 34.49% done, estimate finish Fri Feb 24 19:07:21 2012 34.50% done, estimate finish Fri Feb 24 19:07:21 2012 34.50% done, estimate finish Fri Feb 24 19:07:20 2012 34.51% done, estimate finish Fri Feb 24 19:07:20 2012 34.51% done, estimate finish Fri Feb 24 19:07:22 2012 34.52% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 34.53% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 34.54% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 34.55% done, estimate finish Fri Feb 24 19:07:23 2012 34.55% done, estimate finish Fri Feb 24 19:07:22 2012 34.56% done, estimate finish Fri Feb 24 19:07:22 2012 34.56% done, estimate finish Fri Feb 24 19:07:21 2012 34.57% done, estimate finish Fri Feb 24 19:07:21 2012 34.58% done, estimate finish Fri Feb 24 19:07:21 2012 34.58% done, estimate finish Fri Feb 24 19:07:20 2012 34.59% done, estimate finish Fri Feb 24 19:07:20 2012 34.59% done, estimate finish Fri Feb 24 19:07:23 2012 34.60% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 34.61% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 34.62% done, estimate finish Fri Feb 24 19:07:21 2012 34.62% done, estimate finish Fri Feb 24 19:07:20 2012 34.63% done, estimate finish Fri Feb 24 19:07:23 2012 34.63% done, estimate finish Fri Feb 24 19:07:22 2012 34.64% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 34.65% done, estimate finish Fri Feb 24 19:07:21 2012 34.66% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 34.67% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 34.68% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 34.69% done, estimate finish Fri Feb 24 19:07:22 2012 34.69% done, estimate finish Fri Feb 24 19:07:21 2012 34.70% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 34.71% done, estimate finish Fri Feb 24 19:07:23 2012 === last message repeated 2 times. === 34.72% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 34.73% done, estimate finish Fri Feb 24 19:07:22 2012 34.74% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 34.75% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 34.76% done, estimate finish Fri Feb 24 19:07:23 2012 34.76% done, estimate finish Fri Feb 24 19:07:22 2012 34.77% done, estimate finish Fri Feb 24 19:07:22 2012 34.77% done, estimate finish Fri Feb 24 19:07:21 2012 34.78% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 34.79% done, estimate finish Fri Feb 24 19:07:20 2012 34.79% done, estimate finish Fri Feb 24 19:07:23 2012 34.80% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 34.81% done, estimate finish Fri Feb 24 19:07:22 2012 34.82% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 34.83% done, estimate finish Fri Feb 24 19:07:21 2012 34.83% done, estimate finish Fri Feb 24 19:07:20 2012 34.84% done, estimate finish Fri Feb 24 19:07:23 2012 34.84% done, estimate finish Fri Feb 24 19:07:22 2012 34.85% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 34.86% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 34.87% done, estimate finish Fri Feb 24 19:07:21 2012 34.87% done, estimate finish Fri Feb 24 19:07:20 2012 34.88% done, estimate finish Fri Feb 24 19:07:20 2012 34.88% done, estimate finish Fri Feb 24 19:07:22 2012 34.89% done, estimate finish Fri Feb 24 19:07:22 2012 34.90% done, estimate finish Fri Feb 24 19:07:22 2012 34.90% done, estimate finish Fri Feb 24 19:07:21 2012 34.91% done, estimate finish Fri Feb 24 19:07:21 2012 34.91% done, estimate finish Fri Feb 24 19:07:20 2012 34.92% done, estimate finish Fri Feb 24 19:07:20 2012 34.92% done, estimate finish Fri Feb 24 19:07:23 2012 34.93% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 34.94% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 34.95% done, estimate finish Fri Feb 24 19:07:21 2012 34.95% done, estimate finish Fri Feb 24 19:07:20 2012 34.96% done, estimate finish Fri Feb 24 19:07:20 2012 34.96% done, estimate finish Fri Feb 24 19:07:22 2012 34.97% done, estimate finish Fri Feb 24 19:07:22 2012 34.98% done, estimate finish Fri Feb 24 19:07:22 2012 34.98% done, estimate finish Fri Feb 24 19:07:21 2012 34.99% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.00% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 35.01% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 35.02% done, estimate finish Fri Feb 24 19:07:22 2012 35.02% done, estimate finish Fri Feb 24 19:07:21 2012 35.03% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.04% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 35.05% done, estimate finish Fri Feb 24 19:07:22 2012 35.06% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 35.07% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.08% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 35.09% done, estimate finish Fri Feb 24 19:07:20 2012 35.09% done, estimate finish Fri Feb 24 19:07:22 2012 35.10% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 35.11% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.12% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 35.13% done, estimate finish Fri Feb 24 19:07:20 2012 35.14% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 35.15% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.16% done, estimate finish Fri Feb 24 19:07:21 2012 35.16% done, estimate finish Fri Feb 24 19:07:20 2012 35.17% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 35.18% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 35.19% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.20% done, estimate finish Fri Feb 24 19:07:21 2012 35.20% done, estimate finish Fri Feb 24 19:07:20 2012 35.21% done, estimate finish Fri Feb 24 19:07:23 2012 35.22% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 35.23% done, estimate finish Fri Feb 24 19:07:22 2012 35.23% done, estimate finish Fri Feb 24 19:07:21 2012 35.24% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.25% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 35.26% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 35.27% done, estimate finish Fri Feb 24 19:07:22 2012 35.27% done, estimate finish Fri Feb 24 19:07:21 2012 35.28% done, estimate finish Fri Feb 24 19:07:21 2012 35.28% done, estimate finish Fri Feb 24 19:07:20 2012 35.29% done, estimate finish Fri Feb 24 19:07:20 2012 35.30% done, estimate finish Fri Feb 24 19:07:20 2012 35.30% done, estimate finish Fri Feb 24 19:07:22 2012 35.31% done, estimate finish Fri Feb 24 19:07:22 2012 35.31% done, estimate finish Fri Feb 24 19:07:21 2012 35.32% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.33% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 35.34% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 35.35% done, estimate finish Fri Feb 24 19:07:22 2012 35.35% done, estimate finish Fri Feb 24 19:07:21 2012 35.36% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.37% done, estimate finish Fri Feb 24 19:07:20 2012 35.38% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 35.39% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 35.40% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.41% done, estimate finish Fri Feb 24 19:07:21 2012 35.41% done, estimate finish Fri Feb 24 19:07:20 2012 35.42% done, estimate finish Fri Feb 24 19:07:20 2012 35.42% done, estimate finish Fri Feb 24 19:07:22 2012 35.43% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 35.44% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.45% done, estimate finish Fri Feb 24 19:07:21 2012 35.46% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 35.47% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 35.48% done, estimate finish Fri Feb 24 19:07:22 2012 35.48% done, estimate finish Fri Feb 24 19:07:21 2012 35.49% done, estimate finish Fri Feb 24 19:07:21 2012 35.49% done, estimate finish Fri Feb 24 19:07:20 2012 35.50% done, estimate finish Fri Feb 24 19:07:20 2012 35.50% done, estimate finish Fri Feb 24 19:07:23 2012 35.51% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 35.52% done, estimate finish Fri Feb 24 19:07:21 2012 35.53% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.54% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 35.55% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 35.56% done, estimate finish Fri Feb 24 19:07:22 2012 35.56% done, estimate finish Fri Feb 24 19:07:21 2012 35.57% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.58% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 35.59% done, estimate finish Fri Feb 24 19:07:20 2012 35.59% done, estimate finish Fri Feb 24 19:07:22 2012 35.60% done, estimate finish Fri Feb 24 19:07:22 2012 35.61% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.62% done, estimate finish Fri Feb 24 19:07:21 2012 35.62% done, estimate finish Fri Feb 24 19:07:20 2012 35.63% done, estimate finish Fri Feb 24 19:07:20 2012 35.63% done, estimate finish Fri Feb 24 19:07:22 2012 35.64% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 35.65% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.66% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 35.67% done, estimate finish Fri Feb 24 19:07:20 2012 35.67% done, estimate finish Fri Feb 24 19:07:22 2012 35.68% done, estimate finish Fri Feb 24 19:07:22 2012 35.69% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.70% done, estimate finish Fri Feb 24 19:07:21 2012 35.70% done, estimate finish Fri Feb 24 19:07:20 2012 35.71% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 35.72% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 35.73% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.74% done, estimate finish Fri Feb 24 19:07:21 2012 35.74% done, estimate finish Fri Feb 24 19:07:20 2012 35.75% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 35.76% done, estimate finish Fri Feb 24 19:07:22 2012 35.77% done, estimate finish Fri Feb 24 19:07:22 2012 35.77% done, estimate finish Fri Feb 24 19:07:21 2012 35.78% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.79% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 35.80% done, estimate finish Fri Feb 24 19:07:20 2012 35.80% done, estimate finish Fri Feb 24 19:07:22 2012 35.81% done, estimate finish Fri Feb 24 19:07:22 2012 35.81% done, estimate finish Fri Feb 24 19:07:21 2012 35.82% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.83% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 35.84% done, estimate finish Fri Feb 24 19:07:19 2012 35.85% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 35.86% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.87% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 35.88% done, estimate finish Fri Feb 24 19:07:20 2012 35.88% done, estimate finish Fri Feb 24 19:07:22 2012 35.89% done, estimate finish Fri Feb 24 19:07:22 2012 35.89% done, estimate finish Fri Feb 24 19:07:21 2012 35.90% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.91% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 35.92% done, estimate finish Fri Feb 24 19:07:20 2012 35.93% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 35.94% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.95% done, estimate finish Fri Feb 24 19:07:21 2012 35.95% done, estimate finish Fri Feb 24 19:07:20 2012 35.96% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 35.97% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 35.98% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 35.99% done, estimate finish Fri Feb 24 19:07:21 2012 35.99% done, estimate finish Fri Feb 24 19:07:20 2012 36.00% done, estimate finish Fri Feb 24 19:07:20 2012 36.01% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 36.02% done, estimate finish Fri Feb 24 19:07:22 2012 36.02% done, estimate finish Fri Feb 24 19:07:21 2012 36.03% done, estimate finish Fri Feb 24 19:07:21 2012 36.03% done, estimate finish Fri Feb 24 19:07:20 2012 36.04% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 36.05% done, estimate finish Fri Feb 24 19:07:19 2012 36.05% done, estimate finish Fri Feb 24 19:07:22 2012 36.06% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.07% done, estimate finish Fri Feb 24 19:07:21 2012 36.07% done, estimate finish Fri Feb 24 19:07:20 2012 36.08% done, estimate finish Fri Feb 24 19:07:20 2012 36.09% done, estimate finish Fri Feb 24 19:07:20 2012 36.09% done, estimate finish Fri Feb 24 19:07:22 2012 36.10% done, estimate finish Fri Feb 24 19:07:22 2012 36.10% done, estimate finish Fri Feb 24 19:07:21 2012 36.11% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.12% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 36.13% done, estimate finish Fri Feb 24 19:07:20 2012 36.13% done, estimate finish Fri Feb 24 19:07:19 2012 36.14% done, estimate finish Fri Feb 24 19:07:22 2012 36.14% done, estimate finish Fri Feb 24 19:07:21 2012 36.15% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.16% done, estimate finish Fri Feb 24 19:07:20 2012 36.17% done, estimate finish Fri Feb 24 19:07:20 2012 36.17% done, estimate finish Fri Feb 24 19:07:22 2012 36.18% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 36.19% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.20% done, estimate finish Fri Feb 24 19:07:21 2012 36.20% done, estimate finish Fri Feb 24 19:07:20 2012 36.21% done, estimate finish Fri Feb 24 19:07:23 2012 36.21% done, estimate finish Fri Feb 24 19:07:22 2012 36.22% done, estimate finish Fri Feb 24 19:07:22 2012 36.22% done, estimate finish Fri Feb 24 19:07:21 2012 36.23% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.24% done, estimate finish Fri Feb 24 19:07:20 2012 36.25% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 36.26% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 36.27% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.28% done, estimate finish Fri Feb 24 19:07:21 2012 36.28% done, estimate finish Fri Feb 24 19:07:20 2012 36.29% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 36.30% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 36.31% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.32% done, estimate finish Fri Feb 24 19:07:21 2012 36.33% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 36.34% done, estimate finish Fri Feb 24 19:07:20 2012 36.34% done, estimate finish Fri Feb 24 19:07:22 2012 36.35% done, estimate finish Fri Feb 24 19:07:22 2012 36.35% done, estimate finish Fri Feb 24 19:07:21 2012 36.36% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.37% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 36.38% done, estimate finish Fri Feb 24 19:07:19 2012 36.38% done, estimate finish Fri Feb 24 19:07:22 2012 36.39% done, estimate finish Fri Feb 24 19:07:22 2012 36.39% done, estimate finish Fri Feb 24 19:07:21 2012 36.40% done, estimate finish Fri Feb 24 19:07:21 2012 36.41% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 36.42% done, estimate finish Fri Feb 24 19:07:20 2012 36.42% done, estimate finish Fri Feb 24 19:07:19 2012 36.43% done, estimate finish Fri Feb 24 19:07:22 2012 36.43% done, estimate finish Fri Feb 24 19:07:21 2012 36.44% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.45% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 36.46% done, estimate finish Fri Feb 24 19:07:20 2012 36.46% done, estimate finish Fri Feb 24 19:07:19 2012 36.47% done, estimate finish Fri Feb 24 19:07:22 2012 36.47% done, estimate finish Fri Feb 24 19:07:21 2012 36.48% done, estimate finish Fri Feb 24 19:07:21 2012 36.49% done, estimate finish Fri Feb 24 19:07:21 2012 36.49% done, estimate finish Fri Feb 24 19:07:20 2012 36.50% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 36.51% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 36.52% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.53% done, estimate finish Fri Feb 24 19:07:21 2012 36.53% done, estimate finish Fri Feb 24 19:07:20 2012 36.54% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 36.55% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 36.56% done, estimate finish Fri Feb 24 19:07:21 2012 36.57% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.58% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 36.59% done, estimate finish Fri Feb 24 19:07:19 2012 36.59% done, estimate finish Fri Feb 24 19:07:22 2012 36.60% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.61% done, estimate finish Fri Feb 24 19:07:21 2012 36.61% done, estimate finish Fri Feb 24 19:07:20 2012 36.62% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 36.63% done, estimate finish Fri Feb 24 19:07:22 2012 36.64% done, estimate finish Fri Feb 24 19:07:22 2012 36.64% done, estimate finish Fri Feb 24 19:07:21 2012 36.65% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.66% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 36.67% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 36.68% done, estimate finish Fri Feb 24 19:07:22 2012 36.68% done, estimate finish Fri Feb 24 19:07:21 2012 36.69% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.70% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 36.71% done, estimate finish Fri Feb 24 19:07:20 2012 36.72% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 36.73% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.74% done, estimate finish Fri Feb 24 19:07:21 2012 36.74% done, estimate finish Fri Feb 24 19:07:20 2012 36.75% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 36.76% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 36.77% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.78% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 36.79% done, estimate finish Fri Feb 24 19:07:20 2012 36.80% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 36.81% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.82% done, estimate finish Fri Feb 24 19:07:21 2012 36.82% done, estimate finish Fri Feb 24 19:07:20 2012 36.83% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 36.84% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 36.85% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.86% done, estimate finish Fri Feb 24 19:07:21 2012 36.86% done, estimate finish Fri Feb 24 19:07:20 2012 36.87% done, estimate finish Fri Feb 24 19:07:20 2012 36.88% done, estimate finish Fri Feb 24 19:07:20 2012 36.88% done, estimate finish Fri Feb 24 19:07:22 2012 36.89% done, estimate finish Fri Feb 24 19:07:22 2012 36.89% done, estimate finish Fri Feb 24 19:07:21 2012 36.90% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.91% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 36.92% done, estimate finish Fri Feb 24 19:07:20 2012 36.92% done, estimate finish Fri Feb 24 19:07:22 2012 36.93% done, estimate finish Fri Feb 24 19:07:22 2012 36.93% done, estimate finish Fri Feb 24 19:07:21 2012 36.94% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.95% done, estimate finish Fri Feb 24 19:07:20 2012 36.96% done, estimate finish Fri Feb 24 19:07:20 2012 36.96% done, estimate finish Fri Feb 24 19:07:19 2012 36.97% done, estimate finish Fri Feb 24 19:07:22 2012 36.97% done, estimate finish Fri Feb 24 19:07:21 2012 36.98% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 36.99% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.00% done, estimate finish Fri Feb 24 19:07:20 2012 37.00% done, estimate finish Fri Feb 24 19:07:19 2012 37.01% done, estimate finish Fri Feb 24 19:07:22 2012 37.01% done, estimate finish Fri Feb 24 19:07:21 2012 37.02% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 37.03% done, estimate finish Fri Feb 24 19:07:20 2012 37.04% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.05% done, estimate finish Fri Feb 24 19:07:19 2012 37.05% done, estimate finish Fri Feb 24 19:07:22 2012 37.06% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 37.07% done, estimate finish Fri Feb 24 19:07:21 2012 37.07% done, estimate finish Fri Feb 24 19:07:20 2012 37.08% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.09% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 37.10% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 37.11% done, estimate finish Fri Feb 24 19:07:21 2012 37.12% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.13% done, estimate finish Fri Feb 24 19:07:22 2012 === last message repeated 2 times. === 37.14% done, estimate finish Fri Feb 24 19:07:22 2012 37.14% done, estimate finish Fri Feb 24 19:07:21 2012 37.15% done, estimate finish Fri Feb 24 19:07:21 2012 37.15% done, estimate finish Fri Feb 24 19:07:20 2012 37.16% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.17% done, estimate finish Fri Feb 24 19:07:19 2012 37.17% done, estimate finish Fri Feb 24 19:07:22 2012 37.18% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 37.19% done, estimate finish Fri Feb 24 19:07:21 2012 37.20% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.21% done, estimate finish Fri Feb 24 19:07:20 2012 37.21% done, estimate finish Fri Feb 24 19:07:19 2012 37.22% done, estimate finish Fri Feb 24 19:07:22 2012 37.22% done, estimate finish Fri Feb 24 19:07:21 2012 37.23% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 37.24% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.25% done, estimate finish Fri Feb 24 19:07:20 2012 37.25% done, estimate finish Fri Feb 24 19:07:22 2012 37.26% done, estimate finish Fri Feb 24 19:07:22 2012 37.26% done, estimate finish Fri Feb 24 19:07:21 2012 37.27% done, estimate finish Fri Feb 24 19:07:21 2012 37.28% done, estimate finish Fri Feb 24 19:07:21 2012 37.28% done, estimate finish Fri Feb 24 19:07:20 2012 37.29% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.30% done, estimate finish Fri Feb 24 19:07:19 2012 37.30% done, estimate finish Fri Feb 24 19:07:22 2012 37.31% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 37.32% done, estimate finish Fri Feb 24 19:07:21 2012 37.32% done, estimate finish Fri Feb 24 19:07:20 2012 37.33% done, estimate finish Fri Feb 24 19:07:20 2012 37.33% done, estimate finish Fri Feb 24 19:07:19 2012 37.34% done, estimate finish Fri Feb 24 19:07:19 2012 37.34% done, estimate finish Fri Feb 24 19:07:21 2012 37.35% done, estimate finish Fri Feb 24 19:07:21 2012 37.36% done, estimate finish Fri Feb 24 19:07:21 2012 37.36% done, estimate finish Fri Feb 24 19:07:20 2012 37.37% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.38% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 37.39% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 37.40% done, estimate finish Fri Feb 24 19:07:21 2012 37.40% done, estimate finish Fri Feb 24 19:07:20 2012 37.41% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.42% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 37.43% done, estimate finish Fri Feb 24 19:07:21 2012 37.44% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 37.45% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.46% done, estimate finish Fri Feb 24 19:07:20 2012 37.46% done, estimate finish Fri Feb 24 19:07:19 2012 37.47% done, estimate finish Fri Feb 24 19:07:19 2012 37.47% done, estimate finish Fri Feb 24 19:07:21 2012 37.48% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 37.49% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.50% done, estimate finish Fri Feb 24 19:07:20 2012 37.50% done, estimate finish Fri Feb 24 19:07:19 2012 37.51% done, estimate finish Fri Feb 24 19:07:19 2012 37.52% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 37.53% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.54% done, estimate finish Fri Feb 24 19:07:20 2012 37.54% done, estimate finish Fri Feb 24 19:07:19 2012 37.55% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 37.56% done, estimate finish Fri Feb 24 19:07:21 2012 === last message repeated 2 times. === 37.57% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.58% done, estimate finish Fri Feb 24 19:07:20 2012 37.58% done, estimate finish Fri Feb 24 19:07:19 2012 37.59% done, estimate finish Fri Feb 24 19:07:19 2012 37.60% done, estimate finish Fri Feb 24 19:07:19 2012 37.60% done, estimate finish Fri Feb 24 19:07:18 2012 37.61% done, estimate finish Fri Feb 24 19:07:18 2012 37.61% done, estimate finish Fri Feb 24 19:07:20 2012 37.62% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.63% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 37.64% done, estimate finish Fri Feb 24 19:07:19 2012 37.64% done, estimate finish Fri Feb 24 19:07:18 2012 37.65% done, estimate finish Fri Feb 24 19:07:18 2012 37.65% done, estimate finish Fri Feb 24 19:07:20 2012 37.66% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.67% done, estimate finish Fri Feb 24 19:07:19 2012 37.68% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 37.69% done, estimate finish Fri Feb 24 19:07:18 2012 37.69% done, estimate finish Fri Feb 24 19:07:21 2012 37.70% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.71% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 37.72% done, estimate finish Fri Feb 24 19:07:19 2012 37.72% done, estimate finish Fri Feb 24 19:07:18 2012 37.73% done, estimate finish Fri Feb 24 19:07:18 2012 === last message repeated 2 times. === 37.74% done, estimate finish Fri Feb 24 19:07:20 2012 37.75% done, estimate finish Fri Feb 24 19:07:20 2012 37.75% done, estimate finish Fri Feb 24 19:07:19 2012 37.76% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 37.77% done, estimate finish Fri Feb 24 19:07:18 2012 === last message repeated 2 times. === 37.78% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.79% done, estimate finish Fri Feb 24 19:07:20 2012 37.79% done, estimate finish Fri Feb 24 19:07:19 2012 37.80% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 37.81% done, estimate finish Fri Feb 24 19:07:18 2012 === last message repeated 2 times. === 37.82% done, estimate finish Fri Feb 24 19:07:18 2012 37.83% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.84% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 37.85% done, estimate finish Fri Feb 24 19:07:19 2012 37.85% done, estimate finish Fri Feb 24 19:07:18 2012 37.86% done, estimate finish Fri Feb 24 19:07:18 2012 37.86% done, estimate finish Fri Feb 24 19:07:20 2012 37.87% done, estimate finish Fri Feb 24 19:07:20 2012 === last message repeated 2 times. === 37.88% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 37.89% done, estimate finish Fri Feb 24 19:07:19 2012 37.89% done, estimate finish Fri Feb 24 19:07:18 2012 37.90% done, estimate finish Fri Feb 24 19:07:18 2012 37.91% done, estimate finish Fri Feb 24 19:07:18 2012 37.91% done, estimate finish Fri Feb 24 19:07:20 2012 37.92% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 37.93% done, estimate finish Fri Feb 24 19:07:19 2012 37.93% done, estimate finish Fri Feb 24 19:07:18 2012 37.94% done, estimate finish Fri Feb 24 19:07:18 2012 === last message repeated 2 times. === 37.95% done, estimate finish Fri Feb 24 19:07:17 2012 37.95% done, estimate finish Fri Feb 24 19:07:20 2012 37.96% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 37.97% done, estimate finish Fri Feb 24 19:07:19 2012 37.97% done, estimate finish Fri Feb 24 19:07:18 2012 37.98% done, estimate finish Fri Feb 24 19:07:18 2012 37.99% done, estimate finish Fri Feb 24 19:07:18 2012 37.99% done, estimate finish Fri Feb 24 19:07:17 2012 38.00% done, estimate finish Fri Feb 24 19:07:20 2012 38.00% done, estimate finish Fri Feb 24 19:07:19 2012 38.01% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 38.02% done, estimate finish Fri Feb 24 19:07:18 2012 === last message repeated 2 times. === 38.03% done, estimate finish Fri Feb 24 19:07:18 2012 38.03% done, estimate finish Fri Feb 24 19:07:17 2012 38.04% done, estimate finish Fri Feb 24 19:07:20 2012 38.04% done, estimate finish Fri Feb 24 19:07:19 2012 38.05% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 38.06% done, estimate finish Fri Feb 24 19:07:18 2012 38.07% done, estimate finish Fri Feb 24 19:07:18 2012 === last message repeated 2 times. === 38.08% done, estimate finish Fri Feb 24 19:07:17 2012 38.08% done, estimate finish Fri Feb 24 19:07:20 2012 38.09% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 38.10% done, estimate finish Fri Feb 24 19:07:19 2012 38.10% done, estimate finish Fri Feb 24 19:07:18 2012 38.11% done, estimate finish Fri Feb 24 19:07:18 2012 38.11% done, estimate finish Fri Feb 24 19:07:17 2012 38.12% done, estimate finish Fri Feb 24 19:07:20 2012 38.12% done, estimate finish Fri Feb 24 19:07:19 2012 38.13% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 38.14% done, estimate finish Fri Feb 24 19:07:18 2012 38.15% done, estimate finish Fri Feb 24 19:07:18 2012 === last message repeated 2 times. === 38.16% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 38.17% done, estimate finish Fri Feb 24 19:07:17 2012 38.17% done, estimate finish Fri Feb 24 19:07:19 2012 38.18% done, estimate finish Fri Feb 24 19:07:19 2012 38.18% done, estimate finish Fri Feb 24 19:07:18 2012 38.19% done, estimate finish Fri Feb 24 19:07:18 2012 === last message repeated 2 times. === 38.20% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 38.21% done, estimate finish Fri Feb 24 19:07:17 2012 38.21% done, estimate finish Fri Feb 24 19:07:19 2012 38.22% done, estimate finish Fri Feb 24 19:07:19 2012 38.23% done, estimate finish Fri Feb 24 19:07:18 2012 === last message repeated 2 times. === 38.24% done, estimate finish Fri Feb 24 19:07:18 2012 38.24% done, estimate finish Fri Feb 24 19:07:17 2012 38.25% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 38.26% done, estimate finish Fri Feb 24 19:07:19 2012 === last message repeated 2 times. === 38.27% done, estimate finish Fri Feb 24 19:07:18 2012 === last message repeated 2 times. === 38.28% done, estimate finish Fri Feb 24 19:07:18 2012 38.28% done, estimate finish Fri Feb 24 19:07:17 2012 38.29% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 38.30% done, estimate finish Fri Feb 24 19:07:19 2012 38.31% done, estimate finish Fri Feb 24 19:07:18 2012 === last message repeated 2 times. === 38.32% done, estimate finish Fri Feb 24 19:07:18 2012 38.32% done, estimate finish Fri Feb 24 19:07:17 2012 38.33% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 38.34% done, estimate finish Fri Feb 24 19:07:16 2012 38.34% done, estimate finish Fri Feb 24 19:07:19 2012 38.35% done, estimate finish Fri Feb 24 19:07:18 2012 === last message repeated 2 times. === 38.36% done, estimate finish Fri Feb 24 19:07:18 2012 38.36% done, estimate finish Fri Feb 24 19:07:17 2012 38.37% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 38.38% done, estimate finish Fri Feb 24 19:07:16 2012 38.39% done, estimate finish Fri Feb 24 19:07:19 2012 38.39% done, estimate finish Fri Feb 24 19:07:18 2012 38.40% done, estimate finish Fri Feb 24 19:07:18 2012 === last message repeated 2 times. === 38.41% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 38.42% done, estimate finish Fri Feb 24 19:07:17 2012 38.42% done, estimate finish Fri Feb 24 19:07:16 2012 38.43% done, estimate finish Fri Feb 24 19:07:19 2012 38.43% done, estimate finish Fri Feb 24 19:07:18 2012 38.44% done, estimate finish Fri Feb 24 19:07:18 2012 === last message repeated 2 times. === 38.45% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 38.46% done, estimate finish Fri Feb 24 19:07:17 2012 38.47% done, estimate finish Fri Feb 24 19:07:16 2012 38.47% done, estimate finish Fri Feb 24 19:07:19 2012 38.48% done, estimate finish Fri Feb 24 19:07:18 2012 === last message repeated 2 times. === 38.49% done, estimate finish Fri Feb 24 19:07:18 2012 38.49% done, estimate finish Fri Feb 24 19:07:17 2012 38.50% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 38.51% done, estimate finish Fri Feb 24 19:07:16 2012 38.51% done, estimate finish Fri Feb 24 19:07:18 2012 38.52% done, estimate finish Fri Feb 24 19:07:18 2012 === last message repeated 2 times. === 38.53% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 38.54% done, estimate finish Fri Feb 24 19:07:17 2012 38.55% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 38.56% done, estimate finish Fri Feb 24 19:07:16 2012 38.56% done, estimate finish Fri Feb 24 19:07:18 2012 38.57% done, estimate finish Fri Feb 24 19:07:18 2012 38.57% done, estimate finish Fri Feb 24 19:07:17 2012 38.58% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 38.59% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 38.60% done, estimate finish Fri Feb 24 19:07:16 2012 38.60% done, estimate finish Fri Feb 24 19:07:18 2012 38.61% done, estimate finish Fri Feb 24 19:07:18 2012 38.61% done, estimate finish Fri Feb 24 19:07:17 2012 38.62% done, estimate finish Fri Feb 24 19:07:17 2012 38.63% done, estimate finish Fri Feb 24 19:07:17 2012 38.63% done, estimate finish Fri Feb 24 19:07:16 2012 38.64% done, estimate finish Fri Feb 24 19:07:16 2012 38.64% done, estimate finish Fri Feb 24 19:07:18 2012 38.65% done, estimate finish Fri Feb 24 19:07:18 2012 === last message repeated 2 times. === 38.66% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 38.67% done, estimate finish Fri Feb 24 19:07:17 2012 38.67% done, estimate finish Fri Feb 24 19:07:16 2012 38.68% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 38.69% done, estimate finish Fri Feb 24 19:07:18 2012 === last message repeated 2 times. === 38.70% done, estimate finish Fri Feb 24 19:07:17 2012 38.71% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 38.72% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 38.73% done, estimate finish Fri Feb 24 19:07:16 2012 38.73% done, estimate finish Fri Feb 24 19:07:18 2012 38.74% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 38.75% done, estimate finish Fri Feb 24 19:07:17 2012 38.75% done, estimate finish Fri Feb 24 19:07:16 2012 38.76% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 38.77% done, estimate finish Fri Feb 24 19:07:15 2012 38.77% done, estimate finish Fri Feb 24 19:07:18 2012 38.78% done, estimate finish Fri Feb 24 19:07:17 2012 38.79% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 38.80% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 38.81% done, estimate finish Fri Feb 24 19:07:16 2012 38.81% done, estimate finish Fri Feb 24 19:07:15 2012 38.82% done, estimate finish Fri Feb 24 19:07:18 2012 38.82% done, estimate finish Fri Feb 24 19:07:17 2012 38.83% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 38.84% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 38.85% done, estimate finish Fri Feb 24 19:07:16 2012 38.86% done, estimate finish Fri Feb 24 19:07:15 2012 38.86% done, estimate finish Fri Feb 24 19:07:18 2012 38.87% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 38.88% done, estimate finish Fri Feb 24 19:07:17 2012 38.88% done, estimate finish Fri Feb 24 19:07:16 2012 38.89% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 38.90% done, estimate finish Fri Feb 24 19:07:15 2012 38.90% done, estimate finish Fri Feb 24 19:07:17 2012 38.91% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 38.92% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 38.93% done, estimate finish Fri Feb 24 19:07:16 2012 38.94% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 38.95% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 38.96% done, estimate finish Fri Feb 24 19:07:17 2012 38.96% done, estimate finish Fri Feb 24 19:07:16 2012 38.97% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 38.98% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 38.99% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 39.00% done, estimate finish Fri Feb 24 19:07:17 2012 39.00% done, estimate finish Fri Feb 24 19:07:16 2012 39.01% done, estimate finish Fri Feb 24 19:07:16 2012 39.02% done, estimate finish Fri Feb 24 19:07:16 2012 39.02% done, estimate finish Fri Feb 24 19:07:15 2012 39.03% done, estimate finish Fri Feb 24 19:07:15 2012 39.03% done, estimate finish Fri Feb 24 19:07:17 2012 39.04% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 39.05% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.06% done, estimate finish Fri Feb 24 19:07:16 2012 39.06% done, estimate finish Fri Feb 24 19:07:15 2012 39.07% done, estimate finish Fri Feb 24 19:07:15 2012 39.07% done, estimate finish Fri Feb 24 19:07:17 2012 39.08% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 39.09% done, estimate finish Fri Feb 24 19:07:16 2012 39.10% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.11% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 39.12% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 39.13% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.14% done, estimate finish Fri Feb 24 19:07:16 2012 39.14% done, estimate finish Fri Feb 24 19:07:15 2012 39.15% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 39.16% done, estimate finish Fri Feb 24 19:07:15 2012 39.16% done, estimate finish Fri Feb 24 19:07:17 2012 39.17% done, estimate finish Fri Feb 24 19:07:16 2012 39.18% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.19% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 39.20% done, estimate finish Fri Feb 24 19:07:15 2012 39.20% done, estimate finish Fri Feb 24 19:07:14 2012 39.21% done, estimate finish Fri Feb 24 19:07:17 2012 39.21% done, estimate finish Fri Feb 24 19:07:16 2012 39.22% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.23% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 39.24% done, estimate finish Fri Feb 24 19:07:15 2012 39.24% done, estimate finish Fri Feb 24 19:07:17 2012 39.25% done, estimate finish Fri Feb 24 19:07:17 2012 39.26% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.27% done, estimate finish Fri Feb 24 19:07:16 2012 39.27% done, estimate finish Fri Feb 24 19:07:15 2012 39.28% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 39.29% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 39.30% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.31% done, estimate finish Fri Feb 24 19:07:16 2012 39.31% done, estimate finish Fri Feb 24 19:07:15 2012 39.32% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 39.33% done, estimate finish Fri Feb 24 19:07:14 2012 39.34% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.35% done, estimate finish Fri Feb 24 19:07:16 2012 39.35% done, estimate finish Fri Feb 24 19:07:15 2012 39.36% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 39.37% done, estimate finish Fri Feb 24 19:07:15 2012 39.37% done, estimate finish Fri Feb 24 19:07:14 2012 39.38% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.39% done, estimate finish Fri Feb 24 19:07:16 2012 39.39% done, estimate finish Fri Feb 24 19:07:15 2012 39.40% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 39.41% done, estimate finish Fri Feb 24 19:07:14 2012 39.42% done, estimate finish Fri Feb 24 19:07:14 2012 39.42% done, estimate finish Fri Feb 24 19:07:16 2012 39.43% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.44% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 39.45% done, estimate finish Fri Feb 24 19:07:15 2012 39.45% done, estimate finish Fri Feb 24 19:07:14 2012 39.46% done, estimate finish Fri Feb 24 19:07:14 2012 39.46% done, estimate finish Fri Feb 24 19:07:16 2012 39.47% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.48% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 39.49% done, estimate finish Fri Feb 24 19:07:15 2012 39.50% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 39.51% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.52% done, estimate finish Fri Feb 24 19:07:16 2012 39.52% done, estimate finish Fri Feb 24 19:07:15 2012 39.53% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 39.54% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 39.55% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.56% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 39.57% done, estimate finish Fri Feb 24 19:07:15 2012 39.58% done, estimate finish Fri Feb 24 19:07:15 2012 39.58% done, estimate finish Fri Feb 24 19:07:14 2012 39.59% done, estimate finish Fri Feb 24 19:07:14 2012 39.59% done, estimate finish Fri Feb 24 19:07:16 2012 39.60% done, estimate finish Fri Feb 24 19:07:16 2012 39.60% done, estimate finish Fri Feb 24 19:07:18 2012 39.61% done, estimate finish Fri Feb 24 19:07:18 2012 39.61% done, estimate finish Fri Feb 24 19:07:17 2012 39.62% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 39.63% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.64% done, estimate finish Fri Feb 24 19:07:16 2012 39.64% done, estimate finish Fri Feb 24 19:07:18 2012 39.65% done, estimate finish Fri Feb 24 19:07:18 2012 39.66% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 39.67% done, estimate finish Fri Feb 24 19:07:17 2012 39.67% done, estimate finish Fri Feb 24 19:07:16 2012 39.68% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.69% done, estimate finish Fri Feb 24 19:07:15 2012 39.69% done, estimate finish Fri Feb 24 19:07:17 2012 39.70% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 39.71% done, estimate finish Fri Feb 24 19:07:17 2012 39.71% done, estimate finish Fri Feb 24 19:07:16 2012 39.72% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.73% done, estimate finish Fri Feb 24 19:07:18 2012 39.74% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 39.75% done, estimate finish Fri Feb 24 19:07:17 2012 39.75% done, estimate finish Fri Feb 24 19:07:16 2012 39.76% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.77% done, estimate finish Fri Feb 24 19:07:15 2012 39.77% done, estimate finish Fri Feb 24 19:07:18 2012 39.78% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 39.79% done, estimate finish Fri Feb 24 19:07:17 2012 39.79% done, estimate finish Fri Feb 24 19:07:16 2012 39.80% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.81% done, estimate finish Fri Feb 24 19:07:15 2012 39.82% done, estimate finish Fri Feb 24 19:07:15 2012 39.82% done, estimate finish Fri Feb 24 19:07:17 2012 39.83% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 39.84% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.85% done, estimate finish Fri Feb 24 19:07:16 2012 39.85% done, estimate finish Fri Feb 24 19:07:15 2012 39.86% done, estimate finish Fri Feb 24 19:07:15 2012 39.86% done, estimate finish Fri Feb 24 19:07:17 2012 39.87% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 39.88% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.89% done, estimate finish Fri Feb 24 19:07:16 2012 39.90% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 39.91% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 39.92% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.93% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.94% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 39.95% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 39.96% done, estimate finish Fri Feb 24 19:07:16 2012 39.97% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 39.98% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 39.99% done, estimate finish Fri Feb 24 19:07:15 2012 39.99% done, estimate finish Fri Feb 24 19:07:17 2012 40.00% done, estimate finish Fri Feb 24 19:07:17 2012 40.00% done, estimate finish Fri Feb 24 19:07:16 2012 40.01% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 40.02% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.03% done, estimate finish Fri Feb 24 19:07:15 2012 40.03% done, estimate finish Fri Feb 24 19:07:17 2012 40.04% done, estimate finish Fri Feb 24 19:07:17 2012 40.05% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 40.06% done, estimate finish Fri Feb 24 19:07:16 2012 40.06% done, estimate finish Fri Feb 24 19:07:15 2012 40.07% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.08% done, estimate finish Fri Feb 24 19:07:17 2012 === last message repeated 2 times. === 40.09% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 40.10% done, estimate finish Fri Feb 24 19:07:16 2012 40.10% done, estimate finish Fri Feb 24 19:07:15 2012 40.11% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.12% done, estimate finish Fri Feb 24 19:07:17 2012 40.13% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 40.14% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 40.15% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.16% done, estimate finish Fri Feb 24 19:07:15 2012 40.16% done, estimate finish Fri Feb 24 19:07:17 2012 40.17% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 40.18% done, estimate finish Fri Feb 24 19:07:16 2012 40.18% done, estimate finish Fri Feb 24 19:07:15 2012 40.19% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.20% done, estimate finish Fri Feb 24 19:07:14 2012 40.21% done, estimate finish Fri Feb 24 19:07:17 2012 40.21% done, estimate finish Fri Feb 24 19:07:16 2012 40.22% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 40.23% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.24% done, estimate finish Fri Feb 24 19:07:15 2012 40.24% done, estimate finish Fri Feb 24 19:07:14 2012 40.25% done, estimate finish Fri Feb 24 19:07:17 2012 40.25% done, estimate finish Fri Feb 24 19:07:16 2012 40.26% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 40.27% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.28% done, estimate finish Fri Feb 24 19:07:15 2012 40.29% done, estimate finish Fri Feb 24 19:07:14 2012 40.29% done, estimate finish Fri Feb 24 19:07:17 2012 40.30% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 40.31% done, estimate finish Fri Feb 24 19:07:16 2012 40.31% done, estimate finish Fri Feb 24 19:07:15 2012 40.32% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.33% done, estimate finish Fri Feb 24 19:07:14 2012 40.33% done, estimate finish Fri Feb 24 19:07:16 2012 40.34% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 40.35% done, estimate finish Fri Feb 24 19:07:16 2012 40.35% done, estimate finish Fri Feb 24 19:07:15 2012 40.36% done, estimate finish Fri Feb 24 19:07:15 2012 40.37% done, estimate finish Fri Feb 24 19:07:15 2012 40.37% done, estimate finish Fri Feb 24 19:07:14 2012 40.38% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 40.39% done, estimate finish Fri Feb 24 19:07:16 2012 40.39% done, estimate finish Fri Feb 24 19:07:15 2012 40.40% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.41% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 40.42% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 40.43% done, estimate finish Fri Feb 24 19:07:16 2012 40.43% done, estimate finish Fri Feb 24 19:07:15 2012 40.44% done, estimate finish Fri Feb 24 19:07:15 2012 40.45% done, estimate finish Fri Feb 24 19:07:15 2012 40.45% done, estimate finish Fri Feb 24 19:07:14 2012 40.46% done, estimate finish Fri Feb 24 19:07:14 2012 40.46% done, estimate finish Fri Feb 24 19:07:16 2012 40.47% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 40.48% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.49% done, estimate finish Fri Feb 24 19:07:15 2012 40.49% done, estimate finish Fri Feb 24 19:07:14 2012 40.50% done, estimate finish Fri Feb 24 19:07:14 2012 40.50% done, estimate finish Fri Feb 24 19:07:16 2012 40.51% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 40.52% done, estimate finish Fri Feb 24 19:07:15 2012 40.53% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.54% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 40.55% done, estimate finish Fri Feb 24 19:07:14 2012 40.55% done, estimate finish Fri Feb 24 19:07:16 2012 40.56% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.57% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.58% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 40.59% done, estimate finish Fri Feb 24 19:07:16 2012 === last message repeated 2 times. === 40.60% done, estimate finish Fri Feb 24 19:07:15 2012 40.61% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.62% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 40.63% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 40.64% done, estimate finish Fri Feb 24 19:07:16 2012 40.64% done, estimate finish Fri Feb 24 19:07:15 2012 40.65% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.66% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 40.67% done, estimate finish Fri Feb 24 19:07:14 2012 40.67% done, estimate finish Fri Feb 24 19:07:16 2012 40.68% done, estimate finish Fri Feb 24 19:07:16 2012 40.69% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.70% done, estimate finish Fri Feb 24 19:07:15 2012 40.70% done, estimate finish Fri Feb 24 19:07:14 2012 40.71% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 40.72% done, estimate finish Fri Feb 24 19:07:13 2012 40.72% done, estimate finish Fri Feb 24 19:07:16 2012 40.73% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.74% done, estimate finish Fri Feb 24 19:07:15 2012 40.74% done, estimate finish Fri Feb 24 19:07:14 2012 40.75% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 40.76% done, estimate finish Fri Feb 24 19:07:13 2012 40.77% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.78% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.79% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 40.80% done, estimate finish Fri Feb 24 19:07:14 2012 40.80% done, estimate finish Fri Feb 24 19:07:13 2012 40.81% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.82% done, estimate finish Fri Feb 24 19:07:15 2012 40.82% done, estimate finish Fri Feb 24 19:07:14 2012 40.83% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 40.84% done, estimate finish Fri Feb 24 19:07:14 2012 40.85% done, estimate finish Fri Feb 24 19:07:13 2012 40.85% done, estimate finish Fri Feb 24 19:07:15 2012 40.86% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.87% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 40.88% done, estimate finish Fri Feb 24 19:07:14 2012 40.88% done, estimate finish Fri Feb 24 19:07:13 2012 40.89% done, estimate finish Fri Feb 24 19:07:13 2012 40.89% done, estimate finish Fri Feb 24 19:07:15 2012 40.90% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.91% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 40.92% done, estimate finish Fri Feb 24 19:07:14 2012 40.93% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 40.94% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.95% done, estimate finish Fri Feb 24 19:07:15 2012 40.95% done, estimate finish Fri Feb 24 19:07:14 2012 40.96% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 40.97% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 40.98% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 40.99% done, estimate finish Fri Feb 24 19:07:15 2012 40.99% done, estimate finish Fri Feb 24 19:07:14 2012 41.00% done, estimate finish Fri Feb 24 19:07:14 2012 41.01% done, estimate finish Fri Feb 24 19:07:14 2012 41.01% done, estimate finish Fri Feb 24 19:07:13 2012 41.02% done, estimate finish Fri Feb 24 19:07:13 2012 41.02% done, estimate finish Fri Feb 24 19:07:15 2012 41.03% done, estimate finish Fri Feb 24 19:07:15 2012 41.03% done, estimate finish Fri Feb 24 19:07:14 2012 41.04% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 41.05% done, estimate finish Fri Feb 24 19:07:14 2012 41.05% done, estimate finish Fri Feb 24 19:07:13 2012 41.06% done, estimate finish Fri Feb 24 19:07:13 2012 41.06% done, estimate finish Fri Feb 24 19:07:15 2012 41.07% done, estimate finish Fri Feb 24 19:07:15 2012 41.08% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 41.09% done, estimate finish Fri Feb 24 19:07:14 2012 41.09% done, estimate finish Fri Feb 24 19:07:13 2012 41.10% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.11% done, estimate finish Fri Feb 24 19:07:15 2012 === last message repeated 2 times. === 41.12% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 41.13% done, estimate finish Fri Feb 24 19:07:14 2012 41.13% done, estimate finish Fri Feb 24 19:07:13 2012 41.14% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.15% done, estimate finish Fri Feb 24 19:07:15 2012 41.16% done, estimate finish Fri Feb 24 19:07:15 2012 41.16% done, estimate finish Fri Feb 24 19:07:14 2012 41.17% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 41.18% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.19% done, estimate finish Fri Feb 24 19:07:13 2012 41.19% done, estimate finish Fri Feb 24 19:07:15 2012 41.20% done, estimate finish Fri Feb 24 19:07:15 2012 41.20% done, estimate finish Fri Feb 24 19:07:14 2012 41.21% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 41.22% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.23% done, estimate finish Fri Feb 24 19:07:13 2012 41.24% done, estimate finish Fri Feb 24 19:07:15 2012 41.24% done, estimate finish Fri Feb 24 19:07:14 2012 41.25% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 41.26% done, estimate finish Fri Feb 24 19:07:14 2012 41.26% done, estimate finish Fri Feb 24 19:07:13 2012 41.27% done, estimate finish Fri Feb 24 19:07:13 2012 41.27% done, estimate finish Fri Feb 24 19:07:15 2012 41.28% done, estimate finish Fri Feb 24 19:07:15 2012 41.28% done, estimate finish Fri Feb 24 19:07:14 2012 41.29% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 41.30% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.31% done, estimate finish Fri Feb 24 19:07:13 2012 41.32% done, estimate finish Fri Feb 24 19:07:13 2012 41.32% done, estimate finish Fri Feb 24 19:07:15 2012 41.33% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 41.34% done, estimate finish Fri Feb 24 19:07:14 2012 41.34% done, estimate finish Fri Feb 24 19:07:13 2012 41.35% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.36% done, estimate finish Fri Feb 24 19:07:12 2012 41.36% done, estimate finish Fri Feb 24 19:07:15 2012 41.37% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 41.38% done, estimate finish Fri Feb 24 19:07:14 2012 41.38% done, estimate finish Fri Feb 24 19:07:13 2012 41.39% done, estimate finish Fri Feb 24 19:07:13 2012 41.40% done, estimate finish Fri Feb 24 19:07:13 2012 41.40% done, estimate finish Fri Feb 24 19:07:15 2012 41.41% done, estimate finish Fri Feb 24 19:07:15 2012 41.41% done, estimate finish Fri Feb 24 19:07:14 2012 41.42% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 41.43% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.44% done, estimate finish Fri Feb 24 19:07:13 2012 41.44% done, estimate finish Fri Feb 24 19:07:12 2012 41.45% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 41.46% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 41.47% done, estimate finish Fri Feb 24 19:07:13 2012 41.48% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.49% done, estimate finish Fri Feb 24 19:07:12 2012 41.49% done, estimate finish Fri Feb 24 19:07:14 2012 41.50% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 41.51% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.52% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.53% done, estimate finish Fri Feb 24 19:07:15 2012 41.53% done, estimate finish Fri Feb 24 19:07:14 2012 41.54% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 41.55% done, estimate finish Fri Feb 24 19:07:13 2012 41.56% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.57% done, estimate finish Fri Feb 24 19:07:13 2012 41.57% done, estimate finish Fri Feb 24 19:07:15 2012 41.58% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 41.59% done, estimate finish Fri Feb 24 19:07:14 2012 41.59% done, estimate finish Fri Feb 24 19:07:13 2012 41.60% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.61% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 41.62% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 41.63% done, estimate finish Fri Feb 24 19:07:14 2012 41.64% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.65% done, estimate finish Fri Feb 24 19:07:13 2012 41.65% done, estimate finish Fri Feb 24 19:07:12 2012 41.66% done, estimate finish Fri Feb 24 19:07:12 2012 41.66% done, estimate finish Fri Feb 24 19:07:14 2012 41.67% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 41.68% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.69% done, estimate finish Fri Feb 24 19:07:13 2012 41.69% done, estimate finish Fri Feb 24 19:07:12 2012 41.70% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 41.71% done, estimate finish Fri Feb 24 19:07:14 2012 41.72% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.73% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.74% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 41.75% done, estimate finish Fri Feb 24 19:07:12 2012 41.75% done, estimate finish Fri Feb 24 19:07:14 2012 41.76% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.77% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.78% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 41.79% done, estimate finish Fri Feb 24 19:07:12 2012 41.80% done, estimate finish Fri Feb 24 19:07:14 2012 41.80% done, estimate finish Fri Feb 24 19:07:13 2012 41.81% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.82% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 41.83% done, estimate finish Fri Feb 24 19:07:12 2012 41.83% done, estimate finish Fri Feb 24 19:07:14 2012 41.84% done, estimate finish Fri Feb 24 19:07:14 2012 41.84% done, estimate finish Fri Feb 24 19:07:13 2012 41.85% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.86% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 41.87% done, estimate finish Fri Feb 24 19:07:12 2012 41.88% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 41.89% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.90% done, estimate finish Fri Feb 24 19:07:13 2012 41.90% done, estimate finish Fri Feb 24 19:07:12 2012 41.91% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 41.92% done, estimate finish Fri Feb 24 19:07:14 2012 41.92% done, estimate finish Fri Feb 24 19:07:13 2012 41.93% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.94% done, estimate finish Fri Feb 24 19:07:13 2012 41.94% done, estimate finish Fri Feb 24 19:07:12 2012 41.95% done, estimate finish Fri Feb 24 19:07:12 2012 41.96% done, estimate finish Fri Feb 24 19:07:14 2012 === last message repeated 2 times. === 41.97% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.98% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 41.99% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.00% done, estimate finish Fri Feb 24 19:07:12 2012 42.00% done, estimate finish Fri Feb 24 19:07:14 2012 42.01% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 42.02% done, estimate finish Fri Feb 24 19:07:13 2012 42.02% done, estimate finish Fri Feb 24 19:07:12 2012 42.03% done, estimate finish Fri Feb 24 19:07:12 2012 42.04% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.05% done, estimate finish Fri Feb 24 19:07:14 2012 42.05% done, estimate finish Fri Feb 24 19:07:13 2012 42.06% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 42.07% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.08% done, estimate finish Fri Feb 24 19:07:12 2012 42.08% done, estimate finish Fri Feb 24 19:07:11 2012 42.09% done, estimate finish Fri Feb 24 19:07:14 2012 42.09% done, estimate finish Fri Feb 24 19:07:13 2012 42.10% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 42.11% done, estimate finish Fri Feb 24 19:07:12 2012 42.12% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.13% done, estimate finish Fri Feb 24 19:07:11 2012 42.13% done, estimate finish Fri Feb 24 19:07:13 2012 42.14% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 42.15% done, estimate finish Fri Feb 24 19:07:13 2012 42.15% done, estimate finish Fri Feb 24 19:07:12 2012 42.16% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.17% done, estimate finish Fri Feb 24 19:07:11 2012 42.17% done, estimate finish Fri Feb 24 19:07:13 2012 42.18% done, estimate finish Fri Feb 24 19:07:13 2012 42.19% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 42.20% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.21% done, estimate finish Fri Feb 24 19:07:12 2012 42.21% done, estimate finish Fri Feb 24 19:07:11 2012 42.22% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 42.23% done, estimate finish Fri Feb 24 19:07:13 2012 42.23% done, estimate finish Fri Feb 24 19:07:12 2012 42.24% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.25% done, estimate finish Fri Feb 24 19:07:12 2012 42.25% done, estimate finish Fri Feb 24 19:07:11 2012 42.26% done, estimate finish Fri Feb 24 19:07:13 2012 42.27% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 42.28% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.29% done, estimate finish Fri Feb 24 19:07:12 2012 42.29% done, estimate finish Fri Feb 24 19:07:11 2012 42.30% done, estimate finish Fri Feb 24 19:07:11 2012 42.30% done, estimate finish Fri Feb 24 19:07:13 2012 42.31% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 42.32% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.33% done, estimate finish Fri Feb 24 19:07:12 2012 42.33% done, estimate finish Fri Feb 24 19:07:11 2012 42.34% done, estimate finish Fri Feb 24 19:07:11 2012 42.35% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 42.36% done, estimate finish Fri Feb 24 19:07:13 2012 42.36% done, estimate finish Fri Feb 24 19:07:12 2012 42.37% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.38% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 42.39% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 42.40% done, estimate finish Fri Feb 24 19:07:13 2012 42.40% done, estimate finish Fri Feb 24 19:07:12 2012 42.41% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.42% done, estimate finish Fri Feb 24 19:07:11 2012 42.43% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 42.44% done, estimate finish Fri Feb 24 19:07:13 2012 42.44% done, estimate finish Fri Feb 24 19:07:12 2012 42.45% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.46% done, estimate finish Fri Feb 24 19:07:12 2012 42.46% done, estimate finish Fri Feb 24 19:07:11 2012 42.47% done, estimate finish Fri Feb 24 19:07:11 2012 42.47% done, estimate finish Fri Feb 24 19:07:13 2012 42.48% done, estimate finish Fri Feb 24 19:07:13 2012 42.48% done, estimate finish Fri Feb 24 19:07:12 2012 42.49% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.50% done, estimate finish Fri Feb 24 19:07:12 2012 42.51% done, estimate finish Fri Feb 24 19:07:11 2012 42.51% done, estimate finish Fri Feb 24 19:07:13 2012 42.52% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 42.53% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.54% done, estimate finish Fri Feb 24 19:07:12 2012 42.54% done, estimate finish Fri Feb 24 19:07:11 2012 42.55% done, estimate finish Fri Feb 24 19:07:11 2012 42.55% done, estimate finish Fri Feb 24 19:07:13 2012 42.56% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 42.57% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.58% done, estimate finish Fri Feb 24 19:07:12 2012 42.59% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 42.60% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 42.61% done, estimate finish Fri Feb 24 19:07:13 2012 42.61% done, estimate finish Fri Feb 24 19:07:12 2012 42.62% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.63% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 42.64% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 42.65% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.66% done, estimate finish Fri Feb 24 19:07:12 2012 42.67% done, estimate finish Fri Feb 24 19:07:12 2012 42.67% done, estimate finish Fri Feb 24 19:07:11 2012 42.68% done, estimate finish Fri Feb 24 19:07:11 2012 42.68% done, estimate finish Fri Feb 24 19:07:13 2012 42.69% done, estimate finish Fri Feb 24 19:07:13 2012 42.69% done, estimate finish Fri Feb 24 19:07:12 2012 42.70% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.71% done, estimate finish Fri Feb 24 19:07:12 2012 42.71% done, estimate finish Fri Feb 24 19:07:11 2012 42.72% done, estimate finish Fri Feb 24 19:07:11 2012 42.72% done, estimate finish Fri Feb 24 19:07:13 2012 42.73% done, estimate finish Fri Feb 24 19:07:13 2012 42.73% done, estimate finish Fri Feb 24 19:07:12 2012 42.74% done, estimate finish Fri Feb 24 19:07:12 2012 42.75% done, estimate finish Fri Feb 24 19:07:12 2012 42.75% done, estimate finish Fri Feb 24 19:07:11 2012 42.76% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 42.77% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 42.78% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.79% done, estimate finish Fri Feb 24 19:07:12 2012 42.79% done, estimate finish Fri Feb 24 19:07:11 2012 42.80% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 42.81% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 42.82% done, estimate finish Fri Feb 24 19:07:12 2012 42.83% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.84% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 42.85% done, estimate finish Fri Feb 24 19:07:13 2012 === last message repeated 2 times. === 42.86% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.87% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.88% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 42.89% done, estimate finish Fri Feb 24 19:07:11 2012 42.89% done, estimate finish Fri Feb 24 19:07:13 2012 42.90% done, estimate finish Fri Feb 24 19:07:12 2012 42.91% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.92% done, estimate finish Fri Feb 24 19:07:12 2012 42.92% done, estimate finish Fri Feb 24 19:07:11 2012 42.93% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 42.94% done, estimate finish Fri Feb 24 19:07:13 2012 42.94% done, estimate finish Fri Feb 24 19:07:12 2012 42.95% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 42.96% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 42.97% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 42.98% done, estimate finish Fri Feb 24 19:07:13 2012 42.99% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.00% done, estimate finish Fri Feb 24 19:07:12 2012 43.00% done, estimate finish Fri Feb 24 19:07:11 2012 43.01% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.02% done, estimate finish Fri Feb 24 19:07:11 2012 43.02% done, estimate finish Fri Feb 24 19:07:13 2012 43.03% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.04% done, estimate finish Fri Feb 24 19:07:12 2012 43.04% done, estimate finish Fri Feb 24 19:07:11 2012 43.05% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.06% done, estimate finish Fri Feb 24 19:07:10 2012 43.07% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.08% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.09% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.10% done, estimate finish Fri Feb 24 19:07:11 2012 43.10% done, estimate finish Fri Feb 24 19:07:13 2012 43.11% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.12% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.13% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.14% done, estimate finish Fri Feb 24 19:07:11 2012 43.15% done, estimate finish Fri Feb 24 19:07:10 2012 43.15% done, estimate finish Fri Feb 24 19:07:12 2012 43.16% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.17% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.18% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.19% done, estimate finish Fri Feb 24 19:07:10 2012 43.19% done, estimate finish Fri Feb 24 19:07:12 2012 43.20% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.21% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.22% done, estimate finish Fri Feb 24 19:07:11 2012 43.23% done, estimate finish Fri Feb 24 19:07:11 2012 43.23% done, estimate finish Fri Feb 24 19:07:10 2012 43.24% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.25% done, estimate finish Fri Feb 24 19:07:12 2012 43.25% done, estimate finish Fri Feb 24 19:07:11 2012 43.26% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.27% done, estimate finish Fri Feb 24 19:07:10 2012 43.27% done, estimate finish Fri Feb 24 19:07:12 2012 43.28% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.29% done, estimate finish Fri Feb 24 19:07:12 2012 43.29% done, estimate finish Fri Feb 24 19:07:11 2012 43.30% done, estimate finish Fri Feb 24 19:07:11 2012 43.31% done, estimate finish Fri Feb 24 19:07:11 2012 43.31% done, estimate finish Fri Feb 24 19:07:10 2012 43.32% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.33% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.34% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.35% done, estimate finish Fri Feb 24 19:07:11 2012 43.35% done, estimate finish Fri Feb 24 19:07:10 2012 43.36% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.37% done, estimate finish Fri Feb 24 19:07:12 2012 43.38% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.39% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.40% done, estimate finish Fri Feb 24 19:07:10 2012 43.40% done, estimate finish Fri Feb 24 19:07:12 2012 43.41% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.42% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.43% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.44% done, estimate finish Fri Feb 24 19:07:10 2012 43.44% done, estimate finish Fri Feb 24 19:07:12 2012 43.45% done, estimate finish Fri Feb 24 19:07:12 2012 43.46% done, estimate finish Fri Feb 24 19:07:12 2012 43.46% done, estimate finish Fri Feb 24 19:07:11 2012 43.47% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.48% done, estimate finish Fri Feb 24 19:07:11 2012 43.48% done, estimate finish Fri Feb 24 19:07:10 2012 43.49% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.50% done, estimate finish Fri Feb 24 19:07:12 2012 43.50% done, estimate finish Fri Feb 24 19:07:11 2012 43.51% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.52% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 43.53% done, estimate finish Fri Feb 24 19:07:12 2012 43.54% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.55% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.56% done, estimate finish Fri Feb 24 19:07:11 2012 43.56% done, estimate finish Fri Feb 24 19:07:10 2012 43.57% done, estimate finish Fri Feb 24 19:07:10 2012 43.57% done, estimate finish Fri Feb 24 19:07:12 2012 43.58% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.59% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.60% done, estimate finish Fri Feb 24 19:07:11 2012 43.60% done, estimate finish Fri Feb 24 19:07:10 2012 43.61% done, estimate finish Fri Feb 24 19:07:10 2012 43.62% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.63% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.64% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.65% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 43.66% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.67% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.68% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.69% done, estimate finish Fri Feb 24 19:07:10 2012 43.70% done, estimate finish Fri Feb 24 19:07:10 2012 43.70% done, estimate finish Fri Feb 24 19:07:12 2012 43.71% done, estimate finish Fri Feb 24 19:07:12 2012 43.71% done, estimate finish Fri Feb 24 19:07:11 2012 43.72% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.73% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 43.74% done, estimate finish Fri Feb 24 19:07:10 2012 43.74% done, estimate finish Fri Feb 24 19:07:12 2012 43.75% done, estimate finish Fri Feb 24 19:07:12 2012 43.75% done, estimate finish Fri Feb 24 19:07:11 2012 43.76% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.77% done, estimate finish Fri Feb 24 19:07:10 2012 43.78% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 43.79% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.80% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.81% done, estimate finish Fri Feb 24 19:07:11 2012 43.81% done, estimate finish Fri Feb 24 19:07:10 2012 43.82% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 43.83% done, estimate finish Fri Feb 24 19:07:12 2012 43.83% done, estimate finish Fri Feb 24 19:07:11 2012 43.84% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.85% done, estimate finish Fri Feb 24 19:07:11 2012 43.86% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 43.87% done, estimate finish Fri Feb 24 19:07:10 2012 43.87% done, estimate finish Fri Feb 24 19:07:12 2012 43.88% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.89% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.90% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 43.91% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 43.92% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.93% done, estimate finish Fri Feb 24 19:07:11 2012 43.94% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 43.95% done, estimate finish Fri Feb 24 19:07:10 2012 43.95% done, estimate finish Fri Feb 24 19:07:12 2012 43.96% done, estimate finish Fri Feb 24 19:07:12 2012 43.96% done, estimate finish Fri Feb 24 19:07:11 2012 43.97% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 43.98% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 43.99% done, estimate finish Fri Feb 24 19:07:10 2012 43.99% done, estimate finish Fri Feb 24 19:07:12 2012 44.00% done, estimate finish Fri Feb 24 19:07:12 2012 44.00% done, estimate finish Fri Feb 24 19:07:11 2012 44.01% done, estimate finish Fri Feb 24 19:07:11 2012 44.02% done, estimate finish Fri Feb 24 19:07:11 2012 44.02% done, estimate finish Fri Feb 24 19:07:10 2012 44.03% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.04% done, estimate finish Fri Feb 24 19:07:12 2012 44.04% done, estimate finish Fri Feb 24 19:07:11 2012 44.05% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.06% done, estimate finish Fri Feb 24 19:07:11 2012 44.06% done, estimate finish Fri Feb 24 19:07:10 2012 44.07% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.08% done, estimate finish Fri Feb 24 19:07:12 2012 44.08% done, estimate finish Fri Feb 24 19:07:11 2012 44.09% done, estimate finish Fri Feb 24 19:07:11 2012 44.10% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.11% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.12% done, estimate finish Fri Feb 24 19:07:10 2012 44.12% done, estimate finish Fri Feb 24 19:07:12 2012 44.13% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.14% done, estimate finish Fri Feb 24 19:07:11 2012 44.14% done, estimate finish Fri Feb 24 19:07:10 2012 44.15% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.16% done, estimate finish Fri Feb 24 19:07:10 2012 44.16% done, estimate finish Fri Feb 24 19:07:12 2012 44.17% done, estimate finish Fri Feb 24 19:07:11 2012 44.18% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.19% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.20% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.21% done, estimate finish Fri Feb 24 19:07:12 2012 44.21% done, estimate finish Fri Feb 24 19:07:11 2012 44.22% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.23% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.24% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.25% done, estimate finish Fri Feb 24 19:07:11 2012 44.26% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.27% done, estimate finish Fri Feb 24 19:07:11 2012 44.27% done, estimate finish Fri Feb 24 19:07:10 2012 44.28% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.29% done, estimate finish Fri Feb 24 19:07:09 2012 44.29% done, estimate finish Fri Feb 24 19:07:11 2012 44.30% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.31% done, estimate finish Fri Feb 24 19:07:11 2012 44.31% done, estimate finish Fri Feb 24 19:07:10 2012 44.32% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.33% done, estimate finish Fri Feb 24 19:07:09 2012 44.34% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.35% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.36% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.37% done, estimate finish Fri Feb 24 19:07:10 2012 44.37% done, estimate finish Fri Feb 24 19:07:09 2012 44.38% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.39% done, estimate finish Fri Feb 24 19:07:11 2012 44.39% done, estimate finish Fri Feb 24 19:07:10 2012 44.40% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.41% done, estimate finish Fri Feb 24 19:07:10 2012 44.42% done, estimate finish Fri Feb 24 19:07:09 2012 44.42% done, estimate finish Fri Feb 24 19:07:11 2012 44.43% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.44% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.45% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.46% done, estimate finish Fri Feb 24 19:07:09 2012 44.46% done, estimate finish Fri Feb 24 19:07:11 2012 44.47% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.48% done, estimate finish Fri Feb 24 19:07:10 2012 44.49% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.50% done, estimate finish Fri Feb 24 19:07:09 2012 44.50% done, estimate finish Fri Feb 24 19:07:11 2012 44.51% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.52% done, estimate finish Fri Feb 24 19:07:11 2012 44.52% done, estimate finish Fri Feb 24 19:07:10 2012 44.53% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.54% done, estimate finish Fri Feb 24 19:07:09 2012 44.54% done, estimate finish Fri Feb 24 19:07:11 2012 44.55% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.56% done, estimate finish Fri Feb 24 19:07:11 2012 44.56% done, estimate finish Fri Feb 24 19:07:10 2012 44.57% done, estimate finish Fri Feb 24 19:07:10 2012 44.58% done, estimate finish Fri Feb 24 19:07:10 2012 44.58% done, estimate finish Fri Feb 24 19:07:09 2012 44.59% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.60% done, estimate finish Fri Feb 24 19:07:11 2012 44.60% done, estimate finish Fri Feb 24 19:07:10 2012 44.61% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.62% done, estimate finish Fri Feb 24 19:07:10 2012 44.62% done, estimate finish Fri Feb 24 19:07:09 2012 44.63% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.64% done, estimate finish Fri Feb 24 19:07:11 2012 44.65% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.66% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.67% done, estimate finish Fri Feb 24 19:07:09 2012 44.67% done, estimate finish Fri Feb 24 19:07:11 2012 44.68% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.69% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.70% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.71% done, estimate finish Fri Feb 24 19:07:09 2012 44.71% done, estimate finish Fri Feb 24 19:07:11 2012 44.72% done, estimate finish Fri Feb 24 19:07:11 2012 44.73% done, estimate finish Fri Feb 24 19:07:11 2012 44.73% done, estimate finish Fri Feb 24 19:07:10 2012 44.74% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.75% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 44.76% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.77% done, estimate finish Fri Feb 24 19:07:11 2012 44.77% done, estimate finish Fri Feb 24 19:07:10 2012 44.78% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.79% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 44.80% done, estimate finish Fri Feb 24 19:07:11 2012 44.81% done, estimate finish Fri Feb 24 19:07:11 2012 44.81% done, estimate finish Fri Feb 24 19:07:10 2012 44.82% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.83% done, estimate finish Fri Feb 24 19:07:10 2012 44.83% done, estimate finish Fri Feb 24 19:07:09 2012 44.84% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.85% done, estimate finish Fri Feb 24 19:07:11 2012 44.85% done, estimate finish Fri Feb 24 19:07:10 2012 44.86% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.87% done, estimate finish Fri Feb 24 19:07:10 2012 44.87% done, estimate finish Fri Feb 24 19:07:09 2012 44.88% done, estimate finish Fri Feb 24 19:07:09 2012 44.89% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.90% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.91% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.92% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 44.93% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 44.94% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 44.95% done, estimate finish Fri Feb 24 19:07:10 2012 44.95% done, estimate finish Fri Feb 24 19:07:09 2012 44.96% done, estimate finish Fri Feb 24 19:07:09 2012 44.97% done, estimate finish Fri Feb 24 19:07:09 2012 44.97% done, estimate finish Fri Feb 24 19:07:11 2012 44.98% done, estimate finish Fri Feb 24 19:07:11 2012 44.98% done, estimate finish Fri Feb 24 19:07:10 2012 44.99% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 45.00% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 45.01% done, estimate finish Fri Feb 24 19:07:09 2012 45.01% done, estimate finish Fri Feb 24 19:07:11 2012 45.02% done, estimate finish Fri Feb 24 19:07:11 2012 45.02% done, estimate finish Fri Feb 24 19:07:10 2012 45.03% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 45.04% done, estimate finish Fri Feb 24 19:07:09 2012 45.05% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 45.06% done, estimate finish Fri Feb 24 19:07:11 2012 45.06% done, estimate finish Fri Feb 24 19:07:10 2012 45.07% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 45.08% done, estimate finish Fri Feb 24 19:07:10 2012 45.08% done, estimate finish Fri Feb 24 19:07:09 2012 45.09% done, estimate finish Fri Feb 24 19:07:09 2012 45.09% done, estimate finish Fri Feb 24 19:07:11 2012 45.10% done, estimate finish Fri Feb 24 19:07:11 2012 45.10% done, estimate finish Fri Feb 24 19:07:10 2012 45.11% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 45.12% done, estimate finish Fri Feb 24 19:07:10 2012 45.13% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 45.14% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.15% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 45.16% done, estimate finish Fri Feb 24 19:07:10 2012 45.16% done, estimate finish Fri Feb 24 19:07:09 2012 45.17% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 45.18% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.19% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 45.20% done, estimate finish Fri Feb 24 19:07:12 2012 45.21% done, estimate finish Fri Feb 24 19:07:12 2012 45.21% done, estimate finish Fri Feb 24 19:07:11 2012 45.22% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.23% done, estimate finish Fri Feb 24 19:07:11 2012 45.23% done, estimate finish Fri Feb 24 19:07:12 2012 45.24% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 45.25% done, estimate finish Fri Feb 24 19:07:12 2012 45.25% done, estimate finish Fri Feb 24 19:07:11 2012 45.26% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.27% done, estimate finish Fri Feb 24 19:07:10 2012 45.27% done, estimate finish Fri Feb 24 19:07:12 2012 45.28% done, estimate finish Fri Feb 24 19:07:12 2012 45.29% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 45.30% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.31% done, estimate finish Fri Feb 24 19:07:11 2012 45.31% done, estimate finish Fri Feb 24 19:07:10 2012 45.32% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 45.33% done, estimate finish Fri Feb 24 19:07:12 2012 45.33% done, estimate finish Fri Feb 24 19:07:11 2012 45.34% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.35% done, estimate finish Fri Feb 24 19:07:11 2012 45.35% done, estimate finish Fri Feb 24 19:07:10 2012 45.36% done, estimate finish Fri Feb 24 19:07:12 2012 45.37% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 45.38% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.39% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.40% done, estimate finish Fri Feb 24 19:07:10 2012 45.40% done, estimate finish Fri Feb 24 19:07:12 2012 45.41% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 45.42% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.43% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.44% done, estimate finish Fri Feb 24 19:07:10 2012 45.45% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 45.46% done, estimate finish Fri Feb 24 19:07:12 2012 45.46% done, estimate finish Fri Feb 24 19:07:11 2012 45.47% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.48% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 45.49% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 45.50% done, estimate finish Fri Feb 24 19:07:12 2012 45.50% done, estimate finish Fri Feb 24 19:07:11 2012 45.51% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.52% done, estimate finish Fri Feb 24 19:07:10 2012 45.53% done, estimate finish Fri Feb 24 19:07:10 2012 45.53% done, estimate finish Fri Feb 24 19:07:12 2012 45.54% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 45.55% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.56% done, estimate finish Fri Feb 24 19:07:11 2012 45.56% done, estimate finish Fri Feb 24 19:07:10 2012 45.57% done, estimate finish Fri Feb 24 19:07:10 2012 45.57% done, estimate finish Fri Feb 24 19:07:12 2012 45.58% done, estimate finish Fri Feb 24 19:07:12 2012 45.58% done, estimate finish Fri Feb 24 19:07:11 2012 45.59% done, estimate finish Fri Feb 24 19:07:11 2012 45.60% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.61% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 45.62% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 45.63% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.64% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.65% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 45.66% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 45.67% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.68% done, estimate finish Fri Feb 24 19:07:11 2012 45.69% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 45.70% done, estimate finish Fri Feb 24 19:07:10 2012 45.70% done, estimate finish Fri Feb 24 19:07:12 2012 45.71% done, estimate finish Fri Feb 24 19:07:12 2012 45.71% done, estimate finish Fri Feb 24 19:07:11 2012 45.72% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.73% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 45.74% done, estimate finish Fri Feb 24 19:07:10 2012 45.74% done, estimate finish Fri Feb 24 19:07:12 2012 45.75% done, estimate finish Fri Feb 24 19:07:12 2012 45.76% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.77% done, estimate finish Fri Feb 24 19:07:11 2012 45.77% done, estimate finish Fri Feb 24 19:07:10 2012 45.78% done, estimate finish Fri Feb 24 19:07:10 2012 45.78% done, estimate finish Fri Feb 24 19:07:12 2012 45.79% done, estimate finish Fri Feb 24 19:07:12 2012 45.79% done, estimate finish Fri Feb 24 19:07:11 2012 45.80% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.81% done, estimate finish Fri Feb 24 19:07:11 2012 45.81% done, estimate finish Fri Feb 24 19:07:10 2012 45.82% done, estimate finish Fri Feb 24 19:07:10 2012 45.82% done, estimate finish Fri Feb 24 19:07:12 2012 45.83% done, estimate finish Fri Feb 24 19:07:12 2012 45.84% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.85% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.86% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 45.87% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 45.88% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.89% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.90% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 45.91% done, estimate finish Fri Feb 24 19:07:12 2012 45.92% done, estimate finish Fri Feb 24 19:07:12 2012 45.92% done, estimate finish Fri Feb 24 19:07:11 2012 45.93% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.94% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 45.95% done, estimate finish Fri Feb 24 19:07:10 2012 45.95% done, estimate finish Fri Feb 24 19:07:12 2012 45.96% done, estimate finish Fri Feb 24 19:07:12 2012 45.96% done, estimate finish Fri Feb 24 19:07:11 2012 45.97% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 45.98% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 45.99% done, estimate finish Fri Feb 24 19:07:12 2012 46.00% done, estimate finish Fri Feb 24 19:07:12 2012 46.00% done, estimate finish Fri Feb 24 19:07:11 2012 46.01% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.02% done, estimate finish Fri Feb 24 19:07:11 2012 46.02% done, estimate finish Fri Feb 24 19:07:10 2012 46.03% done, estimate finish Fri Feb 24 19:07:10 2012 46.03% done, estimate finish Fri Feb 24 19:07:12 2012 46.04% done, estimate finish Fri Feb 24 19:07:12 2012 46.04% done, estimate finish Fri Feb 24 19:07:11 2012 46.05% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.06% done, estimate finish Fri Feb 24 19:07:11 2012 46.06% done, estimate finish Fri Feb 24 19:07:10 2012 46.07% done, estimate finish Fri Feb 24 19:07:10 2012 46.08% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 46.09% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.10% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.11% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 46.12% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 46.13% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.14% done, estimate finish Fri Feb 24 19:07:11 2012 46.14% done, estimate finish Fri Feb 24 19:07:10 2012 46.15% done, estimate finish Fri Feb 24 19:07:10 2012 46.16% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 46.17% done, estimate finish Fri Feb 24 19:07:12 2012 46.17% done, estimate finish Fri Feb 24 19:07:11 2012 46.18% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.19% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 46.20% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 46.21% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.22% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.23% done, estimate finish Fri Feb 24 19:07:10 2012 46.24% done, estimate finish Fri Feb 24 19:07:10 2012 46.24% done, estimate finish Fri Feb 24 19:07:12 2012 46.25% done, estimate finish Fri Feb 24 19:07:12 2012 46.25% done, estimate finish Fri Feb 24 19:07:11 2012 46.26% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.27% done, estimate finish Fri Feb 24 19:07:11 2012 46.27% done, estimate finish Fri Feb 24 19:07:10 2012 46.28% done, estimate finish Fri Feb 24 19:07:10 2012 46.28% done, estimate finish Fri Feb 24 19:07:12 2012 46.29% done, estimate finish Fri Feb 24 19:07:12 2012 46.29% done, estimate finish Fri Feb 24 19:07:11 2012 46.30% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.31% done, estimate finish Fri Feb 24 19:07:11 2012 46.32% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 46.33% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 46.34% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.35% done, estimate finish Fri Feb 24 19:07:11 2012 46.35% done, estimate finish Fri Feb 24 19:07:10 2012 46.36% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 46.37% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 46.38% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.39% done, estimate finish Fri Feb 24 19:07:11 2012 46.40% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 46.41% done, estimate finish Fri Feb 24 19:07:10 2012 46.41% done, estimate finish Fri Feb 24 19:07:12 2012 46.42% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.43% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.44% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 46.45% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 46.46% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.47% done, estimate finish Fri Feb 24 19:07:11 2012 46.48% done, estimate finish Fri Feb 24 19:07:11 2012 46.48% done, estimate finish Fri Feb 24 19:07:10 2012 46.49% done, estimate finish Fri Feb 24 19:07:10 2012 46.49% done, estimate finish Fri Feb 24 19:07:12 2012 46.50% done, estimate finish Fri Feb 24 19:07:12 2012 46.50% done, estimate finish Fri Feb 24 19:07:11 2012 46.51% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.52% done, estimate finish Fri Feb 24 19:07:11 2012 46.52% done, estimate finish Fri Feb 24 19:07:10 2012 46.53% done, estimate finish Fri Feb 24 19:07:10 2012 46.53% done, estimate finish Fri Feb 24 19:07:12 2012 46.54% done, estimate finish Fri Feb 24 19:07:12 2012 46.54% done, estimate finish Fri Feb 24 19:07:11 2012 46.55% done, estimate finish Fri Feb 24 19:07:11 2012 46.56% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.57% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 46.58% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 46.59% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.60% done, estimate finish Fri Feb 24 19:07:11 2012 46.60% done, estimate finish Fri Feb 24 19:07:10 2012 46.61% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 46.62% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 46.63% done, estimate finish Fri Feb 24 19:07:11 2012 46.64% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.65% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 46.66% done, estimate finish Fri Feb 24 19:07:10 2012 46.66% done, estimate finish Fri Feb 24 19:07:12 2012 46.67% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.68% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.69% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 46.70% done, estimate finish Fri Feb 24 19:07:10 2012 46.71% done, estimate finish Fri Feb 24 19:07:12 2012 46.71% done, estimate finish Fri Feb 24 19:07:11 2012 46.72% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.73% done, estimate finish Fri Feb 24 19:07:11 2012 46.73% done, estimate finish Fri Feb 24 19:07:10 2012 46.74% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 46.75% done, estimate finish Fri Feb 24 19:07:12 2012 46.75% done, estimate finish Fri Feb 24 19:07:11 2012 46.76% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.77% done, estimate finish Fri Feb 24 19:07:11 2012 46.77% done, estimate finish Fri Feb 24 19:07:10 2012 46.78% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 46.79% done, estimate finish Fri Feb 24 19:07:12 2012 46.80% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.81% done, estimate finish Fri Feb 24 19:07:11 2012 46.81% done, estimate finish Fri Feb 24 19:07:10 2012 46.82% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 46.83% done, estimate finish Fri Feb 24 19:07:10 2012 46.83% done, estimate finish Fri Feb 24 19:07:12 2012 46.84% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.85% done, estimate finish Fri Feb 24 19:07:11 2012 46.85% done, estimate finish Fri Feb 24 19:07:10 2012 46.86% done, estimate finish Fri Feb 24 19:07:10 2012 46.87% done, estimate finish Fri Feb 24 19:07:10 2012 46.87% done, estimate finish Fri Feb 24 19:07:12 2012 46.88% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.89% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.90% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 46.91% done, estimate finish Fri Feb 24 19:07:10 2012 46.91% done, estimate finish Fri Feb 24 19:07:12 2012 46.92% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.93% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.94% done, estimate finish Fri Feb 24 19:07:10 2012 46.95% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 46.96% done, estimate finish Fri Feb 24 19:07:12 2012 46.96% done, estimate finish Fri Feb 24 19:07:11 2012 46.97% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 46.98% done, estimate finish Fri Feb 24 19:07:11 2012 46.98% done, estimate finish Fri Feb 24 19:07:10 2012 46.99% done, estimate finish Fri Feb 24 19:07:10 2012 46.99% done, estimate finish Fri Feb 24 19:07:12 2012 47.00% done, estimate finish Fri Feb 24 19:07:12 2012 47.00% done, estimate finish Fri Feb 24 19:07:11 2012 47.01% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.02% done, estimate finish Fri Feb 24 19:07:10 2012 47.03% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.04% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 47.05% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.06% done, estimate finish Fri Feb 24 19:07:11 2012 47.06% done, estimate finish Fri Feb 24 19:07:10 2012 47.07% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.08% done, estimate finish Fri Feb 24 19:07:12 2012 47.08% done, estimate finish Fri Feb 24 19:07:11 2012 47.09% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.10% done, estimate finish Fri Feb 24 19:07:11 2012 47.11% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.12% done, estimate finish Fri Feb 24 19:07:10 2012 47.12% done, estimate finish Fri Feb 24 19:07:12 2012 47.13% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.14% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.15% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.16% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 47.17% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.18% done, estimate finish Fri Feb 24 19:07:11 2012 47.19% done, estimate finish Fri Feb 24 19:07:11 2012 47.19% done, estimate finish Fri Feb 24 19:07:10 2012 47.20% done, estimate finish Fri Feb 24 19:07:10 2012 47.20% done, estimate finish Fri Feb 24 19:07:12 2012 47.21% done, estimate finish Fri Feb 24 19:07:12 2012 47.21% done, estimate finish Fri Feb 24 19:07:11 2012 47.22% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.23% done, estimate finish Fri Feb 24 19:07:11 2012 47.23% done, estimate finish Fri Feb 24 19:07:10 2012 47.24% done, estimate finish Fri Feb 24 19:07:10 2012 47.24% done, estimate finish Fri Feb 24 19:07:12 2012 47.25% done, estimate finish Fri Feb 24 19:07:12 2012 47.25% done, estimate finish Fri Feb 24 19:07:11 2012 47.26% done, estimate finish Fri Feb 24 19:07:11 2012 47.27% done, estimate finish Fri Feb 24 19:07:11 2012 47.27% done, estimate finish Fri Feb 24 19:07:10 2012 47.28% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.29% done, estimate finish Fri Feb 24 19:07:12 2012 47.29% done, estimate finish Fri Feb 24 19:07:11 2012 47.30% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.31% done, estimate finish Fri Feb 24 19:07:11 2012 47.31% done, estimate finish Fri Feb 24 19:07:10 2012 47.32% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.33% done, estimate finish Fri Feb 24 19:07:12 2012 47.33% done, estimate finish Fri Feb 24 19:07:11 2012 47.34% done, estimate finish Fri Feb 24 19:07:11 2012 47.35% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.36% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.37% done, estimate finish Fri Feb 24 19:07:10 2012 47.37% done, estimate finish Fri Feb 24 19:07:12 2012 47.38% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.39% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.40% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.41% done, estimate finish Fri Feb 24 19:07:10 2012 47.41% done, estimate finish Fri Feb 24 19:07:12 2012 47.42% done, estimate finish Fri Feb 24 19:07:11 2012 47.43% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.44% done, estimate finish Fri Feb 24 19:07:11 2012 47.44% done, estimate finish Fri Feb 24 19:07:10 2012 47.45% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.46% done, estimate finish Fri Feb 24 19:07:12 2012 47.46% done, estimate finish Fri Feb 24 19:07:11 2012 47.47% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.48% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.49% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.50% done, estimate finish Fri Feb 24 19:07:11 2012 47.51% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.52% done, estimate finish Fri Feb 24 19:07:11 2012 47.52% done, estimate finish Fri Feb 24 19:07:10 2012 47.53% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.54% done, estimate finish Fri Feb 24 19:07:10 2012 47.54% done, estimate finish Fri Feb 24 19:07:11 2012 47.55% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.56% done, estimate finish Fri Feb 24 19:07:11 2012 47.56% done, estimate finish Fri Feb 24 19:07:10 2012 47.57% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.58% done, estimate finish Fri Feb 24 19:07:10 2012 47.59% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.60% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.61% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.62% done, estimate finish Fri Feb 24 19:07:10 2012 47.62% done, estimate finish Fri Feb 24 19:07:12 2012 47.63% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.64% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.65% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.66% done, estimate finish Fri Feb 24 19:07:10 2012 47.67% done, estimate finish Fri Feb 24 19:07:12 2012 47.67% done, estimate finish Fri Feb 24 19:07:11 2012 47.68% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.69% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.70% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.71% done, estimate finish Fri Feb 24 19:07:12 2012 47.71% done, estimate finish Fri Feb 24 19:07:11 2012 47.72% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.73% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.74% done, estimate finish Fri Feb 24 19:07:10 2012 47.75% done, estimate finish Fri Feb 24 19:07:12 2012 47.75% done, estimate finish Fri Feb 24 19:07:11 2012 47.76% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.77% done, estimate finish Fri Feb 24 19:07:11 2012 47.77% done, estimate finish Fri Feb 24 19:07:10 2012 47.78% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.79% done, estimate finish Fri Feb 24 19:07:12 2012 47.79% done, estimate finish Fri Feb 24 19:07:11 2012 47.80% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.81% done, estimate finish Fri Feb 24 19:07:11 2012 47.82% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.83% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 47.84% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.85% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.86% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.87% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 47.88% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.89% done, estimate finish Fri Feb 24 19:07:11 2012 47.89% done, estimate finish Fri Feb 24 19:07:10 2012 47.90% done, estimate finish Fri Feb 24 19:07:10 2012 47.91% done, estimate finish Fri Feb 24 19:07:10 2012 47.91% done, estimate finish Fri Feb 24 19:07:12 2012 47.92% done, estimate finish Fri Feb 24 19:07:12 2012 47.92% done, estimate finish Fri Feb 24 19:07:11 2012 47.93% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.94% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 47.95% done, estimate finish Fri Feb 24 19:07:10 2012 47.95% done, estimate finish Fri Feb 24 19:07:12 2012 47.96% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 47.97% done, estimate finish Fri Feb 24 19:07:11 2012 47.98% done, estimate finish Fri Feb 24 19:07:11 2012 47.98% done, estimate finish Fri Feb 24 19:07:10 2012 47.99% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.00% done, estimate finish Fri Feb 24 19:07:12 2012 48.00% done, estimate finish Fri Feb 24 19:07:11 2012 48.01% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.02% done, estimate finish Fri Feb 24 19:07:11 2012 48.02% done, estimate finish Fri Feb 24 19:07:10 2012 48.03% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.04% done, estimate finish Fri Feb 24 19:07:12 2012 48.04% done, estimate finish Fri Feb 24 19:07:11 2012 48.05% done, estimate finish Fri Feb 24 19:07:11 2012 48.06% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.07% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.08% done, estimate finish Fri Feb 24 19:07:10 2012 48.08% done, estimate finish Fri Feb 24 19:07:12 2012 48.09% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.10% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.11% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.12% done, estimate finish Fri Feb 24 19:07:10 2012 48.12% done, estimate finish Fri Feb 24 19:07:12 2012 48.13% done, estimate finish Fri Feb 24 19:07:11 2012 48.14% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.15% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.16% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.17% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.18% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.19% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.20% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.21% done, estimate finish Fri Feb 24 19:07:11 2012 48.22% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.23% done, estimate finish Fri Feb 24 19:07:11 2012 48.23% done, estimate finish Fri Feb 24 19:07:10 2012 48.24% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.25% done, estimate finish Fri Feb 24 19:07:12 2012 48.25% done, estimate finish Fri Feb 24 19:07:11 2012 48.26% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.27% done, estimate finish Fri Feb 24 19:07:11 2012 48.27% done, estimate finish Fri Feb 24 19:07:10 2012 48.28% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.29% done, estimate finish Fri Feb 24 19:07:12 2012 48.30% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.31% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.32% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.33% done, estimate finish Fri Feb 24 19:07:10 2012 48.33% done, estimate finish Fri Feb 24 19:07:12 2012 48.34% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.35% done, estimate finish Fri Feb 24 19:07:11 2012 48.35% done, estimate finish Fri Feb 24 19:07:10 2012 48.36% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.37% done, estimate finish Fri Feb 24 19:07:12 2012 48.38% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.39% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.40% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.41% done, estimate finish Fri Feb 24 19:07:10 2012 48.41% done, estimate finish Fri Feb 24 19:07:12 2012 48.42% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.43% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.44% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.45% done, estimate finish Fri Feb 24 19:07:12 2012 48.46% done, estimate finish Fri Feb 24 19:07:12 2012 48.46% done, estimate finish Fri Feb 24 19:07:11 2012 48.47% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.48% done, estimate finish Fri Feb 24 19:07:11 2012 48.48% done, estimate finish Fri Feb 24 19:07:10 2012 48.49% done, estimate finish Fri Feb 24 19:07:10 2012 48.49% done, estimate finish Fri Feb 24 19:07:12 2012 48.50% done, estimate finish Fri Feb 24 19:07:12 2012 48.50% done, estimate finish Fri Feb 24 19:07:11 2012 48.51% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.52% done, estimate finish Fri Feb 24 19:07:11 2012 48.52% done, estimate finish Fri Feb 24 19:07:10 2012 48.53% done, estimate finish Fri Feb 24 19:07:10 2012 48.54% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 48.55% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.56% done, estimate finish Fri Feb 24 19:07:11 2012 48.56% done, estimate finish Fri Feb 24 19:07:10 2012 48.57% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.58% done, estimate finish Fri Feb 24 19:07:12 2012 48.58% done, estimate finish Fri Feb 24 19:07:11 2012 48.59% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.60% done, estimate finish Fri Feb 24 19:07:11 2012 48.60% done, estimate finish Fri Feb 24 19:07:10 2012 48.61% done, estimate finish Fri Feb 24 19:07:10 2012 48.62% done, estimate finish Fri Feb 24 19:07:10 2012 48.62% done, estimate finish Fri Feb 24 19:07:12 2012 48.63% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.64% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.65% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.66% done, estimate finish Fri Feb 24 19:07:10 2012 48.66% done, estimate finish Fri Feb 24 19:07:12 2012 48.67% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.68% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.69% done, estimate finish Fri Feb 24 19:07:10 2012 48.70% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.71% done, estimate finish Fri Feb 24 19:07:12 2012 48.71% done, estimate finish Fri Feb 24 19:07:11 2012 48.72% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.73% done, estimate finish Fri Feb 24 19:07:11 2012 48.73% done, estimate finish Fri Feb 24 19:07:10 2012 48.74% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.75% done, estimate finish Fri Feb 24 19:07:12 2012 48.75% done, estimate finish Fri Feb 24 19:07:11 2012 48.76% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.77% done, estimate finish Fri Feb 24 19:07:11 2012 48.78% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.79% done, estimate finish Fri Feb 24 19:07:10 2012 48.79% done, estimate finish Fri Feb 24 19:07:12 2012 48.80% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.81% done, estimate finish Fri Feb 24 19:07:11 2012 48.81% done, estimate finish Fri Feb 24 19:07:10 2012 48.82% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.83% done, estimate finish Fri Feb 24 19:07:12 2012 48.83% done, estimate finish Fri Feb 24 19:07:11 2012 48.84% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.85% done, estimate finish Fri Feb 24 19:07:11 2012 48.86% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.87% done, estimate finish Fri Feb 24 19:07:10 2012 48.87% done, estimate finish Fri Feb 24 19:07:12 2012 48.88% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.89% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.90% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 48.91% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 48.92% done, estimate finish Fri Feb 24 19:07:11 2012 48.93% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.94% done, estimate finish Fri Feb 24 19:07:11 2012 48.94% done, estimate finish Fri Feb 24 19:07:10 2012 48.95% done, estimate finish Fri Feb 24 19:07:10 2012 48.95% done, estimate finish Fri Feb 24 19:07:12 2012 48.96% done, estimate finish Fri Feb 24 19:07:12 2012 48.96% done, estimate finish Fri Feb 24 19:07:11 2012 48.97% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 48.98% done, estimate finish Fri Feb 24 19:07:11 2012 48.98% done, estimate finish Fri Feb 24 19:07:10 2012 48.99% done, estimate finish Fri Feb 24 19:07:10 2012 48.99% done, estimate finish Fri Feb 24 19:07:12 2012 49.00% done, estimate finish Fri Feb 24 19:07:12 2012 49.00% done, estimate finish Fri Feb 24 19:07:11 2012 49.01% done, estimate finish Fri Feb 24 19:07:11 2012 49.02% done, estimate finish Fri Feb 24 19:07:11 2012 49.02% done, estimate finish Fri Feb 24 19:07:10 2012 49.03% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 49.04% done, estimate finish Fri Feb 24 19:07:12 2012 49.04% done, estimate finish Fri Feb 24 19:07:11 2012 49.05% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.06% done, estimate finish Fri Feb 24 19:07:11 2012 49.06% done, estimate finish Fri Feb 24 19:07:10 2012 49.07% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 49.08% done, estimate finish Fri Feb 24 19:07:12 2012 49.09% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.10% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.11% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 49.12% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 49.13% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.14% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.15% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 49.16% done, estimate finish Fri Feb 24 19:07:12 2012 49.17% done, estimate finish Fri Feb 24 19:07:12 2012 49.17% done, estimate finish Fri Feb 24 19:07:11 2012 49.18% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.19% done, estimate finish Fri Feb 24 19:07:11 2012 49.19% done, estimate finish Fri Feb 24 19:07:10 2012 49.20% done, estimate finish Fri Feb 24 19:07:10 2012 49.20% done, estimate finish Fri Feb 24 19:07:12 2012 49.21% done, estimate finish Fri Feb 24 19:07:12 2012 49.21% done, estimate finish Fri Feb 24 19:07:11 2012 49.22% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.23% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 49.24% done, estimate finish Fri Feb 24 19:07:10 2012 49.25% done, estimate finish Fri Feb 24 19:07:12 2012 49.25% done, estimate finish Fri Feb 24 19:07:11 2012 49.26% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.27% done, estimate finish Fri Feb 24 19:07:11 2012 49.27% done, estimate finish Fri Feb 24 19:07:10 2012 49.28% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 49.29% done, estimate finish Fri Feb 24 19:07:12 2012 49.29% done, estimate finish Fri Feb 24 19:07:11 2012 49.30% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.31% done, estimate finish Fri Feb 24 19:07:11 2012 49.31% done, estimate finish Fri Feb 24 19:07:10 2012 49.32% done, estimate finish Fri Feb 24 19:07:10 2012 49.33% done, estimate finish Fri Feb 24 19:07:10 2012 49.33% done, estimate finish Fri Feb 24 19:07:12 2012 49.34% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.35% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.36% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 49.37% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 49.38% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.39% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.40% done, estimate finish Fri Feb 24 19:07:10 2012 49.41% done, estimate finish Fri Feb 24 19:07:10 2012 49.41% done, estimate finish Fri Feb 24 19:07:12 2012 49.42% done, estimate finish Fri Feb 24 19:07:12 2012 49.42% done, estimate finish Fri Feb 24 19:07:11 2012 49.43% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.44% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 49.45% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 49.46% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.47% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.48% done, estimate finish Fri Feb 24 19:07:10 2012 49.49% done, estimate finish Fri Feb 24 19:07:10 2012 49.49% done, estimate finish Fri Feb 24 19:07:12 2012 49.50% done, estimate finish Fri Feb 24 19:07:12 2012 49.50% done, estimate finish Fri Feb 24 19:07:11 2012 49.51% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.52% done, estimate finish Fri Feb 24 19:07:11 2012 49.52% done, estimate finish Fri Feb 24 19:07:10 2012 49.53% done, estimate finish Fri Feb 24 19:07:10 2012 49.53% done, estimate finish Fri Feb 24 19:07:12 2012 49.54% done, estimate finish Fri Feb 24 19:07:12 2012 49.54% done, estimate finish Fri Feb 24 19:07:11 2012 49.55% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.56% done, estimate finish Fri Feb 24 19:07:11 2012 49.57% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 49.58% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 49.59% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.60% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.61% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 49.62% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 49.63% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.64% done, estimate finish Fri Feb 24 19:07:11 2012 49.65% done, estimate finish Fri Feb 24 19:07:11 2012 49.65% done, estimate finish Fri Feb 24 19:07:10 2012 49.66% done, estimate finish Fri Feb 24 19:07:10 2012 49.66% done, estimate finish Fri Feb 24 19:07:12 2012 49.67% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.68% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.69% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 49.70% done, estimate finish Fri Feb 24 19:07:10 2012 49.70% done, estimate finish Fri Feb 24 19:07:12 2012 49.71% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.72% done, estimate finish Fri Feb 24 19:07:11 2012 49.73% done, estimate finish Fri Feb 24 19:07:11 2012 49.73% done, estimate finish Fri Feb 24 19:07:10 2012 49.74% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 49.75% done, estimate finish Fri Feb 24 19:07:12 2012 49.75% done, estimate finish Fri Feb 24 19:07:11 2012 49.76% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.77% done, estimate finish Fri Feb 24 19:07:11 2012 49.77% done, estimate finish Fri Feb 24 19:07:10 2012 49.78% done, estimate finish Fri Feb 24 19:07:10 2012 49.78% done, estimate finish Fri Feb 24 19:07:12 2012 49.79% done, estimate finish Fri Feb 24 19:07:12 2012 49.79% done, estimate finish Fri Feb 24 19:07:11 2012 49.80% done, estimate finish Fri Feb 24 19:07:11 2012 49.81% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.82% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 49.83% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 49.84% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.85% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.86% done, estimate finish Fri Feb 24 19:07:10 2012 49.86% done, estimate finish Fri Feb 24 19:07:12 2012 49.87% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 49.88% done, estimate finish Fri Feb 24 19:07:11 2012 49.89% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.90% done, estimate finish Fri Feb 24 19:07:10 2012 49.90% done, estimate finish Fri Feb 24 19:07:12 2012 49.91% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 49.92% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.93% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.94% done, estimate finish Fri Feb 24 19:07:10 2012 49.94% done, estimate finish Fri Feb 24 19:07:12 2012 49.95% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 49.96% done, estimate finish Fri Feb 24 19:07:11 2012 49.97% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 49.98% done, estimate finish Fri Feb 24 19:07:11 2012 49.98% done, estimate finish Fri Feb 24 19:07:10 2012 49.99% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 50.00% done, estimate finish Fri Feb 24 19:07:12 2012 50.00% done, estimate finish Fri Feb 24 19:07:11 2012 50.01% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.02% done, estimate finish Fri Feb 24 19:07:11 2012 50.02% done, estimate finish Fri Feb 24 19:07:10 2012 50.03% done, estimate finish Fri Feb 24 19:07:12 2012 50.04% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 50.05% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.06% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.07% done, estimate finish Fri Feb 24 19:07:10 2012 50.07% done, estimate finish Fri Feb 24 19:07:12 2012 50.08% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 50.09% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.10% done, estimate finish Fri Feb 24 19:07:11 2012 50.10% done, estimate finish Fri Feb 24 19:07:10 2012 50.11% done, estimate finish Fri Feb 24 19:07:10 2012 50.11% done, estimate finish Fri Feb 24 19:07:12 2012 50.12% done, estimate finish Fri Feb 24 19:07:12 2012 50.13% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.14% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.15% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 50.16% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 50.17% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.18% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.19% done, estimate finish Fri Feb 24 19:07:10 2012 50.20% done, estimate finish Fri Feb 24 19:07:10 2012 50.20% done, estimate finish Fri Feb 24 19:07:12 2012 50.21% done, estimate finish Fri Feb 24 19:07:12 2012 50.21% done, estimate finish Fri Feb 24 19:07:11 2012 50.22% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.23% done, estimate finish Fri Feb 24 19:07:11 2012 50.23% done, estimate finish Fri Feb 24 19:07:10 2012 50.24% done, estimate finish Fri Feb 24 19:07:10 2012 50.24% done, estimate finish Fri Feb 24 19:07:12 2012 50.25% done, estimate finish Fri Feb 24 19:07:12 2012 50.25% done, estimate finish Fri Feb 24 19:07:11 2012 50.26% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.27% done, estimate finish Fri Feb 24 19:07:11 2012 50.28% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 50.29% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 50.30% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.31% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.32% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 50.33% done, estimate finish Fri Feb 24 19:07:12 2012 50.33% done, estimate finish Fri Feb 24 19:07:11 2012 50.34% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.35% done, estimate finish Fri Feb 24 19:07:11 2012 50.36% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 50.37% done, estimate finish Fri Feb 24 19:07:10 2012 50.37% done, estimate finish Fri Feb 24 19:07:12 2012 50.38% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.39% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.40% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 50.41% done, estimate finish Fri Feb 24 19:07:10 2012 50.41% done, estimate finish Fri Feb 24 19:07:12 2012 50.42% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.43% done, estimate finish Fri Feb 24 19:07:11 2012 50.44% done, estimate finish Fri Feb 24 19:07:11 2012 50.44% done, estimate finish Fri Feb 24 19:07:10 2012 50.45% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 50.46% done, estimate finish Fri Feb 24 19:07:12 2012 50.46% done, estimate finish Fri Feb 24 19:07:11 2012 50.47% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.48% done, estimate finish Fri Feb 24 19:07:11 2012 50.48% done, estimate finish Fri Feb 24 19:07:10 2012 50.49% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 50.50% done, estimate finish Fri Feb 24 19:07:10 2012 50.50% done, estimate finish Fri Feb 24 19:07:11 2012 50.51% done, estimate finish Fri Feb 24 19:07:11 2012 50.52% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.53% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 50.54% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 50.55% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.56% done, estimate finish Fri Feb 24 19:07:11 2012 50.56% done, estimate finish Fri Feb 24 19:07:10 2012 50.57% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 50.58% done, estimate finish Fri Feb 24 19:07:10 2012 50.58% done, estimate finish Fri Feb 24 19:07:09 2012 50.59% done, estimate finish Fri Feb 24 19:07:11 2012 50.60% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.61% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 50.62% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 50.63% done, estimate finish Fri Feb 24 19:07:09 2012 50.63% done, estimate finish Fri Feb 24 19:07:11 2012 50.64% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.65% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 50.66% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 50.67% done, estimate finish Fri Feb 24 19:07:09 2012 50.68% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.69% done, estimate finish Fri Feb 24 19:07:11 2012 50.69% done, estimate finish Fri Feb 24 19:07:10 2012 50.70% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 50.71% done, estimate finish Fri Feb 24 19:07:10 2012 50.71% done, estimate finish Fri Feb 24 19:07:09 2012 50.72% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.73% done, estimate finish Fri Feb 24 19:07:11 2012 50.73% done, estimate finish Fri Feb 24 19:07:10 2012 50.74% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 50.75% done, estimate finish Fri Feb 24 19:07:10 2012 50.76% done, estimate finish Fri Feb 24 19:07:09 2012 50.76% done, estimate finish Fri Feb 24 19:07:11 2012 50.77% done, estimate finish Fri Feb 24 19:07:11 2012 50.77% done, estimate finish Fri Feb 24 19:07:10 2012 50.78% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 50.79% done, estimate finish Fri Feb 24 19:07:10 2012 50.79% done, estimate finish Fri Feb 24 19:07:09 2012 50.80% done, estimate finish Fri Feb 24 19:07:09 2012 50.80% done, estimate finish Fri Feb 24 19:07:11 2012 50.81% done, estimate finish Fri Feb 24 19:07:11 2012 50.81% done, estimate finish Fri Feb 24 19:07:10 2012 50.82% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 50.83% done, estimate finish Fri Feb 24 19:07:12 2012 50.84% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.85% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.86% done, estimate finish Fri Feb 24 19:07:10 2012 50.86% done, estimate finish Fri Feb 24 19:07:12 2012 50.87% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 50.88% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.89% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.90% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 50.91% done, estimate finish Fri Feb 24 19:07:12 2012 50.92% done, estimate finish Fri Feb 24 19:07:12 2012 50.92% done, estimate finish Fri Feb 24 19:07:11 2012 50.93% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.94% done, estimate finish Fri Feb 24 19:07:11 2012 50.94% done, estimate finish Fri Feb 24 19:07:10 2012 50.95% done, estimate finish Fri Feb 24 19:07:10 2012 50.95% done, estimate finish Fri Feb 24 19:07:12 2012 50.96% done, estimate finish Fri Feb 24 19:07:12 2012 50.96% done, estimate finish Fri Feb 24 19:07:11 2012 50.97% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 50.98% done, estimate finish Fri Feb 24 19:07:11 2012 50.98% done, estimate finish Fri Feb 24 19:07:10 2012 50.99% done, estimate finish Fri Feb 24 19:07:10 2012 51.00% done, estimate finish Fri Feb 24 19:07:12 2012 51.00% done, estimate finish Fri Feb 24 19:07:11 2012 51.01% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 51.02% done, estimate finish Fri Feb 24 19:07:11 2012 51.02% done, estimate finish Fri Feb 24 19:07:10 2012 51.03% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.04% done, estimate finish Fri Feb 24 19:07:12 2012 51.04% done, estimate finish Fri Feb 24 19:07:11 2012 51.05% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 51.06% done, estimate finish Fri Feb 24 19:07:11 2012 51.06% done, estimate finish Fri Feb 24 19:07:10 2012 51.07% done, estimate finish Fri Feb 24 19:07:10 2012 51.08% done, estimate finish Fri Feb 24 19:07:10 2012 51.08% done, estimate finish Fri Feb 24 19:07:12 2012 51.09% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 51.10% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 51.11% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.12% done, estimate finish Fri Feb 24 19:07:12 2012 === last message repeated 2 times. === 51.13% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 51.14% done, estimate finish Fri Feb 24 19:07:11 2012 51.15% done, estimate finish Fri Feb 24 19:07:11 2012 51.15% done, estimate finish Fri Feb 24 19:07:10 2012 51.16% done, estimate finish Fri Feb 24 19:07:10 2012 51.16% done, estimate finish Fri Feb 24 19:07:12 2012 51.17% done, estimate finish Fri Feb 24 19:07:12 2012 51.17% done, estimate finish Fri Feb 24 19:07:11 2012 51.18% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 51.19% done, estimate finish Fri Feb 24 19:07:11 2012 51.19% done, estimate finish Fri Feb 24 19:07:10 2012 51.20% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.21% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 51.22% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 51.23% done, estimate finish Fri Feb 24 19:07:10 2012 51.24% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.25% done, estimate finish Fri Feb 24 19:07:10 2012 51.25% done, estimate finish Fri Feb 24 19:07:11 2012 51.26% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 51.27% done, estimate finish Fri Feb 24 19:07:11 2012 51.27% done, estimate finish Fri Feb 24 19:07:10 2012 51.28% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.29% done, estimate finish Fri Feb 24 19:07:10 2012 51.29% done, estimate finish Fri Feb 24 19:07:11 2012 51.30% done, estimate finish Fri Feb 24 19:07:11 2012 51.31% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 51.32% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.33% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.34% done, estimate finish Fri Feb 24 19:07:09 2012 51.34% done, estimate finish Fri Feb 24 19:07:11 2012 51.35% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 51.36% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.37% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.38% done, estimate finish Fri Feb 24 19:07:09 2012 51.39% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 51.40% done, estimate finish Fri Feb 24 19:07:11 2012 51.40% done, estimate finish Fri Feb 24 19:07:10 2012 51.41% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.42% done, estimate finish Fri Feb 24 19:07:10 2012 51.42% done, estimate finish Fri Feb 24 19:07:09 2012 51.43% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 51.44% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.45% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.46% done, estimate finish Fri Feb 24 19:07:09 2012 51.47% done, estimate finish Fri Feb 24 19:07:09 2012 51.47% done, estimate finish Fri Feb 24 19:07:11 2012 51.48% done, estimate finish Fri Feb 24 19:07:11 2012 51.48% done, estimate finish Fri Feb 24 19:07:10 2012 51.49% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.50% done, estimate finish Fri Feb 24 19:07:10 2012 51.50% done, estimate finish Fri Feb 24 19:07:09 2012 51.51% done, estimate finish Fri Feb 24 19:07:09 2012 51.51% done, estimate finish Fri Feb 24 19:07:11 2012 51.52% done, estimate finish Fri Feb 24 19:07:11 2012 51.52% done, estimate finish Fri Feb 24 19:07:10 2012 51.53% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.54% done, estimate finish Fri Feb 24 19:07:10 2012 51.55% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 51.56% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 51.57% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.58% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.59% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 51.60% done, estimate finish Fri Feb 24 19:07:11 2012 === last message repeated 2 times. === 51.61% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.62% done, estimate finish Fri Feb 24 19:07:10 2012 51.63% done, estimate finish Fri Feb 24 19:07:10 2012 51.63% done, estimate finish Fri Feb 24 19:07:09 2012 51.64% done, estimate finish Fri Feb 24 19:07:09 2012 51.64% done, estimate finish Fri Feb 24 19:07:11 2012 51.65% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.66% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.67% done, estimate finish Fri Feb 24 19:07:10 2012 51.67% done, estimate finish Fri Feb 24 19:07:09 2012 51.68% done, estimate finish Fri Feb 24 19:07:09 2012 51.68% done, estimate finish Fri Feb 24 19:07:11 2012 51.69% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.70% done, estimate finish Fri Feb 24 19:07:10 2012 51.71% done, estimate finish Fri Feb 24 19:07:10 2012 51.71% done, estimate finish Fri Feb 24 19:07:09 2012 51.72% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 51.73% done, estimate finish Fri Feb 24 19:07:09 2012 51.73% done, estimate finish Fri Feb 24 19:07:10 2012 51.74% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.75% done, estimate finish Fri Feb 24 19:07:10 2012 51.75% done, estimate finish Fri Feb 24 19:07:09 2012 51.76% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 51.77% done, estimate finish Fri Feb 24 19:07:09 2012 51.77% done, estimate finish Fri Feb 24 19:07:10 2012 51.78% done, estimate finish Fri Feb 24 19:07:10 2012 51.79% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.80% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 51.81% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 51.82% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.83% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.84% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 51.85% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 51.86% done, estimate finish Fri Feb 24 19:07:10 2012 51.87% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.88% done, estimate finish Fri Feb 24 19:07:10 2012 51.88% done, estimate finish Fri Feb 24 19:07:09 2012 51.89% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 51.90% done, estimate finish Fri Feb 24 19:07:09 2012 51.90% done, estimate finish Fri Feb 24 19:07:10 2012 51.91% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.92% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 51.93% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 51.94% done, estimate finish Fri Feb 24 19:07:08 2012 51.95% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 51.96% done, estimate finish Fri Feb 24 19:07:10 2012 51.96% done, estimate finish Fri Feb 24 19:07:09 2012 51.97% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 51.98% done, estimate finish Fri Feb 24 19:07:09 2012 51.98% done, estimate finish Fri Feb 24 19:07:08 2012 51.99% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 52.00% done, estimate finish Fri Feb 24 19:07:10 2012 52.00% done, estimate finish Fri Feb 24 19:07:09 2012 52.01% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.02% done, estimate finish Fri Feb 24 19:07:09 2012 52.03% done, estimate finish Fri Feb 24 19:07:08 2012 52.03% done, estimate finish Fri Feb 24 19:07:10 2012 52.04% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 52.05% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.06% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.07% done, estimate finish Fri Feb 24 19:07:08 2012 52.07% done, estimate finish Fri Feb 24 19:07:10 2012 52.08% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 52.09% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.10% done, estimate finish Fri Feb 24 19:07:09 2012 52.11% done, estimate finish Fri Feb 24 19:07:09 2012 52.11% done, estimate finish Fri Feb 24 19:07:08 2012 52.12% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 52.13% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.14% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.15% done, estimate finish Fri Feb 24 19:07:09 2012 52.15% done, estimate finish Fri Feb 24 19:07:08 2012 52.16% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 52.17% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.18% done, estimate finish Fri Feb 24 19:07:09 2012 52.19% done, estimate finish Fri Feb 24 19:07:09 2012 52.19% done, estimate finish Fri Feb 24 19:07:08 2012 52.20% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.21% done, estimate finish Fri Feb 24 19:07:10 2012 52.21% done, estimate finish Fri Feb 24 19:07:09 2012 52.22% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.23% done, estimate finish Fri Feb 24 19:07:09 2012 52.23% done, estimate finish Fri Feb 24 19:07:08 2012 52.24% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.25% done, estimate finish Fri Feb 24 19:07:10 2012 52.26% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.27% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.28% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.29% done, estimate finish Fri Feb 24 19:07:08 2012 52.29% done, estimate finish Fri Feb 24 19:07:10 2012 52.30% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.31% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.32% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.33% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.34% done, estimate finish Fri Feb 24 19:07:09 2012 52.35% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.36% done, estimate finish Fri Feb 24 19:07:09 2012 52.36% done, estimate finish Fri Feb 24 19:07:08 2012 52.37% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.38% done, estimate finish Fri Feb 24 19:07:08 2012 52.38% done, estimate finish Fri Feb 24 19:07:09 2012 52.39% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.40% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.41% done, estimate finish Fri Feb 24 19:07:08 2012 52.42% done, estimate finish Fri Feb 24 19:07:08 2012 52.42% done, estimate finish Fri Feb 24 19:07:09 2012 52.43% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.44% done, estimate finish Fri Feb 24 19:07:09 2012 52.44% done, estimate finish Fri Feb 24 19:07:08 2012 52.45% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.46% done, estimate finish Fri Feb 24 19:07:08 2012 52.46% done, estimate finish Fri Feb 24 19:07:09 2012 52.47% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.48% done, estimate finish Fri Feb 24 19:07:09 2012 52.48% done, estimate finish Fri Feb 24 19:07:08 2012 52.49% done, estimate finish Fri Feb 24 19:07:08 2012 52.50% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.51% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.52% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.53% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.54% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.55% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.56% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.57% done, estimate finish Fri Feb 24 19:07:08 2012 52.58% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.59% done, estimate finish Fri Feb 24 19:07:08 2012 52.59% done, estimate finish Fri Feb 24 19:07:09 2012 52.60% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.61% done, estimate finish Fri Feb 24 19:07:09 2012 52.61% done, estimate finish Fri Feb 24 19:07:08 2012 52.62% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.63% done, estimate finish Fri Feb 24 19:07:08 2012 52.63% done, estimate finish Fri Feb 24 19:07:09 2012 52.64% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.65% done, estimate finish Fri Feb 24 19:07:08 2012 52.66% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.67% done, estimate finish Fri Feb 24 19:07:08 2012 52.67% done, estimate finish Fri Feb 24 19:07:07 2012 52.68% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.69% done, estimate finish Fri Feb 24 19:07:09 2012 52.69% done, estimate finish Fri Feb 24 19:07:08 2012 52.70% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.71% done, estimate finish Fri Feb 24 19:07:08 2012 52.71% done, estimate finish Fri Feb 24 19:07:07 2012 52.72% done, estimate finish Fri Feb 24 19:07:07 2012 52.72% done, estimate finish Fri Feb 24 19:07:09 2012 52.73% done, estimate finish Fri Feb 24 19:07:09 2012 52.74% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.75% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.76% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 52.77% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 52.78% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.79% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.80% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 52.81% done, estimate finish Fri Feb 24 19:07:09 2012 52.82% done, estimate finish Fri Feb 24 19:07:09 2012 52.82% done, estimate finish Fri Feb 24 19:07:08 2012 52.83% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.84% done, estimate finish Fri Feb 24 19:07:08 2012 52.84% done, estimate finish Fri Feb 24 19:07:07 2012 52.85% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 52.86% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.87% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.88% done, estimate finish Fri Feb 24 19:07:08 2012 52.88% done, estimate finish Fri Feb 24 19:07:07 2012 52.89% done, estimate finish Fri Feb 24 19:07:07 2012 52.90% done, estimate finish Fri Feb 24 19:07:07 2012 52.90% done, estimate finish Fri Feb 24 19:07:08 2012 52.91% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.92% done, estimate finish Fri Feb 24 19:07:08 2012 52.92% done, estimate finish Fri Feb 24 19:07:07 2012 52.93% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 52.94% done, estimate finish Fri Feb 24 19:07:07 2012 52.94% done, estimate finish Fri Feb 24 19:07:08 2012 52.95% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 52.96% done, estimate finish Fri Feb 24 19:07:08 2012 52.96% done, estimate finish Fri Feb 24 19:07:07 2012 52.97% done, estimate finish Fri Feb 24 19:07:07 2012 52.98% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 52.99% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 53.00% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 53.01% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.02% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.03% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 53.04% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 53.05% done, estimate finish Fri Feb 24 19:07:07 2012 53.06% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.07% done, estimate finish Fri Feb 24 19:07:09 2012 53.07% done, estimate finish Fri Feb 24 19:07:08 2012 53.08% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 53.09% done, estimate finish Fri Feb 24 19:07:08 2012 53.09% done, estimate finish Fri Feb 24 19:07:07 2012 53.10% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.11% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 53.12% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 53.13% done, estimate finish Fri Feb 24 19:07:08 2012 53.14% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.15% done, estimate finish Fri Feb 24 19:07:07 2012 53.15% done, estimate finish Fri Feb 24 19:07:08 2012 53.16% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 53.17% done, estimate finish Fri Feb 24 19:07:08 2012 53.17% done, estimate finish Fri Feb 24 19:07:07 2012 53.18% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.19% done, estimate finish Fri Feb 24 19:07:07 2012 53.19% done, estimate finish Fri Feb 24 19:07:08 2012 53.20% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 53.21% done, estimate finish Fri Feb 24 19:07:08 2012 53.22% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.23% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.24% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 53.25% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 53.26% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.27% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.28% done, estimate finish Fri Feb 24 19:07:06 2012 53.28% done, estimate finish Fri Feb 24 19:07:08 2012 53.29% done, estimate finish Fri Feb 24 19:07:08 2012 53.30% done, estimate finish Fri Feb 24 19:07:08 2012 53.30% done, estimate finish Fri Feb 24 19:07:07 2012 53.31% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.32% done, estimate finish Fri Feb 24 19:07:07 2012 53.32% done, estimate finish Fri Feb 24 19:07:06 2012 53.33% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 53.34% done, estimate finish Fri Feb 24 19:07:08 2012 53.34% done, estimate finish Fri Feb 24 19:07:07 2012 53.35% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.36% done, estimate finish Fri Feb 24 19:07:07 2012 53.36% done, estimate finish Fri Feb 24 19:07:06 2012 53.37% done, estimate finish Fri Feb 24 19:07:08 2012 53.38% done, estimate finish Fri Feb 24 19:07:08 2012 53.38% done, estimate finish Fri Feb 24 19:07:07 2012 53.39% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.40% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.41% done, estimate finish Fri Feb 24 19:07:06 2012 53.41% done, estimate finish Fri Feb 24 19:07:08 2012 53.42% done, estimate finish Fri Feb 24 19:07:08 2012 53.42% done, estimate finish Fri Feb 24 19:07:07 2012 53.43% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.44% done, estimate finish Fri Feb 24 19:07:07 2012 53.44% done, estimate finish Fri Feb 24 19:07:06 2012 53.45% done, estimate finish Fri Feb 24 19:07:06 2012 53.46% done, estimate finish Fri Feb 24 19:07:06 2012 53.46% done, estimate finish Fri Feb 24 19:07:08 2012 53.47% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.48% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.49% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 53.50% done, estimate finish Fri Feb 24 19:07:06 2012 53.50% done, estimate finish Fri Feb 24 19:07:08 2012 53.51% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.52% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.53% done, estimate finish Fri Feb 24 19:07:06 2012 53.54% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 53.55% done, estimate finish Fri Feb 24 19:07:08 2012 53.55% done, estimate finish Fri Feb 24 19:07:07 2012 53.56% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.57% done, estimate finish Fri Feb 24 19:07:07 2012 53.57% done, estimate finish Fri Feb 24 19:07:06 2012 53.58% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 53.59% done, estimate finish Fri Feb 24 19:07:08 2012 53.59% done, estimate finish Fri Feb 24 19:07:07 2012 53.60% done, estimate finish Fri Feb 24 19:07:07 2012 53.61% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.62% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 53.63% done, estimate finish Fri Feb 24 19:07:06 2012 53.63% done, estimate finish Fri Feb 24 19:07:07 2012 53.64% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.65% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.66% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 53.67% done, estimate finish Fri Feb 24 19:07:06 2012 53.67% done, estimate finish Fri Feb 24 19:07:07 2012 53.68% done, estimate finish Fri Feb 24 19:07:07 2012 53.69% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.70% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 53.71% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 53.72% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.73% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.74% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 53.75% done, estimate finish Fri Feb 24 19:07:06 2012 53.75% done, estimate finish Fri Feb 24 19:07:08 2012 53.76% done, estimate finish Fri Feb 24 19:07:07 2012 53.77% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.78% done, estimate finish Fri Feb 24 19:07:07 2012 53.78% done, estimate finish Fri Feb 24 19:07:06 2012 53.79% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 53.80% done, estimate finish Fri Feb 24 19:07:08 2012 53.80% done, estimate finish Fri Feb 24 19:07:07 2012 53.81% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.82% done, estimate finish Fri Feb 24 19:07:07 2012 53.82% done, estimate finish Fri Feb 24 19:07:06 2012 53.83% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 53.84% done, estimate finish Fri Feb 24 19:07:07 2012 53.85% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.86% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.87% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 53.88% done, estimate finish Fri Feb 24 19:07:06 2012 53.88% done, estimate finish Fri Feb 24 19:07:07 2012 53.89% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.90% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.91% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 53.92% done, estimate finish Fri Feb 24 19:07:06 2012 53.93% done, estimate finish Fri Feb 24 19:07:06 2012 53.93% done, estimate finish Fri Feb 24 19:07:07 2012 53.94% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.95% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 53.96% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 53.97% done, estimate finish Fri Feb 24 19:07:06 2012 53.97% done, estimate finish Fri Feb 24 19:07:07 2012 53.98% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 53.99% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.00% done, estimate finish Fri Feb 24 19:07:06 2012 54.01% done, estimate finish Fri Feb 24 19:07:06 2012 54.01% done, estimate finish Fri Feb 24 19:07:05 2012 54.02% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 54.03% done, estimate finish Fri Feb 24 19:07:07 2012 54.03% done, estimate finish Fri Feb 24 19:07:06 2012 54.04% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.05% done, estimate finish Fri Feb 24 19:07:06 2012 54.05% done, estimate finish Fri Feb 24 19:07:05 2012 54.06% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 54.07% done, estimate finish Fri Feb 24 19:07:07 2012 54.07% done, estimate finish Fri Feb 24 19:07:06 2012 54.08% done, estimate finish Fri Feb 24 19:07:06 2012 54.09% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.10% done, estimate finish Fri Feb 24 19:07:05 2012 54.10% done, estimate finish Fri Feb 24 19:07:07 2012 54.11% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 54.12% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.13% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.14% done, estimate finish Fri Feb 24 19:07:05 2012 54.14% done, estimate finish Fri Feb 24 19:07:07 2012 54.15% done, estimate finish Fri Feb 24 19:07:07 2012 54.15% done, estimate finish Fri Feb 24 19:07:06 2012 54.16% done, estimate finish Fri Feb 24 19:07:06 2012 54.17% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.18% done, estimate finish Fri Feb 24 19:07:06 2012 54.18% done, estimate finish Fri Feb 24 19:07:05 2012 54.19% done, estimate finish Fri Feb 24 19:07:05 2012 54.19% done, estimate finish Fri Feb 24 19:07:07 2012 54.20% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.21% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.22% done, estimate finish Fri Feb 24 19:07:06 2012 54.22% done, estimate finish Fri Feb 24 19:07:05 2012 54.23% done, estimate finish Fri Feb 24 19:07:05 2012 54.23% done, estimate finish Fri Feb 24 19:07:07 2012 54.24% done, estimate finish Fri Feb 24 19:07:06 2012 54.25% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.26% done, estimate finish Fri Feb 24 19:07:06 2012 54.26% done, estimate finish Fri Feb 24 19:07:05 2012 54.27% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.28% done, estimate finish Fri Feb 24 19:07:07 2012 54.28% done, estimate finish Fri Feb 24 19:07:06 2012 54.29% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.30% done, estimate finish Fri Feb 24 19:07:06 2012 54.30% done, estimate finish Fri Feb 24 19:07:05 2012 54.31% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.32% done, estimate finish Fri Feb 24 19:07:07 2012 54.33% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.34% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.35% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.36% done, estimate finish Fri Feb 24 19:07:05 2012 54.36% done, estimate finish Fri Feb 24 19:07:07 2012 54.37% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.38% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.39% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.40% done, estimate finish Fri Feb 24 19:07:07 2012 54.41% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.42% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.43% done, estimate finish Fri Feb 24 19:07:06 2012 54.43% done, estimate finish Fri Feb 24 19:07:05 2012 54.44% done, estimate finish Fri Feb 24 19:07:05 2012 54.44% done, estimate finish Fri Feb 24 19:07:07 2012 54.45% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.46% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.47% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.48% done, estimate finish Fri Feb 24 19:07:05 2012 54.49% done, estimate finish Fri Feb 24 19:07:07 2012 54.49% done, estimate finish Fri Feb 24 19:07:06 2012 54.50% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.51% done, estimate finish Fri Feb 24 19:07:06 2012 54.51% done, estimate finish Fri Feb 24 19:07:05 2012 54.52% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.53% done, estimate finish Fri Feb 24 19:07:07 2012 54.53% done, estimate finish Fri Feb 24 19:07:06 2012 54.54% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.55% done, estimate finish Fri Feb 24 19:07:06 2012 54.55% done, estimate finish Fri Feb 24 19:07:05 2012 54.56% done, estimate finish Fri Feb 24 19:07:05 2012 54.57% done, estimate finish Fri Feb 24 19:07:05 2012 54.57% done, estimate finish Fri Feb 24 19:07:07 2012 54.58% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.59% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.60% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.61% done, estimate finish Fri Feb 24 19:07:05 2012 54.61% done, estimate finish Fri Feb 24 19:07:07 2012 54.62% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.63% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.64% done, estimate finish Fri Feb 24 19:07:05 2012 54.65% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.66% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.67% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.68% done, estimate finish Fri Feb 24 19:07:06 2012 54.68% done, estimate finish Fri Feb 24 19:07:05 2012 54.69% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.70% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.71% done, estimate finish Fri Feb 24 19:07:06 2012 54.72% done, estimate finish Fri Feb 24 19:07:06 2012 54.72% done, estimate finish Fri Feb 24 19:07:05 2012 54.73% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.74% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.75% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.76% done, estimate finish Fri Feb 24 19:07:06 2012 54.76% done, estimate finish Fri Feb 24 19:07:05 2012 54.77% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.78% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.79% done, estimate finish Fri Feb 24 19:07:06 2012 54.80% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.81% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.82% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.83% done, estimate finish Fri Feb 24 19:07:04 2012 54.83% done, estimate finish Fri Feb 24 19:07:06 2012 54.84% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.85% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.86% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.87% done, estimate finish Fri Feb 24 19:07:04 2012 54.88% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.89% done, estimate finish Fri Feb 24 19:07:06 2012 54.89% done, estimate finish Fri Feb 24 19:07:05 2012 54.90% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.91% done, estimate finish Fri Feb 24 19:07:05 2012 54.91% done, estimate finish Fri Feb 24 19:07:04 2012 54.92% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 54.93% done, estimate finish Fri Feb 24 19:07:06 2012 54.93% done, estimate finish Fri Feb 24 19:07:05 2012 54.94% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.95% done, estimate finish Fri Feb 24 19:07:05 2012 54.96% done, estimate finish Fri Feb 24 19:07:04 2012 54.96% done, estimate finish Fri Feb 24 19:07:06 2012 54.97% done, estimate finish Fri Feb 24 19:07:06 2012 54.97% done, estimate finish Fri Feb 24 19:07:05 2012 54.98% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 54.99% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.00% done, estimate finish Fri Feb 24 19:07:04 2012 55.00% done, estimate finish Fri Feb 24 19:07:06 2012 55.01% done, estimate finish Fri Feb 24 19:07:06 2012 55.01% done, estimate finish Fri Feb 24 19:07:05 2012 55.02% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.03% done, estimate finish Fri Feb 24 19:07:05 2012 55.04% done, estimate finish Fri Feb 24 19:07:05 2012 55.04% done, estimate finish Fri Feb 24 19:07:04 2012 55.05% done, estimate finish Fri Feb 24 19:07:04 2012 55.05% done, estimate finish Fri Feb 24 19:07:06 2012 55.06% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.07% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.08% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.09% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 55.10% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.11% done, estimate finish Fri Feb 24 19:07:05 2012 55.12% done, estimate finish Fri Feb 24 19:07:05 2012 55.12% done, estimate finish Fri Feb 24 19:07:04 2012 55.13% done, estimate finish Fri Feb 24 19:07:04 2012 55.13% done, estimate finish Fri Feb 24 19:07:06 2012 55.14% done, estimate finish Fri Feb 24 19:07:06 2012 55.14% done, estimate finish Fri Feb 24 19:07:05 2012 55.15% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.16% done, estimate finish Fri Feb 24 19:07:05 2012 55.16% done, estimate finish Fri Feb 24 19:07:04 2012 55.17% done, estimate finish Fri Feb 24 19:07:04 2012 55.17% done, estimate finish Fri Feb 24 19:07:06 2012 55.18% done, estimate finish Fri Feb 24 19:07:06 2012 55.18% done, estimate finish Fri Feb 24 19:07:05 2012 55.19% done, estimate finish Fri Feb 24 19:07:05 2012 55.20% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.21% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.22% done, estimate finish Fri Feb 24 19:07:06 2012 55.22% done, estimate finish Fri Feb 24 19:07:05 2012 55.23% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.24% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.25% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.26% done, estimate finish Fri Feb 24 19:07:06 2012 55.26% done, estimate finish Fri Feb 24 19:07:05 2012 55.27% done, estimate finish Fri Feb 24 19:07:05 2012 55.28% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.29% done, estimate finish Fri Feb 24 19:07:05 2012 55.29% done, estimate finish Fri Feb 24 19:07:04 2012 55.30% done, estimate finish Fri Feb 24 19:07:04 2012 55.30% done, estimate finish Fri Feb 24 19:07:06 2012 55.31% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.32% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.33% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.34% done, estimate finish Fri Feb 24 19:07:04 2012 55.34% done, estimate finish Fri Feb 24 19:07:06 2012 55.35% done, estimate finish Fri Feb 24 19:07:05 2012 55.36% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.37% done, estimate finish Fri Feb 24 19:07:05 2012 55.37% done, estimate finish Fri Feb 24 19:07:04 2012 55.38% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.39% done, estimate finish Fri Feb 24 19:07:06 2012 55.39% done, estimate finish Fri Feb 24 19:07:05 2012 55.40% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.41% done, estimate finish Fri Feb 24 19:07:05 2012 55.41% done, estimate finish Fri Feb 24 19:07:04 2012 55.42% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.43% done, estimate finish Fri Feb 24 19:07:06 2012 55.44% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.45% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.46% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.47% done, estimate finish Fri Feb 24 19:07:04 2012 55.47% done, estimate finish Fri Feb 24 19:07:05 2012 55.48% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.49% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.50% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.51% done, estimate finish Fri Feb 24 19:07:04 2012 55.52% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.53% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.54% done, estimate finish Fri Feb 24 19:07:05 2012 55.54% done, estimate finish Fri Feb 24 19:07:04 2012 55.55% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.56% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.57% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.58% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.59% done, estimate finish Fri Feb 24 19:07:04 2012 55.60% done, estimate finish Fri Feb 24 19:07:04 2012 55.60% done, estimate finish Fri Feb 24 19:07:05 2012 55.61% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.62% done, estimate finish Fri Feb 24 19:07:05 2012 55.62% done, estimate finish Fri Feb 24 19:07:04 2012 55.63% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.64% done, estimate finish Fri Feb 24 19:07:04 2012 55.64% done, estimate finish Fri Feb 24 19:07:05 2012 55.65% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.66% done, estimate finish Fri Feb 24 19:07:05 2012 55.66% done, estimate finish Fri Feb 24 19:07:04 2012 55.67% done, estimate finish Fri Feb 24 19:07:04 2012 55.68% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.69% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.70% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.71% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.72% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.73% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.74% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.75% done, estimate finish Fri Feb 24 19:07:04 2012 55.76% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.77% done, estimate finish Fri Feb 24 19:07:04 2012 55.77% done, estimate finish Fri Feb 24 19:07:05 2012 55.78% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.79% done, estimate finish Fri Feb 24 19:07:05 2012 55.79% done, estimate finish Fri Feb 24 19:07:04 2012 55.80% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.81% done, estimate finish Fri Feb 24 19:07:04 2012 55.81% done, estimate finish Fri Feb 24 19:07:05 2012 55.82% done, estimate finish Fri Feb 24 19:07:05 2012 55.83% done, estimate finish Fri Feb 24 19:07:05 2012 55.83% done, estimate finish Fri Feb 24 19:07:04 2012 55.84% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.85% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.86% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.87% done, estimate finish Fri Feb 24 19:07:05 2012 55.87% done, estimate finish Fri Feb 24 19:07:04 2012 55.88% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.89% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.90% done, estimate finish Fri Feb 24 19:07:05 2012 55.91% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.92% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.93% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.94% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 55.95% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 55.96% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.97% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 55.98% done, estimate finish Fri Feb 24 19:07:03 2012 55.99% done, estimate finish Fri Feb 24 19:07:03 2012 55.99% done, estimate finish Fri Feb 24 19:07:05 2012 56.00% done, estimate finish Fri Feb 24 19:07:05 2012 56.00% done, estimate finish Fri Feb 24 19:07:04 2012 56.01% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.02% done, estimate finish Fri Feb 24 19:07:04 2012 56.02% done, estimate finish Fri Feb 24 19:07:03 2012 56.03% done, estimate finish Fri Feb 24 19:07:03 2012 56.03% done, estimate finish Fri Feb 24 19:07:05 2012 56.04% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.05% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.06% done, estimate finish Fri Feb 24 19:07:04 2012 56.07% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 56.08% done, estimate finish Fri Feb 24 19:07:05 2012 56.08% done, estimate finish Fri Feb 24 19:07:04 2012 56.09% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.10% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.11% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 56.12% done, estimate finish Fri Feb 24 19:07:05 2012 56.12% done, estimate finish Fri Feb 24 19:07:04 2012 56.13% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.14% done, estimate finish Fri Feb 24 19:07:04 2012 56.15% done, estimate finish Fri Feb 24 19:07:04 2012 56.15% done, estimate finish Fri Feb 24 19:07:03 2012 56.16% done, estimate finish Fri Feb 24 19:07:03 2012 56.16% done, estimate finish Fri Feb 24 19:07:05 2012 56.17% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.18% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.19% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 56.20% done, estimate finish Fri Feb 24 19:07:03 2012 56.20% done, estimate finish Fri Feb 24 19:07:05 2012 56.21% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.22% done, estimate finish Fri Feb 24 19:07:04 2012 56.23% done, estimate finish Fri Feb 24 19:07:04 2012 56.23% done, estimate finish Fri Feb 24 19:07:03 2012 56.24% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 56.25% done, estimate finish Fri Feb 24 19:07:05 2012 56.25% done, estimate finish Fri Feb 24 19:07:04 2012 56.26% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.27% done, estimate finish Fri Feb 24 19:07:04 2012 56.27% done, estimate finish Fri Feb 24 19:07:03 2012 56.28% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 56.29% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.30% done, estimate finish Fri Feb 24 19:07:04 2012 56.31% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.32% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 56.33% done, estimate finish Fri Feb 24 19:07:03 2012 56.33% done, estimate finish Fri Feb 24 19:07:04 2012 56.34% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.35% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.36% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 56.37% done, estimate finish Fri Feb 24 19:07:03 2012 56.37% done, estimate finish Fri Feb 24 19:07:04 2012 56.38% done, estimate finish Fri Feb 24 19:07:04 2012 56.39% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.40% done, estimate finish Fri Feb 24 19:07:04 2012 56.40% done, estimate finish Fri Feb 24 19:07:05 2012 56.41% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.42% done, estimate finish Fri Feb 24 19:07:04 2012 56.42% done, estimate finish Fri Feb 24 19:07:06 2012 56.43% done, estimate finish Fri Feb 24 19:07:06 2012 56.43% done, estimate finish Fri Feb 24 19:07:05 2012 56.44% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.45% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.46% done, estimate finish Fri Feb 24 19:07:04 2012 56.47% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 56.48% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.49% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.50% done, estimate finish Fri Feb 24 19:07:05 2012 56.50% done, estimate finish Fri Feb 24 19:07:04 2012 56.51% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 56.52% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.53% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.54% done, estimate finish Fri Feb 24 19:07:04 2012 56.55% done, estimate finish Fri Feb 24 19:07:04 2012 56.55% done, estimate finish Fri Feb 24 19:07:06 2012 56.56% done, estimate finish Fri Feb 24 19:07:06 2012 56.56% done, estimate finish Fri Feb 24 19:07:05 2012 56.57% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.58% done, estimate finish Fri Feb 24 19:07:05 2012 56.58% done, estimate finish Fri Feb 24 19:07:04 2012 56.59% done, estimate finish Fri Feb 24 19:07:04 2012 56.59% done, estimate finish Fri Feb 24 19:07:06 2012 56.60% done, estimate finish Fri Feb 24 19:07:06 2012 56.60% done, estimate finish Fri Feb 24 19:07:05 2012 56.61% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.62% done, estimate finish Fri Feb 24 19:07:05 2012 56.63% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.64% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 56.65% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.66% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.67% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.68% done, estimate finish Fri Feb 24 19:07:06 2012 56.68% done, estimate finish Fri Feb 24 19:07:05 2012 56.69% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.70% done, estimate finish Fri Feb 24 19:07:05 2012 56.71% done, estimate finish Fri Feb 24 19:07:05 2012 56.71% done, estimate finish Fri Feb 24 19:07:04 2012 56.72% done, estimate finish Fri Feb 24 19:07:04 2012 56.72% done, estimate finish Fri Feb 24 19:07:06 2012 56.73% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.74% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.75% done, estimate finish Fri Feb 24 19:07:05 2012 56.75% done, estimate finish Fri Feb 24 19:07:04 2012 56.76% done, estimate finish Fri Feb 24 19:07:04 2012 56.76% done, estimate finish Fri Feb 24 19:07:06 2012 56.77% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.78% done, estimate finish Fri Feb 24 19:07:05 2012 56.79% done, estimate finish Fri Feb 24 19:07:05 2012 56.79% done, estimate finish Fri Feb 24 19:07:04 2012 56.80% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.81% done, estimate finish Fri Feb 24 19:07:06 2012 56.81% done, estimate finish Fri Feb 24 19:07:05 2012 56.82% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.83% done, estimate finish Fri Feb 24 19:07:05 2012 56.83% done, estimate finish Fri Feb 24 19:07:04 2012 56.84% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.85% done, estimate finish Fri Feb 24 19:07:06 2012 56.85% done, estimate finish Fri Feb 24 19:07:05 2012 56.86% done, estimate finish Fri Feb 24 19:07:05 2012 56.87% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.88% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.89% done, estimate finish Fri Feb 24 19:07:04 2012 56.89% done, estimate finish Fri Feb 24 19:07:05 2012 56.90% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.91% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.92% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.93% done, estimate finish Fri Feb 24 19:07:04 2012 56.94% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.95% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.96% done, estimate finish Fri Feb 24 19:07:05 2012 56.96% done, estimate finish Fri Feb 24 19:07:04 2012 56.97% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 56.98% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 56.99% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 57.00% done, estimate finish Fri Feb 24 19:07:05 2012 57.00% done, estimate finish Fri Feb 24 19:07:04 2012 57.01% done, estimate finish Fri Feb 24 19:07:04 2012 57.02% done, estimate finish Fri Feb 24 19:07:04 2012 57.02% done, estimate finish Fri Feb 24 19:07:05 2012 57.03% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 57.04% done, estimate finish Fri Feb 24 19:07:05 2012 57.04% done, estimate finish Fri Feb 24 19:07:04 2012 57.05% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.06% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.07% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 57.08% done, estimate finish Fri Feb 24 19:07:05 2012 57.08% done, estimate finish Fri Feb 24 19:07:04 2012 57.09% done, estimate finish Fri Feb 24 19:07:04 2012 57.10% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.11% done, estimate finish Fri Feb 24 19:07:04 2012 57.11% done, estimate finish Fri Feb 24 19:07:05 2012 57.12% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 57.13% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.14% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.15% done, estimate finish Fri Feb 24 19:07:04 2012 57.15% done, estimate finish Fri Feb 24 19:07:05 2012 57.16% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 57.17% done, estimate finish Fri Feb 24 19:07:04 2012 57.18% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.19% done, estimate finish Fri Feb 24 19:07:04 2012 57.19% done, estimate finish Fri Feb 24 19:07:03 2012 57.20% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 57.21% done, estimate finish Fri Feb 24 19:07:05 2012 57.21% done, estimate finish Fri Feb 24 19:07:04 2012 57.22% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.23% done, estimate finish Fri Feb 24 19:07:04 2012 57.23% done, estimate finish Fri Feb 24 19:07:03 2012 57.24% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 57.25% done, estimate finish Fri Feb 24 19:07:05 2012 57.26% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.27% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.28% done, estimate finish Fri Feb 24 19:07:03 2012 57.28% done, estimate finish Fri Feb 24 19:07:05 2012 57.29% done, estimate finish Fri Feb 24 19:07:05 2012 57.29% done, estimate finish Fri Feb 24 19:07:04 2012 57.30% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.31% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.32% done, estimate finish Fri Feb 24 19:07:03 2012 57.32% done, estimate finish Fri Feb 24 19:07:05 2012 57.33% done, estimate finish Fri Feb 24 19:07:05 2012 57.34% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.35% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.36% done, estimate finish Fri Feb 24 19:07:04 2012 57.36% done, estimate finish Fri Feb 24 19:07:03 2012 57.37% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 57.38% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.39% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.40% done, estimate finish Fri Feb 24 19:07:04 2012 57.40% done, estimate finish Fri Feb 24 19:07:03 2012 57.41% done, estimate finish Fri Feb 24 19:07:05 2012 57.42% done, estimate finish Fri Feb 24 19:07:05 2012 57.42% done, estimate finish Fri Feb 24 19:07:04 2012 57.43% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.44% done, estimate finish Fri Feb 24 19:07:04 2012 57.44% done, estimate finish Fri Feb 24 19:07:03 2012 57.45% done, estimate finish Fri Feb 24 19:07:03 2012 57.45% done, estimate finish Fri Feb 24 19:07:05 2012 57.46% done, estimate finish Fri Feb 24 19:07:05 2012 57.46% done, estimate finish Fri Feb 24 19:07:04 2012 57.47% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.48% done, estimate finish Fri Feb 24 19:07:04 2012 57.48% done, estimate finish Fri Feb 24 19:07:03 2012 57.49% done, estimate finish Fri Feb 24 19:07:03 2012 57.50% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 57.51% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.52% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.53% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 57.54% done, estimate finish Fri Feb 24 19:07:05 2012 57.54% done, estimate finish Fri Feb 24 19:07:04 2012 57.55% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.56% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.57% done, estimate finish Fri Feb 24 19:07:03 2012 57.58% done, estimate finish Fri Feb 24 19:07:03 2012 57.58% done, estimate finish Fri Feb 24 19:07:05 2012 57.59% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.60% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.61% done, estimate finish Fri Feb 24 19:07:04 2012 57.61% done, estimate finish Fri Feb 24 19:07:03 2012 57.62% done, estimate finish Fri Feb 24 19:07:03 2012 57.62% done, estimate finish Fri Feb 24 19:07:05 2012 57.63% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.64% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.65% done, estimate finish Fri Feb 24 19:07:04 2012 57.66% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 57.67% done, estimate finish Fri Feb 24 19:07:05 2012 57.67% done, estimate finish Fri Feb 24 19:07:04 2012 57.68% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.69% done, estimate finish Fri Feb 24 19:07:04 2012 57.69% done, estimate finish Fri Feb 24 19:07:03 2012 57.70% done, estimate finish Fri Feb 24 19:07:03 2012 57.70% done, estimate finish Fri Feb 24 19:07:05 2012 57.71% done, estimate finish Fri Feb 24 19:07:05 2012 57.71% done, estimate finish Fri Feb 24 19:07:04 2012 57.72% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.73% done, estimate finish Fri Feb 24 19:07:04 2012 57.74% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 57.75% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 57.76% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.77% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.78% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 57.79% done, estimate finish Fri Feb 24 19:07:05 2012 57.79% done, estimate finish Fri Feb 24 19:07:04 2012 57.80% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.81% done, estimate finish Fri Feb 24 19:07:04 2012 57.82% done, estimate finish Fri Feb 24 19:07:04 2012 57.82% done, estimate finish Fri Feb 24 19:07:03 2012 57.83% done, estimate finish Fri Feb 24 19:07:03 2012 57.83% done, estimate finish Fri Feb 24 19:07:05 2012 57.84% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.85% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.86% done, estimate finish Fri Feb 24 19:07:04 2012 57.86% done, estimate finish Fri Feb 24 19:07:03 2012 57.87% done, estimate finish Fri Feb 24 19:07:03 2012 57.87% done, estimate finish Fri Feb 24 19:07:05 2012 57.88% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.89% done, estimate finish Fri Feb 24 19:07:04 2012 57.90% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.91% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 57.92% done, estimate finish Fri Feb 24 19:07:05 2012 57.92% done, estimate finish Fri Feb 24 19:07:04 2012 57.93% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.94% done, estimate finish Fri Feb 24 19:07:04 2012 57.94% done, estimate finish Fri Feb 24 19:07:03 2012 57.95% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 57.96% done, estimate finish Fri Feb 24 19:07:05 2012 57.96% done, estimate finish Fri Feb 24 19:07:04 2012 57.97% done, estimate finish Fri Feb 24 19:07:04 2012 57.98% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 57.99% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.00% done, estimate finish Fri Feb 24 19:07:03 2012 58.00% done, estimate finish Fri Feb 24 19:07:05 2012 58.01% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.02% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.03% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.04% done, estimate finish Fri Feb 24 19:07:03 2012 58.05% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.06% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.07% done, estimate finish Fri Feb 24 19:07:04 2012 58.07% done, estimate finish Fri Feb 24 19:07:03 2012 58.08% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.09% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.10% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.11% done, estimate finish Fri Feb 24 19:07:04 2012 58.11% done, estimate finish Fri Feb 24 19:07:03 2012 58.12% done, estimate finish Fri Feb 24 19:07:03 2012 58.13% done, estimate finish Fri Feb 24 19:07:03 2012 58.13% done, estimate finish Fri Feb 24 19:07:04 2012 58.14% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.15% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.16% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.17% done, estimate finish Fri Feb 24 19:07:03 2012 58.17% done, estimate finish Fri Feb 24 19:07:04 2012 58.18% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.19% done, estimate finish Fri Feb 24 19:07:04 2012 58.19% done, estimate finish Fri Feb 24 19:07:03 2012 58.20% done, estimate finish Fri Feb 24 19:07:03 2012 58.21% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.22% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.23% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.24% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.25% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.26% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.27% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.28% done, estimate finish Fri Feb 24 19:07:03 2012 58.29% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.30% done, estimate finish Fri Feb 24 19:07:03 2012 58.30% done, estimate finish Fri Feb 24 19:07:04 2012 58.31% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.32% done, estimate finish Fri Feb 24 19:07:04 2012 58.32% done, estimate finish Fri Feb 24 19:07:03 2012 58.33% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.34% done, estimate finish Fri Feb 24 19:07:03 2012 58.34% done, estimate finish Fri Feb 24 19:07:04 2012 58.35% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.36% done, estimate finish Fri Feb 24 19:07:04 2012 58.37% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.38% done, estimate finish Fri Feb 24 19:07:03 2012 58.38% done, estimate finish Fri Feb 24 19:07:04 2012 58.39% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.40% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.41% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.42% done, estimate finish Fri Feb 24 19:07:03 2012 58.42% done, estimate finish Fri Feb 24 19:07:04 2012 58.43% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.44% done, estimate finish Fri Feb 24 19:07:04 2012 58.45% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.46% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.47% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.48% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.49% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.50% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.51% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.52% done, estimate finish Fri Feb 24 19:07:04 2012 58.53% done, estimate finish Fri Feb 24 19:07:04 2012 58.53% done, estimate finish Fri Feb 24 19:07:03 2012 58.54% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.55% done, estimate finish Fri Feb 24 19:07:03 2012 58.55% done, estimate finish Fri Feb 24 19:07:04 2012 58.56% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.57% done, estimate finish Fri Feb 24 19:07:04 2012 58.57% done, estimate finish Fri Feb 24 19:07:03 2012 58.58% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.59% done, estimate finish Fri Feb 24 19:07:03 2012 58.59% done, estimate finish Fri Feb 24 19:07:04 2012 58.60% done, estimate finish Fri Feb 24 19:07:04 2012 58.61% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.62% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.63% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.64% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.65% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.66% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.67% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.68% done, estimate finish Fri Feb 24 19:07:04 2012 58.69% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.70% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.71% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.72% done, estimate finish Fri Feb 24 19:07:03 2012 58.72% done, estimate finish Fri Feb 24 19:07:04 2012 58.73% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.74% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.75% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.76% done, estimate finish Fri Feb 24 19:07:03 2012 58.77% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.78% done, estimate finish Fri Feb 24 19:07:04 2012 58.78% done, estimate finish Fri Feb 24 19:07:03 2012 58.79% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.80% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.81% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.82% done, estimate finish Fri Feb 24 19:07:04 2012 58.82% done, estimate finish Fri Feb 24 19:07:03 2012 58.83% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.84% done, estimate finish Fri Feb 24 19:07:03 2012 58.85% done, estimate finish Fri Feb 24 19:07:03 2012 58.85% done, estimate finish Fri Feb 24 19:07:04 2012 58.86% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.87% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.88% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.89% done, estimate finish Fri Feb 24 19:07:02 2012 58.89% done, estimate finish Fri Feb 24 19:07:04 2012 58.90% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.91% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.92% done, estimate finish Fri Feb 24 19:07:03 2012 58.93% done, estimate finish Fri Feb 24 19:07:03 2012 58.93% done, estimate finish Fri Feb 24 19:07:02 2012 58.94% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.95% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.96% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 58.97% done, estimate finish Fri Feb 24 19:07:03 2012 58.97% done, estimate finish Fri Feb 24 19:07:02 2012 58.98% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 58.99% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.00% done, estimate finish Fri Feb 24 19:07:03 2012 59.01% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.02% done, estimate finish Fri Feb 24 19:07:02 2012 59.02% done, estimate finish Fri Feb 24 19:07:04 2012 59.03% done, estimate finish Fri Feb 24 19:07:04 2012 59.03% done, estimate finish Fri Feb 24 19:07:03 2012 59.04% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.05% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.06% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 59.07% done, estimate finish Fri Feb 24 19:07:04 2012 59.07% done, estimate finish Fri Feb 24 19:07:03 2012 59.08% done, estimate finish Fri Feb 24 19:07:03 2012 59.09% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.10% done, estimate finish Fri Feb 24 19:07:03 2012 59.10% done, estimate finish Fri Feb 24 19:07:04 2012 59.11% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 59.12% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.13% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.14% done, estimate finish Fri Feb 24 19:07:02 2012 59.14% done, estimate finish Fri Feb 24 19:07:04 2012 59.15% done, estimate finish Fri Feb 24 19:07:04 2012 59.16% done, estimate finish Fri Feb 24 19:07:04 2012 59.16% done, estimate finish Fri Feb 24 19:07:03 2012 59.17% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.18% done, estimate finish Fri Feb 24 19:07:03 2012 59.18% done, estimate finish Fri Feb 24 19:07:02 2012 59.19% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 59.20% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.21% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.22% done, estimate finish Fri Feb 24 19:07:03 2012 59.22% done, estimate finish Fri Feb 24 19:07:04 2012 59.23% done, estimate finish Fri Feb 24 19:07:04 2012 59.24% done, estimate finish Fri Feb 24 19:07:04 2012 59.24% done, estimate finish Fri Feb 24 19:07:03 2012 59.25% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.26% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.27% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 59.28% done, estimate finish Fri Feb 24 19:07:04 2012 59.28% done, estimate finish Fri Feb 24 19:07:03 2012 59.29% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 59.30% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 59.31% done, estimate finish Fri Feb 24 19:07:04 2012 59.32% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 59.33% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.34% done, estimate finish Fri Feb 24 19:07:05 2012 59.34% done, estimate finish Fri Feb 24 19:07:04 2012 59.35% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 59.36% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 59.37% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 59.38% done, estimate finish Fri Feb 24 19:07:05 2012 59.38% done, estimate finish Fri Feb 24 19:07:04 2012 59.39% done, estimate finish Fri Feb 24 19:07:06 2012 59.40% done, estimate finish Fri Feb 24 19:07:06 2012 59.40% done, estimate finish Fri Feb 24 19:07:05 2012 59.41% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 59.42% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 59.43% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 59.44% done, estimate finish Fri Feb 24 19:07:06 2012 59.44% done, estimate finish Fri Feb 24 19:07:05 2012 59.45% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 59.46% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 59.47% done, estimate finish Fri Feb 24 19:07:04 2012 59.48% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 59.49% done, estimate finish Fri Feb 24 19:07:04 2012 59.49% done, estimate finish Fri Feb 24 19:07:03 2012 59.50% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.51% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.52% done, estimate finish Fri Feb 24 19:07:02 2012 59.52% done, estimate finish Fri Feb 24 19:07:04 2012 59.53% done, estimate finish Fri Feb 24 19:07:04 2012 59.53% done, estimate finish Fri Feb 24 19:07:03 2012 59.54% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.55% done, estimate finish Fri Feb 24 19:07:03 2012 59.56% done, estimate finish Fri Feb 24 19:07:03 2012 59.56% done, estimate finish Fri Feb 24 19:07:02 2012 59.57% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 59.58% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.59% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.60% done, estimate finish Fri Feb 24 19:07:03 2012 59.60% done, estimate finish Fri Feb 24 19:07:04 2012 59.61% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 59.62% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.63% done, estimate finish Fri Feb 24 19:07:03 2012 59.64% done, estimate finish Fri Feb 24 19:07:03 2012 59.64% done, estimate finish Fri Feb 24 19:07:02 2012 59.65% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 59.66% done, estimate finish Fri Feb 24 19:07:04 2012 59.66% done, estimate finish Fri Feb 24 19:07:03 2012 59.67% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.68% done, estimate finish Fri Feb 24 19:07:03 2012 59.68% done, estimate finish Fri Feb 24 19:07:02 2012 59.69% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 59.70% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.71% done, estimate finish Fri Feb 24 19:07:03 2012 59.72% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.73% done, estimate finish Fri Feb 24 19:07:02 2012 59.73% done, estimate finish Fri Feb 24 19:07:04 2012 59.74% done, estimate finish Fri Feb 24 19:07:04 2012 59.74% done, estimate finish Fri Feb 24 19:07:03 2012 59.75% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.76% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.77% done, estimate finish Fri Feb 24 19:07:02 2012 59.77% done, estimate finish Fri Feb 24 19:07:04 2012 59.78% done, estimate finish Fri Feb 24 19:07:04 2012 59.78% done, estimate finish Fri Feb 24 19:07:03 2012 59.79% done, estimate finish Fri Feb 24 19:07:03 2012 59.80% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.81% done, estimate finish Fri Feb 24 19:07:03 2012 59.81% done, estimate finish Fri Feb 24 19:07:02 2012 59.82% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 59.83% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.84% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.85% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 59.86% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 59.87% done, estimate finish Fri Feb 24 19:07:03 2012 59.88% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.89% done, estimate finish Fri Feb 24 19:07:03 2012 59.89% done, estimate finish Fri Feb 24 19:07:02 2012 59.90% done, estimate finish Fri Feb 24 19:07:02 2012 59.90% done, estimate finish Fri Feb 24 19:07:04 2012 59.91% done, estimate finish Fri Feb 24 19:07:04 2012 59.91% done, estimate finish Fri Feb 24 19:07:03 2012 59.92% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.93% done, estimate finish Fri Feb 24 19:07:03 2012 59.93% done, estimate finish Fri Feb 24 19:07:02 2012 59.94% done, estimate finish Fri Feb 24 19:07:02 2012 59.94% done, estimate finish Fri Feb 24 19:07:04 2012 59.95% done, estimate finish Fri Feb 24 19:07:03 2012 59.96% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.97% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 59.98% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 59.99% done, estimate finish Fri Feb 24 19:07:04 2012 59.99% done, estimate finish Fri Feb 24 19:07:03 2012 60.00% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.01% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.02% done, estimate finish Fri Feb 24 19:07:02 2012 60.02% done, estimate finish Fri Feb 24 19:07:04 2012 60.03% done, estimate finish Fri Feb 24 19:07:04 2012 60.04% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.05% done, estimate finish Fri Feb 24 19:07:05 2012 60.05% done, estimate finish Fri Feb 24 19:07:04 2012 60.06% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 60.07% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 60.08% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.09% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.10% done, estimate finish Fri Feb 24 19:07:03 2012 60.10% done, estimate finish Fri Feb 24 19:07:02 2012 60.11% done, estimate finish Fri Feb 24 19:07:04 2012 60.12% done, estimate finish Fri Feb 24 19:07:04 2012 60.12% done, estimate finish Fri Feb 24 19:07:03 2012 60.13% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.14% done, estimate finish Fri Feb 24 19:07:03 2012 60.14% done, estimate finish Fri Feb 24 19:07:02 2012 60.15% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 60.16% done, estimate finish Fri Feb 24 19:07:04 2012 60.16% done, estimate finish Fri Feb 24 19:07:03 2012 60.17% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.18% done, estimate finish Fri Feb 24 19:07:03 2012 60.18% done, estimate finish Fri Feb 24 19:07:02 2012 60.19% done, estimate finish Fri Feb 24 19:07:02 2012 60.20% done, estimate finish Fri Feb 24 19:07:04 2012 60.20% done, estimate finish Fri Feb 24 19:07:03 2012 60.21% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.22% done, estimate finish Fri Feb 24 19:07:03 2012 60.22% done, estimate finish Fri Feb 24 19:07:04 2012 60.23% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 60.24% done, estimate finish Fri Feb 24 19:07:04 2012 60.24% done, estimate finish Fri Feb 24 19:07:03 2012 60.25% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.26% done, estimate finish Fri Feb 24 19:07:03 2012 60.27% done, estimate finish Fri Feb 24 19:07:03 2012 60.27% done, estimate finish Fri Feb 24 19:07:04 2012 60.28% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 60.29% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.30% done, estimate finish Fri Feb 24 19:07:03 2012 60.30% done, estimate finish Fri Feb 24 19:07:04 2012 60.31% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 60.32% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 60.33% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.34% done, estimate finish Fri Feb 24 19:07:03 2012 60.35% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 60.36% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 60.37% done, estimate finish Fri Feb 24 19:07:04 2012 60.37% done, estimate finish Fri Feb 24 19:07:03 2012 60.38% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.39% done, estimate finish Fri Feb 24 19:07:03 2012 60.39% done, estimate finish Fri Feb 24 19:07:04 2012 60.40% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 60.41% done, estimate finish Fri Feb 24 19:07:04 2012 60.41% done, estimate finish Fri Feb 24 19:07:03 2012 60.42% done, estimate finish Fri Feb 24 19:07:03 2012 60.43% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.44% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 60.45% done, estimate finish Fri Feb 24 19:07:02 2012 60.45% done, estimate finish Fri Feb 24 19:07:03 2012 60.46% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.47% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.48% done, estimate finish Fri Feb 24 19:07:02 2012 60.48% done, estimate finish Fri Feb 24 19:07:04 2012 60.49% done, estimate finish Fri Feb 24 19:07:04 2012 60.49% done, estimate finish Fri Feb 24 19:07:03 2012 60.50% done, estimate finish Fri Feb 24 19:07:03 2012 60.51% done, estimate finish Fri Feb 24 19:07:03 2012 60.51% done, estimate finish Fri Feb 24 19:07:04 2012 60.52% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 60.53% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 60.54% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.55% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.56% done, estimate finish Fri Feb 24 19:07:03 2012 60.56% done, estimate finish Fri Feb 24 19:07:02 2012 60.57% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 60.58% done, estimate finish Fri Feb 24 19:07:03 2012 60.59% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.60% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.61% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 60.62% done, estimate finish Fri Feb 24 19:07:04 2012 60.62% done, estimate finish Fri Feb 24 19:07:03 2012 60.63% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.64% done, estimate finish Fri Feb 24 19:07:03 2012 60.64% done, estimate finish Fri Feb 24 19:07:04 2012 60.65% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 60.66% done, estimate finish Fri Feb 24 19:07:04 2012 60.67% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.68% done, estimate finish Fri Feb 24 19:07:03 2012 60.68% done, estimate finish Fri Feb 24 19:07:04 2012 60.69% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 60.70% done, estimate finish Fri Feb 24 19:07:04 2012 60.70% done, estimate finish Fri Feb 24 19:07:03 2012 60.71% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.72% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.73% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 60.74% done, estimate finish Fri Feb 24 19:07:02 2012 60.75% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.76% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.77% done, estimate finish Fri Feb 24 19:07:03 2012 60.77% done, estimate finish Fri Feb 24 19:07:02 2012 60.78% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 60.79% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.80% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.81% done, estimate finish Fri Feb 24 19:07:03 2012 60.81% done, estimate finish Fri Feb 24 19:07:02 2012 60.82% done, estimate finish Fri Feb 24 19:07:02 2012 60.83% done, estimate finish Fri Feb 24 19:07:04 2012 60.83% done, estimate finish Fri Feb 24 19:07:03 2012 60.84% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.85% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.86% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 60.87% done, estimate finish Fri Feb 24 19:07:04 2012 60.87% done, estimate finish Fri Feb 24 19:07:03 2012 60.88% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.89% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 60.90% done, estimate finish Fri Feb 24 19:07:04 2012 60.91% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 60.92% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 60.93% done, estimate finish Fri Feb 24 19:07:05 2012 60.93% done, estimate finish Fri Feb 24 19:07:04 2012 60.94% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 60.95% done, estimate finish Fri Feb 24 19:07:04 2012 60.95% done, estimate finish Fri Feb 24 19:07:05 2012 60.96% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 60.97% done, estimate finish Fri Feb 24 19:07:05 2012 60.97% done, estimate finish Fri Feb 24 19:07:04 2012 60.98% done, estimate finish Fri Feb 24 19:07:06 2012 60.99% done, estimate finish Fri Feb 24 19:07:06 2012 60.99% done, estimate finish Fri Feb 24 19:07:05 2012 61.00% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 61.01% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 61.02% done, estimate finish Fri Feb 24 19:07:08 2012 61.02% done, estimate finish Fri Feb 24 19:07:07 2012 61.03% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 61.04% done, estimate finish Fri Feb 24 19:07:07 2012 61.04% done, estimate finish Fri Feb 24 19:07:06 2012 61.05% done, estimate finish Fri Feb 24 19:07:06 2012 61.05% done, estimate finish Fri Feb 24 19:07:08 2012 61.06% done, estimate finish Fri Feb 24 19:07:07 2012 61.07% done, estimate finish Fri Feb 24 19:07:07 2012 61.07% done, estimate finish Fri Feb 24 19:07:09 2012 61.08% done, estimate finish Fri Feb 24 19:07:09 2012 61.08% done, estimate finish Fri Feb 24 19:07:08 2012 61.09% done, estimate finish Fri Feb 24 19:07:08 2012 61.09% done, estimate finish Fri Feb 24 19:07:10 2012 61.10% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 61.11% done, estimate finish Fri Feb 24 19:07:11 2012 61.11% done, estimate finish Fri Feb 24 19:07:10 2012 61.12% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 61.13% done, estimate finish Fri Feb 24 19:07:10 2012 61.13% done, estimate finish Fri Feb 24 19:07:09 2012 61.14% done, estimate finish Fri Feb 24 19:07:11 2012 61.15% done, estimate finish Fri Feb 24 19:07:11 2012 61.15% done, estimate finish Fri Feb 24 19:07:10 2012 61.16% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 61.17% done, estimate finish Fri Feb 24 19:07:10 2012 === last message repeated 2 times. === 61.18% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 61.19% done, estimate finish Fri Feb 24 19:07:09 2012 === last message repeated 2 times. === 61.20% done, estimate finish Fri Feb 24 19:07:09 2012 61.20% done, estimate finish Fri Feb 24 19:07:08 2012 61.21% done, estimate finish Fri Feb 24 19:07:08 2012 === last message repeated 2 times. === 61.22% done, estimate finish Fri Feb 24 19:07:08 2012 61.23% done, estimate finish Fri Feb 24 19:07:08 2012 61.23% done, estimate finish Fri Feb 24 19:07:07 2012 61.24% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 61.25% done, estimate finish Fri Feb 24 19:07:07 2012 === last message repeated 2 times. === 61.26% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 61.27% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 61.28% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 61.29% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 61.30% done, estimate finish Fri Feb 24 19:07:05 2012 61.31% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 61.32% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 61.33% done, estimate finish Fri Feb 24 19:07:04 2012 61.33% done, estimate finish Fri Feb 24 19:07:03 2012 61.34% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.35% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.36% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 61.37% done, estimate finish Fri Feb 24 19:07:02 2012 61.38% done, estimate finish Fri Feb 24 19:07:02 2012 61.38% done, estimate finish Fri Feb 24 19:07:03 2012 61.39% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.40% done, estimate finish Fri Feb 24 19:07:03 2012 61.40% done, estimate finish Fri Feb 24 19:07:02 2012 61.41% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 61.42% done, estimate finish Fri Feb 24 19:07:02 2012 61.42% done, estimate finish Fri Feb 24 19:07:03 2012 61.43% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.44% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 61.45% done, estimate finish Fri Feb 24 19:07:02 2012 61.46% done, estimate finish Fri Feb 24 19:07:02 2012 61.46% done, estimate finish Fri Feb 24 19:07:03 2012 61.47% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.48% done, estimate finish Fri Feb 24 19:07:03 2012 61.48% done, estimate finish Fri Feb 24 19:07:02 2012 61.49% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 61.50% done, estimate finish Fri Feb 24 19:07:02 2012 61.50% done, estimate finish Fri Feb 24 19:07:03 2012 61.51% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.52% done, estimate finish Fri Feb 24 19:07:03 2012 61.52% done, estimate finish Fri Feb 24 19:07:02 2012 61.53% done, estimate finish Fri Feb 24 19:07:02 2012 61.54% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 61.55% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.56% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.57% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 61.58% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 61.59% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.60% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.61% done, estimate finish Fri Feb 24 19:07:02 2012 61.62% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 61.63% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.64% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.65% done, estimate finish Fri Feb 24 19:07:03 2012 61.65% done, estimate finish Fri Feb 24 19:07:02 2012 61.66% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 61.67% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.68% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.69% done, estimate finish Fri Feb 24 19:07:02 2012 61.70% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 61.71% done, estimate finish Fri Feb 24 19:07:02 2012 61.71% done, estimate finish Fri Feb 24 19:07:03 2012 61.72% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.73% done, estimate finish Fri Feb 24 19:07:03 2012 61.73% done, estimate finish Fri Feb 24 19:07:02 2012 61.74% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 61.75% done, estimate finish Fri Feb 24 19:07:02 2012 61.75% done, estimate finish Fri Feb 24 19:07:03 2012 61.76% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.77% done, estimate finish Fri Feb 24 19:07:03 2012 61.78% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 61.79% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 61.80% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.81% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.82% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 61.83% done, estimate finish Fri Feb 24 19:07:02 2012 61.83% done, estimate finish Fri Feb 24 19:07:03 2012 61.84% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.85% done, estimate finish Fri Feb 24 19:07:03 2012 61.86% done, estimate finish Fri Feb 24 19:07:03 2012 61.86% done, estimate finish Fri Feb 24 19:07:02 2012 61.87% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 61.88% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.89% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.90% done, estimate finish Fri Feb 24 19:07:03 2012 61.90% done, estimate finish Fri Feb 24 19:07:02 2012 61.91% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 61.92% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.93% done, estimate finish Fri Feb 24 19:07:03 2012 61.94% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.95% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 61.96% done, estimate finish Fri Feb 24 19:07:02 2012 61.96% done, estimate finish Fri Feb 24 19:07:03 2012 61.97% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 61.98% done, estimate finish Fri Feb 24 19:07:03 2012 61.98% done, estimate finish Fri Feb 24 19:07:02 2012 61.99% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 62.00% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.01% done, estimate finish Fri Feb 24 19:07:03 2012 62.02% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.03% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.04% done, estimate finish Fri Feb 24 19:07:04 2012 62.04% done, estimate finish Fri Feb 24 19:07:03 2012 62.05% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.06% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.07% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.08% done, estimate finish Fri Feb 24 19:07:04 2012 62.08% done, estimate finish Fri Feb 24 19:07:03 2012 62.09% done, estimate finish Fri Feb 24 19:07:03 2012 62.10% done, estimate finish Fri Feb 24 19:07:03 2012 62.10% done, estimate finish Fri Feb 24 19:07:04 2012 62.11% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.12% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.13% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.14% done, estimate finish Fri Feb 24 19:07:03 2012 62.14% done, estimate finish Fri Feb 24 19:07:04 2012 62.15% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.16% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.17% done, estimate finish Fri Feb 24 19:07:03 2012 62.18% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.19% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.20% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.21% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.22% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.23% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.24% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.25% done, estimate finish Fri Feb 24 19:07:03 2012 62.26% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.27% done, estimate finish Fri Feb 24 19:07:03 2012 62.27% done, estimate finish Fri Feb 24 19:07:04 2012 62.28% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.29% done, estimate finish Fri Feb 24 19:07:04 2012 62.29% done, estimate finish Fri Feb 24 19:07:03 2012 62.30% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.31% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.32% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.33% done, estimate finish Fri Feb 24 19:07:04 2012 62.34% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.35% done, estimate finish Fri Feb 24 19:07:03 2012 62.35% done, estimate finish Fri Feb 24 19:07:04 2012 62.36% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.37% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.38% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.39% done, estimate finish Fri Feb 24 19:07:03 2012 62.39% done, estimate finish Fri Feb 24 19:07:04 2012 62.40% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.41% done, estimate finish Fri Feb 24 19:07:04 2012 62.42% done, estimate finish Fri Feb 24 19:07:04 2012 62.42% done, estimate finish Fri Feb 24 19:07:03 2012 62.43% done, estimate finish Fri Feb 24 19:07:03 2012 62.43% done, estimate finish Fri Feb 24 19:07:05 2012 62.44% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.45% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.46% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.47% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.48% done, estimate finish Fri Feb 24 19:07:04 2012 62.49% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.50% done, estimate finish Fri Feb 24 19:07:04 2012 62.50% done, estimate finish Fri Feb 24 19:07:03 2012 62.51% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.52% done, estimate finish Fri Feb 24 19:07:03 2012 62.52% done, estimate finish Fri Feb 24 19:07:04 2012 62.53% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.54% done, estimate finish Fri Feb 24 19:07:04 2012 62.54% done, estimate finish Fri Feb 24 19:07:03 2012 62.55% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.56% done, estimate finish Fri Feb 24 19:07:03 2012 62.57% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.58% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.59% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.60% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.61% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.62% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.63% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.64% done, estimate finish Fri Feb 24 19:07:03 2012 62.65% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.66% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.67% done, estimate finish Fri Feb 24 19:07:04 2012 62.67% done, estimate finish Fri Feb 24 19:07:03 2012 62.68% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.69% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.70% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.71% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.72% done, estimate finish Fri Feb 24 19:07:03 2012 62.73% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.74% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.75% done, estimate finish Fri Feb 24 19:07:04 2012 62.75% done, estimate finish Fri Feb 24 19:07:03 2012 62.76% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.77% done, estimate finish Fri Feb 24 19:07:03 2012 62.77% done, estimate finish Fri Feb 24 19:07:04 2012 62.78% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.79% done, estimate finish Fri Feb 24 19:07:04 2012 62.79% done, estimate finish Fri Feb 24 19:07:03 2012 62.80% done, estimate finish Fri Feb 24 19:07:03 2012 62.81% done, estimate finish Fri Feb 24 19:07:03 2012 62.81% done, estimate finish Fri Feb 24 19:07:04 2012 62.82% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.83% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.84% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.85% done, estimate finish Fri Feb 24 19:07:03 2012 62.85% done, estimate finish Fri Feb 24 19:07:04 2012 62.86% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.87% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.88% done, estimate finish Fri Feb 24 19:07:03 2012 62.89% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.90% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.91% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.92% done, estimate finish Fri Feb 24 19:07:04 2012 62.92% done, estimate finish Fri Feb 24 19:07:03 2012 62.93% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.94% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.95% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 62.96% done, estimate finish Fri Feb 24 19:07:03 2012 62.97% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 62.98% done, estimate finish Fri Feb 24 19:07:03 2012 62.98% done, estimate finish Fri Feb 24 19:07:04 2012 62.99% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.00% done, estimate finish Fri Feb 24 19:07:04 2012 63.00% done, estimate finish Fri Feb 24 19:07:03 2012 63.01% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.02% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.03% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.04% done, estimate finish Fri Feb 24 19:07:04 2012 63.05% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.06% done, estimate finish Fri Feb 24 19:07:03 2012 63.06% done, estimate finish Fri Feb 24 19:07:04 2012 63.07% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.08% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.09% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.10% done, estimate finish Fri Feb 24 19:07:03 2012 63.10% done, estimate finish Fri Feb 24 19:07:04 2012 63.11% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.12% done, estimate finish Fri Feb 24 19:07:04 2012 63.13% done, estimate finish Fri Feb 24 19:07:04 2012 63.13% done, estimate finish Fri Feb 24 19:07:03 2012 63.14% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.15% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.16% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.17% done, estimate finish Fri Feb 24 19:07:04 2012 63.17% done, estimate finish Fri Feb 24 19:07:03 2012 63.18% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.19% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.20% done, estimate finish Fri Feb 24 19:07:04 2012 63.21% done, estimate finish Fri Feb 24 19:07:04 2012 63.21% done, estimate finish Fri Feb 24 19:07:03 2012 63.22% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.23% done, estimate finish Fri Feb 24 19:07:03 2012 63.23% done, estimate finish Fri Feb 24 19:07:04 2012 63.24% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.25% done, estimate finish Fri Feb 24 19:07:04 2012 63.25% done, estimate finish Fri Feb 24 19:07:03 2012 63.26% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.27% done, estimate finish Fri Feb 24 19:07:03 2012 63.27% done, estimate finish Fri Feb 24 19:07:04 2012 63.28% done, estimate finish Fri Feb 24 19:07:04 2012 63.29% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.30% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.31% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.32% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.33% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.34% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.35% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.36% done, estimate finish Fri Feb 24 19:07:04 2012 63.37% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.38% done, estimate finish Fri Feb 24 19:07:04 2012 63.38% done, estimate finish Fri Feb 24 19:07:03 2012 63.39% done, estimate finish Fri Feb 24 19:07:03 2012 63.39% done, estimate finish Fri Feb 24 19:07:05 2012 63.40% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.41% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.42% done, estimate finish Fri Feb 24 19:07:04 2012 63.42% done, estimate finish Fri Feb 24 19:07:03 2012 63.43% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.44% done, estimate finish Fri Feb 24 19:07:03 2012 63.45% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.46% done, estimate finish Fri Feb 24 19:07:04 2012 63.46% done, estimate finish Fri Feb 24 19:07:03 2012 63.47% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.48% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.49% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.50% done, estimate finish Fri Feb 24 19:07:04 2012 63.50% done, estimate finish Fri Feb 24 19:07:03 2012 63.51% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.52% done, estimate finish Fri Feb 24 19:07:03 2012 63.53% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.54% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.55% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.56% done, estimate finish Fri Feb 24 19:07:03 2012 63.56% done, estimate finish Fri Feb 24 19:07:04 2012 63.57% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.58% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.59% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.60% done, estimate finish Fri Feb 24 19:07:03 2012 63.61% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.62% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.63% done, estimate finish Fri Feb 24 19:07:04 2012 63.63% done, estimate finish Fri Feb 24 19:07:03 2012 63.64% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.65% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.66% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.67% done, estimate finish Fri Feb 24 19:07:04 2012 63.68% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.69% done, estimate finish Fri Feb 24 19:07:05 2012 63.69% done, estimate finish Fri Feb 24 19:07:04 2012 63.70% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.71% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.72% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.73% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.74% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.75% done, estimate finish Fri Feb 24 19:07:04 2012 63.76% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.77% done, estimate finish Fri Feb 24 19:07:03 2012 63.77% done, estimate finish Fri Feb 24 19:07:04 2012 63.78% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.79% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.80% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.81% done, estimate finish Fri Feb 24 19:07:05 2012 63.81% done, estimate finish Fri Feb 24 19:07:04 2012 63.82% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.83% done, estimate finish Fri Feb 24 19:07:04 2012 63.84% done, estimate finish Fri Feb 24 19:07:04 2012 63.84% done, estimate finish Fri Feb 24 19:07:03 2012 63.85% done, estimate finish Fri Feb 24 19:07:03 2012 63.85% done, estimate finish Fri Feb 24 19:07:05 2012 63.86% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.87% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.88% done, estimate finish Fri Feb 24 19:07:04 2012 63.88% done, estimate finish Fri Feb 24 19:07:03 2012 63.89% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.90% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.91% done, estimate finish Fri Feb 24 19:07:04 2012 63.92% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.93% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.94% done, estimate finish Fri Feb 24 19:07:03 2012 63.94% done, estimate finish Fri Feb 24 19:07:04 2012 63.95% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.96% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 63.97% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 63.98% done, estimate finish Fri Feb 24 19:07:03 2012 63.98% done, estimate finish Fri Feb 24 19:07:04 2012 63.99% done, estimate finish Fri Feb 24 19:07:04 2012 64.00% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.01% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 64.02% done, estimate finish Fri Feb 24 19:07:03 2012 64.02% done, estimate finish Fri Feb 24 19:07:04 2012 64.03% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.04% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.05% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 64.06% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 64.07% done, estimate finish Fri Feb 24 19:07:04 2012 64.08% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.09% done, estimate finish Fri Feb 24 19:07:04 2012 64.09% done, estimate finish Fri Feb 24 19:07:03 2012 64.10% done, estimate finish Fri Feb 24 19:07:03 2012 64.10% done, estimate finish Fri Feb 24 19:07:05 2012 64.11% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.12% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.13% done, estimate finish Fri Feb 24 19:07:04 2012 64.13% done, estimate finish Fri Feb 24 19:07:03 2012 64.14% done, estimate finish Fri Feb 24 19:07:03 2012 64.14% done, estimate finish Fri Feb 24 19:07:05 2012 64.15% done, estimate finish Fri Feb 24 19:07:04 2012 64.16% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.17% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.18% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 64.19% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.20% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.21% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.22% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 64.23% done, estimate finish Fri Feb 24 19:07:04 2012 64.24% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.25% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.26% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 64.27% done, estimate finish Fri Feb 24 19:07:03 2012 64.27% done, estimate finish Fri Feb 24 19:07:04 2012 64.28% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.29% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.30% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 64.31% done, estimate finish Fri Feb 24 19:07:03 2012 64.32% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.33% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.34% done, estimate finish Fri Feb 24 19:07:04 2012 64.34% done, estimate finish Fri Feb 24 19:07:03 2012 64.35% done, estimate finish Fri Feb 24 19:07:03 2012 64.35% done, estimate finish Fri Feb 24 19:07:05 2012 64.36% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.37% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.38% done, estimate finish Fri Feb 24 19:07:04 2012 64.38% done, estimate finish Fri Feb 24 19:07:03 2012 64.39% done, estimate finish Fri Feb 24 19:07:03 2012 64.40% done, estimate finish Fri Feb 24 19:07:05 2012 64.40% done, estimate finish Fri Feb 24 19:07:04 2012 64.41% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.42% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.43% done, estimate finish Fri Feb 24 19:07:03 2012 64.43% done, estimate finish Fri Feb 24 19:07:05 2012 64.44% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.45% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.46% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.47% done, estimate finish Fri Feb 24 19:07:03 2012 64.48% done, estimate finish Fri Feb 24 19:07:03 2012 64.48% done, estimate finish Fri Feb 24 19:07:04 2012 64.49% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.50% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.51% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 64.52% done, estimate finish Fri Feb 24 19:07:03 2012 64.52% done, estimate finish Fri Feb 24 19:07:04 2012 64.53% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.54% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.55% done, estimate finish Fri Feb 24 19:07:03 2012 64.56% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 64.57% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.58% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.59% done, estimate finish Fri Feb 24 19:07:04 2012 64.59% done, estimate finish Fri Feb 24 19:07:03 2012 64.60% done, estimate finish Fri Feb 24 19:07:03 2012 64.60% done, estimate finish Fri Feb 24 19:07:05 2012 64.61% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.62% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.63% done, estimate finish Fri Feb 24 19:07:04 2012 64.64% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 64.65% done, estimate finish Fri Feb 24 19:07:03 2012 64.65% done, estimate finish Fri Feb 24 19:07:04 2012 64.66% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.67% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.68% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 64.69% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.70% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.71% done, estimate finish Fri Feb 24 19:07:04 2012 64.72% done, estimate finish Fri Feb 24 19:07:04 2012 64.72% done, estimate finish Fri Feb 24 19:07:03 2012 64.73% done, estimate finish Fri Feb 24 19:07:05 2012 64.73% done, estimate finish Fri Feb 24 19:07:04 2012 64.74% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.75% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.76% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 64.77% done, estimate finish Fri Feb 24 19:07:05 2012 64.77% done, estimate finish Fri Feb 24 19:07:04 2012 64.78% done, estimate finish Fri Feb 24 19:07:04 2012 64.79% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.80% done, estimate finish Fri Feb 24 19:07:04 2012 64.80% done, estimate finish Fri Feb 24 19:07:03 2012 64.81% done, estimate finish Fri Feb 24 19:07:03 2012 64.81% done, estimate finish Fri Feb 24 19:07:05 2012 64.82% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.83% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.84% done, estimate finish Fri Feb 24 19:07:04 2012 64.84% done, estimate finish Fri Feb 24 19:07:03 2012 64.85% done, estimate finish Fri Feb 24 19:07:03 2012 64.85% done, estimate finish Fri Feb 24 19:07:05 2012 64.86% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.87% done, estimate finish Fri Feb 24 19:07:04 2012 64.88% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.89% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 64.90% done, estimate finish Fri Feb 24 19:07:05 2012 64.90% done, estimate finish Fri Feb 24 19:07:04 2012 64.91% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.92% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.93% done, estimate finish Fri Feb 24 19:07:03 2012 64.93% done, estimate finish Fri Feb 24 19:07:05 2012 64.94% done, estimate finish Fri Feb 24 19:07:04 2012 64.95% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.96% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 64.97% done, estimate finish Fri Feb 24 19:07:04 2012 64.97% done, estimate finish Fri Feb 24 19:07:03 2012 64.98% done, estimate finish Fri Feb 24 19:07:05 2012 64.98% done, estimate finish Fri Feb 24 19:07:04 2012 64.99% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.00% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.01% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 65.02% done, estimate finish Fri Feb 24 19:07:05 2012 65.03% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.04% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.05% done, estimate finish Fri Feb 24 19:07:04 2012 65.05% done, estimate finish Fri Feb 24 19:07:03 2012 65.06% done, estimate finish Fri Feb 24 19:07:03 2012 65.06% done, estimate finish Fri Feb 24 19:07:05 2012 65.07% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.08% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.09% done, estimate finish Fri Feb 24 19:07:04 2012 65.09% done, estimate finish Fri Feb 24 19:07:03 2012 65.10% done, estimate finish Fri Feb 24 19:07:03 2012 65.11% done, estimate finish Fri Feb 24 19:07:05 2012 65.11% done, estimate finish Fri Feb 24 19:07:04 2012 65.12% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.13% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.14% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 65.15% done, estimate finish Fri Feb 24 19:07:05 2012 65.15% done, estimate finish Fri Feb 24 19:07:04 2012 65.16% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.17% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.18% done, estimate finish Fri Feb 24 19:07:03 2012 65.19% done, estimate finish Fri Feb 24 19:07:03 2012 65.19% done, estimate finish Fri Feb 24 19:07:04 2012 65.20% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.21% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.22% done, estimate finish Fri Feb 24 19:07:04 2012 65.22% done, estimate finish Fri Feb 24 19:07:03 2012 65.23% done, estimate finish Fri Feb 24 19:07:05 2012 65.23% done, estimate finish Fri Feb 24 19:07:04 2012 65.24% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.25% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.26% done, estimate finish Fri Feb 24 19:07:03 2012 65.27% done, estimate finish Fri Feb 24 19:07:03 2012 65.27% done, estimate finish Fri Feb 24 19:07:05 2012 65.28% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.29% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.30% done, estimate finish Fri Feb 24 19:07:04 2012 65.30% done, estimate finish Fri Feb 24 19:07:03 2012 65.31% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 65.32% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.33% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.34% done, estimate finish Fri Feb 24 19:07:04 2012 65.35% done, estimate finish Fri Feb 24 19:07:03 2012 65.35% done, estimate finish Fri Feb 24 19:07:05 2012 65.36% done, estimate finish Fri Feb 24 19:07:05 2012 65.36% done, estimate finish Fri Feb 24 19:07:04 2012 65.37% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.38% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.39% done, estimate finish Fri Feb 24 19:07:03 2012 65.39% done, estimate finish Fri Feb 24 19:07:05 2012 65.40% done, estimate finish Fri Feb 24 19:07:05 2012 65.40% done, estimate finish Fri Feb 24 19:07:04 2012 65.41% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.42% done, estimate finish Fri Feb 24 19:07:04 2012 65.43% done, estimate finish Fri Feb 24 19:07:04 2012 65.43% done, estimate finish Fri Feb 24 19:07:03 2012 65.44% done, estimate finish Fri Feb 24 19:07:05 2012 65.44% done, estimate finish Fri Feb 24 19:07:04 2012 65.45% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.46% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.47% done, estimate finish Fri Feb 24 19:07:04 2012 65.47% done, estimate finish Fri Feb 24 19:07:03 2012 65.48% done, estimate finish Fri Feb 24 19:07:05 2012 65.48% done, estimate finish Fri Feb 24 19:07:04 2012 65.49% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.50% done, estimate finish Fri Feb 24 19:07:04 2012 65.51% done, estimate finish Fri Feb 24 19:07:04 2012 65.51% done, estimate finish Fri Feb 24 19:07:03 2012 65.52% done, estimate finish Fri Feb 24 19:07:03 2012 65.52% done, estimate finish Fri Feb 24 19:07:05 2012 65.53% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.54% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.55% done, estimate finish Fri Feb 24 19:07:04 2012 65.55% done, estimate finish Fri Feb 24 19:07:03 2012 65.56% done, estimate finish Fri Feb 24 19:07:03 2012 65.56% done, estimate finish Fri Feb 24 19:07:05 2012 65.57% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.58% done, estimate finish Fri Feb 24 19:07:04 2012 65.59% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.60% done, estimate finish Fri Feb 24 19:07:03 2012 65.60% done, estimate finish Fri Feb 24 19:07:05 2012 65.61% done, estimate finish Fri Feb 24 19:07:05 2012 65.61% done, estimate finish Fri Feb 24 19:07:04 2012 65.62% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.63% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.64% done, estimate finish Fri Feb 24 19:07:03 2012 65.64% done, estimate finish Fri Feb 24 19:07:05 2012 65.65% done, estimate finish Fri Feb 24 19:07:05 2012 65.65% done, estimate finish Fri Feb 24 19:07:04 2012 65.66% done, estimate finish Fri Feb 24 19:07:04 2012 65.67% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.68% done, estimate finish Fri Feb 24 19:07:04 2012 65.68% done, estimate finish Fri Feb 24 19:07:05 2012 65.69% done, estimate finish Fri Feb 24 19:07:05 2012 65.69% done, estimate finish Fri Feb 24 19:07:04 2012 65.70% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.71% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.72% done, estimate finish Fri Feb 24 19:07:04 2012 65.72% done, estimate finish Fri Feb 24 19:07:05 2012 65.73% done, estimate finish Fri Feb 24 19:07:05 2012 65.73% done, estimate finish Fri Feb 24 19:07:04 2012 65.74% done, estimate finish Fri Feb 24 19:07:04 2012 65.75% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.76% done, estimate finish Fri Feb 24 19:07:04 2012 65.76% done, estimate finish Fri Feb 24 19:07:05 2012 65.77% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 65.78% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.79% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.80% done, estimate finish Fri Feb 24 19:07:04 2012 65.80% done, estimate finish Fri Feb 24 19:07:05 2012 65.81% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 65.82% done, estimate finish Fri Feb 24 19:07:04 2012 65.83% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.84% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.85% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 65.86% done, estimate finish Fri Feb 24 19:07:05 2012 65.86% done, estimate finish Fri Feb 24 19:07:04 2012 65.87% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.88% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.89% done, estimate finish Fri Feb 24 19:07:05 2012 65.90% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 65.91% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.92% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.93% done, estimate finish Fri Feb 24 19:07:04 2012 65.93% done, estimate finish Fri Feb 24 19:07:05 2012 65.94% done, estimate finish Fri Feb 24 19:07:05 2012 65.94% done, estimate finish Fri Feb 24 19:07:04 2012 65.95% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.96% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 65.97% done, estimate finish Fri Feb 24 19:07:04 2012 65.97% done, estimate finish Fri Feb 24 19:07:05 2012 65.98% done, estimate finish Fri Feb 24 19:07:05 2012 65.99% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.00% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.01% done, estimate finish Fri Feb 24 19:07:04 2012 66.01% done, estimate finish Fri Feb 24 19:07:05 2012 66.02% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.03% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.04% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.05% done, estimate finish Fri Feb 24 19:07:04 2012 66.06% done, estimate finish Fri Feb 24 19:07:03 2012 66.06% done, estimate finish Fri Feb 24 19:07:05 2012 66.07% done, estimate finish Fri Feb 24 19:07:05 2012 66.07% done, estimate finish Fri Feb 24 19:07:04 2012 66.08% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.09% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.10% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.11% done, estimate finish Fri Feb 24 19:07:05 2012 66.11% done, estimate finish Fri Feb 24 19:07:04 2012 66.12% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.13% done, estimate finish Fri Feb 24 19:07:04 2012 66.14% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.15% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.16% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.17% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.18% done, estimate finish Fri Feb 24 19:07:04 2012 66.18% done, estimate finish Fri Feb 24 19:07:05 2012 66.19% done, estimate finish Fri Feb 24 19:07:05 2012 66.19% done, estimate finish Fri Feb 24 19:07:04 2012 66.20% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.21% done, estimate finish Fri Feb 24 19:07:04 2012 66.22% done, estimate finish Fri Feb 24 19:07:04 2012 66.22% done, estimate finish Fri Feb 24 19:07:05 2012 66.23% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.24% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.25% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.26% done, estimate finish Fri Feb 24 19:07:04 2012 66.26% done, estimate finish Fri Feb 24 19:07:05 2012 66.27% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.28% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.29% done, estimate finish Fri Feb 24 19:07:04 2012 66.30% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.31% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.32% done, estimate finish Fri Feb 24 19:07:05 2012 66.32% done, estimate finish Fri Feb 24 19:07:04 2012 66.33% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.34% done, estimate finish Fri Feb 24 19:07:04 2012 66.34% done, estimate finish Fri Feb 24 19:07:05 2012 66.35% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.36% done, estimate finish Fri Feb 24 19:07:05 2012 66.36% done, estimate finish Fri Feb 24 19:07:04 2012 66.37% done, estimate finish Fri Feb 24 19:07:04 2012 66.38% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.39% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.40% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.41% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.42% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.43% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.44% done, estimate finish Fri Feb 24 19:07:05 2012 66.44% done, estimate finish Fri Feb 24 19:07:04 2012 66.45% done, estimate finish Fri Feb 24 19:07:04 2012 66.46% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.47% done, estimate finish Fri Feb 24 19:07:04 2012 66.47% done, estimate finish Fri Feb 24 19:07:05 2012 66.48% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.49% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.50% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.51% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.52% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.53% done, estimate finish Fri Feb 24 19:07:04 2012 66.54% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.55% done, estimate finish Fri Feb 24 19:07:04 2012 66.55% done, estimate finish Fri Feb 24 19:07:05 2012 66.56% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.57% done, estimate finish Fri Feb 24 19:07:05 2012 66.57% done, estimate finish Fri Feb 24 19:07:04 2012 66.58% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.59% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.60% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.61% done, estimate finish Fri Feb 24 19:07:05 2012 66.62% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.63% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.64% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.65% done, estimate finish Fri Feb 24 19:07:05 2012 66.65% done, estimate finish Fri Feb 24 19:07:04 2012 66.66% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.67% done, estimate finish Fri Feb 24 19:07:04 2012 66.67% done, estimate finish Fri Feb 24 19:07:05 2012 66.68% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.69% done, estimate finish Fri Feb 24 19:07:05 2012 66.70% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.71% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.72% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.73% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.74% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.75% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.76% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.77% done, estimate finish Fri Feb 24 19:07:05 2012 66.78% done, estimate finish Fri Feb 24 19:07:05 2012 66.78% done, estimate finish Fri Feb 24 19:07:04 2012 66.79% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.80% done, estimate finish Fri Feb 24 19:07:04 2012 66.80% done, estimate finish Fri Feb 24 19:07:05 2012 66.81% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.82% done, estimate finish Fri Feb 24 19:07:05 2012 66.82% done, estimate finish Fri Feb 24 19:07:04 2012 66.83% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.84% done, estimate finish Fri Feb 24 19:07:04 2012 66.84% done, estimate finish Fri Feb 24 19:07:05 2012 66.85% done, estimate finish Fri Feb 24 19:07:05 2012 66.86% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.87% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.88% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.89% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.90% done, estimate finish Fri Feb 24 19:07:05 2012 66.90% done, estimate finish Fri Feb 24 19:07:04 2012 66.91% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.92% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.93% done, estimate finish Fri Feb 24 19:07:05 2012 66.94% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.95% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.96% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 66.97% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.98% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 66.99% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 67.00% done, estimate finish Fri Feb 24 19:07:04 2012 67.01% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.02% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.03% done, estimate finish Fri Feb 24 19:07:05 2012 67.03% done, estimate finish Fri Feb 24 19:07:04 2012 67.04% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 67.05% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.06% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.07% done, estimate finish Fri Feb 24 19:07:05 2012 67.07% done, estimate finish Fri Feb 24 19:07:04 2012 67.08% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 67.09% done, estimate finish Fri Feb 24 19:07:05 2012 67.10% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.11% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.12% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 67.13% done, estimate finish Fri Feb 24 19:07:04 2012 67.13% done, estimate finish Fri Feb 24 19:07:05 2012 67.14% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.15% done, estimate finish Fri Feb 24 19:07:05 2012 67.15% done, estimate finish Fri Feb 24 19:07:04 2012 67.16% done, estimate finish Fri Feb 24 19:07:04 2012 67.17% done, estimate finish Fri Feb 24 19:07:04 2012 67.17% done, estimate finish Fri Feb 24 19:07:05 2012 67.18% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.19% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.20% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 67.21% done, estimate finish Fri Feb 24 19:07:04 2012 67.21% done, estimate finish Fri Feb 24 19:07:05 2012 67.22% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.23% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.24% done, estimate finish Fri Feb 24 19:07:04 2012 67.25% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 67.26% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.27% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.28% done, estimate finish Fri Feb 24 19:07:05 2012 67.28% done, estimate finish Fri Feb 24 19:07:04 2012 67.29% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 67.30% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.31% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.32% done, estimate finish Fri Feb 24 19:07:05 2012 67.33% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 67.34% done, estimate finish Fri Feb 24 19:07:04 2012 67.34% done, estimate finish Fri Feb 24 19:07:05 2012 67.35% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.36% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.37% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 67.38% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.39% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.40% done, estimate finish Fri Feb 24 19:07:05 2012 67.41% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 67.42% done, estimate finish Fri Feb 24 19:07:04 2012 67.42% done, estimate finish Fri Feb 24 19:07:05 2012 67.43% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.44% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.45% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 67.46% done, estimate finish Fri Feb 24 19:07:06 2012 67.46% done, estimate finish Fri Feb 24 19:07:05 2012 67.47% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.48% done, estimate finish Fri Feb 24 19:07:05 2012 67.49% done, estimate finish Fri Feb 24 19:07:05 2012 67.49% done, estimate finish Fri Feb 24 19:07:04 2012 67.50% done, estimate finish Fri Feb 24 19:07:04 2012 67.50% done, estimate finish Fri Feb 24 19:07:06 2012 67.51% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.52% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.53% done, estimate finish Fri Feb 24 19:07:05 2012 67.53% done, estimate finish Fri Feb 24 19:07:04 2012 67.54% done, estimate finish Fri Feb 24 19:07:04 2012 67.54% done, estimate finish Fri Feb 24 19:07:05 2012 67.55% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.56% done, estimate finish Fri Feb 24 19:07:05 2012 67.57% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.58% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 67.59% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.60% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.61% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 67.62% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 67.63% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.64% done, estimate finish Fri Feb 24 19:07:07 2012 67.65% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 67.66% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 67.67% done, estimate finish Fri Feb 24 19:07:06 2012 67.67% done, estimate finish Fri Feb 24 19:07:05 2012 67.68% done, estimate finish Fri Feb 24 19:07:05 2012 67.68% done, estimate finish Fri Feb 24 19:07:07 2012 67.69% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 67.70% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 67.71% done, estimate finish Fri Feb 24 19:07:06 2012 67.71% done, estimate finish Fri Feb 24 19:07:05 2012 67.72% done, estimate finish Fri Feb 24 19:07:07 2012 67.73% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 67.74% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 67.75% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 67.76% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.77% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 67.78% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 67.79% done, estimate finish Fri Feb 24 19:07:06 2012 67.79% done, estimate finish Fri Feb 24 19:07:05 2012 67.80% done, estimate finish Fri Feb 24 19:07:05 2012 67.81% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.82% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 67.83% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 67.84% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.85% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.86% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 67.87% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 67.88% done, estimate finish Fri Feb 24 19:07:05 2012 67.89% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.90% done, estimate finish Fri Feb 24 19:07:05 2012 67.90% done, estimate finish Fri Feb 24 19:07:06 2012 67.91% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 67.92% done, estimate finish Fri Feb 24 19:07:06 2012 67.92% done, estimate finish Fri Feb 24 19:07:05 2012 67.93% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.94% done, estimate finish Fri Feb 24 19:07:05 2012 67.94% done, estimate finish Fri Feb 24 19:07:06 2012 67.95% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 67.96% done, estimate finish Fri Feb 24 19:07:06 2012 67.97% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.98% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 67.99% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 68.00% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 68.01% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.02% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.03% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 68.04% done, estimate finish Fri Feb 24 19:07:06 2012 68.05% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.06% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.07% done, estimate finish Fri Feb 24 19:07:05 2012 68.07% done, estimate finish Fri Feb 24 19:07:06 2012 68.08% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 68.09% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.10% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.11% done, estimate finish Fri Feb 24 19:07:05 2012 68.12% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 68.13% done, estimate finish Fri Feb 24 19:07:06 2012 68.13% done, estimate finish Fri Feb 24 19:07:05 2012 68.14% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.15% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.16% done, estimate finish Fri Feb 24 19:07:04 2012 68.16% done, estimate finish Fri Feb 24 19:07:06 2012 68.17% done, estimate finish Fri Feb 24 19:07:06 2012 68.17% done, estimate finish Fri Feb 24 19:07:05 2012 68.18% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.19% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.20% done, estimate finish Fri Feb 24 19:07:06 2012 68.21% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 68.22% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.23% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.24% done, estimate finish Fri Feb 24 19:07:05 2012 68.24% done, estimate finish Fri Feb 24 19:07:04 2012 68.25% done, estimate finish Fri Feb 24 19:07:04 2012 68.25% done, estimate finish Fri Feb 24 19:07:06 2012 68.26% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.27% done, estimate finish Fri Feb 24 19:07:05 2012 68.28% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.29% done, estimate finish Fri Feb 24 19:07:04 2012 68.29% done, estimate finish Fri Feb 24 19:07:06 2012 68.30% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.31% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.32% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.33% done, estimate finish Fri Feb 24 19:07:06 2012 === last message repeated 2 times. === 68.34% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.35% done, estimate finish Fri Feb 24 19:07:05 2012 68.36% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.37% done, estimate finish Fri Feb 24 19:07:05 2012 68.37% done, estimate finish Fri Feb 24 19:07:04 2012 68.38% done, estimate finish Fri Feb 24 19:07:06 2012 68.38% done, estimate finish Fri Feb 24 19:07:05 2012 68.39% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.40% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.41% done, estimate finish Fri Feb 24 19:07:04 2012 68.41% done, estimate finish Fri Feb 24 19:07:06 2012 68.42% done, estimate finish Fri Feb 24 19:07:06 2012 68.42% done, estimate finish Fri Feb 24 19:07:05 2012 68.43% done, estimate finish Fri Feb 24 19:07:05 2012 68.44% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.45% done, estimate finish Fri Feb 24 19:07:05 2012 68.45% done, estimate finish Fri Feb 24 19:07:04 2012 68.46% done, estimate finish Fri Feb 24 19:07:04 2012 68.46% done, estimate finish Fri Feb 24 19:07:06 2012 68.47% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.48% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.49% done, estimate finish Fri Feb 24 19:07:05 2012 68.49% done, estimate finish Fri Feb 24 19:07:04 2012 68.50% done, estimate finish Fri Feb 24 19:07:04 2012 68.50% done, estimate finish Fri Feb 24 19:07:06 2012 68.51% done, estimate finish Fri Feb 24 19:07:05 2012 68.52% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.53% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.54% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 68.55% done, estimate finish Fri Feb 24 19:07:04 2012 68.55% done, estimate finish Fri Feb 24 19:07:05 2012 68.56% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.57% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.58% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 68.59% done, estimate finish Fri Feb 24 19:07:04 2012 68.60% done, estimate finish Fri Feb 24 19:07:04 2012 68.60% done, estimate finish Fri Feb 24 19:07:05 2012 68.61% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.62% done, estimate finish Fri Feb 24 19:07:05 2012 68.62% done, estimate finish Fri Feb 24 19:07:04 2012 68.63% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 68.64% done, estimate finish Fri Feb 24 19:07:04 2012 68.64% done, estimate finish Fri Feb 24 19:07:05 2012 68.65% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.66% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 68.67% done, estimate finish Fri Feb 24 19:07:04 2012 68.68% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 68.69% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.70% done, estimate finish Fri Feb 24 19:07:05 2012 68.70% done, estimate finish Fri Feb 24 19:07:04 2012 68.71% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 68.72% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 68.73% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.74% done, estimate finish Fri Feb 24 19:07:05 2012 68.74% done, estimate finish Fri Feb 24 19:07:04 2012 68.75% done, estimate finish Fri Feb 24 19:07:04 2012 68.76% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 68.77% done, estimate finish Fri Feb 24 19:07:04 2012 68.77% done, estimate finish Fri Feb 24 19:07:05 2012 68.78% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.79% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 68.80% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 68.81% done, estimate finish Fri Feb 24 19:07:04 2012 68.81% done, estimate finish Fri Feb 24 19:07:05 2012 68.82% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.83% done, estimate finish Fri Feb 24 19:07:04 2012 68.84% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 68.85% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 68.86% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 68.87% done, estimate finish Fri Feb 24 19:07:05 2012 68.87% done, estimate finish Fri Feb 24 19:07:04 2012 68.88% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 68.89% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 68.90% done, estimate finish Fri Feb 24 19:07:03 2012 68.90% done, estimate finish Fri Feb 24 19:07:05 2012 68.91% done, estimate finish Fri Feb 24 19:07:04 2012 68.92% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 68.93% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 68.94% done, estimate finish Fri Feb 24 19:07:04 2012 68.94% done, estimate finish Fri Feb 24 19:07:05 2012 68.95% done, estimate finish Fri Feb 24 19:07:05 2012 68.95% done, estimate finish Fri Feb 24 19:07:04 2012 68.96% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 68.97% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 68.98% done, estimate finish Fri Feb 24 19:07:04 2012 68.98% done, estimate finish Fri Feb 24 19:07:03 2012 68.99% done, estimate finish Fri Feb 24 19:07:05 2012 69.00% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.01% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.02% done, estimate finish Fri Feb 24 19:07:04 2012 69.02% done, estimate finish Fri Feb 24 19:07:03 2012 69.03% done, estimate finish Fri Feb 24 19:07:05 2012 === last message repeated 2 times. === 69.04% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.05% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.06% done, estimate finish Fri Feb 24 19:07:04 2012 69.06% done, estimate finish Fri Feb 24 19:07:03 2012 69.07% done, estimate finish Fri Feb 24 19:07:03 2012 69.08% done, estimate finish Fri Feb 24 19:07:05 2012 69.08% done, estimate finish Fri Feb 24 19:07:04 2012 69.09% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.10% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.11% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.12% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.13% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.14% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.15% done, estimate finish Fri Feb 24 19:07:03 2012 69.16% done, estimate finish Fri Feb 24 19:07:03 2012 69.16% done, estimate finish Fri Feb 24 19:07:04 2012 69.17% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.18% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.19% done, estimate finish Fri Feb 24 19:07:04 2012 69.19% done, estimate finish Fri Feb 24 19:07:03 2012 69.20% done, estimate finish Fri Feb 24 19:07:03 2012 69.20% done, estimate finish Fri Feb 24 19:07:04 2012 69.21% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.22% done, estimate finish Fri Feb 24 19:07:04 2012 69.23% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.24% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.25% done, estimate finish Fri Feb 24 19:07:03 2012 69.25% done, estimate finish Fri Feb 24 19:07:04 2012 69.26% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.27% done, estimate finish Fri Feb 24 19:07:04 2012 69.27% done, estimate finish Fri Feb 24 19:07:03 2012 69.28% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.29% done, estimate finish Fri Feb 24 19:07:03 2012 69.29% done, estimate finish Fri Feb 24 19:07:04 2012 69.30% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.31% done, estimate finish Fri Feb 24 19:07:04 2012 69.32% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.33% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.34% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.35% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.36% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.37% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.38% done, estimate finish Fri Feb 24 19:07:03 2012 69.39% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.40% done, estimate finish Fri Feb 24 19:07:04 2012 69.40% done, estimate finish Fri Feb 24 19:07:03 2012 69.41% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.42% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.43% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.44% done, estimate finish Fri Feb 24 19:07:04 2012 69.44% done, estimate finish Fri Feb 24 19:07:03 2012 69.45% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.46% done, estimate finish Fri Feb 24 19:07:03 2012 69.47% done, estimate finish Fri Feb 24 19:07:03 2012 69.47% done, estimate finish Fri Feb 24 19:07:04 2012 69.48% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.49% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.50% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.51% done, estimate finish Fri Feb 24 19:07:03 2012 69.51% done, estimate finish Fri Feb 24 19:07:04 2012 69.52% done, estimate finish Fri Feb 24 19:07:04 2012 69.52% done, estimate finish Fri Feb 24 19:07:03 2012 69.53% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.54% done, estimate finish Fri Feb 24 19:07:03 2012 69.55% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.56% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.57% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.58% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.59% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.60% done, estimate finish Fri Feb 24 19:07:04 2012 === last message repeated 2 times. === 69.61% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.62% done, estimate finish Fri Feb 24 19:07:03 2012 69.63% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.64% done, estimate finish Fri Feb 24 19:07:03 2012 69.64% done, estimate finish Fri Feb 24 19:07:04 2012 69.65% done, estimate finish Fri Feb 24 19:07:04 2012 69.65% done, estimate finish Fri Feb 24 19:07:03 2012 69.66% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.67% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.68% done, estimate finish Fri Feb 24 19:07:02 2012 69.68% done, estimate finish Fri Feb 24 19:07:04 2012 69.69% done, estimate finish Fri Feb 24 19:07:04 2012 69.69% done, estimate finish Fri Feb 24 19:07:03 2012 69.70% done, estimate finish Fri Feb 24 19:07:03 2012 69.71% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.72% done, estimate finish Fri Feb 24 19:07:03 2012 69.72% done, estimate finish Fri Feb 24 19:07:02 2012 69.73% done, estimate finish Fri Feb 24 19:07:02 2012 69.73% done, estimate finish Fri Feb 24 19:07:04 2012 69.74% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.75% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.76% done, estimate finish Fri Feb 24 19:07:03 2012 69.76% done, estimate finish Fri Feb 24 19:07:04 2012 69.77% done, estimate finish Fri Feb 24 19:07:04 2012 69.77% done, estimate finish Fri Feb 24 19:07:03 2012 69.78% done, estimate finish Fri Feb 24 19:07:03 2012 69.79% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.80% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.81% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 69.82% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.83% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.84% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.85% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 69.86% done, estimate finish Fri Feb 24 19:07:03 2012 69.87% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.88% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.89% done, estimate finish Fri Feb 24 19:07:03 2012 69.89% done, estimate finish Fri Feb 24 19:07:02 2012 69.90% done, estimate finish Fri Feb 24 19:07:02 2012 69.90% done, estimate finish Fri Feb 24 19:07:03 2012 69.91% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.92% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.93% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 69.94% done, estimate finish Fri Feb 24 19:07:02 2012 69.95% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.96% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 69.97% done, estimate finish Fri Feb 24 19:07:03 2012 69.97% done, estimate finish Fri Feb 24 19:07:02 2012 69.98% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 69.99% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 70.00% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 70.01% done, estimate finish Fri Feb 24 19:07:03 2012 70.01% done, estimate finish Fri Feb 24 19:07:02 2012 70.02% done, estimate finish Fri Feb 24 19:07:02 2012 70.03% done, estimate finish Fri Feb 24 19:07:02 2012 70.03% done, estimate finish Fri Feb 24 19:07:03 2012 70.04% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 70.05% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 70.06% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.07% done, estimate finish Fri Feb 24 19:07:02 2012 70.07% done, estimate finish Fri Feb 24 19:07:03 2012 70.08% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 70.09% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 70.10% done, estimate finish Fri Feb 24 19:07:02 2012 70.11% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.12% done, estimate finish Fri Feb 24 19:07:02 2012 70.12% done, estimate finish Fri Feb 24 19:07:03 2012 70.13% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 70.14% done, estimate finish Fri Feb 24 19:07:03 2012 70.14% done, estimate finish Fri Feb 24 19:07:02 2012 70.15% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.16% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 70.17% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 70.18% done, estimate finish Fri Feb 24 19:07:02 2012 70.19% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.20% done, estimate finish Fri Feb 24 19:07:02 2012 70.20% done, estimate finish Fri Feb 24 19:07:03 2012 70.21% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 70.22% done, estimate finish Fri Feb 24 19:07:03 2012 70.22% done, estimate finish Fri Feb 24 19:07:02 2012 70.23% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.24% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.25% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 70.26% done, estimate finish Fri Feb 24 19:07:03 2012 70.27% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.28% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.29% done, estimate finish Fri Feb 24 19:07:02 2012 70.29% done, estimate finish Fri Feb 24 19:07:03 2012 70.30% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 70.31% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.32% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.33% done, estimate finish Fri Feb 24 19:07:02 2012 70.34% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 70.35% done, estimate finish Fri Feb 24 19:07:03 2012 70.35% done, estimate finish Fri Feb 24 19:07:02 2012 70.36% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.37% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.38% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 70.39% done, estimate finish Fri Feb 24 19:07:03 2012 70.39% done, estimate finish Fri Feb 24 19:07:02 2012 70.40% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.41% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.42% done, estimate finish Fri Feb 24 19:07:03 2012 70.43% done, estimate finish Fri Feb 24 19:07:03 2012 70.43% done, estimate finish Fri Feb 24 19:07:02 2012 70.44% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.45% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.46% done, estimate finish Fri Feb 24 19:07:02 2012 70.46% done, estimate finish Fri Feb 24 19:07:03 2012 70.47% done, estimate finish Fri Feb 24 19:07:03 2012 70.47% done, estimate finish Fri Feb 24 19:07:02 2012 70.48% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.49% done, estimate finish Fri Feb 24 19:07:02 2012 70.50% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.51% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 70.52% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.53% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.54% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.55% done, estimate finish Fri Feb 24 19:07:03 2012 === last message repeated 2 times. === 70.56% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.57% done, estimate finish Fri Feb 24 19:07:02 2012 70.58% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.59% done, estimate finish Fri Feb 24 19:07:02 2012 70.59% done, estimate finish Fri Feb 24 19:07:03 2012 70.60% done, estimate finish Fri Feb 24 19:07:03 2012 70.60% done, estimate finish Fri Feb 24 19:07:02 2012 70.61% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.62% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.63% done, estimate finish Fri Feb 24 19:07:01 2012 70.63% done, estimate finish Fri Feb 24 19:07:03 2012 70.64% done, estimate finish Fri Feb 24 19:07:03 2012 70.64% done, estimate finish Fri Feb 24 19:07:02 2012 70.65% done, estimate finish Fri Feb 24 19:07:02 2012 70.66% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.67% done, estimate finish Fri Feb 24 19:07:02 2012 70.67% done, estimate finish Fri Feb 24 19:07:01 2012 70.68% done, estimate finish Fri Feb 24 19:07:01 2012 70.68% done, estimate finish Fri Feb 24 19:07:02 2012 70.69% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.70% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.71% done, estimate finish Fri Feb 24 19:07:02 2012 70.71% done, estimate finish Fri Feb 24 19:07:01 2012 70.72% done, estimate finish Fri Feb 24 19:07:03 2012 70.72% done, estimate finish Fri Feb 24 19:07:02 2012 70.73% done, estimate finish Fri Feb 24 19:07:02 2012 70.74% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.75% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.76% done, estimate finish Fri Feb 24 19:07:01 2012 70.76% done, estimate finish Fri Feb 24 19:07:03 2012 70.77% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.78% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.79% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.80% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 70.81% done, estimate finish Fri Feb 24 19:07:01 2012 70.82% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.83% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.84% done, estimate finish Fri Feb 24 19:07:02 2012 70.84% done, estimate finish Fri Feb 24 19:07:01 2012 70.85% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 70.86% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.87% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.88% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 70.89% done, estimate finish Fri Feb 24 19:07:03 2012 70.90% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.91% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.92% done, estimate finish Fri Feb 24 19:07:02 2012 70.92% done, estimate finish Fri Feb 24 19:07:01 2012 70.93% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 70.94% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.95% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 70.96% done, estimate finish Fri Feb 24 19:07:02 2012 70.96% done, estimate finish Fri Feb 24 19:07:01 2012 70.97% done, estimate finish Fri Feb 24 19:07:01 2012 70.98% done, estimate finish Fri Feb 24 19:07:01 2012 70.98% done, estimate finish Fri Feb 24 19:07:02 2012 70.99% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 71.00% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 71.01% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.02% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.03% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 71.04% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 71.05% done, estimate finish Fri Feb 24 19:07:01 2012 71.06% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.07% done, estimate finish Fri Feb 24 19:07:01 2012 71.07% done, estimate finish Fri Feb 24 19:07:02 2012 71.08% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 71.09% done, estimate finish Fri Feb 24 19:07:02 2012 71.09% done, estimate finish Fri Feb 24 19:07:01 2012 71.10% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.11% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 71.12% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 71.13% done, estimate finish Fri Feb 24 19:07:01 2012 71.14% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.15% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.16% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 71.17% done, estimate finish Fri Feb 24 19:07:02 2012 71.17% done, estimate finish Fri Feb 24 19:07:01 2012 71.18% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.19% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.20% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 71.21% done, estimate finish Fri Feb 24 19:07:02 2012 71.22% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.23% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.24% done, estimate finish Fri Feb 24 19:07:01 2012 71.24% done, estimate finish Fri Feb 24 19:07:02 2012 71.25% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 71.26% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.27% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.28% done, estimate finish Fri Feb 24 19:07:01 2012 71.28% done, estimate finish Fri Feb 24 19:07:02 2012 71.29% done, estimate finish Fri Feb 24 19:07:02 2012 71.30% done, estimate finish Fri Feb 24 19:07:02 2012 71.30% done, estimate finish Fri Feb 24 19:07:01 2012 71.31% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.32% done, estimate finish Fri Feb 24 19:07:01 2012 71.32% done, estimate finish Fri Feb 24 19:07:02 2012 71.33% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 71.34% done, estimate finish Fri Feb 24 19:07:02 2012 71.34% done, estimate finish Fri Feb 24 19:07:01 2012 71.35% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.36% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.37% done, estimate finish Fri Feb 24 19:07:00 2012 71.38% done, estimate finish Fri Feb 24 19:07:02 2012 71.38% done, estimate finish Fri Feb 24 19:07:01 2012 71.39% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.40% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.41% done, estimate finish Fri Feb 24 19:07:01 2012 71.41% done, estimate finish Fri Feb 24 19:07:00 2012 71.42% done, estimate finish Fri Feb 24 19:07:02 2012 71.42% done, estimate finish Fri Feb 24 19:07:01 2012 71.43% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.44% done, estimate finish Fri Feb 24 19:07:01 2012 71.45% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.46% done, estimate finish Fri Feb 24 19:07:00 2012 71.46% done, estimate finish Fri Feb 24 19:07:02 2012 71.47% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.48% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.49% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.50% done, estimate finish Fri Feb 24 19:07:00 2012 71.50% done, estimate finish Fri Feb 24 19:07:02 2012 71.51% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.52% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.53% done, estimate finish Fri Feb 24 19:07:01 2012 71.54% done, estimate finish Fri Feb 24 19:07:01 2012 71.54% done, estimate finish Fri Feb 24 19:07:00 2012 71.55% done, estimate finish Fri Feb 24 19:07:02 2012 71.55% done, estimate finish Fri Feb 24 19:07:01 2012 71.56% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.57% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.58% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 71.59% done, estimate finish Fri Feb 24 19:07:02 2012 71.59% done, estimate finish Fri Feb 24 19:07:01 2012 71.60% done, estimate finish Fri Feb 24 19:07:01 2012 71.61% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.62% done, estimate finish Fri Feb 24 19:07:01 2012 71.62% done, estimate finish Fri Feb 24 19:07:00 2012 71.63% done, estimate finish Fri Feb 24 19:07:00 2012 71.63% done, estimate finish Fri Feb 24 19:07:02 2012 71.64% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.65% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.66% done, estimate finish Fri Feb 24 19:07:01 2012 71.66% done, estimate finish Fri Feb 24 19:07:00 2012 71.67% done, estimate finish Fri Feb 24 19:07:00 2012 71.67% done, estimate finish Fri Feb 24 19:07:01 2012 71.68% done, estimate finish Fri Feb 24 19:07:01 2012 71.69% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.70% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.71% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 71.72% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.73% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.74% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.75% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 71.76% done, estimate finish Fri Feb 24 19:07:00 2012 71.77% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.78% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.79% done, estimate finish Fri Feb 24 19:07:01 2012 71.79% done, estimate finish Fri Feb 24 19:07:00 2012 71.80% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 71.81% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.82% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.83% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 71.84% done, estimate finish Fri Feb 24 19:07:00 2012 71.85% done, estimate finish Fri Feb 24 19:07:00 2012 71.85% done, estimate finish Fri Feb 24 19:07:01 2012 71.86% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.87% done, estimate finish Fri Feb 24 19:07:01 2012 71.87% done, estimate finish Fri Feb 24 19:07:00 2012 71.88% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 71.89% done, estimate finish Fri Feb 24 19:07:00 2012 71.89% done, estimate finish Fri Feb 24 19:07:01 2012 71.90% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.91% done, estimate finish Fri Feb 24 19:07:01 2012 71.91% done, estimate finish Fri Feb 24 19:07:00 2012 71.92% done, estimate finish Fri Feb 24 19:07:00 2012 71.93% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 71.94% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.95% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.96% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 71.97% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 71.98% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 71.99% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 72.00% done, estimate finish Fri Feb 24 19:07:00 2012 72.01% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.02% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 72.03% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 72.04% done, estimate finish Fri Feb 24 19:07:01 2012 72.04% done, estimate finish Fri Feb 24 19:07:00 2012 72.05% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.06% done, estimate finish Fri Feb 24 19:07:00 2012 72.06% done, estimate finish Fri Feb 24 19:07:01 2012 72.07% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 72.08% done, estimate finish Fri Feb 24 19:07:01 2012 72.09% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.10% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.11% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 72.12% done, estimate finish Fri Feb 24 19:07:01 2012 72.12% done, estimate finish Fri Feb 24 19:07:00 2012 72.13% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.14% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.15% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 72.16% done, estimate finish Fri Feb 24 19:07:01 2012 72.17% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.18% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.19% done, estimate finish Fri Feb 24 19:07:00 2012 72.19% done, estimate finish Fri Feb 24 19:07:01 2012 72.20% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 72.21% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.22% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.23% done, estimate finish Fri Feb 24 19:07:00 2012 72.23% done, estimate finish Fri Feb 24 19:07:01 2012 72.24% done, estimate finish Fri Feb 24 19:07:01 2012 72.25% done, estimate finish Fri Feb 24 19:07:01 2012 72.25% done, estimate finish Fri Feb 24 19:07:00 2012 72.26% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.27% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.28% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 72.29% done, estimate finish Fri Feb 24 19:07:01 2012 72.29% done, estimate finish Fri Feb 24 19:07:00 2012 72.30% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.31% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.32% done, estimate finish Fri Feb 24 19:07:01 2012 72.33% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 72.34% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.35% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.36% done, estimate finish Fri Feb 24 19:07:00 2012 72.36% done, estimate finish Fri Feb 24 19:06:59 2012 72.37% done, estimate finish Fri Feb 24 19:07:01 2012 72.37% done, estimate finish Fri Feb 24 19:07:00 2012 72.38% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.39% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.40% done, estimate finish Fri Feb 24 19:07:00 2012 72.41% done, estimate finish Fri Feb 24 19:06:59 2012 72.41% done, estimate finish Fri Feb 24 19:07:01 2012 72.42% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.43% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.44% done, estimate finish Fri Feb 24 19:07:00 2012 72.44% done, estimate finish Fri Feb 24 19:07:01 2012 72.45% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 72.46% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.47% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.48% done, estimate finish Fri Feb 24 19:07:00 2012 72.49% done, estimate finish Fri Feb 24 19:07:00 2012 72.49% done, estimate finish Fri Feb 24 19:06:59 2012 72.50% done, estimate finish Fri Feb 24 19:07:01 2012 72.50% done, estimate finish Fri Feb 24 19:07:00 2012 72.51% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.52% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.53% done, estimate finish Fri Feb 24 19:07:00 2012 72.53% done, estimate finish Fri Feb 24 19:06:59 2012 72.54% done, estimate finish Fri Feb 24 19:07:01 2012 72.54% done, estimate finish Fri Feb 24 19:07:00 2012 72.55% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.56% done, estimate finish Fri Feb 24 19:07:00 2012 72.57% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.58% done, estimate finish Fri Feb 24 19:06:59 2012 72.58% done, estimate finish Fri Feb 24 19:07:01 2012 72.59% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.60% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.61% done, estimate finish Fri Feb 24 19:07:00 2012 72.61% done, estimate finish Fri Feb 24 19:06:59 2012 72.62% done, estimate finish Fri Feb 24 19:06:59 2012 72.62% done, estimate finish Fri Feb 24 19:07:01 2012 72.63% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.64% done, estimate finish Fri Feb 24 19:07:00 2012 72.65% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.66% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 72.67% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.68% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.69% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.70% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 72.71% done, estimate finish Fri Feb 24 19:07:00 2012 72.72% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.73% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.74% done, estimate finish Fri Feb 24 19:07:00 2012 72.74% done, estimate finish Fri Feb 24 19:06:59 2012 72.75% done, estimate finish Fri Feb 24 19:06:59 2012 72.75% done, estimate finish Fri Feb 24 19:07:00 2012 72.76% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.77% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.78% done, estimate finish Fri Feb 24 19:07:00 2012 72.78% done, estimate finish Fri Feb 24 19:06:59 2012 72.79% done, estimate finish Fri Feb 24 19:06:59 2012 72.80% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.81% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.82% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.83% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 72.84% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.85% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.86% done, estimate finish Fri Feb 24 19:07:00 2012 72.86% done, estimate finish Fri Feb 24 19:06:59 2012 72.87% done, estimate finish Fri Feb 24 19:06:59 2012 72.88% done, estimate finish Fri Feb 24 19:06:59 2012 72.88% done, estimate finish Fri Feb 24 19:07:00 2012 72.89% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.90% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.91% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 72.92% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 72.93% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.94% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.95% done, estimate finish Fri Feb 24 19:06:59 2012 72.96% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 72.97% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.98% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 72.99% done, estimate finish Fri Feb 24 19:07:00 2012 72.99% done, estimate finish Fri Feb 24 19:06:59 2012 73.00% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 73.01% done, estimate finish Fri Feb 24 19:06:59 2012 73.01% done, estimate finish Fri Feb 24 19:07:00 2012 73.02% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.03% done, estimate finish Fri Feb 24 19:07:00 2012 73.04% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 73.05% done, estimate finish Fri Feb 24 19:06:59 2012 73.05% done, estimate finish Fri Feb 24 19:07:00 2012 73.06% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.07% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.08% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 73.09% done, estimate finish Fri Feb 24 19:06:59 2012 73.09% done, estimate finish Fri Feb 24 19:07:00 2012 73.10% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.11% done, estimate finish Fri Feb 24 19:07:00 2012 73.12% done, estimate finish Fri Feb 24 19:07:00 2012 73.12% done, estimate finish Fri Feb 24 19:06:59 2012 73.13% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 73.14% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.15% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.16% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 73.17% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 73.18% done, estimate finish Fri Feb 24 19:06:59 2012 73.18% done, estimate finish Fri Feb 24 19:07:00 2012 73.19% done, estimate finish Fri Feb 24 19:07:00 2012 73.20% done, estimate finish Fri Feb 24 19:07:00 2012 73.20% done, estimate finish Fri Feb 24 19:06:59 2012 73.21% done, estimate finish Fri Feb 24 19:07:01 2012 73.21% done, estimate finish Fri Feb 24 19:07:00 2012 73.22% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.23% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.24% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 73.25% done, estimate finish Fri Feb 24 19:07:01 2012 73.25% done, estimate finish Fri Feb 24 19:07:00 2012 73.26% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.27% done, estimate finish Fri Feb 24 19:07:00 2012 73.28% done, estimate finish Fri Feb 24 19:07:00 2012 73.28% done, estimate finish Fri Feb 24 19:07:01 2012 73.29% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 73.30% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.31% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.32% done, estimate finish Fri Feb 24 19:07:00 2012 73.32% done, estimate finish Fri Feb 24 19:07:01 2012 73.33% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 73.34% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.35% done, estimate finish Fri Feb 24 19:07:00 2012 73.36% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.37% done, estimate finish Fri Feb 24 19:07:00 2012 73.37% done, estimate finish Fri Feb 24 19:07:01 2012 73.38% done, estimate finish Fri Feb 24 19:07:01 2012 73.38% done, estimate finish Fri Feb 24 19:07:00 2012 73.39% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.40% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.41% done, estimate finish Fri Feb 24 19:06:59 2012 73.41% done, estimate finish Fri Feb 24 19:07:01 2012 73.42% done, estimate finish Fri Feb 24 19:07:01 2012 73.42% done, estimate finish Fri Feb 24 19:07:00 2012 73.43% done, estimate finish Fri Feb 24 19:07:00 2012 73.44% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.45% done, estimate finish Fri Feb 24 19:07:00 2012 73.45% done, estimate finish Fri Feb 24 19:07:01 2012 73.46% done, estimate finish Fri Feb 24 19:07:01 2012 73.46% done, estimate finish Fri Feb 24 19:07:00 2012 73.47% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.48% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.49% done, estimate finish Fri Feb 24 19:07:00 2012 73.49% done, estimate finish Fri Feb 24 19:07:01 2012 73.50% done, estimate finish Fri Feb 24 19:07:01 2012 73.50% done, estimate finish Fri Feb 24 19:07:00 2012 73.51% done, estimate finish Fri Feb 24 19:07:00 2012 73.52% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.53% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.54% done, estimate finish Fri Feb 24 19:06:59 2012 73.54% done, estimate finish Fri Feb 24 19:07:01 2012 73.55% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.56% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.57% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.58% done, estimate finish Fri Feb 24 19:06:59 2012 73.58% done, estimate finish Fri Feb 24 19:07:01 2012 73.59% done, estimate finish Fri Feb 24 19:07:00 2012 73.60% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.61% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.62% done, estimate finish Fri Feb 24 19:07:00 2012 73.62% done, estimate finish Fri Feb 24 19:06:59 2012 73.63% done, estimate finish Fri Feb 24 19:07:01 2012 73.63% done, estimate finish Fri Feb 24 19:07:00 2012 73.64% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.65% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.66% done, estimate finish Fri Feb 24 19:07:00 2012 73.66% done, estimate finish Fri Feb 24 19:06:59 2012 73.67% done, estimate finish Fri Feb 24 19:07:01 2012 73.68% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.69% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.70% done, estimate finish Fri Feb 24 19:07:00 2012 73.70% done, estimate finish Fri Feb 24 19:06:59 2012 73.71% done, estimate finish Fri Feb 24 19:06:59 2012 73.71% done, estimate finish Fri Feb 24 19:07:00 2012 73.72% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.73% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.74% done, estimate finish Fri Feb 24 19:07:00 2012 73.74% done, estimate finish Fri Feb 24 19:06:59 2012 73.75% done, estimate finish Fri Feb 24 19:06:59 2012 73.76% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.77% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.78% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.79% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 73.80% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.81% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.82% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.83% done, estimate finish Fri Feb 24 19:06:59 2012 73.84% done, estimate finish Fri Feb 24 19:06:59 2012 73.84% done, estimate finish Fri Feb 24 19:07:00 2012 73.85% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.86% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.87% done, estimate finish Fri Feb 24 19:07:00 2012 73.87% done, estimate finish Fri Feb 24 19:06:59 2012 73.88% done, estimate finish Fri Feb 24 19:06:59 2012 73.88% done, estimate finish Fri Feb 24 19:07:00 2012 73.89% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.90% done, estimate finish Fri Feb 24 19:07:00 2012 73.91% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.92% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 73.93% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.94% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.95% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.96% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 73.97% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 73.98% done, estimate finish Fri Feb 24 19:07:00 2012 73.99% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.00% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.01% done, estimate finish Fri Feb 24 19:06:59 2012 74.01% done, estimate finish Fri Feb 24 19:07:00 2012 74.02% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.03% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.04% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.05% done, estimate finish Fri Feb 24 19:06:59 2012 74.05% done, estimate finish Fri Feb 24 19:07:00 2012 74.06% done, estimate finish Fri Feb 24 19:07:00 2012 74.07% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.08% done, estimate finish Fri Feb 24 19:07:00 2012 74.08% done, estimate finish Fri Feb 24 19:06:59 2012 74.09% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.10% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.11% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.12% done, estimate finish Fri Feb 24 19:07:00 2012 74.12% done, estimate finish Fri Feb 24 19:06:59 2012 74.13% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.14% done, estimate finish Fri Feb 24 19:07:00 2012 74.15% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.16% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.17% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.18% done, estimate finish Fri Feb 24 19:06:59 2012 74.18% done, estimate finish Fri Feb 24 19:07:00 2012 74.19% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.20% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.21% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.22% done, estimate finish Fri Feb 24 19:06:59 2012 74.23% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.24% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.25% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.26% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.27% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.28% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.29% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.30% done, estimate finish Fri Feb 24 19:06:59 2012 74.31% done, estimate finish Fri Feb 24 19:06:59 2012 74.31% done, estimate finish Fri Feb 24 19:07:00 2012 74.32% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.33% done, estimate finish Fri Feb 24 19:07:00 2012 74.33% done, estimate finish Fri Feb 24 19:06:59 2012 74.34% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.35% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.36% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.37% done, estimate finish Fri Feb 24 19:07:00 2012 74.37% done, estimate finish Fri Feb 24 19:06:59 2012 74.38% done, estimate finish Fri Feb 24 19:06:59 2012 74.39% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.40% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.41% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.42% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.43% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.44% done, estimate finish Fri Feb 24 19:06:59 2012 74.44% done, estimate finish Fri Feb 24 19:07:00 2012 74.45% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.46% done, estimate finish Fri Feb 24 19:06:59 2012 74.47% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.48% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.49% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.50% done, estimate finish Fri Feb 24 19:07:00 2012 74.50% done, estimate finish Fri Feb 24 19:06:59 2012 74.51% done, estimate finish Fri Feb 24 19:07:01 2012 74.51% done, estimate finish Fri Feb 24 19:07:00 2012 74.52% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.53% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.54% done, estimate finish Fri Feb 24 19:06:59 2012 74.55% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.56% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.57% done, estimate finish Fri Feb 24 19:06:59 2012 74.57% done, estimate finish Fri Feb 24 19:07:00 2012 74.58% done, estimate finish Fri Feb 24 19:07:00 2012 74.58% done, estimate finish Fri Feb 24 19:06:59 2012 74.59% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.60% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.61% done, estimate finish Fri Feb 24 19:06:59 2012 74.61% done, estimate finish Fri Feb 24 19:07:00 2012 74.62% done, estimate finish Fri Feb 24 19:07:00 2012 74.63% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.64% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.65% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.66% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.67% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.68% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.69% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.70% done, estimate finish Fri Feb 24 19:07:00 2012 74.71% done, estimate finish Fri Feb 24 19:07:00 2012 74.71% done, estimate finish Fri Feb 24 19:06:59 2012 74.72% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.73% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.74% done, estimate finish Fri Feb 24 19:06:59 2012 74.74% done, estimate finish Fri Feb 24 19:07:00 2012 74.75% done, estimate finish Fri Feb 24 19:07:00 2012 74.75% done, estimate finish Fri Feb 24 19:06:59 2012 74.76% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.77% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.78% done, estimate finish Fri Feb 24 19:06:58 2012 74.79% done, estimate finish Fri Feb 24 19:07:00 2012 74.79% done, estimate finish Fri Feb 24 19:06:59 2012 74.80% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.81% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.82% done, estimate finish Fri Feb 24 19:06:59 2012 74.82% done, estimate finish Fri Feb 24 19:06:58 2012 74.83% done, estimate finish Fri Feb 24 19:07:00 2012 74.83% done, estimate finish Fri Feb 24 19:06:59 2012 74.84% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.85% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.86% done, estimate finish Fri Feb 24 19:06:59 2012 74.87% done, estimate finish Fri Feb 24 19:06:58 2012 74.87% done, estimate finish Fri Feb 24 19:07:00 2012 74.88% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.89% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.90% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.91% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 74.92% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.93% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.94% done, estimate finish Fri Feb 24 19:06:59 2012 74.95% done, estimate finish Fri Feb 24 19:06:59 2012 74.95% done, estimate finish Fri Feb 24 19:07:00 2012 74.96% done, estimate finish Fri Feb 24 19:07:00 2012 74.96% done, estimate finish Fri Feb 24 19:06:59 2012 74.97% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.98% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 74.99% done, estimate finish Fri Feb 24 19:06:59 2012 74.99% done, estimate finish Fri Feb 24 19:06:58 2012 75.00% done, estimate finish Fri Feb 24 19:07:00 2012 75.00% done, estimate finish Fri Feb 24 19:06:59 2012 75.01% done, estimate finish Fri Feb 24 19:06:59 2012 75.02% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.03% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.04% done, estimate finish Fri Feb 24 19:06:58 2012 75.04% done, estimate finish Fri Feb 24 19:07:00 2012 75.05% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.06% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.07% done, estimate finish Fri Feb 24 19:06:59 2012 75.07% done, estimate finish Fri Feb 24 19:06:58 2012 75.08% done, estimate finish Fri Feb 24 19:07:00 2012 75.08% done, estimate finish Fri Feb 24 19:06:59 2012 75.09% done, estimate finish Fri Feb 24 19:06:59 2012 75.10% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.11% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.12% done, estimate finish Fri Feb 24 19:06:58 2012 75.12% done, estimate finish Fri Feb 24 19:07:00 2012 75.13% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.14% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.15% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.16% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 75.17% done, estimate finish Fri Feb 24 19:06:59 2012 75.18% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.19% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.20% done, estimate finish Fri Feb 24 19:06:59 2012 75.20% done, estimate finish Fri Feb 24 19:06:58 2012 75.21% done, estimate finish Fri Feb 24 19:07:00 2012 75.21% done, estimate finish Fri Feb 24 19:06:59 2012 75.22% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.23% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.24% done, estimate finish Fri Feb 24 19:06:59 2012 75.24% done, estimate finish Fri Feb 24 19:06:58 2012 75.25% done, estimate finish Fri Feb 24 19:06:58 2012 75.26% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.27% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.28% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.29% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 75.30% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.31% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.32% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.33% done, estimate finish Fri Feb 24 19:06:58 2012 75.34% done, estimate finish Fri Feb 24 19:06:58 2012 75.34% done, estimate finish Fri Feb 24 19:06:59 2012 75.35% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.36% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.37% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 75.38% done, estimate finish Fri Feb 24 19:06:58 2012 75.38% done, estimate finish Fri Feb 24 19:06:59 2012 75.39% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.40% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.41% done, estimate finish Fri Feb 24 19:06:58 2012 75.42% done, estimate finish Fri Feb 24 19:06:58 2012 75.42% done, estimate finish Fri Feb 24 19:06:59 2012 75.43% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.44% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.45% done, estimate finish Fri Feb 24 19:06:59 2012 75.45% done, estimate finish Fri Feb 24 19:06:58 2012 75.46% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 75.47% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.48% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.49% done, estimate finish Fri Feb 24 19:06:59 2012 75.50% done, estimate finish Fri Feb 24 19:06:58 2012 75.50% done, estimate finish Fri Feb 24 19:07:00 2012 75.51% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.52% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.53% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.54% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 75.55% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.56% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.57% done, estimate finish Fri Feb 24 19:06:59 2012 75.58% done, estimate finish Fri Feb 24 19:06:59 2012 75.58% done, estimate finish Fri Feb 24 19:06:58 2012 75.59% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 75.60% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.61% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.62% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 75.63% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 75.64% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.65% done, estimate finish Fri Feb 24 19:06:59 2012 75.66% done, estimate finish Fri Feb 24 19:06:59 2012 75.66% done, estimate finish Fri Feb 24 19:06:58 2012 75.67% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 75.68% done, estimate finish Fri Feb 24 19:06:58 2012 75.68% done, estimate finish Fri Feb 24 19:06:59 2012 75.69% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.70% done, estimate finish Fri Feb 24 19:06:59 2012 75.70% done, estimate finish Fri Feb 24 19:06:58 2012 75.71% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 75.72% done, estimate finish Fri Feb 24 19:06:58 2012 75.72% done, estimate finish Fri Feb 24 19:06:59 2012 75.73% done, estimate finish Fri Feb 24 19:06:59 2012 75.74% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.75% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 75.76% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 75.77% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.78% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.79% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 75.80% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 75.81% done, estimate finish Fri Feb 24 19:06:59 2012 75.82% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.83% done, estimate finish Fri Feb 24 19:06:59 2012 75.83% done, estimate finish Fri Feb 24 19:06:58 2012 75.84% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 75.85% done, estimate finish Fri Feb 24 19:06:58 2012 75.85% done, estimate finish Fri Feb 24 19:06:59 2012 75.86% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.87% done, estimate finish Fri Feb 24 19:06:59 2012 75.87% done, estimate finish Fri Feb 24 19:06:58 2012 75.88% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 75.89% done, estimate finish Fri Feb 24 19:06:58 2012 75.90% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.91% done, estimate finish Fri Feb 24 19:06:59 2012 75.91% done, estimate finish Fri Feb 24 19:06:58 2012 75.92% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 75.93% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 75.94% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 75.95% done, estimate finish Fri Feb 24 19:06:59 2012 75.95% done, estimate finish Fri Feb 24 19:06:58 2012 75.96% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 75.97% done, estimate finish Fri Feb 24 19:06:58 2012 75.98% done, estimate finish Fri Feb 24 19:06:58 2012 75.98% done, estimate finish Fri Feb 24 19:06:59 2012 75.99% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 76.00% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.01% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.02% done, estimate finish Fri Feb 24 19:06:58 2012 76.02% done, estimate finish Fri Feb 24 19:06:59 2012 76.03% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 76.04% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.05% done, estimate finish Fri Feb 24 19:06:58 2012 76.06% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.07% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 76.08% done, estimate finish Fri Feb 24 19:06:59 2012 76.08% done, estimate finish Fri Feb 24 19:06:58 2012 76.09% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.10% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.11% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 76.12% done, estimate finish Fri Feb 24 19:06:59 2012 76.13% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.14% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.15% done, estimate finish Fri Feb 24 19:06:58 2012 76.15% done, estimate finish Fri Feb 24 19:06:59 2012 76.16% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 76.17% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.18% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.19% done, estimate finish Fri Feb 24 19:06:58 2012 76.19% done, estimate finish Fri Feb 24 19:06:59 2012 76.20% done, estimate finish Fri Feb 24 19:06:59 2012 76.21% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.22% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.23% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.24% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 76.25% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.26% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.27% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.28% done, estimate finish Fri Feb 24 19:06:59 2012 76.29% done, estimate finish Fri Feb 24 19:06:59 2012 76.29% done, estimate finish Fri Feb 24 19:06:58 2012 76.30% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.31% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.32% done, estimate finish Fri Feb 24 19:06:58 2012 76.32% done, estimate finish Fri Feb 24 19:06:59 2012 76.33% done, estimate finish Fri Feb 24 19:06:59 2012 76.33% done, estimate finish Fri Feb 24 19:06:58 2012 76.34% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.35% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.36% done, estimate finish Fri Feb 24 19:06:58 2012 76.37% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 76.38% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.39% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.40% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.41% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 76.42% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.43% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.44% done, estimate finish Fri Feb 24 19:06:58 2012 76.45% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 76.46% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.47% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.48% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.49% done, estimate finish Fri Feb 24 19:06:57 2012 76.49% done, estimate finish Fri Feb 24 19:06:59 2012 76.50% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.51% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.52% done, estimate finish Fri Feb 24 19:06:58 2012 76.53% done, estimate finish Fri Feb 24 19:06:58 2012 76.53% done, estimate finish Fri Feb 24 19:06:57 2012 76.54% done, estimate finish Fri Feb 24 19:06:59 2012 76.54% done, estimate finish Fri Feb 24 19:06:58 2012 76.55% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.56% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.57% done, estimate finish Fri Feb 24 19:06:58 2012 76.57% done, estimate finish Fri Feb 24 19:06:59 2012 76.58% done, estimate finish Fri Feb 24 19:06:59 2012 76.58% done, estimate finish Fri Feb 24 19:06:58 2012 76.59% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.60% done, estimate finish Fri Feb 24 19:06:58 2012 76.61% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.62% done, estimate finish Fri Feb 24 19:06:57 2012 76.62% done, estimate finish Fri Feb 24 19:06:59 2012 76.63% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.64% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.65% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.66% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 76.67% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.68% done, estimate finish Fri Feb 24 19:06:58 2012 76.69% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.70% done, estimate finish Fri Feb 24 19:06:58 2012 76.70% done, estimate finish Fri Feb 24 19:06:59 2012 76.71% done, estimate finish Fri Feb 24 19:06:59 2012 76.71% done, estimate finish Fri Feb 24 19:06:58 2012 76.72% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.73% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.74% done, estimate finish Fri Feb 24 19:06:58 2012 76.74% done, estimate finish Fri Feb 24 19:06:57 2012 76.75% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.76% done, estimate finish Fri Feb 24 19:06:58 2012 76.77% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.78% done, estimate finish Fri Feb 24 19:06:58 2012 76.78% done, estimate finish Fri Feb 24 19:06:57 2012 76.79% done, estimate finish Fri Feb 24 19:06:59 2012 76.79% done, estimate finish Fri Feb 24 19:06:58 2012 76.80% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.81% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.82% done, estimate finish Fri Feb 24 19:06:58 2012 76.82% done, estimate finish Fri Feb 24 19:06:57 2012 76.83% done, estimate finish Fri Feb 24 19:06:57 2012 76.83% done, estimate finish Fri Feb 24 19:06:58 2012 76.84% done, estimate finish Fri Feb 24 19:06:58 2012 76.85% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.86% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.87% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 76.88% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.89% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.90% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.91% done, estimate finish Fri Feb 24 19:06:57 2012 76.91% done, estimate finish Fri Feb 24 19:06:59 2012 76.92% done, estimate finish Fri Feb 24 19:06:58 2012 76.93% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.94% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.95% done, estimate finish Fri Feb 24 19:06:58 2012 76.95% done, estimate finish Fri Feb 24 19:06:57 2012 76.96% done, estimate finish Fri Feb 24 19:06:57 2012 76.96% done, estimate finish Fri Feb 24 19:06:58 2012 76.97% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.98% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 76.99% done, estimate finish Fri Feb 24 19:06:58 2012 76.99% done, estimate finish Fri Feb 24 19:06:57 2012 77.00% done, estimate finish Fri Feb 24 19:06:57 2012 77.01% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.02% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.03% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.04% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.05% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.06% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.07% done, estimate finish Fri Feb 24 19:06:58 2012 77.07% done, estimate finish Fri Feb 24 19:06:57 2012 77.08% done, estimate finish Fri Feb 24 19:06:57 2012 77.09% done, estimate finish Fri Feb 24 19:06:57 2012 77.09% done, estimate finish Fri Feb 24 19:06:58 2012 77.10% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.11% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.12% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.13% done, estimate finish Fri Feb 24 19:06:57 2012 77.13% done, estimate finish Fri Feb 24 19:06:58 2012 77.14% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.15% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.16% done, estimate finish Fri Feb 24 19:06:57 2012 77.17% done, estimate finish Fri Feb 24 19:06:57 2012 77.17% done, estimate finish Fri Feb 24 19:06:58 2012 77.18% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.19% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.20% done, estimate finish Fri Feb 24 19:06:58 2012 77.20% done, estimate finish Fri Feb 24 19:06:57 2012 77.21% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.22% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.23% done, estimate finish Fri Feb 24 19:06:58 2012 77.24% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.25% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.26% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.27% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.28% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.29% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.30% done, estimate finish Fri Feb 24 19:06:57 2012 77.30% done, estimate finish Fri Feb 24 19:06:58 2012 77.31% done, estimate finish Fri Feb 24 19:06:58 2012 77.32% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.33% done, estimate finish Fri Feb 24 19:06:58 2012 77.33% done, estimate finish Fri Feb 24 19:06:57 2012 77.34% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.35% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.36% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.37% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.38% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.39% done, estimate finish Fri Feb 24 19:06:58 2012 77.40% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.41% done, estimate finish Fri Feb 24 19:06:58 2012 77.41% done, estimate finish Fri Feb 24 19:06:57 2012 77.42% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.43% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.44% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.45% done, estimate finish Fri Feb 24 19:06:58 2012 77.45% done, estimate finish Fri Feb 24 19:06:57 2012 77.46% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.47% done, estimate finish Fri Feb 24 19:06:57 2012 77.48% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.49% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.50% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.51% done, estimate finish Fri Feb 24 19:06:57 2012 77.51% done, estimate finish Fri Feb 24 19:06:58 2012 77.52% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.53% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.54% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.55% done, estimate finish Fri Feb 24 19:06:57 2012 77.56% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.57% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.58% done, estimate finish Fri Feb 24 19:06:58 2012 77.58% done, estimate finish Fri Feb 24 19:06:57 2012 77.59% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.60% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.61% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.62% done, estimate finish Fri Feb 24 19:06:58 2012 77.62% done, estimate finish Fri Feb 24 19:06:57 2012 77.63% done, estimate finish Fri Feb 24 19:06:57 2012 77.64% done, estimate finish Fri Feb 24 19:06:57 2012 77.64% done, estimate finish Fri Feb 24 19:06:58 2012 77.65% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.66% done, estimate finish Fri Feb 24 19:06:58 2012 77.66% done, estimate finish Fri Feb 24 19:06:57 2012 77.67% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.68% done, estimate finish Fri Feb 24 19:06:57 2012 77.68% done, estimate finish Fri Feb 24 19:06:58 2012 77.69% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.70% done, estimate finish Fri Feb 24 19:06:58 2012 77.70% done, estimate finish Fri Feb 24 19:06:57 2012 77.71% done, estimate finish Fri Feb 24 19:06:57 2012 77.72% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.73% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.74% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.75% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.76% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.77% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.78% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.79% done, estimate finish Fri Feb 24 19:06:57 2012 77.80% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.81% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.82% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.83% done, estimate finish Fri Feb 24 19:06:58 2012 77.83% done, estimate finish Fri Feb 24 19:06:57 2012 77.84% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.85% done, estimate finish Fri Feb 24 19:06:57 2012 77.85% done, estimate finish Fri Feb 24 19:06:58 2012 77.86% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.87% done, estimate finish Fri Feb 24 19:06:58 2012 77.88% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.89% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.90% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.91% done, estimate finish Fri Feb 24 19:06:58 2012 77.91% done, estimate finish Fri Feb 24 19:06:57 2012 77.92% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.93% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.94% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 77.95% done, estimate finish Fri Feb 24 19:06:58 2012 77.96% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.97% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 77.98% done, estimate finish Fri Feb 24 19:06:57 2012 77.98% done, estimate finish Fri Feb 24 19:06:58 2012 77.99% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.00% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.01% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.02% done, estimate finish Fri Feb 24 19:06:57 2012 78.02% done, estimate finish Fri Feb 24 19:06:58 2012 78.03% done, estimate finish Fri Feb 24 19:06:58 2012 78.04% done, estimate finish Fri Feb 24 19:06:58 2012 78.04% done, estimate finish Fri Feb 24 19:06:57 2012 78.05% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.06% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.07% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.08% done, estimate finish Fri Feb 24 19:06:58 2012 78.08% done, estimate finish Fri Feb 24 19:06:57 2012 78.09% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.10% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.11% done, estimate finish Fri Feb 24 19:06:58 2012 78.12% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.13% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.14% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.15% done, estimate finish Fri Feb 24 19:06:57 2012 78.15% done, estimate finish Fri Feb 24 19:06:58 2012 78.16% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.17% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.18% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.19% done, estimate finish Fri Feb 24 19:06:57 2012 78.20% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.21% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.22% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.23% done, estimate finish Fri Feb 24 19:06:57 2012 78.23% done, estimate finish Fri Feb 24 19:06:58 2012 78.24% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.25% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.26% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.27% done, estimate finish Fri Feb 24 19:06:57 2012 78.28% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.29% done, estimate finish Fri Feb 24 19:06:58 2012 78.29% done, estimate finish Fri Feb 24 19:06:57 2012 78.30% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.31% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.32% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.33% done, estimate finish Fri Feb 24 19:06:58 2012 78.33% done, estimate finish Fri Feb 24 19:06:57 2012 78.34% done, estimate finish Fri Feb 24 19:06:57 2012 78.35% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.36% done, estimate finish Fri Feb 24 19:06:57 2012 78.36% done, estimate finish Fri Feb 24 19:06:58 2012 78.37% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.38% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.39% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.40% done, estimate finish Fri Feb 24 19:06:57 2012 78.40% done, estimate finish Fri Feb 24 19:06:58 2012 78.41% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.42% done, estimate finish Fri Feb 24 19:06:57 2012 78.43% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.44% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.45% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.46% done, estimate finish Fri Feb 24 19:06:58 2012 78.46% done, estimate finish Fri Feb 24 19:06:57 2012 78.47% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.48% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.49% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.50% done, estimate finish Fri Feb 24 19:06:57 2012 78.51% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.52% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.53% done, estimate finish Fri Feb 24 19:06:57 2012 78.53% done, estimate finish Fri Feb 24 19:06:58 2012 78.54% done, estimate finish Fri Feb 24 19:06:58 2012 78.54% done, estimate finish Fri Feb 24 19:06:57 2012 78.55% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.56% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.57% done, estimate finish Fri Feb 24 19:06:57 2012 78.57% done, estimate finish Fri Feb 24 19:06:58 2012 78.58% done, estimate finish Fri Feb 24 19:06:58 2012 78.59% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.60% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.61% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.62% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.63% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.64% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.65% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.66% done, estimate finish Fri Feb 24 19:06:58 2012 78.67% done, estimate finish Fri Feb 24 19:06:58 2012 78.67% done, estimate finish Fri Feb 24 19:06:57 2012 78.68% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.69% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.70% done, estimate finish Fri Feb 24 19:06:57 2012 78.70% done, estimate finish Fri Feb 24 19:06:58 2012 78.71% done, estimate finish Fri Feb 24 19:06:58 2012 78.71% done, estimate finish Fri Feb 24 19:06:57 2012 78.72% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.73% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.74% done, estimate finish Fri Feb 24 19:06:57 2012 78.75% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.76% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.77% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.78% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.79% done, estimate finish Fri Feb 24 19:06:58 2012 78.79% done, estimate finish Fri Feb 24 19:06:57 2012 78.80% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 78.81% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.82% done, estimate finish Fri Feb 24 19:06:58 2012 78.83% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.84% done, estimate finish Fri Feb 24 19:06:57 2012 78.84% done, estimate finish Fri Feb 24 19:06:59 2012 78.85% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.86% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.87% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.88% done, estimate finish Fri Feb 24 19:06:57 2012 78.88% done, estimate finish Fri Feb 24 19:06:59 2012 78.89% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.90% done, estimate finish Fri Feb 24 19:06:58 2012 78.91% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.92% done, estimate finish Fri Feb 24 19:06:58 2012 78.92% done, estimate finish Fri Feb 24 19:06:59 2012 78.93% done, estimate finish Fri Feb 24 19:06:59 2012 78.93% done, estimate finish Fri Feb 24 19:06:58 2012 78.94% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.95% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 78.96% done, estimate finish Fri Feb 24 19:06:58 2012 78.96% done, estimate finish Fri Feb 24 19:06:57 2012 78.97% done, estimate finish Fri Feb 24 19:06:59 2012 78.97% done, estimate finish Fri Feb 24 19:06:58 2012 78.98% done, estimate finish Fri Feb 24 19:06:58 2012 78.99% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.00% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.01% done, estimate finish Fri Feb 24 19:06:57 2012 79.01% done, estimate finish Fri Feb 24 19:06:58 2012 79.02% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.03% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.04% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.05% done, estimate finish Fri Feb 24 19:06:57 2012 79.05% done, estimate finish Fri Feb 24 19:06:58 2012 79.06% done, estimate finish Fri Feb 24 19:06:58 2012 79.07% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.08% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.09% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 79.10% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.11% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.12% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.13% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 79.14% done, estimate finish Fri Feb 24 19:06:58 2012 79.15% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.16% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.17% done, estimate finish Fri Feb 24 19:06:58 2012 79.17% done, estimate finish Fri Feb 24 19:06:57 2012 79.18% done, estimate finish Fri Feb 24 19:06:59 2012 79.18% done, estimate finish Fri Feb 24 19:06:58 2012 79.19% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.20% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.21% done, estimate finish Fri Feb 24 19:06:58 2012 79.21% done, estimate finish Fri Feb 24 19:06:57 2012 79.22% done, estimate finish Fri Feb 24 19:06:59 2012 79.23% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.24% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.25% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.26% done, estimate finish Fri Feb 24 19:06:59 2012 79.26% done, estimate finish Fri Feb 24 19:06:58 2012 79.27% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.28% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.29% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.30% done, estimate finish Fri Feb 24 19:06:59 2012 79.31% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.32% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.33% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.34% done, estimate finish Fri Feb 24 19:06:58 2012 79.34% done, estimate finish Fri Feb 24 19:06:57 2012 79.35% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.36% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.37% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.38% done, estimate finish Fri Feb 24 19:06:57 2012 79.39% done, estimate finish Fri Feb 24 19:06:57 2012 79.39% done, estimate finish Fri Feb 24 19:06:58 2012 79.40% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.41% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.42% done, estimate finish Fri Feb 24 19:06:58 2012 79.42% done, estimate finish Fri Feb 24 19:06:57 2012 79.43% done, estimate finish Fri Feb 24 19:06:57 2012 79.43% done, estimate finish Fri Feb 24 19:06:58 2012 79.44% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.45% done, estimate finish Fri Feb 24 19:06:58 2012 79.46% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.47% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 79.48% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.49% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.50% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.51% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 79.52% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.53% done, estimate finish Fri Feb 24 19:06:58 2012 79.54% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.55% done, estimate finish Fri Feb 24 19:06:58 2012 79.55% done, estimate finish Fri Feb 24 19:06:57 2012 79.56% done, estimate finish Fri Feb 24 19:06:57 2012 79.56% done, estimate finish Fri Feb 24 19:06:58 2012 79.57% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.58% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.59% done, estimate finish Fri Feb 24 19:06:58 2012 79.59% done, estimate finish Fri Feb 24 19:06:59 2012 79.60% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.61% done, estimate finish Fri Feb 24 19:06:58 2012 79.62% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.63% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.64% done, estimate finish Fri Feb 24 19:06:57 2012 79.64% done, estimate finish Fri Feb 24 19:06:58 2012 79.65% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.66% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.67% done, estimate finish Fri Feb 24 19:06:58 2012 79.67% done, estimate finish Fri Feb 24 19:06:57 2012 79.68% done, estimate finish Fri Feb 24 19:06:57 2012 79.68% done, estimate finish Fri Feb 24 19:06:58 2012 79.69% done, estimate finish Fri Feb 24 19:06:58 2012 79.70% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.71% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.72% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 79.73% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.74% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.75% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.76% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 79.77% done, estimate finish Fri Feb 24 19:06:58 2012 79.78% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.79% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.80% done, estimate finish Fri Feb 24 19:06:58 2012 79.80% done, estimate finish Fri Feb 24 19:06:57 2012 79.81% done, estimate finish Fri Feb 24 19:06:57 2012 79.81% done, estimate finish Fri Feb 24 19:06:58 2012 79.82% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.83% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.84% done, estimate finish Fri Feb 24 19:06:58 2012 79.84% done, estimate finish Fri Feb 24 19:06:57 2012 79.85% done, estimate finish Fri Feb 24 19:06:57 2012 79.86% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.87% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.88% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.89% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 79.90% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.91% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.92% done, estimate finish Fri Feb 24 19:06:58 2012 79.92% done, estimate finish Fri Feb 24 19:06:57 2012 79.93% done, estimate finish Fri Feb 24 19:06:57 2012 79.94% done, estimate finish Fri Feb 24 19:06:57 2012 79.94% done, estimate finish Fri Feb 24 19:06:58 2012 79.95% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.96% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 79.97% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 79.98% done, estimate finish Fri Feb 24 19:06:57 2012 79.98% done, estimate finish Fri Feb 24 19:06:58 2012 79.99% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.00% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.01% done, estimate finish Fri Feb 24 19:06:57 2012 80.02% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.03% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.04% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.05% done, estimate finish Fri Feb 24 19:06:58 2012 80.05% done, estimate finish Fri Feb 24 19:06:57 2012 80.06% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.07% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.08% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.09% done, estimate finish Fri Feb 24 19:06:58 2012 80.10% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.11% done, estimate finish Fri Feb 24 19:06:57 2012 80.11% done, estimate finish Fri Feb 24 19:06:58 2012 80.12% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.13% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.14% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.15% done, estimate finish Fri Feb 24 19:06:57 2012 80.15% done, estimate finish Fri Feb 24 19:06:58 2012 80.16% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.17% done, estimate finish Fri Feb 24 19:06:58 2012 80.18% done, estimate finish Fri Feb 24 19:06:58 2012 80.18% done, estimate finish Fri Feb 24 19:06:57 2012 80.19% done, estimate finish Fri Feb 24 19:06:57 2012 80.19% done, estimate finish Fri Feb 24 19:06:58 2012 80.20% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.21% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.22% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.23% done, estimate finish Fri Feb 24 19:06:57 2012 80.23% done, estimate finish Fri Feb 24 19:06:58 2012 80.24% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.25% done, estimate finish Fri Feb 24 19:06:58 2012 80.26% done, estimate finish Fri Feb 24 19:06:58 2012 80.26% done, estimate finish Fri Feb 24 19:06:57 2012 80.27% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.28% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.29% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.30% done, estimate finish Fri Feb 24 19:06:58 2012 80.30% done, estimate finish Fri Feb 24 19:06:57 2012 80.31% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.32% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.33% done, estimate finish Fri Feb 24 19:06:58 2012 80.34% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.35% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.36% done, estimate finish Fri Feb 24 19:06:57 2012 80.36% done, estimate finish Fri Feb 24 19:06:58 2012 80.37% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.38% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.39% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.40% done, estimate finish Fri Feb 24 19:06:57 2012 80.40% done, estimate finish Fri Feb 24 19:06:58 2012 80.41% done, estimate finish Fri Feb 24 19:06:58 2012 80.42% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.43% done, estimate finish Fri Feb 24 19:06:58 2012 80.43% done, estimate finish Fri Feb 24 19:06:57 2012 80.44% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.45% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.46% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.47% done, estimate finish Fri Feb 24 19:06:58 2012 80.47% done, estimate finish Fri Feb 24 19:06:57 2012 80.48% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.49% done, estimate finish Fri Feb 24 19:06:58 2012 80.50% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.51% done, estimate finish Fri Feb 24 19:06:58 2012 80.51% done, estimate finish Fri Feb 24 19:06:57 2012 80.52% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.53% done, estimate finish Fri Feb 24 19:06:57 2012 80.53% done, estimate finish Fri Feb 24 19:06:58 2012 80.54% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.55% done, estimate finish Fri Feb 24 19:06:58 2012 80.55% done, estimate finish Fri Feb 24 19:06:57 2012 80.56% done, estimate finish Fri Feb 24 19:06:57 2012 80.57% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.58% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.59% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.60% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.61% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.62% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.63% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.64% done, estimate finish Fri Feb 24 19:06:57 2012 80.65% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.66% done, estimate finish Fri Feb 24 19:06:57 2012 80.66% done, estimate finish Fri Feb 24 19:06:58 2012 80.67% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.68% done, estimate finish Fri Feb 24 19:06:58 2012 80.68% done, estimate finish Fri Feb 24 19:06:57 2012 80.69% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.70% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.71% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.72% done, estimate finish Fri Feb 24 19:06:58 2012 80.73% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.74% done, estimate finish Fri Feb 24 19:06:57 2012 80.74% done, estimate finish Fri Feb 24 19:06:58 2012 80.75% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.76% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.77% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.78% done, estimate finish Fri Feb 24 19:06:57 2012 80.78% done, estimate finish Fri Feb 24 19:06:58 2012 80.79% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.80% done, estimate finish Fri Feb 24 19:06:58 2012 80.81% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.82% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.83% done, estimate finish Fri Feb 24 19:06:57 2012 80.83% done, estimate finish Fri Feb 24 19:06:58 2012 80.84% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.85% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.86% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.87% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.88% done, estimate finish Fri Feb 24 19:06:58 2012 80.89% done, estimate finish Fri Feb 24 19:06:58 2012 80.89% done, estimate finish Fri Feb 24 19:06:57 2012 80.90% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.91% done, estimate finish Fri Feb 24 19:06:57 2012 80.91% done, estimate finish Fri Feb 24 19:06:58 2012 80.92% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.93% done, estimate finish Fri Feb 24 19:06:58 2012 80.93% done, estimate finish Fri Feb 24 19:06:57 2012 80.94% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.95% done, estimate finish Fri Feb 24 19:06:57 2012 80.95% done, estimate finish Fri Feb 24 19:06:58 2012 80.96% done, estimate finish Fri Feb 24 19:06:58 2012 80.97% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 80.98% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 80.99% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.00% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.01% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.02% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.03% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.04% done, estimate finish Fri Feb 24 19:06:58 2012 81.05% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.06% done, estimate finish Fri Feb 24 19:06:58 2012 81.06% done, estimate finish Fri Feb 24 19:06:57 2012 81.07% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.08% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.09% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.10% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.11% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.12% done, estimate finish Fri Feb 24 19:06:57 2012 81.13% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.14% done, estimate finish Fri Feb 24 19:06:58 2012 81.14% done, estimate finish Fri Feb 24 19:06:57 2012 81.15% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.16% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.17% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.18% done, estimate finish Fri Feb 24 19:06:58 2012 81.18% done, estimate finish Fri Feb 24 19:06:57 2012 81.19% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.20% done, estimate finish Fri Feb 24 19:06:57 2012 81.21% done, estimate finish Fri Feb 24 19:06:57 2012 81.21% done, estimate finish Fri Feb 24 19:06:58 2012 81.22% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.23% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.24% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.25% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.26% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.27% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.28% done, estimate finish Fri Feb 24 19:06:57 2012 81.29% done, estimate finish Fri Feb 24 19:06:57 2012 81.29% done, estimate finish Fri Feb 24 19:06:58 2012 81.30% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.31% done, estimate finish Fri Feb 24 19:06:58 2012 81.31% done, estimate finish Fri Feb 24 19:06:57 2012 81.32% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.33% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.34% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.35% done, estimate finish Fri Feb 24 19:06:58 2012 81.35% done, estimate finish Fri Feb 24 19:06:57 2012 81.36% done, estimate finish Fri Feb 24 19:06:57 2012 81.37% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.38% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.39% done, estimate finish Fri Feb 24 19:06:58 2012 81.39% done, estimate finish Fri Feb 24 19:06:57 2012 81.40% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.41% done, estimate finish Fri Feb 24 19:06:57 2012 81.41% done, estimate finish Fri Feb 24 19:06:58 2012 81.42% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.43% done, estimate finish Fri Feb 24 19:06:58 2012 81.43% done, estimate finish Fri Feb 24 19:06:57 2012 81.44% done, estimate finish Fri Feb 24 19:06:57 2012 81.45% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.46% done, estimate finish Fri Feb 24 19:06:57 2012 81.46% done, estimate finish Fri Feb 24 19:06:58 2012 81.47% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.48% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.49% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.50% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.51% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.52% done, estimate finish Fri Feb 24 19:06:57 2012 81.53% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.54% done, estimate finish Fri Feb 24 19:06:57 2012 81.54% done, estimate finish Fri Feb 24 19:06:58 2012 81.55% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.56% done, estimate finish Fri Feb 24 19:06:58 2012 81.56% done, estimate finish Fri Feb 24 19:06:57 2012 81.57% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.58% done, estimate finish Fri Feb 24 19:06:57 2012 81.58% done, estimate finish Fri Feb 24 19:06:58 2012 81.59% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.60% done, estimate finish Fri Feb 24 19:06:58 2012 81.61% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.62% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.63% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.64% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.65% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.66% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.67% done, estimate finish Fri Feb 24 19:06:58 2012 81.68% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.69% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.70% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.71% done, estimate finish Fri Feb 24 19:06:57 2012 81.71% done, estimate finish Fri Feb 24 19:06:58 2012 81.72% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.73% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.74% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.75% done, estimate finish Fri Feb 24 19:06:57 2012 81.76% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.77% done, estimate finish Fri Feb 24 19:06:58 2012 81.77% done, estimate finish Fri Feb 24 19:06:57 2012 81.78% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.79% done, estimate finish Fri Feb 24 19:06:57 2012 81.79% done, estimate finish Fri Feb 24 19:06:58 2012 81.80% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.81% done, estimate finish Fri Feb 24 19:06:58 2012 81.81% done, estimate finish Fri Feb 24 19:06:57 2012 81.82% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.83% done, estimate finish Fri Feb 24 19:06:57 2012 81.84% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.85% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.86% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.87% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.88% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.89% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.90% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.91% done, estimate finish Fri Feb 24 19:06:57 2012 81.92% done, estimate finish Fri Feb 24 19:06:57 2012 81.92% done, estimate finish Fri Feb 24 19:06:58 2012 81.93% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.94% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.95% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.96% done, estimate finish Fri Feb 24 19:06:57 2012 81.96% done, estimate finish Fri Feb 24 19:06:58 2012 81.97% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 81.98% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 81.99% done, estimate finish Fri Feb 24 19:06:57 2012 82.00% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.01% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.02% done, estimate finish Fri Feb 24 19:06:58 2012 82.02% done, estimate finish Fri Feb 24 19:06:57 2012 82.03% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.04% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.05% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.06% done, estimate finish Fri Feb 24 19:06:58 2012 82.06% done, estimate finish Fri Feb 24 19:06:57 2012 82.07% done, estimate finish Fri Feb 24 19:06:57 2012 82.08% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.09% done, estimate finish Fri Feb 24 19:06:57 2012 82.09% done, estimate finish Fri Feb 24 19:06:58 2012 82.10% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.11% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.12% done, estimate finish Fri Feb 24 19:06:57 2012 82.12% done, estimate finish Fri Feb 24 19:06:58 2012 82.13% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.14% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.15% done, estimate finish Fri Feb 24 19:06:57 2012 82.16% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.17% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.18% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.19% done, estimate finish Fri Feb 24 19:06:58 2012 82.19% done, estimate finish Fri Feb 24 19:06:57 2012 82.20% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.21% done, estimate finish Fri Feb 24 19:06:57 2012 82.21% done, estimate finish Fri Feb 24 19:06:58 2012 82.22% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.23% done, estimate finish Fri Feb 24 19:06:57 2012 82.24% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.25% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.26% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.27% done, estimate finish Fri Feb 24 19:06:58 2012 82.27% done, estimate finish Fri Feb 24 19:06:57 2012 82.28% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.29% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.30% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.31% done, estimate finish Fri Feb 24 19:06:58 2012 82.32% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.33% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.34% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.35% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.36% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.37% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.38% done, estimate finish Fri Feb 24 19:06:57 2012 82.38% done, estimate finish Fri Feb 24 19:06:58 2012 82.39% done, estimate finish Fri Feb 24 19:06:58 2012 82.40% done, estimate finish Fri Feb 24 19:06:58 2012 82.40% done, estimate finish Fri Feb 24 19:06:57 2012 82.41% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.42% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.43% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.44% done, estimate finish Fri Feb 24 19:06:58 2012 82.44% done, estimate finish Fri Feb 24 19:06:57 2012 82.45% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.46% done, estimate finish Fri Feb 24 19:06:57 2012 82.46% done, estimate finish Fri Feb 24 19:06:58 2012 82.47% done, estimate finish Fri Feb 24 19:06:58 2012 82.48% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.49% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.50% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.51% done, estimate finish Fri Feb 24 19:06:57 2012 82.51% done, estimate finish Fri Feb 24 19:06:58 2012 82.52% done, estimate finish Fri Feb 24 19:06:58 2012 82.52% done, estimate finish Fri Feb 24 19:06:57 2012 82.53% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.54% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.55% done, estimate finish Fri Feb 24 19:06:57 2012 82.56% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.57% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.58% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.59% done, estimate finish Fri Feb 24 19:06:57 2012 82.59% done, estimate finish Fri Feb 24 19:06:58 2012 82.60% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.61% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.62% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.63% done, estimate finish Fri Feb 24 19:06:58 2012 82.64% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.65% done, estimate finish Fri Feb 24 19:06:58 2012 82.65% done, estimate finish Fri Feb 24 19:06:57 2012 82.66% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.67% done, estimate finish Fri Feb 24 19:06:57 2012 82.67% done, estimate finish Fri Feb 24 19:06:58 2012 82.68% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.69% done, estimate finish Fri Feb 24 19:06:58 2012 82.69% done, estimate finish Fri Feb 24 19:06:57 2012 82.70% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.71% done, estimate finish Fri Feb 24 19:06:57 2012 82.72% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.73% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.74% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.75% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.76% done, estimate finish Fri Feb 24 19:06:57 2012 82.76% done, estimate finish Fri Feb 24 19:06:58 2012 82.77% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.78% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.79% done, estimate finish Fri Feb 24 19:06:57 2012 82.80% done, estimate finish Fri Feb 24 19:06:57 2012 82.80% done, estimate finish Fri Feb 24 19:06:58 2012 82.81% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.82% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.83% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.84% done, estimate finish Fri Feb 24 19:06:57 2012 82.84% done, estimate finish Fri Feb 24 19:06:58 2012 82.85% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.86% done, estimate finish Fri Feb 24 19:06:57 2012 82.87% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.88% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.89% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.90% done, estimate finish Fri Feb 24 19:06:58 2012 82.90% done, estimate finish Fri Feb 24 19:06:57 2012 82.91% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.92% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.93% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.94% done, estimate finish Fri Feb 24 19:06:58 2012 82.95% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.96% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 82.97% done, estimate finish Fri Feb 24 19:06:57 2012 82.97% done, estimate finish Fri Feb 24 19:06:58 2012 82.98% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 82.99% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.00% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.01% done, estimate finish Fri Feb 24 19:06:57 2012 83.01% done, estimate finish Fri Feb 24 19:06:58 2012 83.02% done, estimate finish Fri Feb 24 19:06:58 2012 83.03% done, estimate finish Fri Feb 24 19:06:58 2012 83.03% done, estimate finish Fri Feb 24 19:06:57 2012 83.04% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.05% done, estimate finish Fri Feb 24 19:06:57 2012 83.05% done, estimate finish Fri Feb 24 19:06:58 2012 83.06% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.07% done, estimate finish Fri Feb 24 19:06:58 2012 83.07% done, estimate finish Fri Feb 24 19:06:57 2012 83.08% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.09% done, estimate finish Fri Feb 24 19:06:57 2012 83.09% done, estimate finish Fri Feb 24 19:06:58 2012 83.10% done, estimate finish Fri Feb 24 19:06:58 2012 83.11% done, estimate finish Fri Feb 24 19:06:58 2012 83.11% done, estimate finish Fri Feb 24 19:06:57 2012 83.12% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.13% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.14% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.15% done, estimate finish Fri Feb 24 19:06:58 2012 83.15% done, estimate finish Fri Feb 24 19:06:57 2012 83.16% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.17% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.18% done, estimate finish Fri Feb 24 19:06:58 2012 83.19% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.20% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.21% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.22% done, estimate finish Fri Feb 24 19:06:57 2012 83.22% done, estimate finish Fri Feb 24 19:06:58 2012 83.23% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.24% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.25% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.26% done, estimate finish Fri Feb 24 19:06:57 2012 83.27% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.28% done, estimate finish Fri Feb 24 19:06:58 2012 83.28% done, estimate finish Fri Feb 24 19:06:57 2012 83.29% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.30% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.31% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.32% done, estimate finish Fri Feb 24 19:06:58 2012 83.32% done, estimate finish Fri Feb 24 19:06:57 2012 83.33% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.34% done, estimate finish Fri Feb 24 19:06:57 2012 83.35% done, estimate finish Fri Feb 24 19:06:57 2012 83.35% done, estimate finish Fri Feb 24 19:06:58 2012 83.36% done, estimate finish Fri Feb 24 19:06:58 2012 83.36% done, estimate finish Fri Feb 24 19:06:57 2012 83.37% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.38% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.39% done, estimate finish Fri Feb 24 19:06:57 2012 83.39% done, estimate finish Fri Feb 24 19:06:58 2012 83.40% done, estimate finish Fri Feb 24 19:06:58 2012 83.40% done, estimate finish Fri Feb 24 19:06:57 2012 83.41% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.42% done, estimate finish Fri Feb 24 19:06:57 2012 83.43% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.44% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.45% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.46% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.47% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.48% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.49% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.50% done, estimate finish Fri Feb 24 19:06:57 2012 83.51% done, estimate finish Fri Feb 24 19:06:57 2012 83.51% done, estimate finish Fri Feb 24 19:06:58 2012 83.52% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.53% done, estimate finish Fri Feb 24 19:06:58 2012 83.53% done, estimate finish Fri Feb 24 19:06:57 2012 83.54% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.55% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.56% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.57% done, estimate finish Fri Feb 24 19:06:58 2012 83.57% done, estimate finish Fri Feb 24 19:06:57 2012 83.58% done, estimate finish Fri Feb 24 19:06:57 2012 83.59% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.60% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.61% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.62% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.63% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.64% done, estimate finish Fri Feb 24 19:06:57 2012 83.64% done, estimate finish Fri Feb 24 19:06:58 2012 83.65% done, estimate finish Fri Feb 24 19:06:58 2012 83.65% done, estimate finish Fri Feb 24 19:06:57 2012 83.66% done, estimate finish Fri Feb 24 19:06:57 2012 83.67% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.68% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.69% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.70% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.71% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.72% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.73% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.74% done, estimate finish Fri Feb 24 19:06:57 2012 83.75% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.76% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.77% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.78% done, estimate finish Fri Feb 24 19:06:58 2012 83.78% done, estimate finish Fri Feb 24 19:06:57 2012 83.79% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.80% done, estimate finish Fri Feb 24 19:06:57 2012 83.80% done, estimate finish Fri Feb 24 19:06:58 2012 83.81% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.82% done, estimate finish Fri Feb 24 19:06:58 2012 83.83% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.84% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.85% done, estimate finish Fri Feb 24 19:06:57 2012 83.85% done, estimate finish Fri Feb 24 19:06:58 2012 83.86% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.87% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.88% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.89% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.90% done, estimate finish Fri Feb 24 19:06:58 2012 83.91% done, estimate finish Fri Feb 24 19:06:58 2012 83.91% done, estimate finish Fri Feb 24 19:06:57 2012 83.92% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.93% done, estimate finish Fri Feb 24 19:06:57 2012 83.93% done, estimate finish Fri Feb 24 19:06:58 2012 83.94% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.95% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.96% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 83.97% done, estimate finish Fri Feb 24 19:06:57 2012 83.98% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 83.99% done, estimate finish Fri Feb 24 19:06:58 2012 83.99% done, estimate finish Fri Feb 24 19:06:57 2012 84.00% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 84.01% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 84.02% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.03% done, estimate finish Fri Feb 24 19:06:58 2012 84.03% done, estimate finish Fri Feb 24 19:06:57 2012 84.04% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 84.05% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 84.06% done, estimate finish Fri Feb 24 19:06:58 2012 84.07% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.08% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 84.09% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 84.10% done, estimate finish Fri Feb 24 19:06:57 2012 84.10% done, estimate finish Fri Feb 24 19:06:58 2012 84.11% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.12% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 84.13% done, estimate finish Fri Feb 24 19:06:57 2012 84.14% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 84.15% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.16% done, estimate finish Fri Feb 24 19:06:58 2012 84.16% done, estimate finish Fri Feb 24 19:06:57 2012 84.17% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 84.18% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.19% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.20% done, estimate finish Fri Feb 24 19:06:58 2012 84.20% done, estimate finish Fri Feb 24 19:06:57 2012 84.21% done, estimate finish Fri Feb 24 19:06:57 2012 84.22% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 84.23% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.24% done, estimate finish Fri Feb 24 19:06:58 2012 84.24% done, estimate finish Fri Feb 24 19:06:57 2012 84.25% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 84.26% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 84.27% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.28% done, estimate finish Fri Feb 24 19:06:58 2012 84.28% done, estimate finish Fri Feb 24 19:06:57 2012 84.29% done, estimate finish Fri Feb 24 19:06:57 2012 84.30% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 84.31% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.32% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.33% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 84.34% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 84.35% done, estimate finish Fri Feb 24 19:06:57 2012 84.35% done, estimate finish Fri Feb 24 19:06:58 2012 84.36% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.37% done, estimate finish Fri Feb 24 19:06:57 2012 84.38% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 84.39% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 84.40% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.41% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 84.42% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.43% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.44% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.45% done, estimate finish Fri Feb 24 19:06:59 2012 84.46% done, estimate finish Fri Feb 24 19:06:59 2012 84.46% done, estimate finish Fri Feb 24 19:06:58 2012 84.47% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.48% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.49% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 84.50% done, estimate finish Fri Feb 24 19:06:59 2012 84.50% done, estimate finish Fri Feb 24 19:06:58 2012 84.51% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.52% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.53% done, estimate finish Fri Feb 24 19:06:58 2012 84.54% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 84.55% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.56% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.57% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 84.58% done, estimate finish Fri Feb 24 19:06:59 2012 84.58% done, estimate finish Fri Feb 24 19:06:58 2012 84.59% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.60% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.61% done, estimate finish Fri Feb 24 19:06:58 2012 84.62% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 84.63% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.64% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.65% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.66% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 84.67% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.68% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.69% done, estimate finish Fri Feb 24 19:06:58 2012 84.70% done, estimate finish Fri Feb 24 19:06:58 2012 84.70% done, estimate finish Fri Feb 24 19:06:59 2012 84.71% done, estimate finish Fri Feb 24 19:06:59 2012 84.71% done, estimate finish Fri Feb 24 19:06:58 2012 84.72% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.73% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.74% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 84.75% done, estimate finish Fri Feb 24 19:06:59 2012 84.75% done, estimate finish Fri Feb 24 19:06:58 2012 84.76% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.77% done, estimate finish Fri Feb 24 19:06:58 2012 84.78% done, estimate finish Fri Feb 24 19:06:58 2012 84.78% done, estimate finish Fri Feb 24 19:06:59 2012 84.79% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 84.80% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.81% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.82% done, estimate finish Fri Feb 24 19:06:58 2012 84.82% done, estimate finish Fri Feb 24 19:06:59 2012 84.83% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 84.84% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.85% done, estimate finish Fri Feb 24 19:06:58 2012 84.86% done, estimate finish Fri Feb 24 19:06:58 2012 84.86% done, estimate finish Fri Feb 24 19:06:59 2012 84.87% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 84.88% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.89% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.90% done, estimate finish Fri Feb 24 19:06:58 2012 84.90% done, estimate finish Fri Feb 24 19:06:59 2012 84.91% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 84.92% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.93% done, estimate finish Fri Feb 24 19:06:58 2012 84.94% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.95% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 84.96% done, estimate finish Fri Feb 24 19:06:59 2012 84.96% done, estimate finish Fri Feb 24 19:06:58 2012 84.97% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.98% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 84.99% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.00% done, estimate finish Fri Feb 24 19:06:59 2012 85.00% done, estimate finish Fri Feb 24 19:06:58 2012 85.01% done, estimate finish Fri Feb 24 19:06:58 2012 85.02% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.03% done, estimate finish Fri Feb 24 19:06:58 2012 85.03% done, estimate finish Fri Feb 24 19:06:59 2012 85.04% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.05% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.06% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.07% done, estimate finish Fri Feb 24 19:06:58 2012 85.07% done, estimate finish Fri Feb 24 19:06:59 2012 85.08% done, estimate finish Fri Feb 24 19:06:59 2012 85.09% done, estimate finish Fri Feb 24 19:06:59 2012 85.09% done, estimate finish Fri Feb 24 19:06:58 2012 85.10% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.11% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.12% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.13% done, estimate finish Fri Feb 24 19:06:59 2012 85.13% done, estimate finish Fri Feb 24 19:06:58 2012 85.14% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.15% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.16% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.17% done, estimate finish Fri Feb 24 19:06:58 2012 85.18% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.19% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.20% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.21% done, estimate finish Fri Feb 24 19:06:59 2012 85.21% done, estimate finish Fri Feb 24 19:06:58 2012 85.22% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.23% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.24% done, estimate finish Fri Feb 24 19:06:59 2012 85.25% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.26% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.27% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.28% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.29% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.30% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.31% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.32% done, estimate finish Fri Feb 24 19:06:58 2012 85.33% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.34% done, estimate finish Fri Feb 24 19:06:59 2012 85.34% done, estimate finish Fri Feb 24 19:06:58 2012 85.35% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.36% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.37% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.38% done, estimate finish Fri Feb 24 19:06:59 2012 85.38% done, estimate finish Fri Feb 24 19:06:58 2012 85.39% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.40% done, estimate finish Fri Feb 24 19:06:58 2012 85.41% done, estimate finish Fri Feb 24 19:06:58 2012 85.41% done, estimate finish Fri Feb 24 19:06:59 2012 85.42% done, estimate finish Fri Feb 24 19:06:59 2012 85.42% done, estimate finish Fri Feb 24 19:06:58 2012 85.43% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.44% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.45% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.46% done, estimate finish Fri Feb 24 19:06:59 2012 85.46% done, estimate finish Fri Feb 24 19:06:58 2012 85.47% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.48% done, estimate finish Fri Feb 24 19:06:58 2012 85.49% done, estimate finish Fri Feb 24 19:06:58 2012 85.49% done, estimate finish Fri Feb 24 19:06:59 2012 85.50% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.51% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.52% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.53% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.54% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.55% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.56% done, estimate finish Fri Feb 24 19:06:58 2012 85.57% done, estimate finish Fri Feb 24 19:06:58 2012 85.57% done, estimate finish Fri Feb 24 19:06:59 2012 85.58% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.59% done, estimate finish Fri Feb 24 19:06:59 2012 85.59% done, estimate finish Fri Feb 24 19:06:58 2012 85.60% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.61% done, estimate finish Fri Feb 24 19:06:58 2012 85.61% done, estimate finish Fri Feb 24 19:06:59 2012 85.62% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.63% done, estimate finish Fri Feb 24 19:06:59 2012 85.63% done, estimate finish Fri Feb 24 19:06:58 2012 85.64% done, estimate finish Fri Feb 24 19:06:58 2012 85.65% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.66% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.67% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.68% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.69% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.70% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.71% done, estimate finish Fri Feb 24 19:06:59 2012 85.71% done, estimate finish Fri Feb 24 19:06:58 2012 85.72% done, estimate finish Fri Feb 24 19:06:58 2012 85.73% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.74% done, estimate finish Fri Feb 24 19:06:58 2012 85.74% done, estimate finish Fri Feb 24 19:06:59 2012 85.75% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.76% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.77% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.78% done, estimate finish Fri Feb 24 19:06:58 2012 85.78% done, estimate finish Fri Feb 24 19:06:59 2012 85.79% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.80% done, estimate finish Fri Feb 24 19:06:58 2012 85.81% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.82% done, estimate finish Fri Feb 24 19:06:58 2012 85.82% done, estimate finish Fri Feb 24 19:06:59 2012 85.83% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.84% done, estimate finish Fri Feb 24 19:06:59 2012 85.84% done, estimate finish Fri Feb 24 19:06:58 2012 85.85% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.86% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.87% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.88% done, estimate finish Fri Feb 24 19:06:59 2012 85.89% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.90% done, estimate finish Fri Feb 24 19:06:58 2012 85.90% done, estimate finish Fri Feb 24 19:06:59 2012 85.91% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.92% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.93% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.94% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.95% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 85.96% done, estimate finish Fri Feb 24 19:06:59 2012 85.97% done, estimate finish Fri Feb 24 19:06:59 2012 85.97% done, estimate finish Fri Feb 24 19:06:58 2012 85.98% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 85.99% done, estimate finish Fri Feb 24 19:06:58 2012 85.99% done, estimate finish Fri Feb 24 19:06:59 2012 86.00% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.01% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.02% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.03% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.04% done, estimate finish Fri Feb 24 19:06:59 2012 86.05% done, estimate finish Fri Feb 24 19:06:59 2012 86.05% done, estimate finish Fri Feb 24 19:06:58 2012 86.06% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.07% done, estimate finish Fri Feb 24 19:06:58 2012 86.07% done, estimate finish Fri Feb 24 19:06:59 2012 86.08% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.09% done, estimate finish Fri Feb 24 19:06:59 2012 86.09% done, estimate finish Fri Feb 24 19:06:58 2012 86.10% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.11% done, estimate finish Fri Feb 24 19:06:58 2012 86.11% done, estimate finish Fri Feb 24 19:06:59 2012 86.12% done, estimate finish Fri Feb 24 19:06:59 2012 86.13% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.14% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.15% done, estimate finish Fri Feb 24 19:06:58 2012 86.15% done, estimate finish Fri Feb 24 19:06:59 2012 86.16% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.17% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.18% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.19% done, estimate finish Fri Feb 24 19:06:58 2012 86.20% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.21% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.22% done, estimate finish Fri Feb 24 19:06:59 2012 86.22% done, estimate finish Fri Feb 24 19:06:58 2012 86.23% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.24% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.25% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.26% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.27% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.28% done, estimate finish Fri Feb 24 19:06:59 2012 86.29% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.30% done, estimate finish Fri Feb 24 19:06:59 2012 86.30% done, estimate finish Fri Feb 24 19:06:58 2012 86.31% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.32% done, estimate finish Fri Feb 24 19:06:58 2012 86.32% done, estimate finish Fri Feb 24 19:06:59 2012 86.33% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.34% done, estimate finish Fri Feb 24 19:06:59 2012 86.34% done, estimate finish Fri Feb 24 19:06:58 2012 86.35% done, estimate finish Fri Feb 24 19:06:58 2012 86.36% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.37% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.38% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.39% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.40% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.41% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.42% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.43% done, estimate finish Fri Feb 24 19:06:58 2012 86.44% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.45% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.46% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.47% done, estimate finish Fri Feb 24 19:06:59 2012 86.47% done, estimate finish Fri Feb 24 19:06:58 2012 86.48% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.49% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.50% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.51% done, estimate finish Fri Feb 24 19:06:59 2012 86.52% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.53% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.54% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.55% done, estimate finish Fri Feb 24 19:06:59 2012 86.55% done, estimate finish Fri Feb 24 19:06:58 2012 86.56% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.57% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.58% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.59% done, estimate finish Fri Feb 24 19:06:59 2012 86.60% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.61% done, estimate finish Fri Feb 24 19:06:58 2012 86.61% done, estimate finish Fri Feb 24 19:06:59 2012 86.62% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.63% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.64% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.65% done, estimate finish Fri Feb 24 19:06:58 2012 86.65% done, estimate finish Fri Feb 24 19:06:59 2012 86.66% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.67% done, estimate finish Fri Feb 24 19:06:59 2012 86.68% done, estimate finish Fri Feb 24 19:06:59 2012 86.68% done, estimate finish Fri Feb 24 19:06:58 2012 86.69% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.70% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.71% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.72% done, estimate finish Fri Feb 24 19:06:59 2012 86.72% done, estimate finish Fri Feb 24 19:06:58 2012 86.73% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.74% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.75% done, estimate finish Fri Feb 24 19:06:59 2012 86.76% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.77% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.78% done, estimate finish Fri Feb 24 19:06:58 2012 86.78% done, estimate finish Fri Feb 24 19:06:59 2012 86.79% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.80% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.81% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.82% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.83% done, estimate finish Fri Feb 24 19:06:59 2012 86.84% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.85% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.86% done, estimate finish Fri Feb 24 19:06:58 2012 86.86% done, estimate finish Fri Feb 24 19:06:59 2012 86.87% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.88% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.89% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.90% done, estimate finish Fri Feb 24 19:06:58 2012 86.90% done, estimate finish Fri Feb 24 19:06:59 2012 86.91% done, estimate finish Fri Feb 24 19:06:59 2012 86.92% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.93% done, estimate finish Fri Feb 24 19:06:59 2012 86.93% done, estimate finish Fri Feb 24 19:06:58 2012 86.94% done, estimate finish Fri Feb 24 19:06:58 2012 86.94% done, estimate finish Fri Feb 24 19:06:59 2012 86.95% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.96% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 86.97% done, estimate finish Fri Feb 24 19:06:59 2012 86.97% done, estimate finish Fri Feb 24 19:06:58 2012 86.98% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 86.99% done, estimate finish Fri Feb 24 19:06:59 2012 87.00% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.01% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.02% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 87.03% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.04% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.05% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.06% done, estimate finish Fri Feb 24 19:06:58 2012 87.06% done, estimate finish Fri Feb 24 19:06:59 2012 87.07% done, estimate finish Fri Feb 24 19:06:59 2012 87.08% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.09% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.10% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 87.11% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.12% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.13% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.14% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 87.15% done, estimate finish Fri Feb 24 19:06:59 2012 87.16% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.17% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.18% done, estimate finish Fri Feb 24 19:06:59 2012 87.18% done, estimate finish Fri Feb 24 19:06:58 2012 87.19% done, estimate finish Fri Feb 24 19:06:58 2012 87.19% done, estimate finish Fri Feb 24 19:06:59 2012 87.20% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.21% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.22% done, estimate finish Fri Feb 24 19:06:59 2012 87.22% done, estimate finish Fri Feb 24 19:06:58 2012 87.23% done, estimate finish Fri Feb 24 19:06:58 2012 87.24% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.25% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.26% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.27% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 87.28% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.29% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.30% done, estimate finish Fri Feb 24 19:06:59 2012 87.31% done, estimate finish Fri Feb 24 19:06:59 2012 87.31% done, estimate finish Fri Feb 24 19:06:58 2012 87.32% done, estimate finish Fri Feb 24 19:06:58 2012 87.32% done, estimate finish Fri Feb 24 19:06:59 2012 87.33% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.34% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.35% done, estimate finish Fri Feb 24 19:06:59 2012 87.35% done, estimate finish Fri Feb 24 19:07:00 2012 87.36% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.37% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.38% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.39% done, estimate finish Fri Feb 24 19:06:58 2012 87.40% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 87.41% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.42% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.43% done, estimate finish Fri Feb 24 19:06:59 2012 87.43% done, estimate finish Fri Feb 24 19:06:58 2012 87.44% done, estimate finish Fri Feb 24 19:06:58 2012 87.44% done, estimate finish Fri Feb 24 19:06:59 2012 87.45% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.46% done, estimate finish Fri Feb 24 19:06:59 2012 87.47% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.48% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 87.49% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.50% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.51% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.52% done, estimate finish Fri Feb 24 19:06:58 2012 87.52% done, estimate finish Fri Feb 24 19:06:59 2012 87.53% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.54% done, estimate finish Fri Feb 24 19:06:59 2012 87.55% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.56% done, estimate finish Fri Feb 24 19:06:59 2012 87.56% done, estimate finish Fri Feb 24 19:06:58 2012 87.57% done, estimate finish Fri Feb 24 19:06:58 2012 87.57% done, estimate finish Fri Feb 24 19:06:59 2012 87.58% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.59% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.60% done, estimate finish Fri Feb 24 19:06:59 2012 87.60% done, estimate finish Fri Feb 24 19:06:58 2012 87.61% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.62% done, estimate finish Fri Feb 24 19:06:59 2012 87.63% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.64% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.65% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.66% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.67% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.68% done, estimate finish Fri Feb 24 19:06:59 2012 87.68% done, estimate finish Fri Feb 24 19:06:58 2012 87.69% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.70% done, estimate finish Fri Feb 24 19:06:59 2012 87.71% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.72% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.73% done, estimate finish Fri Feb 24 19:07:00 2012 87.73% done, estimate finish Fri Feb 24 19:06:59 2012 87.74% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.75% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.76% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.77% done, estimate finish Fri Feb 24 19:06:58 2012 87.77% done, estimate finish Fri Feb 24 19:06:59 2012 87.78% done, estimate finish Fri Feb 24 19:06:59 2012 87.79% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.80% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.81% done, estimate finish Fri Feb 24 19:06:59 2012 87.81% done, estimate finish Fri Feb 24 19:06:58 2012 87.82% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.83% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.84% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.85% done, estimate finish Fri Feb 24 19:06:59 2012 87.85% done, estimate finish Fri Feb 24 19:06:58 2012 87.86% done, estimate finish Fri Feb 24 19:06:59 2012 87.87% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.88% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.89% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.90% done, estimate finish Fri Feb 24 19:07:00 2012 87.90% done, estimate finish Fri Feb 24 19:06:59 2012 87.91% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.92% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.93% done, estimate finish Fri Feb 24 19:06:59 2012 87.93% done, estimate finish Fri Feb 24 19:06:58 2012 87.94% done, estimate finish Fri Feb 24 19:06:58 2012 87.95% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.96% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.97% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 87.98% done, estimate finish Fri Feb 24 19:06:58 2012 87.98% done, estimate finish Fri Feb 24 19:06:59 2012 87.99% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.00% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.01% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.02% done, estimate finish Fri Feb 24 19:07:00 2012 88.03% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.04% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.05% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.06% done, estimate finish Fri Feb 24 19:06:59 2012 88.06% done, estimate finish Fri Feb 24 19:07:00 2012 88.07% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.08% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.09% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.10% done, estimate finish Fri Feb 24 19:06:59 2012 88.11% done, estimate finish Fri Feb 24 19:07:00 2012 88.11% done, estimate finish Fri Feb 24 19:06:59 2012 88.12% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.13% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.14% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.15% done, estimate finish Fri Feb 24 19:07:00 2012 88.15% done, estimate finish Fri Feb 24 19:06:59 2012 88.16% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.17% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.18% done, estimate finish Fri Feb 24 19:06:59 2012 88.19% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 88.20% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.21% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.22% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.23% done, estimate finish Fri Feb 24 19:07:00 2012 88.23% done, estimate finish Fri Feb 24 19:06:59 2012 88.24% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.25% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.26% done, estimate finish Fri Feb 24 19:06:59 2012 88.27% done, estimate finish Fri Feb 24 19:06:59 2012 88.27% done, estimate finish Fri Feb 24 19:07:00 2012 88.28% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.29% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.30% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.31% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 88.32% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.33% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.34% done, estimate finish Fri Feb 24 19:06:59 2012 88.35% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.36% done, estimate finish Fri Feb 24 19:07:00 2012 88.36% done, estimate finish Fri Feb 24 19:06:59 2012 88.37% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.38% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.39% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.40% done, estimate finish Fri Feb 24 19:07:00 2012 88.40% done, estimate finish Fri Feb 24 19:06:59 2012 88.41% done, estimate finish Fri Feb 24 19:06:59 2012 88.42% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.43% done, estimate finish Fri Feb 24 19:06:59 2012 88.43% done, estimate finish Fri Feb 24 19:07:00 2012 88.44% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 88.45% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.46% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.47% done, estimate finish Fri Feb 24 19:06:59 2012 88.47% done, estimate finish Fri Feb 24 19:07:00 2012 88.48% done, estimate finish Fri Feb 24 19:07:00 2012 88.48% done, estimate finish Fri Feb 24 19:06:59 2012 88.49% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.50% done, estimate finish Fri Feb 24 19:06:59 2012 88.51% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.52% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 88.53% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.54% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.55% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.56% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 88.57% done, estimate finish Fri Feb 24 19:06:59 2012 88.58% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.59% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.60% done, estimate finish Fri Feb 24 19:06:59 2012 88.60% done, estimate finish Fri Feb 24 19:07:00 2012 88.61% done, estimate finish Fri Feb 24 19:07:00 2012 88.61% done, estimate finish Fri Feb 24 19:06:59 2012 88.62% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.63% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.64% done, estimate finish Fri Feb 24 19:06:59 2012 88.64% done, estimate finish Fri Feb 24 19:07:00 2012 88.65% done, estimate finish Fri Feb 24 19:07:00 2012 88.66% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.67% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.68% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.69% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 88.70% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.71% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.72% done, estimate finish Fri Feb 24 19:06:59 2012 88.72% done, estimate finish Fri Feb 24 19:07:00 2012 88.73% done, estimate finish Fri Feb 24 19:07:00 2012 88.74% done, estimate finish Fri Feb 24 19:07:00 2012 88.74% done, estimate finish Fri Feb 24 19:06:59 2012 88.75% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.76% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.77% done, estimate finish Fri Feb 24 19:06:59 2012 88.77% done, estimate finish Fri Feb 24 19:07:00 2012 88.78% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.79% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.80% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.81% done, estimate finish Fri Feb 24 19:07:00 2012 88.82% done, estimate finish Fri Feb 24 19:07:00 2012 88.82% done, estimate finish Fri Feb 24 19:06:59 2012 88.83% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.84% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.85% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 88.86% done, estimate finish Fri Feb 24 19:07:00 2012 88.86% done, estimate finish Fri Feb 24 19:06:59 2012 88.87% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.88% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.89% done, estimate finish Fri Feb 24 19:06:59 2012 88.90% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 88.91% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.92% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.93% done, estimate finish Fri Feb 24 19:06:59 2012 88.93% done, estimate finish Fri Feb 24 19:07:00 2012 88.94% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 88.95% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.96% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 88.97% done, estimate finish Fri Feb 24 19:07:00 2012 88.98% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 88.99% done, estimate finish Fri Feb 24 19:07:00 2012 88.99% done, estimate finish Fri Feb 24 19:06:59 2012 89.00% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.01% done, estimate finish Fri Feb 24 19:06:59 2012 89.01% done, estimate finish Fri Feb 24 19:07:00 2012 89.02% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.03% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.04% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.05% done, estimate finish Fri Feb 24 19:06:59 2012 89.06% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.07% done, estimate finish Fri Feb 24 19:07:00 2012 89.07% done, estimate finish Fri Feb 24 19:06:59 2012 89.08% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.09% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.10% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.11% done, estimate finish Fri Feb 24 19:07:00 2012 89.11% done, estimate finish Fri Feb 24 19:06:59 2012 89.12% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.13% done, estimate finish Fri Feb 24 19:06:59 2012 89.14% done, estimate finish Fri Feb 24 19:06:59 2012 89.14% done, estimate finish Fri Feb 24 19:07:00 2012 89.15% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.16% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.17% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.18% done, estimate finish Fri Feb 24 19:06:59 2012 89.18% done, estimate finish Fri Feb 24 19:07:00 2012 89.19% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.20% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.21% done, estimate finish Fri Feb 24 19:06:59 2012 89.22% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.23% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.24% done, estimate finish Fri Feb 24 19:07:00 2012 89.24% done, estimate finish Fri Feb 24 19:06:59 2012 89.25% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.26% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.27% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.28% done, estimate finish Fri Feb 24 19:07:00 2012 89.28% done, estimate finish Fri Feb 24 19:06:59 2012 89.29% done, estimate finish Fri Feb 24 19:06:59 2012 89.30% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.31% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.32% done, estimate finish Fri Feb 24 19:07:00 2012 89.32% done, estimate finish Fri Feb 24 19:06:59 2012 89.33% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.34% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.35% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.36% done, estimate finish Fri Feb 24 19:07:00 2012 89.36% done, estimate finish Fri Feb 24 19:06:59 2012 89.37% done, estimate finish Fri Feb 24 19:06:59 2012 89.38% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.39% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.40% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.41% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.42% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.43% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.44% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.45% done, estimate finish Fri Feb 24 19:06:59 2012 89.46% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.47% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.48% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.49% done, estimate finish Fri Feb 24 19:07:00 2012 89.49% done, estimate finish Fri Feb 24 19:06:59 2012 89.50% done, estimate finish Fri Feb 24 19:06:59 2012 89.50% done, estimate finish Fri Feb 24 19:07:00 2012 89.51% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.52% done, estimate finish Fri Feb 24 19:07:00 2012 89.53% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.54% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.55% done, estimate finish Fri Feb 24 19:06:59 2012 89.55% done, estimate finish Fri Feb 24 19:07:00 2012 89.56% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.57% done, estimate finish Fri Feb 24 19:07:00 2012 89.57% done, estimate finish Fri Feb 24 19:06:59 2012 89.58% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.59% done, estimate finish Fri Feb 24 19:06:59 2012 89.59% done, estimate finish Fri Feb 24 19:07:00 2012 89.60% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.61% done, estimate finish Fri Feb 24 19:07:00 2012 89.62% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.63% done, estimate finish Fri Feb 24 19:06:59 2012 89.63% done, estimate finish Fri Feb 24 19:07:00 2012 89.64% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.65% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.66% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.67% done, estimate finish Fri Feb 24 19:06:59 2012 89.67% done, estimate finish Fri Feb 24 19:07:00 2012 89.68% done, estimate finish Fri Feb 24 19:07:00 2012 89.69% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.70% done, estimate finish Fri Feb 24 19:07:00 2012 89.70% done, estimate finish Fri Feb 24 19:06:59 2012 89.71% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.72% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.73% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.74% done, estimate finish Fri Feb 24 19:07:00 2012 89.74% done, estimate finish Fri Feb 24 19:06:59 2012 89.75% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.76% done, estimate finish Fri Feb 24 19:07:00 2012 89.77% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.78% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.79% done, estimate finish Fri Feb 24 19:06:59 2012 89.79% done, estimate finish Fri Feb 24 19:07:00 2012 89.80% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.81% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.82% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.83% done, estimate finish Fri Feb 24 19:06:59 2012 89.83% done, estimate finish Fri Feb 24 19:07:00 2012 89.84% done, estimate finish Fri Feb 24 19:07:00 2012 89.85% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.86% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.87% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.88% done, estimate finish Fri Feb 24 19:06:59 2012 89.88% done, estimate finish Fri Feb 24 19:07:00 2012 89.89% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.90% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.91% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 89.92% done, estimate finish Fri Feb 24 19:06:59 2012 89.93% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.94% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.95% done, estimate finish Fri Feb 24 19:07:00 2012 89.95% done, estimate finish Fri Feb 24 19:06:59 2012 89.96% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.97% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.98% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 89.99% done, estimate finish Fri Feb 24 19:07:00 2012 89.99% done, estimate finish Fri Feb 24 19:06:59 2012 90.00% done, estimate finish Fri Feb 24 19:07:00 2012 90.01% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 90.02% done, estimate finish Fri Feb 24 19:07:00 2012 90.02% done, estimate finish Fri Feb 24 19:07:01 2012 90.03% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.04% done, estimate finish Fri Feb 24 19:07:01 2012 90.04% done, estimate finish Fri Feb 24 19:07:00 2012 90.05% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 90.06% done, estimate finish Fri Feb 24 19:07:00 2012 90.06% done, estimate finish Fri Feb 24 19:07:01 2012 90.07% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.08% done, estimate finish Fri Feb 24 19:07:00 2012 90.09% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 90.10% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 90.11% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.12% done, estimate finish Fri Feb 24 19:07:01 2012 90.12% done, estimate finish Fri Feb 24 19:07:00 2012 90.13% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 90.14% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.15% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.16% done, estimate finish Fri Feb 24 19:07:01 2012 90.17% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 90.18% done, estimate finish Fri Feb 24 19:07:00 2012 90.18% done, estimate finish Fri Feb 24 19:07:01 2012 90.19% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.20% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.21% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 90.22% done, estimate finish Fri Feb 24 19:07:00 2012 90.22% done, estimate finish Fri Feb 24 19:07:01 2012 90.23% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.24% done, estimate finish Fri Feb 24 19:07:01 2012 90.25% done, estimate finish Fri Feb 24 19:07:01 2012 90.25% done, estimate finish Fri Feb 24 19:07:00 2012 90.26% done, estimate finish Fri Feb 24 19:07:00 2012 90.26% done, estimate finish Fri Feb 24 19:07:01 2012 90.27% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.28% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.29% done, estimate finish Fri Feb 24 19:07:01 2012 90.29% done, estimate finish Fri Feb 24 19:07:00 2012 90.30% done, estimate finish Fri Feb 24 19:07:00 2012 90.30% done, estimate finish Fri Feb 24 19:07:01 2012 90.31% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.32% done, estimate finish Fri Feb 24 19:07:01 2012 90.33% done, estimate finish Fri Feb 24 19:07:01 2012 90.33% done, estimate finish Fri Feb 24 19:07:00 2012 90.34% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 90.35% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.36% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.37% done, estimate finish Fri Feb 24 19:07:01 2012 90.37% done, estimate finish Fri Feb 24 19:07:00 2012 90.38% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 90.39% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.40% done, estimate finish Fri Feb 24 19:07:01 2012 90.41% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.42% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 90.43% done, estimate finish Fri Feb 24 19:07:00 2012 90.43% done, estimate finish Fri Feb 24 19:07:01 2012 90.44% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.45% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.46% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 90.47% done, estimate finish Fri Feb 24 19:07:00 2012 90.47% done, estimate finish Fri Feb 24 19:07:01 2012 90.48% done, estimate finish Fri Feb 24 19:07:01 2012 90.49% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.50% done, estimate finish Fri Feb 24 19:07:01 2012 90.50% done, estimate finish Fri Feb 24 19:07:00 2012 90.51% done, estimate finish Fri Feb 24 19:07:00 2012 90.51% done, estimate finish Fri Feb 24 19:07:01 2012 90.52% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.53% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.54% done, estimate finish Fri Feb 24 19:07:01 2012 90.54% done, estimate finish Fri Feb 24 19:07:00 2012 90.55% done, estimate finish Fri Feb 24 19:07:00 2012 90.55% done, estimate finish Fri Feb 24 19:07:01 2012 90.56% done, estimate finish Fri Feb 24 19:07:01 2012 90.57% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.58% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.59% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 90.60% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.61% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.62% done, estimate finish Fri Feb 24 19:07:01 2012 90.62% done, estimate finish Fri Feb 24 19:07:00 2012 90.63% done, estimate finish Fri Feb 24 19:07:00 2012 90.64% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.65% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.66% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.67% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 90.68% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.69% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.70% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.71% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 90.72% done, estimate finish Fri Feb 24 19:07:01 2012 90.73% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.74% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.75% done, estimate finish Fri Feb 24 19:07:01 2012 90.75% done, estimate finish Fri Feb 24 19:07:00 2012 90.76% done, estimate finish Fri Feb 24 19:07:00 2012 90.76% done, estimate finish Fri Feb 24 19:07:01 2012 90.77% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.78% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.79% done, estimate finish Fri Feb 24 19:07:01 2012 90.80% done, estimate finish Fri Feb 24 19:07:00 2012 90.80% done, estimate finish Fri Feb 24 19:07:01 2012 90.81% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.82% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.83% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.84% done, estimate finish Fri Feb 24 19:07:00 2012 90.84% done, estimate finish Fri Feb 24 19:07:01 2012 90.85% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.86% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.87% done, estimate finish Fri Feb 24 19:07:01 2012 90.88% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 90.89% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.90% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.91% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.92% done, estimate finish Fri Feb 24 19:07:00 2012 90.92% done, estimate finish Fri Feb 24 19:07:01 2012 90.93% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.94% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.95% done, estimate finish Fri Feb 24 19:07:01 2012 90.96% done, estimate finish Fri Feb 24 19:07:01 2012 90.96% done, estimate finish Fri Feb 24 19:07:02 2012 90.97% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.98% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 90.99% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.00% done, estimate finish Fri Feb 24 19:07:01 2012 91.00% done, estimate finish Fri Feb 24 19:07:02 2012 91.01% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.02% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.03% done, estimate finish Fri Feb 24 19:07:01 2012 91.04% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.05% done, estimate finish Fri Feb 24 19:07:02 2012 91.05% done, estimate finish Fri Feb 24 19:07:01 2012 91.06% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.07% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.08% done, estimate finish Fri Feb 24 19:07:01 2012 91.08% done, estimate finish Fri Feb 24 19:07:02 2012 91.09% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.10% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.11% done, estimate finish Fri Feb 24 19:07:01 2012 91.12% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.13% done, estimate finish Fri Feb 24 19:07:02 2012 91.13% done, estimate finish Fri Feb 24 19:07:01 2012 91.14% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.15% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.16% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.17% done, estimate finish Fri Feb 24 19:07:02 2012 91.17% done, estimate finish Fri Feb 24 19:07:01 2012 91.18% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.19% done, estimate finish Fri Feb 24 19:07:01 2012 91.20% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.21% done, estimate finish Fri Feb 24 19:07:01 2012 91.21% done, estimate finish Fri Feb 24 19:07:00 2012 91.22% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.23% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.24% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.25% done, estimate finish Fri Feb 24 19:07:01 2012 91.25% done, estimate finish Fri Feb 24 19:07:02 2012 91.26% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.27% done, estimate finish Fri Feb 24 19:07:01 2012 91.28% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.29% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 91.30% done, estimate finish Fri Feb 24 19:07:02 2012 91.30% done, estimate finish Fri Feb 24 19:07:01 2012 91.31% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.32% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.33% done, estimate finish Fri Feb 24 19:07:01 2012 91.33% done, estimate finish Fri Feb 24 19:07:02 2012 91.34% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.35% done, estimate finish Fri Feb 24 19:07:01 2012 91.36% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.37% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.38% done, estimate finish Fri Feb 24 19:07:02 2012 91.38% done, estimate finish Fri Feb 24 19:07:01 2012 91.39% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.40% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.41% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.42% done, estimate finish Fri Feb 24 19:07:02 2012 91.42% done, estimate finish Fri Feb 24 19:07:01 2012 91.43% done, estimate finish Fri Feb 24 19:07:01 2012 91.44% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.45% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.46% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 91.47% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.48% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.49% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.50% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 91.51% done, estimate finish Fri Feb 24 19:07:01 2012 91.52% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.53% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.54% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 91.55% done, estimate finish Fri Feb 24 19:07:02 2012 91.55% done, estimate finish Fri Feb 24 19:07:01 2012 91.56% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.57% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.58% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 91.59% done, estimate finish Fri Feb 24 19:07:01 2012 91.60% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.61% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.62% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 91.63% done, estimate finish Fri Feb 24 19:07:02 2012 91.63% done, estimate finish Fri Feb 24 19:07:01 2012 91.64% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.65% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.66% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 91.67% done, estimate finish Fri Feb 24 19:07:02 2012 91.68% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.69% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.70% done, estimate finish Fri Feb 24 19:07:01 2012 91.70% done, estimate finish Fri Feb 24 19:07:02 2012 91.71% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 91.72% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.73% done, estimate finish Fri Feb 24 19:07:01 2012 91.73% done, estimate finish Fri Feb 24 19:07:02 2012 91.74% done, estimate finish Fri Feb 24 19:07:02 2012 91.75% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 91.76% done, estimate finish Fri Feb 24 19:07:02 2012 91.76% done, estimate finish Fri Feb 24 19:07:01 2012 91.77% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.78% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.79% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 91.80% done, estimate finish Fri Feb 24 19:07:02 2012 91.80% done, estimate finish Fri Feb 24 19:07:01 2012 91.81% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.82% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 91.83% done, estimate finish Fri Feb 24 19:07:02 2012 91.84% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 91.85% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.86% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.87% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 91.88% done, estimate finish Fri Feb 24 19:07:02 2012 91.88% done, estimate finish Fri Feb 24 19:07:01 2012 91.89% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.90% done, estimate finish Fri Feb 24 19:07:01 2012 91.91% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 91.92% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 91.93% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.94% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.95% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 91.96% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 91.97% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 91.98% done, estimate finish Fri Feb 24 19:07:01 2012 91.99% done, estimate finish Fri Feb 24 19:07:01 2012 91.99% done, estimate finish Fri Feb 24 19:07:02 2012 92.00% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 92.01% done, estimate finish Fri Feb 24 19:07:02 2012 92.01% done, estimate finish Fri Feb 24 19:07:01 2012 92.02% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.03% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.04% done, estimate finish Fri Feb 24 19:07:01 2012 92.04% done, estimate finish Fri Feb 24 19:07:02 2012 92.05% done, estimate finish Fri Feb 24 19:07:02 2012 92.05% done, estimate finish Fri Feb 24 19:07:01 2012 92.06% done, estimate finish Fri Feb 24 19:07:01 2012 92.07% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.08% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.09% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 92.10% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.11% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.12% done, estimate finish Fri Feb 24 19:07:01 2012 92.12% done, estimate finish Fri Feb 24 19:07:02 2012 92.13% done, estimate finish Fri Feb 24 19:07:02 2012 92.13% done, estimate finish Fri Feb 24 19:07:01 2012 92.14% done, estimate finish Fri Feb 24 19:07:01 2012 92.15% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.16% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.17% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 92.18% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.19% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.20% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.21% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 92.22% done, estimate finish Fri Feb 24 19:07:01 2012 92.23% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.24% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.25% done, estimate finish Fri Feb 24 19:07:01 2012 92.25% done, estimate finish Fri Feb 24 19:07:02 2012 92.26% done, estimate finish Fri Feb 24 19:07:02 2012 92.26% done, estimate finish Fri Feb 24 19:07:01 2012 92.27% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.28% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.29% done, estimate finish Fri Feb 24 19:07:01 2012 92.29% done, estimate finish Fri Feb 24 19:07:02 2012 92.30% done, estimate finish Fri Feb 24 19:07:02 2012 92.31% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.32% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.33% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.34% done, estimate finish Fri Feb 24 19:07:02 2012 === last message repeated 2 times. === 92.35% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.36% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.37% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.38% done, estimate finish Fri Feb 24 19:07:02 2012 92.39% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.40% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.41% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.42% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.43% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.44% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.45% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.46% done, estimate finish Fri Feb 24 19:07:01 2012 92.47% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.48% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.49% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.50% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.51% done, estimate finish Fri Feb 24 19:07:00 2012 92.51% done, estimate finish Fri Feb 24 19:07:01 2012 92.52% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.53% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.54% done, estimate finish Fri Feb 24 19:07:01 2012 92.55% done, estimate finish Fri Feb 24 19:07:01 2012 92.55% done, estimate finish Fri Feb 24 19:07:00 2012 92.56% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.57% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.58% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.59% done, estimate finish Fri Feb 24 19:07:01 2012 92.59% done, estimate finish Fri Feb 24 19:07:00 2012 92.60% done, estimate finish Fri Feb 24 19:07:00 2012 92.60% done, estimate finish Fri Feb 24 19:07:01 2012 92.61% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.62% done, estimate finish Fri Feb 24 19:07:01 2012 92.63% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.64% done, estimate finish Fri Feb 24 19:07:00 2012 92.64% done, estimate finish Fri Feb 24 19:07:01 2012 92.65% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.66% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.67% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.68% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 92.69% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.70% done, estimate finish Fri Feb 24 19:07:01 2012 92.71% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.72% done, estimate finish Fri Feb 24 19:07:01 2012 92.72% done, estimate finish Fri Feb 24 19:07:00 2012 92.73% done, estimate finish Fri Feb 24 19:07:00 2012 92.73% done, estimate finish Fri Feb 24 19:07:01 2012 92.74% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.75% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.76% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 92.77% done, estimate finish Fri Feb 24 19:07:00 2012 92.77% done, estimate finish Fri Feb 24 19:07:01 2012 92.78% done, estimate finish Fri Feb 24 19:07:01 2012 92.79% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.80% done, estimate finish Fri Feb 24 19:07:01 2012 92.80% done, estimate finish Fri Feb 24 19:07:00 2012 92.81% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 92.82% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.83% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.84% done, estimate finish Fri Feb 24 19:07:01 2012 92.84% done, estimate finish Fri Feb 24 19:07:00 2012 92.85% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 92.86% done, estimate finish Fri Feb 24 19:07:00 2012 92.87% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.88% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.89% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 92.90% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 92.91% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.92% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.93% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 92.94% done, estimate finish Fri Feb 24 19:07:00 2012 92.95% done, estimate finish Fri Feb 24 19:07:00 2012 92.95% done, estimate finish Fri Feb 24 19:07:01 2012 92.96% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 92.97% done, estimate finish Fri Feb 24 19:07:01 2012 92.97% done, estimate finish Fri Feb 24 19:07:00 2012 92.98% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 92.99% done, estimate finish Fri Feb 24 19:07:00 2012 92.99% done, estimate finish Fri Feb 24 19:07:01 2012 93.00% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 93.01% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.02% done, estimate finish Fri Feb 24 19:07:00 2012 93.03% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.04% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 93.05% done, estimate finish Fri Feb 24 19:07:01 2012 93.05% done, estimate finish Fri Feb 24 19:07:00 2012 93.06% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.07% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.08% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 93.09% done, estimate finish Fri Feb 24 19:07:01 2012 93.10% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.11% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.12% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.13% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 93.14% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.15% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.16% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.17% done, estimate finish Fri Feb 24 19:07:01 2012 93.18% done, estimate finish Fri Feb 24 19:07:01 2012 93.18% done, estimate finish Fri Feb 24 19:07:00 2012 93.19% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.20% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.21% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.22% done, estimate finish Fri Feb 24 19:07:01 2012 93.22% done, estimate finish Fri Feb 24 19:07:00 2012 93.23% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.24% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.25% done, estimate finish Fri Feb 24 19:07:01 2012 93.26% done, estimate finish Fri Feb 24 19:07:01 2012 === last message repeated 2 times. === 93.27% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.28% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.29% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.30% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.31% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.32% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.33% done, estimate finish Fri Feb 24 19:07:00 2012 93.34% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.35% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.36% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.37% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.38% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.39% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.40% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.41% done, estimate finish Fri Feb 24 19:07:00 2012 93.42% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.43% done, estimate finish Fri Feb 24 19:06:59 2012 93.43% done, estimate finish Fri Feb 24 19:07:00 2012 93.44% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.45% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.46% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.47% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 93.48% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.49% done, estimate finish Fri Feb 24 19:07:00 2012 93.50% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.51% done, estimate finish Fri Feb 24 19:07:00 2012 93.51% done, estimate finish Fri Feb 24 19:06:59 2012 93.52% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.53% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.54% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.55% done, estimate finish Fri Feb 24 19:07:00 2012 93.55% done, estimate finish Fri Feb 24 19:06:59 2012 93.56% done, estimate finish Fri Feb 24 19:06:59 2012 93.56% done, estimate finish Fri Feb 24 19:07:00 2012 93.57% done, estimate finish Fri Feb 24 19:07:00 2012 93.58% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.59% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.60% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 93.61% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.62% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.63% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.64% done, estimate finish Fri Feb 24 19:06:59 2012 93.64% done, estimate finish Fri Feb 24 19:07:00 2012 93.65% done, estimate finish Fri Feb 24 19:07:00 2012 93.66% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.67% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.68% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 93.69% done, estimate finish Fri Feb 24 19:06:59 2012 93.69% done, estimate finish Fri Feb 24 19:07:00 2012 93.70% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.71% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.72% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 93.73% done, estimate finish Fri Feb 24 19:06:59 2012 93.74% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.75% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.76% done, estimate finish Fri Feb 24 19:07:00 2012 93.76% done, estimate finish Fri Feb 24 19:06:59 2012 93.77% done, estimate finish Fri Feb 24 19:06:59 2012 93.77% done, estimate finish Fri Feb 24 19:07:00 2012 93.78% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.79% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.80% done, estimate finish Fri Feb 24 19:07:00 2012 93.80% done, estimate finish Fri Feb 24 19:06:59 2012 93.81% done, estimate finish Fri Feb 24 19:06:59 2012 93.82% done, estimate finish Fri Feb 24 19:06:59 2012 93.82% done, estimate finish Fri Feb 24 19:07:00 2012 93.83% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.84% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.85% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 93.86% done, estimate finish Fri Feb 24 19:06:59 2012 93.86% done, estimate finish Fri Feb 24 19:07:00 2012 93.87% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.88% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.89% done, estimate finish Fri Feb 24 19:06:59 2012 93.90% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 93.91% done, estimate finish Fri Feb 24 19:06:59 2012 93.91% done, estimate finish Fri Feb 24 19:07:00 2012 93.92% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.93% done, estimate finish Fri Feb 24 19:07:00 2012 93.93% done, estimate finish Fri Feb 24 19:06:59 2012 93.94% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 93.95% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.96% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 93.97% done, estimate finish Fri Feb 24 19:06:59 2012 93.98% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 93.99% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.00% done, estimate finish Fri Feb 24 19:06:59 2012 94.00% done, estimate finish Fri Feb 24 19:07:00 2012 94.01% done, estimate finish Fri Feb 24 19:07:00 2012 94.01% done, estimate finish Fri Feb 24 19:06:59 2012 94.02% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.03% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.04% done, estimate finish Fri Feb 24 19:06:59 2012 94.04% done, estimate finish Fri Feb 24 19:07:00 2012 94.05% done, estimate finish Fri Feb 24 19:07:00 2012 94.06% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.07% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.08% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 94.09% done, estimate finish Fri Feb 24 19:07:00 2012 === last message repeated 2 times. === 94.10% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.11% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.12% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.13% done, estimate finish Fri Feb 24 19:07:00 2012 94.14% done, estimate finish Fri Feb 24 19:07:00 2012 94.14% done, estimate finish Fri Feb 24 19:06:59 2012 94.15% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.16% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.17% done, estimate finish Fri Feb 24 19:06:59 2012 94.17% done, estimate finish Fri Feb 24 19:07:00 2012 94.18% done, estimate finish Fri Feb 24 19:07:00 2012 94.18% done, estimate finish Fri Feb 24 19:06:59 2012 94.19% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.20% done, estimate finish Fri Feb 24 19:06:59 2012 94.21% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.22% done, estimate finish Fri Feb 24 19:07:00 2012 94.22% done, estimate finish Fri Feb 24 19:06:59 2012 94.23% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.24% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.25% done, estimate finish Fri Feb 24 19:06:59 2012 94.25% done, estimate finish Fri Feb 24 19:07:00 2012 94.26% done, estimate finish Fri Feb 24 19:07:00 2012 94.26% done, estimate finish Fri Feb 24 19:06:59 2012 94.27% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.28% done, estimate finish Fri Feb 24 19:06:59 2012 94.29% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.30% done, estimate finish Fri Feb 24 19:06:59 2012 94.30% done, estimate finish Fri Feb 24 19:07:00 2012 94.31% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.32% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.33% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.34% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.35% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.36% done, estimate finish Fri Feb 24 19:06:59 2012 94.37% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.38% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.39% done, estimate finish Fri Feb 24 19:06:58 2012 94.39% done, estimate finish Fri Feb 24 19:06:59 2012 94.40% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.41% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.42% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.43% done, estimate finish Fri Feb 24 19:07:00 2012 94.43% done, estimate finish Fri Feb 24 19:06:59 2012 94.44% done, estimate finish Fri Feb 24 19:06:59 2012 94.45% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.46% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.47% done, estimate finish Fri Feb 24 19:06:59 2012 94.47% done, estimate finish Fri Feb 24 19:06:58 2012 94.48% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.49% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.50% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.51% done, estimate finish Fri Feb 24 19:07:00 2012 94.51% done, estimate finish Fri Feb 24 19:06:59 2012 94.52% done, estimate finish Fri Feb 24 19:06:59 2012 94.53% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.54% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.55% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.56% done, estimate finish Fri Feb 24 19:06:58 2012 94.56% done, estimate finish Fri Feb 24 19:06:59 2012 94.57% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.58% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.59% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.60% done, estimate finish Fri Feb 24 19:06:58 2012 94.61% done, estimate finish Fri Feb 24 19:06:58 2012 94.61% done, estimate finish Fri Feb 24 19:06:59 2012 94.62% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.63% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.64% done, estimate finish Fri Feb 24 19:06:59 2012 94.64% done, estimate finish Fri Feb 24 19:06:58 2012 94.65% done, estimate finish Fri Feb 24 19:06:58 2012 94.65% done, estimate finish Fri Feb 24 19:06:59 2012 94.66% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.67% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.68% done, estimate finish Fri Feb 24 19:06:58 2012 94.69% done, estimate finish Fri Feb 24 19:06:58 2012 94.69% done, estimate finish Fri Feb 24 19:06:59 2012 94.70% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.71% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.72% done, estimate finish Fri Feb 24 19:06:59 2012 94.72% done, estimate finish Fri Feb 24 19:06:58 2012 94.73% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 94.74% done, estimate finish Fri Feb 24 19:06:58 2012 94.74% done, estimate finish Fri Feb 24 19:06:59 2012 94.75% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.76% done, estimate finish Fri Feb 24 19:06:59 2012 94.77% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 94.78% done, estimate finish Fri Feb 24 19:06:58 2012 94.78% done, estimate finish Fri Feb 24 19:06:59 2012 94.79% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.80% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.81% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 94.82% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.83% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.84% done, estimate finish Fri Feb 24 19:06:59 2012 94.85% done, estimate finish Fri Feb 24 19:06:59 2012 94.85% done, estimate finish Fri Feb 24 19:06:58 2012 94.86% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 94.87% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.88% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.89% done, estimate finish Fri Feb 24 19:06:59 2012 94.89% done, estimate finish Fri Feb 24 19:06:58 2012 94.90% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 94.91% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.92% done, estimate finish Fri Feb 24 19:06:59 2012 94.93% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.94% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 94.95% done, estimate finish Fri Feb 24 19:06:58 2012 94.95% done, estimate finish Fri Feb 24 19:06:59 2012 94.96% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 94.97% done, estimate finish Fri Feb 24 19:06:59 2012 94.97% done, estimate finish Fri Feb 24 19:06:58 2012 94.98% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 94.99% done, estimate finish Fri Feb 24 19:06:58 2012 94.99% done, estimate finish Fri Feb 24 19:06:59 2012 95.00% done, estimate finish Fri Feb 24 19:06:59 2012 95.01% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 95.02% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.03% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.04% done, estimate finish Fri Feb 24 19:06:58 2012 95.04% done, estimate finish Fri Feb 24 19:06:59 2012 95.05% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 95.06% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.07% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.08% done, estimate finish Fri Feb 24 19:06:58 2012 95.09% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 95.10% done, estimate finish Fri Feb 24 19:06:59 2012 95.10% done, estimate finish Fri Feb 24 19:06:58 2012 95.11% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.12% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.13% done, estimate finish Fri Feb 24 19:06:58 2012 95.13% done, estimate finish Fri Feb 24 19:06:59 2012 95.14% done, estimate finish Fri Feb 24 19:06:59 2012 95.14% done, estimate finish Fri Feb 24 19:06:58 2012 95.15% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.16% done, estimate finish Fri Feb 24 19:06:58 2012 95.17% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.18% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 95.19% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.20% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.21% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.22% done, estimate finish Fri Feb 24 19:06:59 2012 95.22% done, estimate finish Fri Feb 24 19:06:58 2012 95.23% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.24% done, estimate finish Fri Feb 24 19:06:58 2012 95.25% done, estimate finish Fri Feb 24 19:06:58 2012 95.25% done, estimate finish Fri Feb 24 19:06:59 2012 95.26% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 95.27% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.28% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.29% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.30% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 95.31% done, estimate finish Fri Feb 24 19:06:58 2012 95.32% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.33% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.34% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.35% done, estimate finish Fri Feb 24 19:06:59 2012 95.35% done, estimate finish Fri Feb 24 19:06:58 2012 95.36% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.37% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.38% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.39% done, estimate finish Fri Feb 24 19:06:59 2012 95.40% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.41% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.42% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.43% done, estimate finish Fri Feb 24 19:06:58 2012 95.43% done, estimate finish Fri Feb 24 19:06:59 2012 95.44% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.45% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.46% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.47% done, estimate finish Fri Feb 24 19:06:58 2012 95.48% done, estimate finish Fri Feb 24 19:06:59 2012 95.48% done, estimate finish Fri Feb 24 19:06:58 2012 95.49% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.50% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.51% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.52% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.53% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.54% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.55% done, estimate finish Fri Feb 24 19:06:58 2012 95.56% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.57% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.58% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.59% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.60% done, estimate finish Fri Feb 24 19:06:59 2012 95.60% done, estimate finish Fri Feb 24 19:06:58 2012 95.61% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.62% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 95.63% done, estimate finish Fri Feb 24 19:06:59 2012 95.64% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 95.65% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.66% done, estimate finish Fri Feb 24 19:06:58 2012 95.66% done, estimate finish Fri Feb 24 19:06:59 2012 95.67% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 95.68% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 95.69% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.70% done, estimate finish Fri Feb 24 19:06:58 2012 95.70% done, estimate finish Fri Feb 24 19:06:59 2012 95.71% done, estimate finish Fri Feb 24 19:06:59 2012 95.72% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 95.73% done, estimate finish Fri Feb 24 19:06:59 2012 95.73% done, estimate finish Fri Feb 24 19:06:58 2012 95.74% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.75% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 95.76% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 95.77% done, estimate finish Fri Feb 24 19:06:59 2012 95.77% done, estimate finish Fri Feb 24 19:06:58 2012 95.78% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.79% done, estimate finish Fri Feb 24 19:06:59 2012 95.80% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 95.81% done, estimate finish Fri Feb 24 19:06:59 2012 95.81% done, estimate finish Fri Feb 24 19:06:58 2012 95.82% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.83% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.84% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 95.85% done, estimate finish Fri Feb 24 19:06:59 2012 95.85% done, estimate finish Fri Feb 24 19:06:58 2012 95.86% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.87% done, estimate finish Fri Feb 24 19:06:58 2012 95.88% done, estimate finish Fri Feb 24 19:06:58 2012 95.88% done, estimate finish Fri Feb 24 19:06:59 2012 95.89% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 95.90% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.91% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.92% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.93% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 95.94% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.95% done, estimate finish Fri Feb 24 19:06:58 2012 95.96% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 95.97% done, estimate finish Fri Feb 24 19:06:58 2012 95.97% done, estimate finish Fri Feb 24 19:06:59 2012 95.98% done, estimate finish Fri Feb 24 19:06:59 2012 95.98% done, estimate finish Fri Feb 24 19:06:58 2012 95.99% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.00% done, estimate finish Fri Feb 24 19:06:58 2012 96.00% done, estimate finish Fri Feb 24 19:06:59 2012 96.01% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 96.02% done, estimate finish Fri Feb 24 19:06:59 2012 96.02% done, estimate finish Fri Feb 24 19:06:58 2012 96.03% done, estimate finish Fri Feb 24 19:06:58 2012 96.04% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.05% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.06% done, estimate finish Fri Feb 24 19:06:59 2012 96.06% done, estimate finish Fri Feb 24 19:06:58 2012 96.07% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.08% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.09% done, estimate finish Fri Feb 24 19:06:58 2012 96.09% done, estimate finish Fri Feb 24 19:06:59 2012 96.10% done, estimate finish Fri Feb 24 19:06:59 2012 96.10% done, estimate finish Fri Feb 24 19:06:58 2012 96.11% done, estimate finish Fri Feb 24 19:06:58 2012 96.12% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.13% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.14% done, estimate finish Fri Feb 24 19:06:59 2012 === last message repeated 2 times. === 96.15% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.16% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.17% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.18% done, estimate finish Fri Feb 24 19:06:58 2012 96.18% done, estimate finish Fri Feb 24 19:06:59 2012 96.19% done, estimate finish Fri Feb 24 19:06:58 2012 96.20% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.21% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.22% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.23% done, estimate finish Fri Feb 24 19:06:59 2012 96.23% done, estimate finish Fri Feb 24 19:06:58 2012 96.24% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.25% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.26% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.27% done, estimate finish Fri Feb 24 19:06:59 2012 96.28% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.29% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.30% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.31% done, estimate finish Fri Feb 24 19:06:58 2012 96.31% done, estimate finish Fri Feb 24 19:06:59 2012 96.32% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.33% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.34% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.35% done, estimate finish Fri Feb 24 19:06:58 2012 96.36% done, estimate finish Fri Feb 24 19:06:57 2012 96.36% done, estimate finish Fri Feb 24 19:06:58 2012 96.37% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.38% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.39% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.40% done, estimate finish Fri Feb 24 19:06:57 2012 96.40% done, estimate finish Fri Feb 24 19:06:58 2012 96.41% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.42% done, estimate finish Fri Feb 24 19:06:58 2012 96.43% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.44% done, estimate finish Fri Feb 24 19:06:58 2012 96.44% done, estimate finish Fri Feb 24 19:06:57 2012 96.45% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.46% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.47% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.48% done, estimate finish Fri Feb 24 19:06:58 2012 96.48% done, estimate finish Fri Feb 24 19:06:57 2012 96.49% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.50% done, estimate finish Fri Feb 24 19:06:58 2012 96.51% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.52% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.53% done, estimate finish Fri Feb 24 19:06:57 2012 96.53% done, estimate finish Fri Feb 24 19:06:58 2012 96.54% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.55% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.56% done, estimate finish Fri Feb 24 19:06:58 2012 96.56% done, estimate finish Fri Feb 24 19:06:57 2012 96.57% done, estimate finish Fri Feb 24 19:06:57 2012 96.57% done, estimate finish Fri Feb 24 19:06:58 2012 96.58% done, estimate finish Fri Feb 24 19:06:58 2012 96.59% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.60% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.61% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 96.62% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.63% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.64% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.65% done, estimate finish Fri Feb 24 19:06:57 2012 96.65% done, estimate finish Fri Feb 24 19:06:58 2012 96.66% done, estimate finish Fri Feb 24 19:06:58 2012 96.67% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.68% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.69% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.70% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.71% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.72% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.73% done, estimate finish Fri Feb 24 19:06:58 2012 96.73% done, estimate finish Fri Feb 24 19:06:57 2012 96.74% done, estimate finish Fri Feb 24 19:06:57 2012 96.75% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.76% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.77% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.78% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 96.79% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.80% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.81% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.82% done, estimate finish Fri Feb 24 19:06:57 2012 96.83% done, estimate finish Fri Feb 24 19:06:57 2012 96.83% done, estimate finish Fri Feb 24 19:06:58 2012 96.84% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.85% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.86% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 96.87% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 96.88% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.89% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.90% done, estimate finish Fri Feb 24 19:06:57 2012 96.91% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 96.92% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.93% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.94% done, estimate finish Fri Feb 24 19:06:58 2012 96.94% done, estimate finish Fri Feb 24 19:06:57 2012 96.95% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 96.96% done, estimate finish Fri Feb 24 19:06:57 2012 96.96% done, estimate finish Fri Feb 24 19:06:58 2012 96.97% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 96.98% done, estimate finish Fri Feb 24 19:06:58 2012 96.99% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.00% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.01% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 97.02% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 97.03% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.04% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.05% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 97.06% done, estimate finish Fri Feb 24 19:06:58 2012 97.07% done, estimate finish Fri Feb 24 19:06:58 2012 97.07% done, estimate finish Fri Feb 24 19:06:57 2012 97.08% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.09% done, estimate finish Fri Feb 24 19:06:57 2012 97.09% done, estimate finish Fri Feb 24 19:06:58 2012 97.10% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 97.11% done, estimate finish Fri Feb 24 19:06:58 2012 97.11% done, estimate finish Fri Feb 24 19:06:57 2012 97.12% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.13% done, estimate finish Fri Feb 24 19:06:57 2012 97.13% done, estimate finish Fri Feb 24 19:06:58 2012 97.14% done, estimate finish Fri Feb 24 19:06:58 2012 97.15% done, estimate finish Fri Feb 24 19:06:58 2012 97.15% done, estimate finish Fri Feb 24 19:06:57 2012 97.16% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.17% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.18% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 97.19% done, estimate finish Fri Feb 24 19:06:58 2012 97.19% done, estimate finish Fri Feb 24 19:06:57 2012 97.20% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.21% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.22% done, estimate finish Fri Feb 24 19:06:58 2012 97.23% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 97.24% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.25% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.26% done, estimate finish Fri Feb 24 19:06:57 2012 97.26% done, estimate finish Fri Feb 24 19:06:58 2012 97.27% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 97.28% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.29% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.30% done, estimate finish Fri Feb 24 19:06:57 2012 97.31% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.32% done, estimate finish Fri Feb 24 19:06:58 2012 97.32% done, estimate finish Fri Feb 24 19:06:57 2012 97.33% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.34% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.35% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.36% done, estimate finish Fri Feb 24 19:06:58 2012 97.36% done, estimate finish Fri Feb 24 19:06:57 2012 97.37% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.38% done, estimate finish Fri Feb 24 19:06:57 2012 97.39% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.40% done, estimate finish Fri Feb 24 19:06:58 2012 97.40% done, estimate finish Fri Feb 24 19:06:57 2012 97.41% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.42% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.43% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.44% done, estimate finish Fri Feb 24 19:06:58 2012 97.44% done, estimate finish Fri Feb 24 19:06:57 2012 97.45% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.46% done, estimate finish Fri Feb 24 19:06:57 2012 97.47% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.48% done, estimate finish Fri Feb 24 19:06:57 2012 97.48% done, estimate finish Fri Feb 24 19:06:58 2012 97.49% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.50% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.51% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.52% done, estimate finish Fri Feb 24 19:06:58 2012 === last message repeated 2 times. === 97.53% done, estimate finish Fri Feb 24 19:06:57 2012 97.54% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.55% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.56% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.57% done, estimate finish Fri Feb 24 19:06:58 2012 97.57% done, estimate finish Fri Feb 24 19:06:57 2012 97.58% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.59% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.60% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.61% done, estimate finish Fri Feb 24 19:06:58 2012 97.62% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.63% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.64% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.65% done, estimate finish Fri Feb 24 19:06:57 2012 97.65% done, estimate finish Fri Feb 24 19:06:56 2012 97.66% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.67% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.68% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.69% done, estimate finish Fri Feb 24 19:06:57 2012 97.70% done, estimate finish Fri Feb 24 19:06:56 2012 97.70% done, estimate finish Fri Feb 24 19:06:57 2012 97.71% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.72% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.73% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.74% done, estimate finish Fri Feb 24 19:06:56 2012 97.74% done, estimate finish Fri Feb 24 19:06:57 2012 97.75% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.76% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.77% done, estimate finish Fri Feb 24 19:06:57 2012 97.78% done, estimate finish Fri Feb 24 19:06:57 2012 97.78% done, estimate finish Fri Feb 24 19:06:56 2012 97.79% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.80% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.81% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.82% done, estimate finish Fri Feb 24 19:06:57 2012 97.82% done, estimate finish Fri Feb 24 19:06:56 2012 97.83% done, estimate finish Fri Feb 24 19:06:56 2012 97.83% done, estimate finish Fri Feb 24 19:06:57 2012 97.84% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.85% done, estimate finish Fri Feb 24 19:06:57 2012 97.86% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.87% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 97.88% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.89% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.90% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.91% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.92% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.93% done, estimate finish Fri Feb 24 19:06:57 2012 97.94% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.95% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 97.96% done, estimate finish Fri Feb 24 19:06:56 2012 97.96% done, estimate finish Fri Feb 24 19:06:57 2012 97.97% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.98% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 97.99% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.00% done, estimate finish Fri Feb 24 19:06:56 2012 98.00% done, estimate finish Fri Feb 24 19:06:57 2012 98.01% done, estimate finish Fri Feb 24 19:06:57 2012 98.02% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.03% done, estimate finish Fri Feb 24 19:06:57 2012 98.03% done, estimate finish Fri Feb 24 19:06:56 2012 98.04% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.05% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.06% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.07% done, estimate finish Fri Feb 24 19:06:57 2012 98.07% done, estimate finish Fri Feb 24 19:06:56 2012 98.08% done, estimate finish Fri Feb 24 19:06:56 2012 98.08% done, estimate finish Fri Feb 24 19:06:57 2012 98.09% done, estimate finish Fri Feb 24 19:06:57 2012 98.10% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.11% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.12% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.13% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.14% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.15% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.16% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.17% done, estimate finish Fri Feb 24 19:06:57 2012 98.18% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.19% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.20% done, estimate finish Fri Feb 24 19:06:57 2012 98.20% done, estimate finish Fri Feb 24 19:06:56 2012 98.21% done, estimate finish Fri Feb 24 19:06:56 2012 98.21% done, estimate finish Fri Feb 24 19:06:57 2012 98.22% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.23% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.24% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.25% done, estimate finish Fri Feb 24 19:06:56 2012 98.26% done, estimate finish Fri Feb 24 19:06:56 2012 98.26% done, estimate finish Fri Feb 24 19:06:57 2012 98.27% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.28% done, estimate finish Fri Feb 24 19:06:57 2012 98.28% done, estimate finish Fri Feb 24 19:06:56 2012 98.29% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.30% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.31% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.32% done, estimate finish Fri Feb 24 19:06:57 2012 98.32% done, estimate finish Fri Feb 24 19:06:56 2012 98.33% done, estimate finish Fri Feb 24 19:06:56 2012 98.34% done, estimate finish Fri Feb 24 19:06:56 2012 98.34% done, estimate finish Fri Feb 24 19:06:57 2012 98.35% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.36% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.37% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.38% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.39% done, estimate finish Fri Feb 24 19:06:56 2012 98.39% done, estimate finish Fri Feb 24 19:06:57 2012 98.40% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.41% done, estimate finish Fri Feb 24 19:06:56 2012 98.42% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.43% done, estimate finish Fri Feb 24 19:06:56 2012 98.43% done, estimate finish Fri Feb 24 19:06:57 2012 98.44% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.45% done, estimate finish Fri Feb 24 19:06:57 2012 98.45% done, estimate finish Fri Feb 24 19:06:56 2012 98.46% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.47% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.48% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.49% done, estimate finish Fri Feb 24 19:06:57 2012 98.50% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.51% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.52% done, estimate finish Fri Feb 24 19:06:56 2012 98.52% done, estimate finish Fri Feb 24 19:06:57 2012 98.53% done, estimate finish Fri Feb 24 19:06:57 2012 98.53% done, estimate finish Fri Feb 24 19:06:56 2012 98.54% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.55% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.56% done, estimate finish Fri Feb 24 19:06:56 2012 98.56% done, estimate finish Fri Feb 24 19:06:57 2012 98.57% done, estimate finish Fri Feb 24 19:06:57 2012 98.58% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.59% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.60% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.61% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.62% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.63% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.64% done, estimate finish Fri Feb 24 19:06:56 2012 98.65% done, estimate finish Fri Feb 24 19:06:56 2012 98.65% done, estimate finish Fri Feb 24 19:06:57 2012 98.66% done, estimate finish Fri Feb 24 19:06:57 2012 98.66% done, estimate finish Fri Feb 24 19:06:56 2012 98.67% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.68% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.69% done, estimate finish Fri Feb 24 19:06:56 2012 98.69% done, estimate finish Fri Feb 24 19:06:57 2012 98.70% done, estimate finish Fri Feb 24 19:06:57 2012 98.70% done, estimate finish Fri Feb 24 19:06:56 2012 98.71% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.72% done, estimate finish Fri Feb 24 19:06:56 2012 98.73% done, estimate finish Fri Feb 24 19:06:56 2012 98.73% done, estimate finish Fri Feb 24 19:06:57 2012 98.74% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.75% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.76% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.77% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.78% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.79% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.80% done, estimate finish Fri Feb 24 19:06:56 2012 98.81% done, estimate finish Fri Feb 24 19:06:56 2012 98.81% done, estimate finish Fri Feb 24 19:06:57 2012 98.82% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 98.83% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.84% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.85% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.86% done, estimate finish Fri Feb 24 19:06:56 2012 98.86% done, estimate finish Fri Feb 24 19:06:57 2012 98.87% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.88% done, estimate finish Fri Feb 24 19:06:56 2012 98.89% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.90% done, estimate finish Fri Feb 24 19:06:56 2012 98.90% done, estimate finish Fri Feb 24 19:06:57 2012 98.91% done, estimate finish Fri Feb 24 19:06:57 2012 98.91% done, estimate finish Fri Feb 24 19:06:56 2012 98.92% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.93% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.94% done, estimate finish Fri Feb 24 19:06:56 2012 98.94% done, estimate finish Fri Feb 24 19:06:57 2012 98.95% done, estimate finish Fri Feb 24 19:06:57 2012 98.95% done, estimate finish Fri Feb 24 19:06:56 2012 98.96% done, estimate finish Fri Feb 24 19:06:56 2012 98.97% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.98% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 98.99% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 99.00% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.01% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.02% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.03% done, estimate finish Fri Feb 24 19:06:57 2012 === last message repeated 2 times. === 99.04% done, estimate finish Fri Feb 24 19:06:56 2012 99.05% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.06% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.07% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.08% done, estimate finish Fri Feb 24 19:06:57 2012 99.08% done, estimate finish Fri Feb 24 19:06:56 2012 99.09% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.10% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.11% done, estimate finish Fri Feb 24 19:06:56 2012 99.11% done, estimate finish Fri Feb 24 19:06:57 2012 99.12% done, estimate finish Fri Feb 24 19:06:56 2012 99.13% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.14% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.15% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.16% done, estimate finish Fri Feb 24 19:06:56 2012 99.16% done, estimate finish Fri Feb 24 19:06:55 2012 99.17% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.18% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.19% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.20% done, estimate finish Fri Feb 24 19:06:56 2012 99.21% done, estimate finish Fri Feb 24 19:06:55 2012 99.21% done, estimate finish Fri Feb 24 19:06:56 2012 99.22% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.23% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.24% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.25% done, estimate finish Fri Feb 24 19:06:55 2012 99.25% done, estimate finish Fri Feb 24 19:06:56 2012 99.26% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.27% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.28% done, estimate finish Fri Feb 24 19:06:56 2012 99.29% done, estimate finish Fri Feb 24 19:06:56 2012 99.29% done, estimate finish Fri Feb 24 19:06:55 2012 99.30% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.31% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.32% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.33% done, estimate finish Fri Feb 24 19:06:56 2012 99.33% done, estimate finish Fri Feb 24 19:06:55 2012 99.34% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.35% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.36% done, estimate finish Fri Feb 24 19:06:56 2012 99.37% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.38% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.39% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.40% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.41% done, estimate finish Fri Feb 24 19:06:56 2012 99.41% done, estimate finish Fri Feb 24 19:06:55 2012 99.42% done, estimate finish Fri Feb 24 19:06:55 2012 99.42% done, estimate finish Fri Feb 24 19:06:56 2012 99.43% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.44% done, estimate finish Fri Feb 24 19:06:56 2012 99.45% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.46% done, estimate finish Fri Feb 24 19:06:55 2012 === last message repeated 2 times. === 99.47% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.48% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.49% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.50% done, estimate finish Fri Feb 24 19:06:55 2012 === last message repeated 2 times. === 99.51% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.52% done, estimate finish Fri Feb 24 19:06:56 2012 99.53% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.54% done, estimate finish Fri Feb 24 19:06:56 2012 99.54% done, estimate finish Fri Feb 24 19:06:55 2012 99.55% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.56% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.57% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.58% done, estimate finish Fri Feb 24 19:06:56 2012 99.58% done, estimate finish Fri Feb 24 19:06:55 2012 99.59% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.60% done, estimate finish Fri Feb 24 19:06:56 2012 99.61% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.62% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.63% done, estimate finish Fri Feb 24 19:06:55 2012 === last message repeated 2 times. === 99.64% done, estimate finish Fri Feb 24 19:06:55 2012 99.64% done, estimate finish Fri Feb 24 19:06:56 2012 99.65% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.66% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.67% done, estimate finish Fri Feb 24 19:06:55 2012 99.67% done, estimate finish Fri Feb 24 19:06:56 2012 99.68% done, estimate finish Fri Feb 24 19:06:56 2012 99.69% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.70% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.71% done, estimate finish Fri Feb 24 19:06:55 2012 === last message repeated 2 times. === 99.72% done, estimate finish Fri Feb 24 19:06:55 2012 99.72% done, estimate finish Fri Feb 24 19:06:56 2012 99.73% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.74% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.75% done, estimate finish Fri Feb 24 19:06:55 2012 99.76% done, estimate finish Fri Feb 24 19:06:55 2012 === last message repeated 2 times. === 99.77% done, estimate finish Fri Feb 24 19:06:55 2012 99.77% done, estimate finish Fri Feb 24 19:06:56 2012 99.78% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.79% done, estimate finish Fri Feb 24 19:06:56 2012 99.79% done, estimate finish Fri Feb 24 19:06:55 2012 99.80% done, estimate finish Fri Feb 24 19:06:55 2012 === last message repeated 2 times. === 99.81% done, estimate finish Fri Feb 24 19:06:55 2012 99.81% done, estimate finish Fri Feb 24 19:06:56 2012 99.82% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.83% done, estimate finish Fri Feb 24 19:06:56 2012 99.84% done, estimate finish Fri Feb 24 19:06:55 2012 === last message repeated 2 times. === 99.85% done, estimate finish Fri Feb 24 19:06:55 2012 === last message repeated 2 times. === 99.86% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.87% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.88% done, estimate finish Fri Feb 24 19:06:55 2012 === last message repeated 2 times. === 99.89% done, estimate finish Fri Feb 24 19:06:55 2012 === last message repeated 2 times. === 99.90% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.91% done, estimate finish Fri Feb 24 19:06:56 2012 99.92% done, estimate finish Fri Feb 24 19:06:56 2012 99.92% done, estimate finish Fri Feb 24 19:06:55 2012 99.93% done, estimate finish Fri Feb 24 19:06:55 2012 === last message repeated 2 times. === 99.94% done, estimate finish Fri Feb 24 19:06:55 2012 99.94% done, estimate finish Fri Feb 24 19:06:56 2012 99.95% done, estimate finish Fri Feb 24 19:06:56 2012 === last message repeated 2 times. === 99.96% done, estimate finish Fri Feb 24 19:06:56 2012 99.96% done, estimate finish Fri Feb 24 19:06:55 2012 99.97% done, estimate finish Fri Feb 24 19:06:55 2012 === last message repeated 2 times. === 99.98% done, estimate finish Fri Feb 24 19:06:55 2012 99.98% done, estimate finish Fri Feb 24 19:06:56 2012 99.99% done, estimate finish Fri Feb 24 19:06:56 2012 100.00% done, estimate finish Fri Feb 24 19:06:56 2012 Total translation table size: 0 Total rockridge attributes bytes: 259 Total directory bytes: 382 Path table size(bytes): 10 Max brk space used 0 9369461 extents written (18299 MB) mkisofs calculate size command: ----------------------- /usr/bin/genisoimage -gui -graft-points -print-size -quiet -volid gansterspa -volset -appid K3B THE CD KREATOR (C) 1998-2010 SEBASTIAN TRUEG AND MICHAL MALEK -publisher -preparer -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /tmp/kde-desputin/k3bME7345.tmp -rational-rock -hide-list /tmp/kde-desputin/k3bPs7345.tmp -no-cache-inodes -allow-limited-size -udf -full-iso9660-filenames -iso-level 3 -path-list /tmp/kde-desputin/k3blP7345.tmp mkisofs command: ----------------------- /usr/bin/genisoimage -gui -graft-points -volid gansterspa -volset -appid K3B THE CD KREATOR (C) 1998-2010 SEBASTIAN TRUEG AND MICHAL MALEK -publisher -preparer -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /tmp/kde-desputin/k3bIK7345.tmp -rational-rock -hide-list /tmp/kde-desputin/k3bva7345.tmp -no-cache-inodes -allow-limited-size -udf -full-iso9660-filenames -iso-level 3 -path-list /tmp/kde-desputin/k3bMU7345.tmp